International Code of Practice for Entertainment Rigging
34

International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

Aug 26, 2018

Download

Documents

truongkiet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

InternationalCodeofPractice

forEntertainmentRigging

Page 2: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

IndexAcknowledgements..................................................................................................................................1Introduction.............................................................................................................................................2MissionStatement...................................................................................................................................2GenesisandDevelopment.....................................................................................................................3-4InternationalCodeofPracticeforEntertainmentRigging.........................................................................5

1.0 Pre-Installation,PlanningandEngineering.................................................................................51.1 General....................................................................................................................................51.2 Documentation........................................................................................................................51.3 Engineering..........................................................................................................................5-61.4 OnSiteWork............................................................................................................................61.5 RiskAssessmentandManagement.........................................................................................61.6 RescuePlan..........................................................................................................................6-71.7 WeatherRelatedProcedures...................................................................................................7

2.0 DrawingConventions.................................................................................................................82.1 Introduction.............................................................................................................................82.2 TitleBlock................................................................................................................................82.3 AllDrawings.........................................................................................................................8-92.4 PointSpecificInformation.......................................................................................................92.5 VenueSpecificDrawings..........................................................................................................9

Page 3: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

3.0 EquipmentSelection................................................................................................................103.1 Selection................................................................................................................................103.2 LoadCapacity.........................................................................................................................103.3 RiskManagement..................................................................................................................103.4 Compliance............................................................................................................................103.5 Non-StandardEquipment......................................................................................................103.6 CustomBuiltEquipment........................................................................................................103.7 Traceability............................................................................................................................103.8 Marking..................................................................................................................................103.9 Maintenance..........................................................................................................................103.10 MaintenanceRecords............................................................................................................10

4.0 OnsiteRiggingWork................................................................................................................114.1 TasksandResponsibilities......................................................................................................114.2 PriortotheStartofWork......................................................................................................114.3 Briefings–ToolBoxTalks......................................................................................................114.4 On-GoingSupervision............................................................................................................114.5 SafeWork........................................................................................................................12-134.6 SecondarySuspensions..........................................................................................................13

5.0 LiftingOperations....................................................................................................................145.1 PriortoStartingWorkOnSite...............................................................................................145.2 PreparingtheEquipment.......................................................................................................145.3 AttachingtheLoad.................................................................................................................14

Page 4: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

5.0LiftingOperations(continued)5.4 Lifting.....................................................................................................................................155.5 Trimming................................................................................................................................155.6 LoadMonitoring....................................................................................................................155.7 SecuringtheLoadatTrim................................................................................................15-16

6.0 ShowRiggingOperations.........................................................................................................176.1 TasksandResponsibilities......................................................................................................176.2 RiskManagement..................................................................................................................176.3 MethodStatements...............................................................................................................176.4 CommunicationsRequirements............................................................................................176.5 SafetyProtocols...............................................................................................................17-19

7.0 De-RiggingWork......................................................................................................................207.1 TasksandResponsibilities......................................................................................................207.2 PriortotheStartofWork......................................................................................................207.3 Briefings–ToolBoxTalks......................................................................................................207.4 On-GoingSupervision............................................................................................................207.5 SafeWork..............................................................................................................................21

8.0 PostProduction.......................................................................................................................228.1 Reporting...............................................................................................................................228.2 GapTraining...........................................................................................................................22

Glossary............................................................................................................................................23-26AppendixA–DeterminateandIndeterminateRiggingSystems........................................................27-29RegionalComparisonofTermsRegardingStandards..............................................................................30

Page 5: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

1

InternationalCodeofPracticeforEntertainmentRiggingCopyright2017NickBarnfield,T.J.“Tiny”Good,ChrisHiggs,EdKish,BillSapsis,RoySchilderman,EntertainmentServicesandTechnologyAssociation(ESTA)andProfessionalLightingandSoundAssociation(PLASA).Version1.0.Thisdocumentmaynotbetranslatedwithoutthewrittenpermissionofthecopyrightholders.PrincipalAuthorsNickBarnfield–NewZealandTinyGood–AustraliaChrisHiggs–UnitedKingdomEdKish–UnitedStatesBillSapsis–UnitedStatesRoySchilderman–TheNetherlandsAdministrativeSupportLoriRubinstein–ESTAAdditionaladministrativesupportprovidedbyPLASAandMicheleEnright.AdditionalContributorsandReviewersRinusBakkerSteveBarberDanaBartholomewMarcelBouletRayCalcutt

JRCassidyMartyCohenSimonFrostAndrewGibsonKellyGreen

TomHeemskerkStéphaneMayrandTomMcClainLoriBensonMcCloyJoeMcGeough

MichaelReedJamesRingEricRousePaulRowlandsJeong-SikYoo

Thecopyrightholdersdonotapprove,inspect,orcertifyanyinstallations,procedures,equipmentormaterialsforcompliancewithcodes,recommendedpracticesorstandards.CompliancewiththisCodeofPracticeisthesoleandexclusiveresponsibilityoftheuserandisentirelywithintheircontrolanddiscretion.Anymarkings,identification,orotherclaimsofcompliancedonotconstitutecertificationorapprovalofanytypeornaturewhatsoeverbythecopyrightholders.Thecopyrightholdersneitherguaranteenorwarranttheaccuracyorcompletenessofanyinformationpublishedhereinanddisclaimliabilityforanypersonalinjury,propertyorotherdamageorinjuryofanynaturewhatsoever,whetherspecial,indirect,consequentialorcompensatory,directlyorindirectlyresultingfromthepublication,useof,orrelianceonthisdocument.Inissuinganddistributingthisdocument,thecopyrightholdersdonoteither(a)undertaketorenderprofessionalorotherservicesfororonbehalfofanypersonorentity,or(b)undertakeanydutytoanypersonorentitywithrespecttothisdocumentoritscontents.Anyoneusingthisdocumentshouldrelyonhisorherownindependentjudgmentor,asappropriate,seektheadviceofacompetentprofessionalindeterminingtheexerciseofreasonablecareinanygivencircumstance.

Page 6: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

2

InternationalCodeofPracticeforEntertainmentRiggingIntroduction

Inresponsetocallsfromtheinternationalentertainmentriggingcommunity,riggingprofessionalsfromaroundtheglobehavevoluntarilycollaboratedtocreatethisInternationalCodeofPracticeforEntertainmentRigging(ICOPER).Recognitionandacceptanceofthisuniversalcodewillhelppromoteregulatoryharmonyandreducepotentialconflictsbetweenregionsaroundtheworld.Theresultingimprovementsincommunicationsandrelationswithregionalandlocalregulatorswillbeparticularlybeneficialtothoseprofessionalsinvolvedininternationalproduction.Acknowledgingthatregulationsandstandardsdifferaroundtheworld,ICOPERisnotprescriptive,ratheritprovidesaseriesofguidelinesthat,iffollowed,willproduceuniformlypredictableresultsandenhancesafepractice.AdoptingandsupportingICOPERthereforebenefitseveryoneinvolvedineventproduction.MissionStatement

ThepurposeoftheInternationalCodeofPracticeforEntertainmentRiggingistopromoteawarenessandsafetyworldwidebyprovidingamodelcodeofpracticewithafocusonarenarigging.Thepracticesdescribedinthecodeareintendedtoprovideauniversalfoundationforthoseengagedinplanning,managingandexecutingrigging.ICOPERalsoprovidesguidelinesforthosewhowishtodeveloppolicy,designtrainingcontentorhelpestablishcertificationcriteria.

Page 7: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

3

ICOPER–GenesisandDevelopment

Callsfromtheinternationalriggingcommunitytocreateauniformcodeofpracticetoserveriggersinallgeographicareasfirstaroseatthe2010PLASARiggingConference.Manycountrieswerekeentoprofessionalisewhattheydoandwereconcernedwithinternationalparity.Inresponsetothis,theideaofadaptingandapplyinganexistingqualificationsuchastheETCPorNRCtoallgeographicareaswasexploredandfoundtobeimpracticalduetolegislativeandeducationaldifferencesbetweenregions.TheconclusionwasreachedthattheglobalriggingindustrywouldbebestservedbyanInternationalCodeofPractice.In2013MicheleEnrightandLoriRubinsteinfromthePLASASkillsDivisionagreedtoundertaketheadministrativeaspectsofdevelopingthisCodeandassembledagroupofsubjectmatterexperts(SMEs)representingthreedifferentregionsoftheworld:AsiaPacific,EuropeanUnion,andNorthAmerica.Theyalsocontractedwitharesearchfirmtoundertakeatask-basedmappingexerciseofexistingriggingstandardsandcodesofpracticefromsixcountriesaroundtheworld.Thereportissuedfromthisexercisestatedthat“Overall,whiletherewasconsiderableoverlap,thereappearedtobesignificantunevennessinthestandardscoverageacrossthedifferentcountries.Asubstantialandimportantfeaturethatemergedwasthattherewasconsiderablevariationintheweightattachedtocertainelementsoftheriggingprocessbyindividualcountries.Innearlyeverycase,certainelementsofknowledgeandskillsrelatedtoriggingweremissing,orwerenotexplicitlycovered,withindocuments.”TheSMEsdevelopedaproposedcontentoutlineandreceivedfeedbackonitfromattendeesatthePLASARiggingConference.Thechapterswerethendividedupequallyamongthethreeregionstoauthorafirstdraft.Oncearegionhadcompletedtheirdraftitwasforwardedtotheothertworegionsforcomment.Thegroupdiscoveredthat,onceaninitialdraftwascompleted,theirmostproductivewayofworkingwastomeetviaWebExandgothrougheachchapteronalinebylinebasissotheycoulddiscussindetailandagreeonfinalwording.Thegroupmeteveryfourtosixweeksforeighteenmonthsfortwotothreehoursessions,oftenbeginningat6aminSydneyand11pminAmsterdam.TheSMEsalsocompletedextensiveworkbetweenWebExsessions.

Page 8: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

4

ICOPER–GenesisandDevelopment(continued)

Thegoalfromthestartwastoachieveconsensusonwhattoinclude,whatconstitutesgoodpractice,whatlevelofdetail,andwhatterminology.Inparticular,theSMEsrecognisedthatdifferentregionsusedifferentterminologybut,inagreeingonthefinalwording,thequestiontheycontinuallyaskedthemselveswas“DoIunderstandwhatitmeans?”ItishopedthattheinclusionoftheGlossarywillhelpeveryonetounderstandacommonlanguage.TheSMEswantedtoapproachthedocumentfroma“10,000footpointofview”andagreatdealoftimewasspentinparingdownlongdescriptionsorexplanationstobeasconciseaspossible.Oncetheinitialreviewwascompleted,theentiredocumentwasreviewedagainforconsistencyofpracticeandterminology.AsecondgroupofSMEsfromaroundtheworldwasthenaskedtoreviewthedocumentandsubmittheircomments.TheoriginalSMEsheldseveraladditionalWebExmeetingstodiscusseachcommentreceivedanddeterminewhethertoincorporatethesuggestedchangeintothedocument.CommentsonICOPERarecordiallyinvitedfromtheriggingcommunityandwillbereviewedonaperiodicbasisforinclusioninfutureeditions.Commentsmaybesenttoicoper@esta.org.Weaskyoutokeepinmindthatthisdocumentisintendedtoservetheworldwidecommunity,soreferencestolocallegislationandpractices,etc.,shouldbeappendedtoyourcopyoftheCodebutwillnotbeincludedinthegeneralconsensusdocument.WhenESTAandPLASAendedtheircooperationagreementin2015,administrationoftheICOPERprojectwasundertakenbyESTA.TheBoardsofDirectorsofESTAandPLASAagreedtomakeICOPERelectronicallyavailableatnochargetotheworldwideriggingcommunity.ESTAandPLASAwishtoextendtheirsincerestappreciationtoalltheSMEswhoparticipatedintheprocess,butparticularlytothesixindividualswhogavesounselfishlyoftheirtimeandknowledgetoauthorandrefineICOPERforthebenefitofall:NickBarnfield,TinyGood,ChrisHiggs,EdKish,BillSapsis,andRoySchilderman.

Page 9: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

5

Sub-Heading Statement

General 1.1 Alltemporaryrigginginstallationsmustbepreplannedbyacompetentperson.

1.1.1 Accuratedrawingsdepictingtheriggingdesignmustbesubmittedtoandapprovedbytheenforcingauthorityandthevenuepriortothecommencementofanysitework.

1.1.2 Theriggingdesignandengineeringmustcomplywithapplicableregulationsandstandards.

1.1.3 Incaseswheretherigginginstallationexceedsorisnotcoveredbypre-determinedlimits,thedesignmustbereviewedandapprovedbyaqualifiedstructuralengineerwithprovenexperienceinentertainmentrigging.

1.1.4 Houseriggingrulesmustbecompliedwithandincorporatedintotheriggingdesign.

1.1.5 Allcriticalsiteconditionsaffectingtheproperexecution,integrityandsafetyoftheinstallationmustbesiteverifiedpriortosubmittingriggingdesigndocumentsforapproval.

Documentation 1.2 Riggingplansanddocumentsmustincludesufficientinformationtoconveythelocation,magnitudeandeffectofallriggingforces.Peakdynamicloadsmustbeidentified.

1.2.1 Whenappropriate,thelocationandloadcapacityofvenueriggingmembersandattachmentpointsmustbeidentifiedandshownintheriggingdesigndocuments.

1.2.2 Thedistributionofloadstosupportingmembersandattachmentpointsmustbeshownintheriggingdesigndocumentsandplans.

1.2.3 Venueobstructionswhichaffecttheproperexecutionoftheriggingdesignmustbeidentifiedandshownintheriggingdocuments.

Engineering 1.3 Allforces,includingdynamicloads,mustbewithinthepre-determinedlimitsofthesupportingstuctureor,innon-conformingcases,approvedbyaqualifiedstructuralengineer.

1.3.1 Pointloadsindicatedonriggingdocumentsmustincludetheself-weightofallequipment,crewandperformers.

1.3.2 Considerationmustbegiventothephysicalnatureofanyloadwithpotentialfordynamicloading(e.g.equipmentcontainingfluids).

1.0Pre-Installation,PlanningandEngineeringIndexNumber

InternationalCodeofPracticeforEntertainmentRigging

Page 10: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

6

Engineering(continued) 1.3.3 Thebehaviourofdeterminateandindeterminateriggingsystemsmustbeconsideredintheriggingdesign.(SeeAppendixA)

1.3.4 Theeffectsofweathermustbeaccountedforintheriggingdocuments.

OnSiteWork 1.4 Methodsofaccessforworkatheight,fallprotectionsystemsandrescuemustbedesignedbyaqualifiedpersonanddeemedtobeadequatefortheproposedwork.

1.4.1 Crewandequipmentrequirementsmustbedeterminedandagreeduponbyallstakeholderspriortothecommencementofanysitework.

1.4.2 Venueandtemporaryelectricalservicelocationsandcapacitiesmustbeverifiedasadequatefortheproposeddesign.

RiskAssessmentandManagement

1.5 Ariskmanagementplanthatmitigatesriskstoacceptablelevelsmustbeauthorizedbyaqualifiedpersonpriortocommencementofanysitework.

1.5.1 Theplanmustbeapprovedandadoptedbyallstakeholders,includingtheenforcingauthority,priortothecommencementofanysitework.

1.5.2 Theriskassessmentmustspecificallyidentifyandconsidertherisksassociatedwithriggingoperationsandequipmentfailure.

1.5.2.1 Whenassessingriskofequipmentfailure,considerationmustbegiventoredundancyinmulti-point[3ormore]suspensionsystems;accountingforthenumberandloadcapacityofsuspensions.

1.5.3 Theplanmustbecoordinatedwithvenueorotherriskmanagementplans.

1.5.4 Theplanmustclearlyidentifythechainofcommandandindividualresponsibilities.

RescuePlan 1.6 Arescueplanmustbedevelopedanddocumentedpriortocommencementofanysitework.

1.6.1 Theplanmustincludecontactinformationforoutsideemergencyrespondersandmedicalservicesprovidersasagreedbyallstakeholders.

1.6.2 Theplanmustincludethemeansandmethodsforcommunicatingemergencyinformationtoallstakeholders.

1.6.3 Rescuepersonnelmustnotbeexposedtohazardsbeyondtheirtrainingandabilitywhenexecutingtheplan.

1.0Pre-Installation,PlanningandEngineering(continued)

Page 11: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

7

RescuePlan(continued) 1.6.4 Theplanmustupdatedtoreflectanyonsitechanges.

WeatherRelatedProcedures 1.7 Theemergencyresponseplantotheeffectsofweathershouldinclude:

1.7.1 Appropriateresponsestotheeffectsofweathersuchasrain,wind,snow,floodandotherenvironmentalconditionssuchasseismic,fire,etc.ontherigginginstallation.

1.7.2 Thepotentialeffectsofweatheronindoorriggingsystemsduetohazardssuchasopenfreightdoors.

1.0Pre-Installation,PlanningandEngineering(continued)

Page 12: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

8

Introduction 2.1 Allriggingworkmustbecarriedoutinaccordancewithdrawings.

TitleBlock 2.2 ATitleBlockmustbeusedonalldrawingsandincludethefollowinginformation:

2.2.1 Nameoftheeventoract.

2.2.2 Nameofclient.

2.2.3 Nameofvenue.

2.2.4 Venueaddress.

2.2.5 Nameofpersonreponsiblefortheriggingdesign.

2.2.6 Methodfordeterminingweightslistedonplan.

2.2.7 Nameandcontactinformationforthesupervisor.

2.2.8 Nameandcontactinformationofpartyresponsibleforriggingonsite.

2.2.9 Scaleusedonplan.

2.2.10 Drawingnumberanddraftsperson.

2.2.11 Drawingversionnumberanddate.

2.2.12 Drawingstatus(e.g.concept,approved,etc.).

AllDrawings 2.3 Allriggingdrawingsmustindicatethefollowing:

2.3.1 Allriggingpointsmustbeindicatedbyasymbolandauniquealphanumericdesignation.

2.3.2 Akeyorlegendtosymbolsusedondrawings.

2.3.3 Riggingpointsymbolsshouldconveyinformationthatisessentialtotheexecutionoftherigging(e.g.hoisttype,capacity,speed,chainlength,etc.).

2.3.4 Thedatumpoint(i.e.adefinedpositionthatmeasurementsaretakenfrom.)

2.3.5 Forpointlocationpurposes,thedrawingshouldutilizecartesiancoordinateswhichreferencethedatumpoint.Thedatumaxislinesonthedrawingmustbelabeledforclarity.

2.3.6 Unitsofmeasurementusedinassociationwithdimensions,weightsandforcesondrawingsmustbeclearlyidentified.

2.3.7 Ascalebar(i.e.agraphicrepresentationofthescaleused).

2.3.8 Requiredhookheight(i.e.distancefromvenuefloortoupperhook).

2.0DrawingConventions

Page 13: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

9

AllDrawings(continued) 2.3.9 Locationofelectricalpowersupplyrequiredforariggingsystemincludingvoltage,frequency,singleorthreephase,amperage,andconnection(i.e.fourorfivewireandconnectortype,e.g.

PointSpecificInformation 2.4 Pointspecificinformationmustbeindicatedonthedrawingsorbelistedinasupplementaltableandshouldinclude:

2.4.1 Alphanumericpointdesignation.

2.4.2 Pointlocationrelativetothedatum.

2.4.3 Staticloadofeachpoint.

2.4.4 Peakdynamicloadofeachpoint.

2.4.5 Pointsassociatedwithmovingloads,orloadsthatvary,shouldhavedistinguishingsymbolsorotherwisebeidentified.

2.4.6 Totalstaticweightofallrigging.

VenueSpecificDrawings 2.5 Drawingsthatarespecifictoaparticularvenuemustindicatethefollowing:

2.5.1 Venuestructuralelementsincludingspecificanchorsthatsupporttherigging.

2.5.2 Heightofvenuestructuralsupportelementsabovespecifiedlocation(e.g.heightofbeamabovevenuefloor).

2.5.3 Whenappropriate,capacityofbeamsoranchorsasspecifiedbyfacilityorengineerofrecord.

2.5.4 Overheadobstructionsandhazardsthatarepartofthevenue(e.g.heightofairductabovevenuefloor).

2.5.5 Invenueswhereriggingcanoccurinmultiplelocations,akeyplanshouldbeprovidedtoindicatewhereriggingistotakeplace.

2.0DrawingConventions(continued)

Page 14: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

10

Selection 3.1 Allequipmentmustbefitforpurposeandcomplywithapplicablestandardsorbeprofessionallyengineeredforitsintendeduse.

3.1.1 Allequipmentmustbeusedinaccordancewiththemanufacturers'instructionsandrecommendations.

LoadCapacity 3.2 The selection process for all equipment must consider the highest anticipated load orcombinationofloads,includingdynamicloads.

RiskManagement 3.3 The equipment selection process must take into account all forseeable hazards to which theequipmentmaybesubject.

Compliance 3.4 Allequipmentselectedmustcomplywithapplicableregulationsand/orstandards.

Non-StandardEquipment 3.5 In the absence of manufacturers' load ratings and specifications, or applicable regulationsand/orstandards, aqualifiedpersonmust reviewandapprove theselectionof equipment for itsintended use to ensure safety. Non-standard equipment must be provided with necessarymarkingsanddocumentationtoensuresafeuse.

CustomBuiltEquipment 3.6 All custombuiltequipmentselected foraproject must be reviewedand approvedby aqualifiedperson.Custombuiltequipment must be providedwith necessarymarkings anddocumentationtoensuresafeuse.

Traceability 3.7 Allequipmentmustbeidentifiableandtraceabletothemanufacturer.

Marking 3.8 All equipment must be marked to indicate compliance with applicable regulations and/orstandards.

Maintenance 3.9 All equipment must have current compliancewith maintenance schedules per manufacturers'requirementsandapplicable regulations and/orstandards at itstimeof use andfor thedurationoftheevent.

MaintenanceRecords 3.10 Maintenancerecordsforequipmentmustbereadilyavailableatthetimeofselectionandforthedurationoftheevent.

3.0EquipmentSelection

Page 15: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

11

TasksandResponsibilities 4.1

4.1.1 Achainofcommandmustbeestablishedandclearlyunderstoodbyallcrew.

4.1.2 Thetasksandresponsibilitiesofeachcrewmembermustbeclearlydefinedanddocumented.

PriortotheStartofWork 4.2

4.2.1 Creworientationmusttakeplacepriortothestartofwork.

4.2.2 Supervisorsmustverifyworkingconditionsandidentifynewhazards.

4.2.3 Confirmthatallcrewhavevalidlicences/permitsforthetaskstheywillundertakeasrequired.

Briefings-ToolBoxTalks 4.3 Atoolboxtalkmustbeheldforeveryworkshiftandaddressthefollowing:

4.3.1 Generalworkplacesafetyandhousekeeping.

4.3.2 Identifyhazards,includinganyspecificproductionhazards,andexplainhowtomanagethem.

4.3.3 Identifysupervisors,crewandspecifictasks.

4.3.4 Communicatehowtheworkistobeaccomplished.

4.3.5 Communicatethescheduleandendofshiftgoalsandhandoverprocedures.

4.3.6 Checkthatallcrewhavepersonalprotectiveequipment(PPE)appropriatetothetasks.

4.3.7 Coordinationrequiredbetweenteams.

4.3.8 Overviewofdrawingsandconventions.

4.3.9 Overviewofcommunicationandradiouse.

4.3.10 Emergencyproceduresincludingrescue.

4.3.11 Malfunctioning or faulty equipment should be clearly marked and quarantined.

On-GoingSupervision 4.4

4.4.1 Supervisorsmustmonitorchangingcircumstancesandconditions,andtakeappropriateactionwhenneeded.

4.4.2 Supervisorsmustmonitorthephysicalandmentalconditionoftheircrew.

4.4.3 Supervisorsmustcompensateforandreportdeviationsfromtheriggingplanorschedule.

4.0OnSiteRiggingWork

Page 16: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

12

SafeWork 4.5

4.5.1 Allcrewmust:

4.5.1.1 Visuallycheckequipmentforpropercondition.

4.5.1.2 Malfunctioning or faulty equipment should be clearly marked and quarantined.

4.5.1.3 Ensureclearcommunicationswithcrew.

4.5.1.4 Monitortheenvironmentforchangesandnewhazards,andreactaccordingly.

4.5.1.5 Wearpersonalprotectiveequipment(PPE)asinstructed.

4.5.1.6 Verifysafeconditionofworkateachstagebeforeproceeding.

4.5.2 Leadriggersmust:

4.5.2.1 Communicateinstallationmethodologywithcrew.

4.5.2.2 Verifytheintegrityoftheriggingconnectionsandtheaccuracyofpointlocations.

4.5.3 Groundriggersmust:

4.5.3.1 Safeguardthegroundareabelowtheriggers.

4.5.3.2 Checktheintegrityandcorrectconfigurationofriggingassemblybeforetyingin.

4.5.3.3 Guidetheriggingassemblyasitispulledup.

4.5.4 Upriggersmust:

4.5.4.1 Visuallychecktheirfallprotectionsystemsbeforeuse.

4.5.4.2 Verifytheintegrityoftheriggingconnectionsandcommunicatewhenthepointisreadytobeloaded.

4.5.5 Personsresponsibleforriggingpowermust:

4.5.5.1 Verifythepowersupplyisappropriatefortheequipmentbeingused.

4.5.5.2 Checkallelectricalconnectionsforproperfunctioning,directionofmotorrotation,andrepairorchangeequipmentasnecessary.

4.5.5.3 Monitorhoistconnections,cables,multicores,etc.,accordingtothecableplan.

4.5.6 Trusscrewmust:

4.5.6.1 Assembletrussesaccordingtothetrussplanandmanufacturers'instructions.

4.5.6.2 Useconnectinghardwareaccordingtomanufacturers'instructions.

4.0OnsiteRiggingWork(continued)

Page 17: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

13

SecondarySuspensions 4.6

4.6.1 Secondarysuspensionsshouldbeavoidedifpossibleandtheriggingdesignshouldfavorredundancy.

4.6.2 Secondarysuspensions,ifrequired,shouldbeinstalled(attheirupperandlowerattachments)suchthattimespentworkingatheightisreducedtotheminimumpossiblewhileemployingthemostappropriatemeansofaccess.

4.0OnsiteRiggingWork(continued)

Page 18: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

14

PriortoStartingWorkOnSite 5.1 Planning,tasksandresponsibilitiesinclude:

5.1.1 Operationsmustbeplannedandcoordinated.

5.1.2 Planningmusttakeintoaccountapplicablelocalregulationsand/orstandardsaswellasbestpractices.

5.1.3 Thecapacityoftheriggingsystem,thenatureoftheload,itsweight,andanycharacteristicsthatmayaffectitssafehandlingmustbecommunicatedinthepre-operationbriefing.

5.1.4 Crewinvolvedintheliftingoperationsmustbebriefedaboutthecommunicationmethodstobeused.

5.1.5 Thecommunicationssystemdesignmustallowanyoneintheimmediateareatostoptheliftingoperation.

PreparingtheEquipment 5.2

5.2.1 Allcomponentsmustbevisuallycheckedbyacompetentpersoneachtimetheyareattachedtoorremovedfromaload.

5.2.2 Theintegrityofthesystemmustbevisuallycheckedpriortoeveryliftand/orseriesofliftingoperations.

5.2.3 Thecapacityoftheequipmentmustmeetorexceedthedesignspecificationintheliftingplan.

5.2.4 Equipmentmustbetaggedormarkedasrequiredbyapplicableregulationsandstandards.

5.2.5 Anyitemofequipmentfoundtobedefective,orsuspectedofbeingdefective,mustberemovedfromserviceandquarantinedordisposedofimmediatelytopreventfurtheruse.

AttachingtheLoad 5.3

5.3.1 Theloadmustbeattachedtotheequipmentinamannerthatwillnotallowdamagetotheloadortheequipment.

5.3.2 Themethodofattachmentmustnotcreateforcesthatexceedtheworkingloadlimit(WLL)oftheequipmentorcompromisetheintegrityoftheload.Slinganglefactorsmustbeconsidered.

5.3.3 Themethodofattachmentmustpreventslidingorshiftingoftheload.

5.3.4 Theloadmustbeattachedtotheequipmentinaccordancewithmanufacturer'sspecifications.

5.3.5 Ifcomponentscouldunintentionallylooseninusetheymustbesecured,e.g."mousing"shackles.

5.0LiftingOperations

Page 19: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

15

Lifting 5.4

5.4.1 Theliftingplan,ororderoflifts,istobeunderstoodandadheredtoatalltimes.

5.4.2 Supervisorandoperatormustperformavisualcheckofthesystemandflightpath.

5.4.3 Providespottersasnecessarytoensureeffectivevisualmonitoringofthemovingload.

5.4.4 Allliftingoperationsmustbesupervisedbyacompetentperson.

5.4.5 Theloadonthesystemmustbeappliedorremovedgraduallyinacontrolledmanner.

5.4.6 Theintegrityofthesystemmustbeverifiedafterinitial"floating"ofload.

5.4.7 Stoptheloadbeforelandingittoensurethelandingzoneisclear.

Trimming 5.5

5.5.1 Allobjectsmustbepositionedattrimheightaccordingtotheliftingplan.

5.5.2 Methodoftrimmingmustensureappropriateloadsharing.

5.5.3 Methodoftrimmingmustavoidrepeateddynamicloading.

LoadMonitoring 5.6

5.6.1 Theuseofloadmonitoringequipmentisrecommended.

5.6.2 Theuseofloadmonitoringequipmentishighlyrecommendedwhenperformingamulti-pointliftorwhendynamicloadsareinvolved.

SecuringtheLoadatTrim 5.7

5.7.1 Allriggingsystemsmustensurethesafetyofperformers,crewandpatronsintheeventofequipmentfailure,withoutcompromisingthestructuralintegrityofthebuilding.Considerationmustbegiventoredundancyofmulti-point[3ormore]suspensions;accountingforthenumberandloadcapacityofsuspensions.

5.7.2 Checkrequirementsforsecondarysuspensionstoensurecompliancewithapplicableregulationsandstandards.

5.7.3 Noticemustbeplacedatthecontrolpointofaliftingsystemwhensecondarysuspensionsareused.

5.7.4 Secondarysuspensionsmusthavecapacityequaltoorgreaterthantheprimarysuspension.

5.0LiftingOperations(continued)

Page 20: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

16

SecuringtheLoadatTrim(continued)

5.7.5 Secondarysuspensionsmustbetauttoavoidshockloading.

5.7.6 Wherepossible,secondarysuspensionsshouldbeattachedtoasupportingstructureindependentoftheprimarysuspension.

5.0LiftingOperations(continued)

Page 21: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

17

TasksandResponsibilities 6.1 Thesupervisormustcoordinatewithalldepartmentstoensuresafeoperations.

6.1.1 Achainofcommandmustbeestablishedandclearlyunderstoodbyallcrew.

6.1.2 Thetasksandresponsibilitiesofeachcrewmembermustbeclearlydefinedanddocumented.

6.1.3 Asystemmustbeinplacethatgiveseachcrewmembertheauthoritytoperformorhaltactivitiesintheirareaofcontrol.

RiskManagement 6.2 Ariskassessmentmustbecarriedoutandariskmanagementplanpreparedforeachtaskintheshowoperation.

6.2.1 Ariskassessmentmustconsiderthecast,crew,venuestaff,andaudience.

MethodStatements 6.3 Amethodstatementmustbeproducedforeachtaskintheshowoperationtoincludehandlingofshowstopsandemergencyproceduressuchasrescues.

CommunicationsRequirements

6.4 Thecommunicationsprotocolandsystemsmustbedesignedtoensuresafetyandsmoothshowoperations:

6.4.1 Thecommunicationssystemmustaccommodatethespecifictaskstobeperformed.

6.4.2 Thecommunicationssystemmustbecapableofallowingspecificteamstoworkindependentlyofthemainproduction.

6.4.3 Aclearlydefinedcommunicationsvocabularymustbeestablishedtoensuresafeoperationsinthevicinityofmovingloadsorperformers.

SafetyProtocols 6.5

6.5.1 Scenechanges:

6.5.1.1 Scenechangesmustberehearsedmethodically,progressivelyaddingelementssuchasshowlighting,audio,effects,andcastonlywhenproficiencyisachieved.

6.5.1.2 Scenechangesmustberehearsedperiodicallyonlongerrunstoensureactualworkmatchesdocumentationandunderstanding.

6.5.2 Performerflyingrigging:

6.5.2.1 Mustbeoperatedonlybytrainedcrew.

6.5.2.2 Mustincludeapre-performancecheckofallsystemsandcomponents.

6.0ShowRiggingOperations

Page 22: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

18

SafetyProtocols(continued) 6.5.2.3 Pre-performancechecksmustbelogged.

6.5.2.4 Rescuemethodsforallflyingeffectsmustbeplannedandtestedpriortofirstrehearsal.

6.5.2.5 Rescuemethodsforallflyingeffectsmustbeperiodicallyrehearsed.

6.5.3 Scenicautomationandcomputercontrolledeffectsmusthavethefollowingsafetyfeatures:

6.5.3.1 Apressandholdtooperatedevice(deadmanhandle).

6.5.3.2 Emergencystopsystems(E-stops)asspecifiedbyriskassessment.

6.5.3.3 Anoperatormustalwaysbeabletooverrrideandstopasystemregardlessofwhatinitiatesmotion.

6.5.3.4 Theoperatormustmaintaingoodvisualcontactwiththeeffect.Alternatively,thiscouldbeachievedwithadirectcameraandmonitorsystem.

6.5.3.5 Apre-performancecheckofallsystemsandcomponents.

6.5.3.6 Pre-performancechecksmustbelogged.

6.5.4 Potentialhazardstosaferiggingoperationcausedbyspecialeffectssuchaspyrotechnics,lasers,stunts,etc.,mustbeconsideredintheriskassesment:

6.5.4.1 Reducedvisibility.

6.5.4.2 Operatorsbeingunfamiliarwithothercomponentsoftheshow.

6.5.4.3 Specialeffectsthatdon'thavealocalsafetyswitchbeingattachedtoflyingelements.

6.5.4.4 Increasednoiselevels.

6.5.4.5 Specialeffectsresidue(heat,smoke,ash,confetti,etc.)withregardtoproximitytoperformers,crewandequipment.

6.5.5 Potentialhazardstosaferiggingoperationcausedbywater,includingiceandsteam,mustbeconsideredintheriskassessment.Someoftherisksmayinclude:

6.5.5.1 Electricalcircuitsmadeunsafe.

6.5.5.2 Thecorrosionofmetallicitemsthroughimmersionand/orcondensation.

6.5.5.3 Chemicalandbiologicalhazards.

6.5.5.4 Burning.

6.0ShowRiggingOperations(continued)

Page 23: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

19

SafetyProtocols(continued) 6.5.5.5 Drowning,includingfluidpreventingairfrombeingtakenintothelungs.

6.5.5.6 Theeffectontrafficablesurfaces.

6.0ShowRiggingOperations(continued)

Page 24: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

20

TasksandResponsibilities 7.1

7.1.1 Achainofcommandmustbeestablishedandclearlyunderstoodbyallcrew.

7.1.2 Thetasksandresponsibilitiesofeachcrewmembermustbeclearlydefinedanddocumented.

PriortotheStartofWork 7.2

7.2.1 Newcreworientationmusttakeplacepriortothestartofwork.

7.2.2 Supervisorsmustverifyworkingconditionsandidentifynewhazards.

Briefings-ToolBoxTalks 7.3 Atoolboxtalkmustbeheldpershiftandaddressthefollowingtopics:

7.3.1 Generalworkplacesafetyandhousekeeping.

7.3.2 Hazards.

7.3.2.1 Identifyhazards,includinganyspecificproductionhazards,andexplainhowtomanagethem.

7.3.2.2 Identifyspecificpreparatorytasksthatmustbecompletedpriortoanyde-rigging.

7.3.3 Identifysupervisors,crewandspecifictasks.

7.3.4 Communicatehowtheworkistobeaccomplishedandinwhatorder.

7.3.5 Communicatethescheduleandendofshiftgoalsandhandoverprocedures.

7.3.6 Checkthatallcrewhavepersonalprotectiveequipment(PPE)appropriatetothetasks.

7.3.7 Coordinationrequiredbetweenteams.

7.3.8 Overviewofcommunicationandradiouse.

7.3.9 Emergencyproceduresincludingrescue.

7.3.10 Malfunctioningequipmentmustbeclearlymarked.

On-GoingSupervision 7.4

7.4.1 Supervisorsmustmonitorchangingcircumstancesandconditions,andtakeappropriateactionwhenneeded.

7.4.2 Supervisorsmustmonitorthephysicalandmentalconditionoftheircrew.

7.4.3 Supervisorsmustcompensateforandreportdeviationsfromthede-riggingplanorschedule.

7.0De-RiggingWork

Page 25: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

21

SafeWork 7.5

7.5.1 Allcrewmust:

7.5.1.1 Visuallycheckequipmentforpropercondition.

7.5.1.2 Ensureclearcommunications.

7.5.1.3 Monitortheenvironmentforchangesandnewhazards,andreactaccordingly.

7.5.1.4 Wearpersonalprotectiveequipment(PPE)asinstructed.

7.5.1.5 Verifysafeconditionofworkateachstagebeforeproceeding.

7.5.2 Groundriggersmust:

7.5.2.1 Safeguardtheareabelowtheriggers.

7.5.2.2 Verifythatsuspendedequipmentcanbeloweredsafelyandequipmentisoperatingcorrectly.

7.5.2.3 Guidetheriggingassemblyduringloweringandlanding.

7.5.2.4 Disassembleandremoveequipmentassoonaspossibletokeepworkareaclear.

7.5.3 Upriggersmust:

7.5.3.1 Visuallychecktheirfallprotectionsystemsbeforeuse.

7.5.3.2 Verifythatsuspendedequipmentcanbeloweredsafely.

7.5.3.3 Communicatewheneachpointisreadytobede-rigged.

7.5.4 Personsresponsibleforriggingpowermust:

7.5.4.1 Verifythepowersupplyisappropriatefortheequipmentbeingused.

7.5.4.2 Checkallelectricalconnectionsforproperfunctioning,andrepairorchangeequipmentasnecessary.

7.5.4.3 Monitorhoistconnections,cables,multicores,etc.

7.5.5 Trusscrewmust:

7.5.5.1 Disassembletrussesandprepareforsafetransportaccordingtoinstructions.

7.5.5.2 Collectconnectinghardwareduringdisassembly.

7.5.5.3 Ensuregoodhousekeepingismaintained.

7.0De-RiggingWork(continued)

Page 26: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

22

Reporting 8.1 Apostproductionreportmustbepreparedbyacompetentmemberofthecrewandmustinclude:

8.1.1 Startandenddatesofproduction.

8.1.2 Crewinvolvedandtheirroles.

8.1.3 Recordofpre-operationalchecks.

8.1.4 Detailsofincidentsordeficiencies.

8.1.5 Detailsofitemsneedingrepairorreplacement.

8.1.6 Detailsofalterationstoplansorproceduresrequiredduringthedurationoftheproduction.

8.1.7 Commentsandremarksabouttheproductionfromcrew.

8.1.8 Alldocumentationpertainingtosafetygeneratedfortheproductionmustbeheldintheappropriatelocationfortheperiodrequiredbyapplicableregulation.

GapTraining 8.2 Postproductionevaluationofcrewskillsandnecessarytrainingmustbeconductedbyemployerto:

8.2.1 Refreshskills.

8.2.2 Upgradeskillsrequiredbynewequipmentorprocedures.

8.2.3 Upgradeknowledgeduetochangesinlocalregulationsand/orstandards.

8.2.4 Upgradeskillstoconformtoindustrybestpractice.

8.0PostProduction

Page 27: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

23

IndexNumber Term Definition

2.3.5 CartesianCoordinates Asystemofcoordinatesthatspecifiesthelocationofapointinrelationtoadatum,on2or3axes.

1.5.4,4.1.1,6.1.1,7.1.1 ChainofCommand Thehierarchyofauthoritythatdictateswhoisinchargeofwhom,andofwhompermissionmustbeasked.

CodeofPractice Asetofwrittenguidelinesthatexplainshowpeopleworkinginaparticularprofessionshouldplan,manageandexecutetheirwork.

6.4 CommunicationsProtocol Asystemofrulesandetiquetteenablingorderlycommunicationamongstmultipleusersofacommunicationssystem.

5.1.5,6.4.1,6.4.2 CommunicationsSystem Areliablemeansofcommunicationbetweenparties,typicallyutilizingwiredintercomortwowayradios.Videocansupplementaudio.

1.1,5.2.1,5.4.4,8.1 CompetentPerson/CompetentPersonnel Apersonwhohastheknowledge,experienceandskilltocarryoutthetaskathand.

3.4,3.8,3.9,5.7.2 Compliance Conformitywithregulations,standardsorpolicies.

2.3.4,2.3.5,2.4.2 Datum Adefinedpointofreference.

2.3.5 DatumAxisLines Referencelinesthatoriginateatthedatum.

6.5.3.1 DeadManHandle Aswitchinanautomationsystemthatmustbemanuallyengagedtoenablethesystemtooperate.

1.3.3 DeterminateRiggingSystem SeeAppendixA

1.2,1.3,1.3.2,2.4.4,3.2,5.5.3,5.6.2 DynamicLoad Theincreasedforcethatresultsfromchangingthespeedofanobject.

6.5.3.2 EmergencyStopSystem(E-stop) Anemergencymeansofstoppingthemovementofariggingsystemtopreventinjuryordamage.

1.1.1,1.5.1 EnforcingAuthority Thepersonorentityhavingthepowertoenforceregulations,standardsorpolicies.

Equipment Rigginghardwareandmachineryusedtomoveorsecuresuspendedobjects.

3.1 FitforPurpose Equipmentthatisappropriatefortheintendeduse.

5.4.2 FlightPath Thespacerequiredforunrestrictedmovementofaliftingsystem.

5.4.6 Floating Theinitialliftofobjectstoworkingheight.

ICOPER–Glossary

Page 28: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

24

1.2,1.3,2.3.6,5.3.2,AppendixA Force Thepushorpullonanobjectresultingfromitsinteractionwithanotherobject.Forceischaracterizedbyitsmagnitude,directionandpointofapplication.

8.2 GapTraining Additionaltrainingrequiredtoensurecompetency.

4.5.3,7.5.2 GroundRigger Thepersonresponsibleforassemblingrigginghardwareonthegroundandcoordinationofhaulingoperations.

1.3.3 IndeterminateRiggingSystem SeeAppendixA

2.3.2 KeyorLegend Asectiononadrawingthatdefinesthesybmolsusedinthatdrawing.

2.5.5 KeyPlan Aportionofthedrawingthatindicatestheprojectspecificlocationwithinalargerarea.

5.2.2,5.6.2 Lift Thecontrolledmovementofasuspendedobject.

5.1.4,5.1.5,5.2.2,5.4.4 LiftingOperations Proceduresandactionsassociatedwiththecontrolledmovementofasuspendedobject.

5.2.3,5.4.1,5.5.1 LiftingPlan Theorderofactionsincarryingoutaliftorsequenceoflifts.

5.7.3 LiftingSystem Theequipment,controlsandobjectsthatcomprisealift.

Load SeeAppendixA.Anexternalappliedforce.Inentertainmentrigging,generally,"load"referstotheobjectorobjectstobelifted.

5.3.5 Mousing Useofwireorothermaterialtopreventtheunintentionalopeningofaconnectororhook.

2.5.4 OverheadObstruction Anobjectthatblockstheintendedflightpathofalift.

6.5.2 PerformerFlying Suspendingormovingaperformerusingariggingsystem.

1.3.1 PointLoad Aconcentratedloadappliedatasinglelocation.

4.6.2,5.7.4,5.7.6 PrimarySuspension Theminimumnumberofsuspensionpointsrequiredtosupporttheloadasdictatedbytheriggingdesign.Seealso"Redundancy."

1.4,1.5,3.5,3.6 QualifiedPerson Apersonwhohastheprofessionalcredentialsrequiredtosolveorresolveproblemsrelatingtothesubjectmatter.

ICOPER–Glossary(continued)

Page 29: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

25

AppendixA ReactionForces (SeeillustrationinAppendixA)Equalandoppositeforcesthatoccuratthesuspensionpoint(s)inastructurethatpreventanobject’smotion(e.g.thereactionstoaloadappliedtoabeam,occuratthebeamsupports).

1.5.2.1,4.6.1,5.7.1 Redundancy Theuseofadditionalsuspensionpointsthatshareloadtosafeguardagainstasuspensionfailure.

1.1.2,3.4,3.5,3.8,3.9,5.1.2,5.2.4,5.7.2,8.1.8,8.2.3

Regulation Agovernmentalorderhavingtheforceoflaw.

Rigging Theinstallation,useandremovalofequipmenttomove,suspendorsecureobjects.

4.5.3.2,4.5.3.3,7.5.2.3 RiggingAssembly Acombinationofhardwarethatisconnectedtogether.

2.3.1 RiggingPoints Theconnectionofconcentratedloadstoasupportstructureaccordingtotheriggingplan.

1.3.3,1.7.2,2.3.9,5.1.3,5.7.1 RiggingSystem Anyequipmentusedforsuspensionbelowthesupportingstucture.

1.5,1.5.2,6.2,6.2.1,6.5.3.2,6.5.5 RiskAssessment Aformalprocessusedtoidentifyhazardsandmitigaterisk.

1.5,1.5.3,6.2 RiskManagementPlan Adocumentdetailingprocedurestoensuretheongoingidentificationofhazardsandmitigationofrisk.

2.2.9,2.3.7 Scale Theratioofmeasurementsusedtorepresentobjectsonadrawingtotheiractualsize.

4.6,4.6.1,4.6.2,5.7.2,5.7.3,5.7.4,5.7.5,5.7.6

SecondarySuspension Additionalriggingusedtosupporttheloadincaseofequipmentfailure.

5.7.5 ShockLoading Theextremesurgeinforceassociatedwithsuddenimpact.

5.3.2 SlingAngleFactors Multipliersthataccountforincreasedforcesinslingswhentheyarenotvertical.

6.5.4,6.5.4.3,6.5.4.5 SpecialEffects Elementsusedtoenhanceanevent(e.g.fog,laser,pyrotechnics,water,performerflying,stunts,etc.).

1.4.1,1.5.1,1.6.1,1.6.2 Stakeholder Apersonororganizationwhocanaffect,orisaffectedby,anaction,decisionorpolicy.

ICOPER–Glossary(continued)

Page 30: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

26

1.1.2,2.3.4,3.1,3.4,3.5,3.8,3.9,5.1.2,5.2.4,5.7.2,8.2.3

Standard Adocumentthatprovidesrulesorguidelinestoachieveadesired,consistentoutcome.

2.4.3 StaticLoad Theconstantforceassociatedwithastationaryobject.

5.7.1 StructuralIntegrity Theabilityofastructuretoremainintactandstableunderload.

2.2.7,4.2.2,4.3.3,4.4.1,4.4.2,4.4.3,5.4.2,6.1,7.2.2,7.3.3,7.4.1,7.4.2,7.4.3

Supervisor Thepersonresponsibleforoverseeingtheproperexecutionofatask.

3.5.2.1,6.6,6.6.1,6.6.2,7.7.1,7.7.2,7.7.3,7.7.4,7.7.5,7.7.6,AppendixA

Suspension Theequipmentintheloadpaththatsupportstheload.

2.2 TitleBlock Aportionofadrawingthatidentifiesthedrawingcontents.

5.5.1 TrimHeight Verticaldistancefromadatumtoaspecifiedpointonasuspendedobject.

4.5.4,7.5.3 UpRigger Ariggerwhocarriesoutriggingworkatheight.

1.3.1,2.2.6,2.3.6,2.4.6,5.1.3 Weight Theeffectofgravityonastaticobject.

5.3.2 WorkingLoadLimit(WLL) Themaximumallowableloadtobeappliedtoaliftingcomponentasspecifiedbythemanufacturer.

ICOPER–Glossary(continued)

Page 31: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

27

AppendixA–DeterminateandIndeterminateRiggingSystems

ItisimportantforriggerstohaveanunderstandingofthenatureandbehaviorofDeterminateandIndeterminateriggingsystemswhendesigningriggingandoperatingequipment.Abriefdescriptionofthesetwosystemsandrelatedterminologyfollows:

DeterminateRiggingSystemsDefinition:

Ariggingsystemwhichhastheminimumnumberofprimarysuspensionpointsrequiredtosupporttheload.

Characteristics:• Reactionforcesarepredictableandcanbecalculatedusingbasicmathematicalequations.• Bydefinitionandforpurposesofcalculationtheydonothaveredundantsuspensions.• Variationsinanobject’sliftheightcausedbyoperatingoneormorehoistsinagroupwillnotresult

inunpredictableorlargechangesinreactionforces.

Examples:

(Aboveexamplesassumeadequatesupportisprovided.)

Page 32: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

28

AppendixA(continued)

IndeterminateRiggingSystemsDefinition:

Ariggingsystemwhichhasmoreprimarysuspensionsthanrequiredtosupporttheload.

Characteristics:• Reactionforcescanonlybecalculatedusingcomplexanalyticalmethods.• Smallvariationsinliftheightcanproducepotentiallydangerousvariationsinreactionforces.• Reactionforcesmustbeverifiedonsiteusingloadmonitoringequipment.• Thenumberofsuspensionsinanindeterminatesystemcanprovideredundancy,makingitpossibleforasuspensionfailure

tooccurwithoutcausingcollapseoftheriggingsystem.Shockloadsmustbeconsidered.

Examples:

(Intheexamplesabove,itmaybetheoreticallypossibletoremoveonesuspensionandhavetheobjectsremainstable.Inpractice,adequatesupportmustbeprovidedtoensurestability.)

Page 33: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

29

AppendixA(continued)

ReactionForces

Page 34: International Code of Practice for Entertainment Rigging · 4.5 Safe Work ... 17-19 7.0 De-Rigging Work ... providing a model code of practice with a focus on arena rigging.

30

Term Description Australia EuropeanUnion NewZealand UnitedKingdom UnitedStates

Legislation/Regulation Lawenactedbygovernment. Legallyrequired. Legallyrequired. Legallyrequired. Legallyrequired. Legallyrequired.

StandardAconsensusdocumentdraftedbyindustryusingaformalprocess.

Notmandatorybutlegallyreferenced.Compliancerequiredifreferencedinlegislation.

EqualtoNorm.Notmandatorybutlegallyreferenced.Compliancerequiredifreferencedinlegislation.

Notmandatorybutlegallyreferenced.Compliancerequiredifreferencedinlegislation.

Notmandatorybutlegallyreferenced.Compliancerequiredifreferencedinlegislation.

Notmandatorybutlegallyreferenced.Compliancerequiredifreferencedinlegislation.

(AconsensusdocumentNorm Europeanequivalentofstandard.

Termnotgenerallyused. Compliancerequiredifreferencedinlegislation.

Termnotgenerallyused. Termnotgenerallyused. Termnotgenerallyused.

ApprovedCodeofPractice Approvedbygovernmentagencyorarecognizedstandardsadministrator.

Notmandatorybutlegallyreferenced.

Haslegalstatus. Notmandatorybutlegallyreferenced.

Haslegalstatus. Notmandatorybutlegallyreferenced.

CodeofPracticeGoodWorkingPracticeSafeWorkingPractice

Aconsensusdocumentdraftedbyindustryofferinggoodpracticeguidelines.

Notmandatorybutmaybelegallyreferenced.

Notmandatorybutmaybelegallyreferenced.

Notmandatorybutmaybelegallyreferenced.

Notmandatorybutmaybelegallyreferenced.

Notmandatorybutmaybelegallyreferenced.

Usersofthisdocumentarerecommendedtosourceandnotethereferencesforlegislation/standards/norms/codesofpracticeapplicableforyourregion.Beawarethatthesemaybeupdatedfromtimetotimebytheissuerandyouwillneedtoupdateyourreferencesaccordingly.Someareastoconsider:hoists,liftingequipment,aluminumstructures,plant/machinery,workingatheight,fallprotection,siteinduction,andsafework.

RegionalComparisonofTermsRegardingStandards