FIRST TRACECA INVESTMENT FORUM Brussels 12 th October 2010 Brussels, 12 th October 2010 International Border Terminal “Nizhniy Pyanj” TAJIKISTAN
34

International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Dec 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

FIRST TRACECA INVESTMENT FORUMBrussels 12th October 2010Brussels, 12th October 2010

International Border Terminal “Nizhniy Pyanj”

TAJIKISTAN

Page 2: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Building of International border Terminal “Nizhniy Pyanj”

Page 3: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Уфа

Астрахань Алматы

ОшДушанбе

Ош

Page 4: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

TECHNICAL DESCRIPTION

Analysis of arrival, departure and transit passage of y , p p gvehicles for the previous five years has shown a big increase in transport flow:

2005 – 198 vehicles,2009 – 8921 vehicles.

45 ti 4 500 % (F Th d)45 times more or 4,500 % (Four Thousand)

Brussels, 12th October 2010 First TRACECA Investment Forum 4

Page 5: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTIONThe outputs of the project implementationp p j p

a unique base for implementing all control procedures andfacilitaties of all controlling bodies at the borderreduction of time of delivery time for goods according to modernreduction of time of delivery time for goods according to modernrequirementsattraction of the addition volume of road transport and reduction oftransport costtransport costdevelopment of transfer, escort and distribution systemsreduction of transport time for goods, waiting time and overload of

eho ewarehouses;reduction of time for transfer vehicles and loading units

Brussels, 12th October 2010 First TRACECA Investment Forum 5

Page 6: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

INVESTMENT AMOUNT AND REPAYMENT

Project costs: 6.8 Million US Dollars Period of compensation: 10 years

Form of participation: p pDirect Investment

Brussels, 12th October 2010 First TRACECA Investment Forum 6

Page 7: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTIONS

F ibilit St d fi d b EU d i• Feasibility Study financed by EU undergoing• Additional economic analysis will be done to assure sound foundation

for revenues to cover the investment amout

Goals• Fulfil international obligations proceeding from international legal acts • Fulfil international obligations proceeding from international legal acts

which recognized by the Republic of Tajikistan• Transport management for foreign vehicles on the territory of Tajikistan

and subsequent prevention of their inexpedient arriving in towns and subsequent prevention of their inexpedient arriving in towns, districts and other inhabited locality settlement.

Brussels, 12th October 2010 First TRACECA Investment Forum 7

Page 8: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SUMMARYTotal project cost: 6 8 Milli USD 6.8 Million USD

HERE !HERE !

Strategic objectives of the projectS ibl f hi h d t ti f l l t t k t d• Sensible usage of highways and protection of local transport market and services

• Gain information concerning physical and non-physical barriers for the transit in the Central Asia region and elaborating on recommendations aimed to their elimination

Brussels, 12th October 2010 First TRACECA Investment Forum 8

Page 9: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Brussels, 12th October 2010 First TRACECA Investment Forum 9

Page 10: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

FIRST TRACECA INVESTMENT FORUMBrussels 12th October 2010Brussels, 12th October 2010

ILC at the New Baku International Sea Trade Port AlyatNew Baku International Sea Trade Port Alyat

R bli f A b ijRepublic of Azerbaijan

Page 11: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

BOYUK KESIK

RUSSIAN FEDERATION

GEORGIA

KAZAKHSTAN

BAKU

REPUBLIC OF ALYATΣAZERBAIJAN

CASPIAN

ALYATSEA

PORT

CASPIAN SEA

TURKMENISTAN

ISLAMIC REPUBLIC OF IRAN

Page 12: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTION

• Multimodal node with extended logistics• Multimodal node with extended logistics

• Value added functions on Caspian Sea • Value added functions on Caspian Sea adjacent to the new port of Baku

• Base for an improved distribution of imported cargo to consumers in the Baku p gregion as well as throughout Azerbaijan

Brussels, 12th October 2010 First TRACECA Investment Forum 12

Page 13: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

TECHNICAL DESCRIPTION

Brussels, 12th October 2010 First TRACECA Investment Forum 13

Page 14: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTIONGovernment of Azerbaijan

Ownership, investment,

manage-

Lease & management agreement

Investment in land

Specialist firms

gment ILC Management

Company

& selected facilities; retention of ownership

ILC l d b h d k ddi i l iN B k

Outsourced services

ILC management & investment

| INTERNATIONAL LOGISTICS CENTRE |

ILC populated by tenants who undertake additional investment, provide services directly to customers and pay rent and fees to

the ILC Management Company

New Baku Port

at Alyat

Brussels, 12th October 2010 First TRACECA Investment Forum 14

| --------------------- INTERNATIONAL LOGISTICS CENTRE --------------------- |

Page 15: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

CASPIANSEA

ILYICHEVSK

SEA

MARABDABOYUK KESIK

POTI

ALYATSEAKARSISTANBUL

BOYUK KESIKBATUMI

ΣAKHALKALAKI

SEAPORT

KARSISTANBUL

Page 16: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

OUTLOOK INTO THE FUTURE

Brussels, 12th October 2010 First TRACECA Investment Forum 16

Page 17: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SUMMARY

New estimations: New estimations: 37 Million Euro in three tranches in three tranches

• Increase of competitiveness of TRACECA corridorI f th l i ti t i t d b t th EU d• Increase of the logistics component in trade between the EU and TRACECA countries

• Provision of modern intermodal facilities and variety of logistics • Services presently absent in Azerbaijan and on TRACECA corridor

Brussels, 12th October 2010 First TRACECA Investment Forum 17

• Services presently absent in Azerbaijan and on TRACECA corridor.

Page 18: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Brussels, 12th October 2010 First TRACECA Investment Forum 18

Page 19: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

FIRST TRACECA INVESTMENT FORUMBrussels, 12th October 2010

International Logistics Centre at theInternational Logistics Centre at theFree International Airport Marculesti

MOLDOVAMOLDOVA

Page 20: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

International Logistics Centre at the Free International Airport Marculesti

Brussels, 12th October 2010 First TRACECA Investment Forum 20

Page 21: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

TECHNICAL DESCRIPTION• The Free International

Airport Marculesti (FIAM) is a Free Economic Zone

• The available land plot is b t f 40 habout of 40 ha.

• Off-site infrastructure will have to be constructed to provide a new road provide a new road access and rail access.

• These costs are included as project costs p jirrespective of the source of funding.

Brussels, 12th October 2010 First TRACECA Investment Forum 21

Page 22: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

INVESTMENT AMOUNT AND REPAYMENT

E ti t d i t t d fEstimated investment needs forILC development:• Stage 1, 2012-14: € 10.6 million

Stage 2 2015 18: € 4 8 million• Stage 2, 2015-18: € 4.8 million• Stage 3, 2019-22: € 1.3 million

Total Stages 1-3: € 16.7 millionTotal Stages 1 3: € 16.7 million

Rates of Return (current prices, 10 year period):( p , y p )

IRR to the project, irrespective of funding arrangements: 8% paIRR to the investor, with implementation of the proposed Financing Plan: 18%pa

Brussels, 12th October 2010 First TRACECA Investment Forum 22

Page 23: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTION

• At the moment there are no modern intermodal container At the moment there are no modern intermodal container handling facilities in northern Moldova.

• There will substantial socio-economic benefits from increased road vehicle load factors and modal shift away from road road vehicle load factors and modal shift away from road transport in favour of rail.

• They will take the form of reduced external logistics costs: reduced transport infrastructure construction and maintenance costs, less road accidents, reduced air and noise pollution and CO2 emissions.noise pollution and CO2 emissions.

• EIRR using financial values for quantifiable costs and benefits is 15%pa (20 year period).

Brussels, 12th October 2010 First TRACECA Investment Forum 23

Page 24: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTION

• The socio-economic impact of the project will be felt by The socio economic impact of the project will be felt by agricultural producers in northern Moldova, who will have much-enhanced, reliable and cheaper access to domestic and export marketsand export markets.

• So far five private companies have expressed of interest in h lthe logistics centre.

• A draft feasibility study has been prepared by the EU –A draft feasibility study has been prepared by the EU funded project “International Logistics Centres in Western NIS and the Caucasus”. The Final report will be presented early 2011early 2011.

Brussels, 12th October 2010 First TRACECA Investment Forum 24

Page 25: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SUMMARY

The total investment amount needed is amount needed is € 16.7 million.

• The objective of the logistics centre is to provide efficient transport and l i i i h l llogistics services to support the local economy. Furthermore, it will create a basis for the development of cross-border intermodal transport services in the Northern Region of Moldova,

Brussels, 12th October 2010 First TRACECA Investment Forum 25

integrated into the TRACECA network of logistics centres.

Page 26: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Brussels, 12th October 2010 First TRACECA Investment Forum 26

Page 27: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

FIRST TRACECA INVESTMENT FORUMBrussels, 12th October 2010

Creation of a Logistic Center on the basis of N i I t ti l Ai tNavoi International Airport

UZBEKISTAN

Page 28: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Uzbekistan, Navoi airport located in the middle of the country, crossing E-40 and E-60.

Brussels, 12th October 2010 First TRACECA Investment Forum 28

Page 29: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SOCIO-ECONOMIC DESCRIPTION

• If in transportations• If in transportationsbetween Europe and Asiatoday participate up to170 wide-body planes ofvarious airlines, carrying

t th 50 fli htout more than 50 flightsdaily, almost 40% ofthem will be carried outthem will be carried outthrough the internationalairport of Navoi.

Brussels, 12th October 2010 First TRACECA Investment Forum 29

Page 30: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

INVESTMENT AMOUNT AND REPAYMENT

50 Million EUR Repayment period 7 years 50 Million EUR, Repayment period 7 years. Reconstruction and Development Foundation of Uzbekistan and PPP. Project TRACECA.Uzbekistan and PPP. Project TRACECA.

Brussels, 12th October 2010 First TRACECA Investment Forum 30

Page 31: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

OTHER SOCIO-ECONOMIC DESCRIPTIONSAt present Navoi Airportis successfully utilized byKorean air.

b k lUzbekistan plans tocreate a HUB based onthe airport of Navoi tothe airport of Navoi toreduce distances betweenthe countries of America,,Europe and SoutheastAsia twice.

Brussels, 12th October 2010 First TRACECA Investment Forum 31

Page 32: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

SUMMARY

• The Logistic Centre Navoi • The Logistic Centre Navoi will be transformed into a transcontinental transport - distributive knot within the near f t d ill t future and will connect Far East, Southeast Asia, Southern Asia and Southern Asia and Europe. Investment amount: 50 Million EUR

Brussels, 12th October 2010 First TRACECA Investment Forum 32

Page 33: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Thank for your attentionWelcome to UzbekistanWelcome to Uzbekistan

Contact: [email protected] [email protected]

Page 34: International Border Terminal “Nizhniy Pyanj” · 2010. 11. 19. · • Stage 1, 2012-14: € 10.6 million • Stage 2 2015Stage 2, 2015-18: € 4 8 million4.8 million • Stage

Brussels, 12th October 2010 First TRACECA Investment Forum 34