Page 1: INTERNAL EROSION Associated with Conduits through Embankments

INTERNAL EROSIONAssociated with Conduits

through Embankments

by

Hal Van AllerMaryland Dam Safety

Page 2: INTERNAL EROSION Associated with Conduits through Embankments

Embankment Dam Schematic

Page 3: INTERNAL EROSION Associated with Conduits through Embankments
Page 4: INTERNAL EROSION Associated with Conduits through Embankments

Medford Quarry Wash Pond CMP failure

Page 5: INTERNAL EROSION Associated with Conduits through Embankments

Velvet Hills sinkhole

Page 6: INTERNAL EROSION Associated with Conduits through Embankments

Sinkhole in crest of new MD dam

Page 7: INTERNAL EROSION Associated with Conduits through Embankments
Page 8: INTERNAL EROSION Associated with Conduits through Embankments

WCC (Joe Kula) Testpit along pond CMP spillway

Page 9: INTERNAL EROSION Associated with Conduits through Embankments

AACounty CMP with void

Page 10: INTERNAL EROSION Associated with Conduits through Embankments

Loveton Dam Failure (1989) Breach

Page 11: INTERNAL EROSION Associated with Conduits through Embankments
Page 12: INTERNAL EROSION Associated with Conduits through Embankments
Page 13: INTERNAL EROSION Associated with Conduits through Embankments

Anti-seep collars do

not prevent seepage failures!

Page 14: INTERNAL EROSION Associated with Conduits through Embankments

Loveton 78” CMP viewed from downstream

78 inch CMP viewed from downstream

Page 15: INTERNAL EROSION Associated with Conduits through Embankments

Failed PVC pipe with anti-seep collar

Page 16: INTERNAL EROSION Associated with Conduits through Embankments

Annap Mall collapsed CMP d.s. of Riser

Page 17: INTERNAL EROSION Associated with Conduits through Embankments

Annap Mall u.s. view

Page 18: INTERNAL EROSION Associated with Conduits through Embankments

What caused these failures?• Design• Construction• Inspection• All of the

above??

Page 19: INTERNAL EROSION Associated with Conduits through Embankments

Spillways are “Confined Space”

Page 20: INTERNAL EROSION Associated with Conduits through Embankments

Ray Martin cave

Page 21: INTERNAL EROSION Associated with Conduits through Embankments

Typical Problems schematic

Page 22: INTERNAL EROSION Associated with Conduits through Embankments
Page 23: INTERNAL EROSION Associated with Conduits through Embankments

Compaction in Haunches

Page 24: INTERNAL EROSION Associated with Conduits through Embankments

Pipe Installation in DamDam Embankment

Filter Diaphragm

Flowable FillPipe in vertical trench

Page 25: INTERNAL EROSION Associated with Conduits through Embankments
Page 26: INTERNAL EROSION Associated with Conduits through Embankments
Page 27: INTERNAL EROSION Associated with Conduits through Embankments

Excavation through dam

• Side slopes must be 2(H):1(V) or flatter

15 ft

Page 28: INTERNAL EROSION Associated with Conduits through Embankments
Page 29: INTERNAL EROSION Associated with Conduits through Embankments
Page 30: INTERNAL EROSION Associated with Conduits through Embankments

FILTER DIAPHRAGM

Page 31: INTERNAL EROSION Associated with Conduits through Embankments

Centennial Park dam chimney drain construction

Page 32: INTERNAL EROSION Associated with Conduits through Embankments

Filter Diaphragmflooding with water for

compaction

Page 33: INTERNAL EROSION Associated with Conduits through Embankments

Merkle Filter Diaphragm with vibrator

Page 34: INTERNAL EROSION Associated with Conduits through Embankments
Page 35: INTERNAL EROSION Associated with Conduits through Embankments

CONSTRUCTIONExperienced contractor desired

• must realize that ponds are different from roads and utilities

• must work with design engineer• compaction along spillway is critical--

don’t construct embankment and then cut trench

• spillway joints must be watertight

Page 36: INTERNAL EROSION Associated with Conduits through Embankments

Alternative Designs• Avoid large diameter CMP• User weir or drop box structure• If pipes unavoidable, use:

– Concrete pressure pipe (min. ASTM C-361)– Complete concrete cradle or flowable fill– Watertight joints with o-ring gaskets– Filter diaphragm

• Avoid combining pond with road embankment

Page 37: INTERNAL EROSION Associated with Conduits through Embankments

Chute Spillways

Page 38: INTERNAL EROSION Associated with Conduits through Embankments

Concrete flumes on embankment have problems too

Page 39: INTERNAL EROSION Associated with Conduits through Embankments
Page 40: INTERNAL EROSION Associated with Conduits through Embankments

CMP spillway on steep slope through dam embankment

Page 41: INTERNAL EROSION Associated with Conduits through Embankments

Tasker’s Chance concrete weir

Page 42: INTERNAL EROSION Associated with Conduits through Embankments

Crooksville, OHIO-COMPLETED WEIR

Page 43: INTERNAL EROSION Associated with Conduits through Embankments
Page 44: INTERNAL EROSION Associated with Conduits through Embankments

Parker Pond new sheet pile spillway

Page 45: INTERNAL EROSION Associated with Conduits through Embankments

Do's and Don’ts for Pond Design and Construction

• Don’t use anti-seep collars to “stop” leakage• Do use filter diaphragms• Don’t allow spillway installation in trench• Do require watertight joints• Do inspect each pipe joint as it is put together

so it can be redone if necessary• Do consider alternative spillway design that

eliminates pipe through dam or foundation

Page 46: INTERNAL EROSION Associated with Conduits through Embankments

InspectionMore than just testing Compaction!

• Inspector should:! work for the design engineer, not the

contractor! understand design assumptions and effects

of unanticipated conditions! not allow deviation from design without

design engineer’s approval! observe and document: pipe mfg marks, joint

type, gasket material and size, and installation procedure

Page 47: INTERNAL EROSION Associated with Conduits through Embankments

Foundation

• Proof rolling• Inspection by Geotechnical Engineer

Page 48: INTERNAL EROSION Associated with Conduits through Embankments

Compaction

• Use STANDARD Proctor (ASTM D-698 or AASHTO T-99)

• Do Not use MODIFIED Proctor (ASTM D-1557 or AASHTO T-180)

• Nuclear gage readings need to be corrected to match lab moisture & density

Page 49: INTERNAL EROSION Associated with Conduits through Embankments

Utility Conduits(water, sewer, gas)

• Pipes through the dam must meet spillway requirements

• No granular backfill for pipes parallel to the dam axis

Page 50: INTERNAL EROSION Associated with Conduits through Embankments

Pre-cast riser structures

Page 51: INTERNAL EROSION Associated with Conduits through Embankments

Anchor Plates

Movement

Page 52: INTERNAL EROSION Associated with Conduits through Embankments

Leaky Joints

Page 53: INTERNAL EROSION Associated with Conduits through Embankments

Concrete Pipe Installation

• Pipe supports• Clean and Lubricate joints• Lubricate Gasket• Tension Gasket• Full concrete cradle, not just bedding• If not o-ring gaskets then owner and

engineer must approve

Page 54: INTERNAL EROSION Associated with Conduits through Embankments
Page 55: INTERNAL EROSION Associated with Conduits through Embankments
Page 56: INTERNAL EROSION Associated with Conduits through Embankments
Page 57: INTERNAL EROSION Associated with Conduits through Embankments

Prepare foundation and supports

Page 58: INTERNAL EROSION Associated with Conduits through Embankments

Mudmat is a good idea

Page 59: INTERNAL EROSION Associated with Conduits through Embankments

Clean joints

Page 60: INTERNAL EROSION Associated with Conduits through Embankments

Lubricate joints

Page 61: INTERNAL EROSION Associated with Conduits through Embankments

Lubricate o-ring

Page 62: INTERNAL EROSION Associated with Conduits through Embankments

Tension o-ring withround-shaft screwdriver

Page 63: INTERNAL EROSION Associated with Conduits through Embankments

Mis-aligned o-ring ...

Page 64: INTERNAL EROSION Associated with Conduits through Embankments

...causes broken bell

Page 65: INTERNAL EROSION Associated with Conduits through Embankments

Gaskets for Concrete PipeTraditional O-ring joint

•Deep joint allows for substantial extensibility

•Symmetric design accommodates internal or external pressure

Page 66: INTERNAL EROSION Associated with Conduits through Embankments

Newer “Profile Gaskets”

Press-Seal Gasket Company states these “advantages” over o-rings:

•Stepped joint is cheaper to manufacture than groove for confined o-ring gasket

•Easier to install, less force needed to “home” joint

•Less bell breakage

Page 67: INTERNAL EROSION Associated with Conduits through Embankments

Gaskets for Concrete PipeNew style “Profile Joint”

•Smaller joint separation allowance

•Designed for internal pressure

Page 68: INTERNAL EROSION Associated with Conduits through Embankments

Gaskets for Concrete PipeNew style “Profile Joint”

Page 69: INTERNAL EROSION Associated with Conduits through Embankments

Formed concrete cradle

Page 70: INTERNAL EROSION Associated with Conduits through Embankments

Cradle poured against

soil

Page 71: INTERNAL EROSION Associated with Conduits through Embankments

Poor installation

Page 72: INTERNAL EROSION Associated with Conduits through Embankments
Page 73: INTERNAL EROSION Associated with Conduits through Embankments
Page 74: INTERNAL EROSION Associated with Conduits through Embankments
Page 75: INTERNAL EROSION Associated with Conduits through Embankments
Page 76: INTERNAL EROSION Associated with Conduits through Embankments

Dam on Soft Foundation

Page 77: INTERNAL EROSION Associated with Conduits through Embankments