SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
1 Make aperture in cell doors, BDG both sides w/ abrasive Pcs
2 Supply plate w/ punching & epoxy paint for camera boxes Pcs
3 Cutting cover of Puxi camera w/ abrasive Pcs
4 Repair BGD doors & welding Pcs
5 Removal & installation of grill windows Pcs
6 Installation of hatch roof Pcs
7 Repair of louver doors & rewelding Pcs
8 Supply & manufacture steel base corners on elect rooms Lm
9 Galvanized steel circular handrails STP for tank Lm
10 Supply & install stainless steel shelve Pcs
ADDENDUM 2
Reinstallation & leveling of hollow metal doors incl grouting, filling, frames & leafs as per approved drwgs, matls & specs. (Ajustment to 300)
Page 2 of 149
SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SN Description Unit
1 Install ceramic hangers under book shelves for bathroom/cells Pcs
2 Install mirror above lavatories Pcs
ADDENDUM 3
1 Supply only of galvanized steel guard rail 2606 A201 Lm
2 Lm
ADDENDUM 4
1 Supply & install hook for ladder Pcs
2 Supply & install of fixed galvanized steel ladder Lm
SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SN Description Unit
ADDENDUM 5
1 New installation (single door) with grout Pcs
2 New installation (double door) with grout Pcs
3 Remove & re-installation (single door) Pcs
4 Remove & re-installation (double door) Pcs
5 Pcs
6 Install 25mm vision panel w/o cut (30x30) Pcs
8 Install vision panel without cut (W 30* L 90) Pcs
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Repair & make & closing holes for HMD (Repair hardwares Only)
Page 4 of 149
SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SN Description Unit
7 Pcs
8 Pcs
9 Making open 60mm dia in elect panel Pcs
10 Supply & install GI plate for bar grill doors Pcs
ADDENDUM 8
1 Pcs
2 Pcs
3 Supply & install galvanize access doors, 60 x 60 cm Pcs
4 Supply & install galvanize access doors, 60 x 120 cm Pcs
5 Pcs
Quantity Surveyor
Modifying HMD SD panel (Supply and Install)
Modifying HMD DD panel (Supply and Install)
Fabrication & installation of Food Bus for cell doors (Prometal Co doors) (B.1201).
Fabrication & installation & fixing of Food Bus for cell doors (Mofac Co doors) (B1202,B1002,B1001,B1302,B1301))
Supply & install of front cover of rooms of electricity 1.50 x 1.50 mm checkered plate 6mm with angles.
Page 5 of 149
Progress % Installed Prev Current To Date Prev Current To Date
300.00 100% - 100% 300.00 - 300.00
2,229.00 61% 39% 100% 1,227.00 1,002.00 2,229.00
295.95 71% 29% 100% 199.00 96.95 295.95
4,477.60 100% - 100% 4,387.60 90.00 4,477.60
204.00 100% - 100% 204.00 - 204.00
214.85 100% - 100% 175.85 39.00 214.85
105.20 100% - 100% 85.20 20.00 105.20
1,461.00 100% - 100% 1,461.00 - 1,461.00
931.00 80% 20% 100% 364.00 567.00 931.00
575.00 100% - 100% 320.00 255.00 575.00
8.00 100% - 100% 8.00 - 8.00
12.50 100% - 100% 12.50 - 12.50
16.00 100% - 100% 14.00 2.00 16.00
15.00 100% - 100% 15.00 - 15.00
86.85 100% - 100% 83.85 3.00 86.85
94.20 100% - 100% 94.20 - 94.20
49.00 100% - 100% 48.00 1.00 49.00
As-Built Qty
Page 6 of 149
Progress % Installed Prev Current To Date Prev Current To Date
As-Built Qty
5,633.00 90% 10% 100% 4,436.10 1,196.90 5,633.00
2,465.70 90% 10% 100% 2,010.33 455.37 2,465.70
260.00 100% - 100% 260.00 - 260.00
100.00 100% - 100% 100.00 - 100.00
181.10 100% - 100% 175.10 6.00 181.10
1,007.50 100% - 100% 389.20 618.30 1,007.50
147.50 100% - 100% 87.50 60.00 147.50
Page 7 of 149
Progress % Installed Prev Current To Date Prev Current To Date
As-Built Qty
231.00 100% - 100% 231.00 - 231.00
27.00 100% - 100% 27.00 - 27.00
1,373.00 100% - 100% 1,233.00 140.00 1,373.00
194.95 100% - 100% 149.95 45.00 194.95
2,776.80 90% 10% 100% 1,896.12 880.68 2,776.80
731.95 100% - 100% 731.95 - 731.95
48.00 100% - 100% 48.00 - 48.00
176.00 100% - 100% 176.00 - 176.00
4.00 100% - 100% 4.00 - 4.00
1.00 100% - 100% 1.00 - 1.00
79.00 100% - 100% 79.00 - 79.00
168.00 100% - 100% 168.00 - 168.00
451.50 100% - 100% 447.50 4.00 451.50
244.30 100% - 100% 183.50 60.80 244.30
74.00 100% - 100% 71.00 3.00 74.00
857.95 100% - 100% 857.95 - 857.95
88.95 100% - 100% 82.95 6.00 88.95
Page 8 of 149
Progress % Installed Prev Current To Date Prev Current To Date
As-Built Qty
298.70 100% - 100% 208.70 90.00 298.70
111.00 100% - 100% 102.00 9.00 111.00
150.00 100% - 100% 150.00 - 150.00
1,497.00 100% - 100% 1,497.00 - 1,497.00
192.00 100% - 100% 192.00 - 192.00
130.00 100% - 100% 130.00 - 130.00
52.00 100% - 100% 52.00 - 52.00
52.00 100% - 100% 52.00 - 52.00
98.00 100% - 100% 67.00 31.00 98.00
Eng'r AHMAD SHEIKH Area Manager
Page 9 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
Reinstallation & leveling of hollow metal doors incl grouting, frames & leafs
Page 10 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
1201-5~121201-131201-141201-151201-16
1201-17~242006280030003100
.A0-6 Handrail
100201202
1201-71201-141201-151201-16
1204-1~42302300032073209
.A0-7 Handrail, wall mount
100201202
1204-1~4.
Page 17 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
Addendum 1 .A1-1 Aperture in cell doors
10011002
1201-1~241201-14,151204-1~4
13011302
.A1-2
1204-1~4complete bldgs nos All Bldgs
.A1-3 Cutting cover of Puxi camera w/ abrasive
1204-1~4.
A1-4 Repair BGD doors & welding1301
.A1-5 Removal & installation of grill windows
(various).
A1-6 Roof Hatch100201202120216023208
.
Supply plate w/ punching & epoxy paint for camera boxes
Page 18 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
A1-7 Repair of louver doors & rewelding(various)
.A1-8 Steel Base
20114001500160317012301
3202A-1~143202B-1~8
3207.
A1-9 Handrail, STP300032073209
.A1-10 Stainless steel shelves
1201-1~41201-5~121201-13,16
1201-141201-15
1201-17~24PC1 pg6,7 / PC11 pg133 1201-22
.Addendum 2 .
A2-1(various)
Install ceramic hangers under book shelves for bathroom/cells
Page 19 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
1601-31601-41601-51601-617011702
.A2-2 Install mirror above lavatories
(various)100201202400500602700800
901-1901-2901-4901-5902
903.1903.2100110021100
1201-11201-21201-31201-4
Page 21 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
location not shown in PC 10 pg53 / PC11 pg59 170219002001200220032004
2007-1,2,3,4
Page 24 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
170117021900200120022003200420052006
2007-1~42008-1,2
210022012202230123022400
2501-1~9270028002900300031003201320332073208
seg 7,12.
A4-3 Supply & install of movement GI steel ladder100
Page 27 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
1002017001001
1201-91201-101201-111201-121201-141201-22
15002501-1,4,5,9
2501-1~92700280032073209
.A5-2 New installation DD w/ grout
2012003230128003100
3202B-4.
A5-3 Remove & re-installation SD100201202400
Page 29 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
3202A-13202A-23202A-33202A-63202B-13202B-3
32073208
.A5-5 Adjustment SD & DD
100201202400601602700800
901-1901-3901-4901-5902
903.1903.2100110021100
1201-11201-21201-3
Page 33 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
270028002900
.A5-8 Install vision panel without cut (W 30* L 90)
1201-14~151201-21~24
.A5-9 Install vision panel w/o cut 40x90
1201-1~41201-5~12
1201-13,16~24.
Addendum 6 .A6-1 New installation SD w/ grout
400.
A6-2 New installation DD w/ grout800
.A6-3 Remove & re-installation SD
901-110011002
1201-31201-413011500
1601-216021701
Page 37 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
202601602800
1201-1~41201-51201-61201-7
1201-9-121201-13,16~24
1201-14-151500210022022301270028002900
.A7-6 Repair & make & closing holes for HMD hardwares
2011002
1201-101201-111201-13
14001500
1601-417013203
.
Page 41 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
A7-7 Modifying HMD SD panel (Supply and Install)100201202500601700800
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
2004
Page 44 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
A7-10 Supply & install GI plate for bar grill doors10011002
1201-1~12
Page 45 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
1201-131201-14,151201-16~241204-1~4
13011302
.Addendum 8 .
A8-11201-1~4
1201-51201-61201-7
1201-8~24.
A8-220110011002120213011302
.A8-3
19002001200220032004
.A8-4
Fabrication & installation of Food Bus for cell doors (B1201)
Fabrication & installation of Food Bus for cell doors (B1202,B1002,B1001,B1302,B1301))
Supply & install galvanize access doors, 60 x 60 cm
Supply & install galvanize access doors, 60 x 120 cm
Page 46 of 149
SAUDI BINLADIN GROUPProject Correctional FacilitiesSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11Period As of 29 March 2015
CN Description Building
120215002001
.A8-5
1002015001202
1204-1~4130114001500230227003000
3202A-1~143202A-13202A-33202A-6
3202B-1~83203320732083209
Lift Sta.
Supply & install of front cover of rooms of electricity 1.50 x 1.50 mm chequered plate 6mm with angles.
Page 123 of 149SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11 - BACKCHARGESPeriod As of 29 March 2015
Page No. Ref No. Details Bldg unit Qty ABCD Fin Div 13 Vision 21 BTAT
1 A5.5 1201-18 pcs 20 100%
1 A4.2 1201-18 Lm 10 100%
4 A7.2 Install fire rated louver for HMD 1201-19 pcs 4
7 A7.2 Install fire rated louver for HMD 1201-20 pcs 4
7 A5.5 1201-20 pcs 20 100%
7 A4.2 1201-20 Lm 8
10 A2.1 1201-21 pcs 40 25% 25%
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)Supply & install of fixed galvanized steel ladder
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)Supply & install of fixed galvanized steel ladder
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)Supply & install of fixed galvanized steel ladder
Install ceramic hangers under book shelves for bathroom/cells
Page 124 of 149SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11 - BACKCHARGESPeriod As of 29 March 2015
Page No. Ref No. Details Bldg unit Qty ABCD Fin Div 13 Vision 21 BTAT
10 A7.7 1201-21 pcs 4 100%
10 A7.2 Install fire rated louver for HMD 1201-21 pcs 4
10 A5.5 1201-21 pcs 20 100%
12 A2.1 1201-22 pcs 30
12 A7.7 1201-22 pcs 5
12 A7.2 Install fire rated louver for HMD 1201-22 pcs 5
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)Install ceramic hangers under book shelves for bathroom/cells
Modifying HMD SD panel (Supply and Install)
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Install ceramic hangers under book shelves for bathroom/cells
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Page 125 of 149SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11 - BACKCHARGESPeriod As of 29 March 2015
Page No. Ref No. Details Bldg unit Qty ABCD Fin Div 13 Vision 21 BTAT
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Modifying HMD SD panel (Supply and Install)
Install ceramic hangers under book shelves for bathroom/cells
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Modifying HMD SD panel (Supply and Install)
Page 126 of 149SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11 - BACKCHARGESPeriod As of 29 March 2015
Page No. Ref No. Details Bldg unit Qty ABCD Fin Div 13 Vision 21 BTAT
19 A5.5 901-5 pcs 6
19 A7.7 901-5 pcs 1
19 A7.2 Install fire rated louver for HMD 901-5 pcs 1
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Modifying HMD SD panel (Supply and Install)
Modifying HMD SD panel (Supply and Install)
Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)Adjustment (single door)(Adjustment from Main contract Item no.1 to A5-5 : 26 Nos)
Supply & install of front cover of rooms of electricity 1.50 x 1.50 mm checkered plate 6mm with angles.Supply & install galvanized steel handrails with finishing paint
Page 127 of 149SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIESSubCon Lateen International Co, CN 0235 - Metal WorksSubject Payment Certificate No. 11 - BACKCHARGESPeriod As of 29 March 2015
Page No. Ref No. Details Bldg unit Qty ABCD Fin Div 13 Vision 21 BTAT
58 A7.7 3000 pcs 2 50%
58 A7.2 Install fire rated louver for HMD 3000 pcs 2 50%
71 A1.2 various pcs 476 100%
71 A1.3 Cutting cover of Puxi camera w/ abrasive various pcs 255 100%
TOTAL
Modifying HMD SD panel (Supply and Install)
Supply plate w/ punching & epoxy paint for camera boxes
Page 128 of 149
158 RAZ Rate ABCD Fin Div 13 Vision 21 BTAT 124 Mofac
100 - - 2,000 - -
550 - - 5,500 - -
100% 100 - - - - -
50% 100 - - 750 750 -
550 - - 5,500 - -
375 - - 375 - -
100% 100 - - - - -
100 - - - 2,000 -
100% 550 - - - - -
25% 25% 20 - - 200 200 -
124 Mofac
337 SacoD
161 Promtl
302 Shuman
214 Marim J
Page 129 of 149
158 RAZ Rate ABCD Fin Div 13 Vision 21 BTAT 124 Mofac124
Mofac337
SacoD161
Promtl302
Shuman214
Marim J
850 - - - 3,400 -
100% 100 - - - - -
100 - - - 2,000 -
100% 20 - - - - -
100% 850 - - - - -
100% 100 - - - - -
25% 100 - 750 750 750 -
375 - - - 1,500 -
50% 20 - - 150 150 -
100% 100 - - - - -
Page 130 of 149
158 RAZ Rate ABCD Fin Div 13 Vision 21 BTAT 124 Mofac124
Mofac337
SacoD161
Promtl302
Shuman214
Marim J
100% 850 - - - - -
375 - - - 1,125 -
100% 100 - - - - -
100% 850 - - - - -
100% 100 - - - - -
50% 20 - - 150 150 -
100 - - - 2,000 -
100% 850 - - - - -
100% 100 - - - - -
100% 375 - - - - -
Page 131 of 149
158 RAZ Rate ABCD Fin Div 13 Vision 21 BTAT 124 Mofac124
Mofac337
SacoD161
Promtl302
Shuman214
Marim J
100% 100 - - - - -
100% 850 - - - - -
100% 100 - - - - -
100% 375 - - - - 3,375
100% 850 - - - - 850
25% 100 - 750 750 750 -
50% 100 - - 1,000 1,000 -
100% 375 - - - - 5,625
1,350 2,700 - - - -
100% 550 - - - - -
Page 132 of 149
158 RAZ Rate ABCD Fin Div 13 Vision 21 BTAT 124 Mofac124