INTERGO bv I www.intergo.nl PO Box 19218 E [email protected] 3501 DE UTRECHT T +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level crossing safety
20

INTERGO bvI PO Box 19218E [email protected] 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Jan 16, 2016

Download

Documents

Vivian Edwards
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

INTERGO bv I www.intergo.nlPO Box 19218 E [email protected] DE UTRECHT T +31 30 677 87 00

Countdown on a platform

Higher punctuality and increased level crossing

safety

Page 2: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 2

Contents

1. Inducement

2. The idea

3. Development process

4. Pilot

5. Results: the pay off of human factors integration

6. Follow up

Page 3: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 3

1 Unsafe behaviour at a level crossing

In Holland about 40% of al incidents on level

crossings with lethal consequences are related to

unsafe behaviour at a closed level crossing.• about 8 lethal incidents a year

Waiting time at a closed level crossing is an

important factor to predict unsafe behaviour.• Time between closure of level crossing and

passage of the train

Page 4: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 4

1 Departure of a train at a station near a level crossing: current situation

Process:• Route setting triggers closure of the level crossing• Departure of the train is only allowed after closure

of the level crossing

Consequences:• Train waits for closure of the level crossing• Road users at closed level crossing wait for the

departure of the train

Page 5: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 5

2 The idea

Parallel performance, instead of serial performance,

of the process of route setting, closure of the level

crossing and departure of the train:• Shortening total processing time• Decrease in waiting time of road users at closed

level crossing• Earlier departure of the train for higher punctuality

in train service• Use of a kind of countdown device

Page 6: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 6

2 Animation of the concept

Animation

Page 7: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 7

3 Development

Common safety method on Risk Evaluation and Assessment

Page 8: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 8

3 First assessment

Several ‘interfaces’ with human behaviour:• Train staff for safe departure of the train• Train passengers / travellers for safe boarding• Road users related to level crossing safety• Track workers using a level crossing as a warning

system for arrival of a train at the working place

Page 9: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 9

3 Requirements for the countdown device

• Activation of count down dependent of:o safe closure of the level crossingo safe (automatic) route setting

• Count down value related to minimum process

time for departure of a train• Departure process of a train without a pause• Actual departure of the train after published

departure time

Page 10: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 10

4 Departure of train with aid of countdown

15: start of departure procedure

• First safety check of train staff

8: auditory signal to passengers

• Close all but one doors of train

• Safety check alongside train

0: activation departure light

• Close last door of the train

Page 11: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 11

4 Piloting period

Piloting period: November and December 2014• With countdown• Without countdown

Reference period: June or October 2014• Without countdown

Evaluation of 6.693 train departures in total

Page 12: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 12

4 Methods for evaluation

Quantitive data (all trains):• Process time for train departure• Punctuality in departure of the train• Closure times of level crossing

Qualitive data based on video images (selection):• Behaviour of train staff• Behaviour of passengers on platform• Behaviour of road users at level crossing

Page 13: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 13

4 Behaviour of train staff and passengers

Behaviour at safety critical moments during train

departure procedure• Train staff:

o compliance with regulation based on risk

assessmento way of performing safety checks

• Passengers:o Possibly hazardous behaviour during closure

of doors and during departure of train

Page 14: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 14

5 Behaviour of train staff and passengers

Movie

Page 15: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 15

5 Behaviour of train staff and passengers

• Train staff shows safe behaviour in compliance

with dedicated regulation about use of the

countdown.• In situations with very little passengers boarding

the train, train departure procedure cannot always

be performed without a short pause.• With use of countdown passengers are more in a

hurry in boarding the train, but no dangerous

situations (train is not moving).

Page 16: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 16

5 Process time for train departure

Station of Hilversum N Difference in process time for train departure

Piloting period with countdown vs reference period with countdown

828 -16.88 sec (p<0.05)

Piloting period with countdown vs piloting period without countdown

5.715 -14.88 sec (p<0.05)

Piloting period without countdown vs reference period without countdown

150 - 1.92 sec (p<0.05)

TOTAL 6.693

Page 17: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 17

5 Punctual departure of the train

Station of Hilversum

Quick departures Slow departures

no countdown

countdown no countdown

countdown

before departure time

- - - -

0 – 30 sec after departure time

37% 70% - 45%

> 30 sec after departure time

63% 30% 100% 45%

No data - - - 10%

Page 18: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 18

5 Behaviour at level crossing

About 900 level crossingclosures:Not enough data forstatistic reliable results

Predictive factor:Closure time of the level crossing with use of a countdown is 16.3 seconds less then without countdown (p<0.01).

Page 19: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 19

5 Waiting time at closed level crossing

In average: 16.3 sec less waiting time (p<0.01)

Page 20: INTERGO bvI  PO Box 19218E info@intergo.nl 3501 DE UTRECHTT +31 30 677 87 00 Countdown on a platform Higher punctuality and increased level.

Countdown on a platform • ICHRF 2015 • Melcher Zeilstra 20

6 Pay off: implementation in Holland

• Design specs are met:

> 15 sec less• No change in safety in

train departure

process• Increase in level

crossing safety• Increase in punctual

departure of the train