Chile (onshore wind & solar)
Pipeline:1,200MW
South Africa (onshore wind & solar)
Pipeline: 4,854MW
USA (onshore)Pipeline: 1,265MW
Germany (offshore wind)Horizont: 1,200MW
Scotland (offshore wind)Neart na Gaoithe: 450MW
UK (offshore wind)Hornsea: 6,000MW
Canada (onshore wind & solar)
Pipeline:995MW
Ireland (onshore wind)Pipeline: 1200 MW
In Construction/In Operation In Development
Ireland (onshore wind)Knockaneden – 9 MWCarrickeeney – 8 MW
Old Man wind farm - 46MW
Jeffreys Bay wind farm – 138MWDe Aar solar park – 50MW
Droogfontein solar park – 50MW
Negrete wind farm – 33MW
Coal26%
Nu-clear25%
Gas24%
Hy-dro15%
Wind3%
Oil3%
Biomass2%
Waste1%
Solar PVGeothermal
•Energy Security
•Sustainability
•Economic Development
•GHG Reduction
Source: IEA
Drivers for Change – Europe’s Electricity Fuel Mix (2008)
Debate?
S. & Cent. America1%
Azerbaijan1% Kazakhstan
2%
Russian Federation
33%
Turk-menistan
2%Uzbek-istan2%
Africa15%
Middle East8%
Western Europe
35%
•Remove Coal•Nuclear Debate•Increase Renewables•Secure Supplies•Invest in Transmission
Constraints•Regulation•Public Opposition
•Onshore Wind•Overhead Lines
Europe Gas Sources 2010Source: BP
• Ireland 2020 targets• 4GW
• Gate 3 = 3.9GW• Only require 55%• Future of PSO Contribution for wind beyond gate 3?
• Currently 13.5GW in queue BEYOND Gate 3
•Not possible to absorb domestically•Curtailment / Constraint
• Interconnector Exports?
Beyond Gate 3 (2025) – The Queue
Ireland & UK 2020 Targets Synergy
Ireland● Electricity from Renewables by 2020 – 40%
● Equates to 4 GW installed by 2020● 2 GW already installed● 0.25 GW p.a. required to reach target● 16 GW waiting in Grid Queue!
● Only requires 12.5% of current grid queue to reach2020 target
● Irish Wind potential = 345 TWh p.a.● Equates to 19 x market size● Significant opportunity to Export
UK● Electricity from Renewables by 2020 – 30%
● Equates to 35 GW installed by 2020● Currently 8.5 GW installed● 3.3 GW p.a. required to reach target● 22 GW in Grid Queue
● UK installed 0.7 GW in 2011
● LCPD – coal decommissioning
Political Stimulus
● Concept of export first raised at British Irish council 2011
● Declarations of intent made by both ministers June 2012 to enact legislation
● UK Energy Bill Dec 2012● Provides for projects outside UK REZ to
qualify for CfD’s
● Bi-lateral MoU now signed● IGA Q1 2014
Mainstream Energy Bridge – 5,000MW Direct Export
Projects of Common Interest and SuperNode
Energy Bridge Context
Technology and Innovation
12
Cables Today
● AC Application● SCFF - 500kV / 1,200 MW● XLPE - 500kV / 1,000 MW
● DC Application● Mass-Impregnated (MI)
● 500kV / 1,600 MW Installed● 600kV / 2,200 MW Awarded
● Extruded (XLPE)● 200kV / 400 MW Installed● 320kV / 900 MW Awarded
● SCFF● AC/DC● Short Lengths
13
Grid Design
Friends of the Supergrid Technical Working Group
DC Breakers
•Resonance
•Power Electronics•Full Bridge Conversion
•Ballistic Breaker
•Superconductor
•Hybrid
•Plasma
Ballistic Breaker™
Roger Faulkner :Ballistic Breaker Corporation
Long Distance Transmission
•HVDC•Overhead Lines
•Permitting/Consent
•Cables (>100 Years Old)•MI = 800kV •XLPE = 500kV•No. Joints•Drilling / Tunnelling
•GIL•Elpipes•Research
Roger Faulkner: LONG DISTANCE UNDERGROUND HVDC TRANSMISSION VIA ELPIPES (ICHVE 2010)
Baker Hughes
Technology Development (Friends of the Supergrid – Technical Working Group)
● Increased power ratings for VSC (1,000 MW at 320 kV DC)
● Demonstrators for DC side fault clearing (e.g. DC Circuit Breakers)
● DC 320 kV cables with extruded insulation in operation at different onshore and offshore projects (500 MW per cable)
● DC cables with extruded insulation >320 kV developed
● MI-PPL 600kV (1.1GW per cable) developed and higher voltages in development
● MI >500 kV cable developed
● AC GIL in operation
● Standardization work for HVDC grids in CIGRÈ, CENELEC started
Today – 2015 (Supergrid Preparation Phase)
2015 – 2020 (Supergrid Phase 1)
After 2020 (Supergrid Phase 2)
● DC cables with extruded insulation >320 kV in operation
● MI-PPL 600kV cable in operation
● MI >500kV in operation
● Development of new extruded insulation compounds for HVDC cables
● System for fast selective fault detection in HVDC networks
● DC side selective fault clearing and system reconfiguration
● Hierarchical control architecture for integrated AC and DC Grid in Europe
● Demonstrators for DC/DC Converter
● Further Development of MI and MI-PPL Cables
● HVDC cables with new extruded insulation compounds in operation
● Superconducting cables
● DC GIL
● DC/DC converter
Control and InformationCo
mm
unica
tions
/SCA
DA SuperNode Control
AC Control & Protection
Smart Meter
Source: Sustainable Energy Horizon Panel report
Mainstream Initiatives
Friends of the Supergrid
SuperNode• Low Voltage Model• Medium Power Pilot (H2020)• TEN-E-Funding• SuperNode Concept Design and Scale
Model
PowerTube
International Bodies Working Groups
Inventing the Future
Insanity: doing the same thing over and over again and expecting different results.— Albert Einstein—
There are those who look at things the way they are, and ask why... I dream of things that never were, and ask why not?— Robert Kennedy —
Source: Microsoft
We are on a once-off transition to sustainability