M/F Age Qualification Experience in Watershed (yrs)
Description on Of professional Training
1 Ankur Kumar Shrivastava
M 25 Agg. Engg. 6 month
2 Ajay Kaushik
M 29 B.SC(Agg.),B.ED,M.A 4 year
3 Vijay Kumar
M 28 Diploma in veterinary science
4 year
4 Manju Rani Yadav
F 26 B.A in Sociology 1 year
13
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased
production which can be achieved through expansion in cultivated area and productivity
enhancement. 1304 ha land is uncultivated which can be brought under cultivation .
The productivity gap of major crops in the area as compared with district and with
areas in the same agro climatic zones indicate potential to increase the productivity. The
demonstration of improved package of practices, improved varieties, increased
irrigation facilities and soil conservation measures under the project can bridge this
gap.
Due to small land holdings in the area focus of the project would be on diversification in
agriculture (horticulture, vegetables, green houses, Agro forestry, fodder crops)and
diversification in Livelihoods(Agriculture, Animal husbandry, self employment)
20654865 kg fodder scarcity can be met out through Pasture development .Improved
animal Husbandry practices can increase the productivity of livestock.
2105 no of persons migrate due to unemployment & for more income. This migration
can be checked through creation of employment opportunities in the project area
through increase in production and diversification in agriculture and Livelihoods as
mentioned above. There is accute shortage of drinking water as the watertable has gone
too deep due to depleting ground water so rest of the farmers depend on rain for their
Kharif crops water requirement. In very small area Rabi crop is sown . cattles having
diseases.
14
CHAPTER – II
Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population Male Female Total SC ST
15622 14418 30040 4958 97
Household Details BPL
Household Land Less
Small Farmer
Marginal Farmer
Total Household
SC Household
ST Household
7.5% 115 41% 32% 4845 183 17
Table 2.2 Development indicators
S.No Development Indicators State Project Area
1 Per capita income Rs 16260 20500
2 Poverty ratio 0.22 0.12
3 Literacy (%) 0.604 0.85
4 Sex ratio 921 918
5 Infant mortality rate
6 Maternal mortality ratio
The table indicates poor socio economic conditions
15
Table 2.3
Land Use
Land Use Total Area in Ha.
Private Panchayat Government Community Total Agriculture Land
Temporary Fellow 160
Permanent Fellow 56
Cultivated Rainfed 3717
Cultivated Irrigated 3616
Net Sown Area 7333
Net Area Sown More Then Once
3616
Forest Land 265
Waste Land
Pastures 291
Others 46
Total 25775 337 321
16
Table 2.4.
(a) Agriculture and Horticulture status and fuel availability
S.
No
Season Crop
Sown
Variety Rain Fed Irrigated Total
Area
(Ha)
Productio
n
(Ton)
Productivity
(Kg/Ha)
Area
(Ha)
Productio
n
(Ton)
Productivity
(Kg/Ha)
Area
(Ha)
Productio
n
(Ton)
1 Kharif Bajra Pioner-
86m86
1887 3019 1600 554 776 1400 2441 3795
Gawar Amul -
365
728 1092 1500 228 274 1200 956 1366
Cotton Sriram
-6588-
6317
154 65 219
2 Rabi Mustar
d
Pusha-
gold
1795
3771 2100 546 929 1700 2341 4700
Wheat Pbw-
343
971 4565 4700 244 856 3500 1215 5421
Gram Raj
seed
113 284 2500 48 92 1900 161 376
3 Zaid
4 Total 5648 12731 1685 5397 7333 15658
17
Table 2.4.b
Abstract of cropped Area (ha)
Area under single crop 101 Area under double crop 3616 Area under multiple crop
S.No Name of crop
Present Variety
Recc. Variety
Reason of Recc. Variety
1 Maize Ganga 2 Mahi Dhaval
Maturity period 75-80 Days(early maturity),Production 35-40 q/Ha, Less water required but tolerant to excess water, market value is good due to high starch & appearance tolerant to logging. This variety is most suitable for this W/S Area.
2 Urd PU 19 RBU- 338
Maturity period 90 Days(early maturity),Production 10-12 q/Ha, Less water required, market value is good due to high starch & appearance, tolerant to logging, resistance to bacterial diseases . This variety is most suitable for this W/S Area.
3 Til RT 46 TC-225 White seed variety, Maturity period 95 Days(early maturity),Production 6-7 q/Ha, Less water required, market value is good & appearance, tolerant to logging, resistance to bacterial diseases This variety is most suitable for this W/S Area.
4 Moong K851 SML 668
Maturity period 85 days plants are erect determinate and medium statured 85 cm possesses bolder green grain s with good yellow mosaic virus cercospora leaf spot and bacterial leaf spot diseases its yield potential 15 -18 quintal/ha..This variety is most suitable for this W/S Area.
5 Gawar RCG 986 RCG 986
Maturity period 100-105 days, Seeds medium bolt with buff color, suitable for growing in dry land agriculture, used for fodder and grain purpose, yield potential is 14-15 q/Ha. This variety is most suitable for this W/S Area & good market value.
6 Wheat Lok 1 RAJ 3765
Maturity period 110-120 days and plant height is 89-95 cm, Heat tolerant and susceptible to dust, yield potential is 40-50q/Ha. This variety is most
18
suitable for this W/S Area & good market value.
7 Barely RD 2552
RD 2508
Maturity period 118-120 days , grain is yellow & medium bold , Suitable for rain fed area, variety is 6 row barley, medium tall(92-100 cm),resistance to yellow rust, light, yield potential is 40-45 q/Ha. This variety is most suitable for this W/S Area.
8 Gram DAHOD YELLOW
GNG 469
Maturity period 90-95 days, Suitable for rain fed area, resistance to wild disease, yield potential is 20-24 q/Ha.
9 Mustard Pusha Bold
PUSA JAI KISHAN
Maturity period 100-115 days and plant height is Medium tall. Low logging problem, Resistant to white rust, yield potential is 25-30 q/Ha. This variety is most suitable for this W/S Area
The table shows that 3616 ha is is double cropped area. Also the crop rotation shows
that fallow lands are there. This indicates that there is scope for change in crop rotation
in fields where there are fallow lands through Soil and Water conservation measures,
crop demonstration and diversification in agriculture. Soil and Water conservation
measures besides putting fallow lands under cultivation can change the area under
floriculture, etc which are in negligible existence at present, can be implemented by individual
farmers / private companies. Drip irrigation Drip irrigation will be promoted in all horticulture
plantations, vegetables, green houses and in nurseries for rational use of irrigation higher yields
and quality produce.
Table 2.7
S.No.
Description
of animals
(Breed)
Population
in No.
Yield
Milk Mutton Wool
1 Cows 951 5088 ltr
Indigenous 618
Hybrid 338
2 Buffaloes
9860 121075 ltr
3 Goat 3199 6010.73 ltr 15-20 kg/no.
4 Sheep 549
10-12 kg/no. 2-3 kg/yr
5 Camel 144
6 Poultry
7 Piggery
Total 15659 132173.73 ltr 25-27 kg/no. 2-3 kg/yr
24
In spite of the large number of livestock, production is less hence increase in productivity across
all species, is a major challenge. To reduce production of unproductive cattle and improve the
productivity by improving the breeds by breeding management following activities will be taken
up · Castration · Distribution of superior Breeding bulls for use in Cattle and Buffalo · Artificial
insemination · Breeding distribution crossbred rams Besides breed improvement other animal
husbandry practices like better health, hygiene and feeding practices can increase productivity of
livestock. Hence Activities like Animal health camps ,Urea-Molasses treatment demonstration
,demonstration of improved methods of conservation and utilization of Forage crops are
proposed.
Table 2.8 Agriculture implements
S.No Implements Nos.
1 Tractors 78
2 Sprayers-manual/ power 15
3 Cultivators/Harrows 48
4 Seed drill 4
5 Any Other 8
Farm mechanization and seed banks: As discussed earlier 97% land holdings belong to small and
marginal farmers who own only 13% of total cultivated area so owning of big farm implements by
individual farmers is not economical so SHG would be promoted to buy farm implements and rent
to farmer
25
Table 2.9
NREGA Status - No. of Card Holder, activities taken so far, employment status.
S.No Name of Gram Panchayat
Total No .of job cards
Employment Status
Activity taken up so far
1 Annantpura 473 418 Johar khudai and gravel road construction
2 Khohar 663 612 Johar khudai and gravel road construction
3 Khorana 437 415 Johar khudai and gravel road construction
4 Khori 577 478 Johar khudai and gravel road construction
5 Jakhrana 302 280 Johar khudai and gravel road construction
6 Jatgaowra 304 270 Johar khudai and gravel road construction
7 Basai 525 370 Johar khudai and gravel road construction
8 Bhagwadi 469 328 Johar khudai and gravel road construction
The existing livelihoods Village are given below
Table 2.10(a) Major activities (On Farm) Name of Activity No. of House hold Average Annual Income Cultivators 2866 45,000 Dairying 3010 18,000 Poultry 276 65,000 Pigging Landless Agri. Laborers
510 48,000
26
Table 2.10 (b) Major activities (Off Farm)
Name of Activity No. of House hold
Average Annual Income
Carpenter 44 30,000 Blacksmith 9 32,000 Leather Craft 32 18,000 Mason 747 48,000 The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
Action Plan Gram panchayat – Bhagwari khurd Village-Bhagwari khurd (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
Masonry Check dam
W.H.S 1 No. 1 No. 3.00
Subsurface barrier TOTAL
Live stock
A .I 76 No. 76 No. 0.114
Animal husbandry Health management 4 No. 4 No. 0.96
R.F(S.H.G) 6 No. 6 No. 1.50
TOTAL
Production system & microenterprises
Kharif development 58 No. 58 No. 0.365
Rabi development 46 No. 46 No. 0.520
Horticulture plantation 3 Ha. 3 Ha. 0.855
Vermi compost 3 No. 3 No. 0.36
Compost pit 35 No. 35 No. 0.35
Manger unit 17 No. 17 No. 0.289
TOTAL
Consolidation
Grand TOTAL
20.635
60
Action Plan
Gram panchayat –Bhagwari kurd Village-Bhagwari kalla (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
45 Ha. 45 Ha. 3.375 C.V.H
Waste weir 4 No. 4 No. 0.512
Farm pond
Horticulture 2 Ha. 2 Ha. 0.304
TOTAL
Non Arable Land
Pasture development
6 No. 6 No. 3.948
Road side plantation
TOTAL
61
Action Plan Gram panchayat –Bhagwari kurd Village-Bhagwari kalla (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
Masonry Check dam
W.H.S 4 No. 4 No. 1.941
Subsurface barrier TOTAL
Live stock
A .I 51 No. 51 No. 0.076
Animal husbandry Health management 3 No. 3 No. 0.72
R.F(S.H.G) 3 No. 3 No. 0.75
TOTAL
Production system & microenterprises
Kharif development 41 No. 41 No. 0.258
Rabi development 33 No. 33 No. 0.373
Horticulture plantation 3 Ha. 3 Ha. 0.855
Vermi compost 2 No. 2 No. 0.24
Compost pit 22 No. 22 No. 0.22
Manger unit 11 No. 11 No. 0.187
TOTAL
Consolidation
Grand TOTAL
13.759
62
Action Plan
Gram panchayat – Bhagwari kurd Village- Baalpura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
30 Ha. 30 Ha. 2.25 C.V.H
Waste weir 2 No. 2 No. 0.256
Farm pond
Horticulture 1 Ha. 1 Ha. 0.152
TOTAL
Non Arable Land
Pasture development
4 No. 4 No. 2.632
Road side plantation
TOTAL
63
Action Plan Gram panchayat –Bhagwari kurd Village-Baalpura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
3 No. 3 No. 0.363
Masonry Check dam
W.H.S 2 No. 2 No. 1.00
Subsurface barrier TOTAL
Live stock
A .I 33 No. 33 No. 0.049
Animal husbandry Health management 2 No. 2 No. 0.48
R.F(S.H.G) 2 No. 2 No. 0.50
TOTAL
Production system & microenterprises
Kharif development 25 No. 25 No. 0.157
Rabi development 20 No. 20 No. 0.226
Horticulture plantation 1 Ha. 1 Ha. 0.285
Vermi compost 1 No. 1 No. 0.120
Compost pit 15 No. 15 No. 0.150
Manger unit 7 No. 7 No. 0.119
TOTAL
Consolidation
Grand TOTAL
8.739
64
Action Plan Gram panchayat – Bhagwati kurd Village- Kureli (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
37 Ha. 37 Ha. 2.775 C.V.H
Waste weir 3 No. 3 No. 0.384
Farm pond
Horticulture 1 Ha. 1 Ha. 0.152
TOTAL
Non Arable Land
Pasture development
4 No. 4 No. 2.632
Road side plantation
TOTAL
65
Action Plan Gram panchayat – Bhagwati kurd Village-Kureli (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
Masonry Check dam
W.H.S 5 No. 5 No. 2.457
Subsurface barrier TOTAL
Live stock
A .I 41 No. 41 No. 0.061
Animal husbandry Health management 2 No. 2 No. 0.480
R.F(S.H.G) 3 No. 3 No. 0.75
TOTAL
Production system & microenterprises
Kharif development 32 No. 32 No. 0.202
Rabi development 25 No. 25 No. 0.325
Horticulture plantation 2 Ha. 2 Ha. 0.57
Vermi compost 1 No. 1 No. 0.12
Compost pit 19 No. 19 No. 0.19
Manger unit 9 No. 9 No. 0.153
TOTAL
Consolidation
Grand TOTAL
11.251
66
Action Plan Gram panchayat –Basai Village-Basai (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
250 Ha. 250 Ha. 18.750 C.V.H
Waste weir 20 No. 20 No. 2.56
Farm pond 2 No. 2 No. 1.216
Horticulture 9 Ha. 9 Ha. 1.368
TOTAL
Non Arable Land
Pasture development
33 No. 33 No. 21.714
Road side plantation 1 No. 1 No. 1.02
TOTAL
67
Action Plan Gram panchayat –Basai Village-Basai (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging 1 No. 1 No. 0.051
Masonry Check dam 2 No. 2 No. 4.00
W.H.S 3 No. 3 No. 1.50
Subsurface barrier 1 No. 1 No. 3.00
TOTAL
Live stock
A .I 272 No. 272 No. 0.408
Animal husbandry Health management 14 No. 14 No. 3.36
R.F(S.H.G) 20 No. 20 No. 5.00
TOTAL
Production system & microenterprises
Kharif development 208 No. 208 No. 1.31
Rabi development 164 No. 164 No. 1.853
Horticulture plantation 11 Ha. 11 Ha. 3.135
Vermi compost 9 No. 9 No. 1.08
Compost pit 126 No. 126 No. 1.26
Manger unit 61 No. 61 No. 1.037
TOTAL
Consolidation
Grand TOTAL
73.547
68
Action Plan Gram panchayat –Basai Village-Gogariya (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
38 Ha. 38 Ha. 2.850 C.V.H
Waste weir 3 No. 3 No. 0.384
Farm pond
Horticulture 1 Ha. 1 Ha. 0.152
TOTAL
Non Arable Land
Pasture development
5 No. 5 No. 3.290
Road side plantation
TOTAL
69
Action Plan Gram panchayat –Basai Village-Gogariya (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
2 No. 2 No. 0.251
Masonry Check dam
W.H.S 2 No. 2 No. 1.00
Subsurface barrier TOTAL
Live stock
A .I 38 No. 38 No. 0.057
Animal husbandry Health management 2 No. 2 No. 0.480
R.F(S.H.G) 3 No. 3 No. 0.75
TOTAL
Production system & microenterprises
Kharif development 29 No. 29 No. 0.183
Rabi development 23 No. 23 No. 0.26
Horticulture plantation 2 Ha. 2 Ha. 0.57
Vermi compost 1 No. 1 No. 0.12
Compost pit 18 No. 18 No. 0.18
Manger unit 9 No. 9 No. 0.153
TOTAL
Consolidation
Grand TOTAL
10.548
70
Action Plan Gram panchayat – Khohar Village- Khohar (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
140 Ha. 140 Ha. 10.50 C.V.H
Waste weir 12 No. 12 No. 1.536
Farm pond
Horticulture 10 Ha. 10 Ha. 0.76
TOTAL
Non Arable Land
Pasture development
17 No. 17 No. 11.184
Road side plantation
TOTAL
71
Action Plan Gram panchayat –Khohar Village-Khohar (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
2 No. 2 No. 0.268
Masonry Check dam
W.H.S 2 No. 2 No. 1.00
Subsurface barrier 2 No. 2 No. 6.00
TOTAL
Live stock
A .I 154 No. 154 No. 0.231
Animal husbandry Health management 8 No. 8 No. 1.92
R.F(S.H.G) 12 No. 12 No. 3.00
TOTAL
Production system & microenterprises
Kharif development 118 No. 118 No. 0.743
Rabi development 93 No. 93 No. 1.050
Horticulture plantation 6 Ha. 6 Ha. 1.71
Vermi compost 5 No. 5 No. 0.60
Compost pit 72 No. 72 No. 0.72
Manger unit 34 No. 34 No. 0.578
TOTAL
Consolidation
Grand TOTAL
41.800
72
Action Plan Gram panchayat –Khohar Village-Banesing pura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
44 Ha. 44 Ha. 3.30 C.V.H
Waste weir 4 No. 4 No. 0.512
Farm pond
Horticulture 2 Ha. 2 Ha. 0.304
TOTAL
Non Arable Land
Pasture development
6 No. 6 No. 3.948
Road side plantation
TOTAL
73
Action Plan Gram panchayat –Khohar Village-Banesingh pura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
7 No. 7 No. 0.755
Masonry Check dam
W.H.S 4 No. 4 No. 2.00
Subsurface barrier TOTAL
Live stock
A .I 53 No. 53 No. 0.08
Animal husbandry Health management 3 No. 3 No. 0.72
R.F(S.H.G) 4 No. 4 No. 1.00
TOTAL
Production system & microenterprises
Kharif development 41 No. 41 No. 0.258
Rabi development 32 No. 32 No. 0.362
Horticulture plantation 2 Ha. 2 Ha. 0.57
Vermi compost 2 No. 2 No. 0.24
Compost pit 25 No.
0.25
Manger unit 12 No.
0.204
TOTAL
Consolidation
Grand TOTAL
14.503
74
Action Plan Gram panchayat –Khohar Village-shyodansing pura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
73 Ha. 73 Ha. 5.475 C.V.H
Waste weir 6 No. 6 No. 0.768
Farm pond
Horticulture 3 Ha. 3 Ha. 0.456
TOTAL
Non Arable Land
Pasture development
11 No. 11 No. 7.236
Road side plantation
TOTAL
75
Action Plan Gram panchayat –Khohar Village-shyodansing pura (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging 1 No. 1 No. 0.290
Masonry Check dam 1 No. 1 No. 2.00
W.H.S 1 No. 1 No. 0.50
Subsurface barrier TOTAL
Live stock
A .I 81 No. 81 No. 0.121
Animal husbandry Health management 4 No. 4 No. 0.96
R.F(S.H.G) 6 No. 6 No. 1.50
TOTAL
Production system & microenterprises
Kharif development 62 No. 62 No. 0.390
Rabi development 49 No. 49 No. 0.554
Horticulture plantation 3 Ha. 3 Ha. 0.855
Vermi compost 3 No. 3 No. 0.36
Compost pit 38 No. 38 No. 0.38
Manger unit 18 No. 18 No. 0.306
TOTAL
Consolidation
Grand TOTAL
21.89
76
Action Plan Gram panchayat –Jatgawara Village- Jatgawara (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Administration
Monitoring
Evolution
E.P.A
Capacity
D.P.R TOTAL Arable Land
136 Ha. 136 Ha. 10.125 C.V.H
Waste weir 11 No. 11 No. 1.408
Farm pond
Horticulture 5 Ha. 5 Ha. 0.760
TOTAL
Non Arable Land
Pasture development
15 No. 15 No. 9.870
Road side plantation
TOTAL
77
Action Plan Gram panchayat – Jatgawara Village- Jatgawara (amount in lacs.)
Activity
Quantity
Total
Phy Fin
Drainage
Gully plugging
1 No. 1 No. 0.091
Masonry Check dam 1 No. 1 No. 2.00
W.H.S 1 No. 1 No. 0.50
Subsurface barrier 1 No. 1 No. 3.00
TOTAL
Live stock
A .I 137 No. 137 No. 0.205
Animal husbandry Health management 7 No. 7 No. 1.68
R.F(S.H.G) 10 No. 10 No. 2.50
TOTAL
Production system & microenterprises
Kharif development 105 No. 105 No. 0.661
Rabi development 83 No. 83 No. 0.938
Horticulture plantation 6 Ha. 6 Ha. 1.71
Vermi compost 4 No. 4 No. 0.48
Compost pit 64 No. 64 No. 0.64
Manger unit 31 No. 31 No. 0.52
TOTAL
Consolidation
Grand TOTAL
47.094
78
Chapter-VI
Tech. Designs & Estimates for Proposed Activity
79
ESTIMATE NO. 1
NAME OF WORK: CONSTRUCTION OF CONTOUR BUND TYPE "A"
Cross section of bund - 0.9 sqm
For lenth 100 M.
s.no. Item Quantity Unit Rate Amount
1 Dag belling work up to 5-7 cm depth 400 Rm 0.25 100
2 Earth work in hard soil for construction of bund including ramming compaction and dressing up to the lead of 50m and lift 1.5 m
81 Cum 84 6804
3 Sowing of seed on bunds 300 Rm 0.59 177.00
4 Grass seed
Dhaman/Stylohemata L.S 80.00
Forestry plants L.S 100.00
Total 7261.00
5 Contingency @ 3 % 217.93
6 Total 7478.83
Say Total 7500
80
ESTIMATE NO. 02 NAME OF WORK: CONSTRUCTION OF MASONARY WATER HARVESTING STRUCTURE Design 1 Available crest length 6.00 M 2 Total catchment area 100.00 Ha 3 Hight of structure 1.30 M A Design discharge (By flood discharge method) A HYDROLIC DESIGN Peak rate of run off in cum/sec.= Q = C I A C= 0.40 36 Catchment Area 100.00 Q = 4.89 cumsec K = L3 C. STRUCTURAL DESIGN (I) Top width of Head wall per site condition where h = 0.60 m p = 2.30 0.60 M p Specific gravty of stone masnory in cm = 2.3 (ii) Bottom width of head wall b = h+H /(p-1) 0.5 1.67 Say = 1.70 M H =heigth of head wall in meters = 1.3 m 1.30 M (iii) Length of head wall extension H +d + 1 3.20 3.20 M d = h+free board = 0.90 0.90 M but as per side condition L/S M 1.5 R/S M 1.5 3.00 M (iv) Heigth of Head wall extension H + d = 2.20 M (v) Botton width of HW ext. side wall & wing wall 0.5(H+h)= 0.95 1.10 M (vi) Top width of HW ext 0.4H= 0.52 0.60 M (vii) Length of Basin L.B =0.75(H+d)+H 2.95 2.95 M (viii) Thickness of Basin =0.60m(incloding concreting) (ix) Height of side wall H+d = 2.20 2.20 M (x) Height of side wall =1.5h at W W joints 1.5h = 0.90 1.10 M (xi) Length of side wall = B. W. of H. W -B.W of H W E+L.B+ width of toe wall 4.00 (xii) Length of wing wall = 2.25 h= 1.35 1.50 M (xiii) Height of the wing wall = 0.90 1.10 M (xiv) Top width of Head wall ext site wall wing wall = 0.60mt (xv) Width of toe wall= 0.45 M
81
(xvi)Height of toe wall = 0.30 M (xvii)Height of wing wall at wing end = 1.10 M (xviii)Bottem width of the side wall &wing wall taking as per Bottom width of the head wall ext as in item no.5= m 1.10 M (xix)Depth of foundation taking as 2.00 M STABILITY CHECK'S a Top width of anicut = 0.60 m b Bottm width of anicut = 1.70 m w1 + w2self weight of anicut p1 Pressure due to water besswall p2 Horizontal water pressure p3 Up lift pressure h Food heigth = 0.60 m H heigth of anicut = 1.30 m L considening one metre = 1 S 2.3 C 0.6 Forces acting on a over flow gravity dam Forces and momrnt calculation's considening one metre length of ancut and taking Restoring moment as positive (+ ve) and overturning moment as negative (-ve) moment taken at B
s.no Forces v-vertical forces
H-horizontal forces
Force Acting
at a Distance From B
Moment at B 2x5
+ve -ve
1 W1=axHxLxS
1.79 1.79 2.20 3.95
2 W2=1/2x(b-a)xHxLxS
1.64 1.64 1.13 1.86
3 P1+wh x h
0.78 0.78 0.90 0.70
4 P2= wh2/2 x h
0.85 0.85 0.690 0.51
5 P3= c x b x(H+h)/2
0.80 0.80 1.80 1.43 Total 2.64 1.63 5.81 2.64
CHECKS IN OVERTURNING
Factor of satety agaist overturning
Emr/Emo =+m/-m = Restoning moment/overturning moment
it is more than 1.50 hance structure is safe against overturning
SLINDING
Factor of safety against slinding
82
Ev/Eh = 1.63
it is more than 1.0 hance structure is safe against slinding
RUPTURE (safety against tension at the bese)
X Relne Position of resultant measured from toe
x = Em/Ev = 1.20
e = b/2 - X -0.35
Ev/b(1+6e/b) 0.33
Ev/b(1-6e/b) 2.78
P max = 0.33
P min = 2.78
ABSTRACT OF COST
S.No Particular Qty. Rate Labour Rate
Unit Amount
1 Excavation in soil dry or Most &disposal of excavated material within intial lead of 30 m and lift of 1.5m including dressing etc complete
68.55 71.00 90 cum 6169.50
2 Excavation in ordinary murram or earth mixed with bajri and kankar or boulder dry or most&disposal of excavated material within intial lead of 30 m and liftof 1.5m including dressing etc complete
7.62 82.00 132 cum 1005.84
3 cement concrete well mixed in cement mortar(1:4:8) laid in position complete including curing Aggregate size upto 50mm. HB
12.62 2038 318.29 cum 25719.56
4 Random rubble stone masonary in cement sand mortar(1:6) for foundation
56.47 1416 434.70 cum 79961.52
5 Random rubble stone masonary in cement sand mortar(1:6) forsuper structure
42.34 1643 578.70 cum 69564.62
6 Cement plaster including smooth finishing in cement mortar (1:4)25mm thick
77.60 156 70.77 sqm 12105.60
TOTAL 194526.64 Add 3% Contingency Charges 5835.80 TOTAL 200362.44 Say TOTAL 200000
83
DETAILED ESTIMATE
S.No PARTICULAR No. LENGTH WIDTH HT/DEPTH QUANTITY 1 Total Excavation H.W 1.00 6.00 1.70 2.00 20.40 H.W.E 2.00 3.00 1.10 2.00 13.20 S.W 2.00 4.00 1.10 2.00 17.60 Wing wall 2.00 1.50 1.10 2.00 6.60 Toe wall 1.00 6.00 0.45 0.90 2.43 Apron 1.00 6.00 2.95 0.90 15.93 Total (cu.m) 76.16 2 Excavation in hard soil dry or
Most & disposal of excavated material within intial lead of 30 m and lift of 1.5m including dressing etc complete 10%of
Total 7.62 3 Excavation in ordinary
murram or earth mixed with bajri and kankar or boulder dry or most & disposal of excavated material with in intial lead of 30 m and liftof 1.5m including dressing etc complete 30% of Total Excavation
Total 22.85 4 cement concrete well mixed
in cement mortar(1:4:8) laid in position complete including curing Aggregate size upto 50mm. HB Total Excavation H.W
S.no Particular Unit Quantity Rate Amount 1 Excavation of pit
0.6x0.6x0.6x=0.216 cumx200 No. =43.20 cum
cum 43.20 90 388.00
2 Excavation in hard soil for ring cum 118.69 90 10682.10 3 Filling of 20% pits by yellow soil including
transportation.91+41.7=132.7 cum cum 132.7 90 1194.30
4 Cost of Plant no 220 8 1760.00 5 Transportation of Plant beyond 20 km. no 220 2.654 583.88 6 Treatment by insecticide no 200 0.55 110 7 Cost of insecticide no 200 1.00 200 8 Plantation of plants no 200 2.52 504 9 Making of Thawala of 50 cm radius no 200 1.70 340 10 Irrigation to plant (7 irrigation) no 1400 1.85 2590 11 Purchase and Transportation of water(20
liters per plant) Per tanker
7 510 3570
12 Two times weeding and hoeing no 400 1.43 572 13 Thore fencing Rmt 1507 31 46717 14 Vegetative 2 mt. dia. fencing no 200 8.20 1640 TOTAL 74351.28 CONTENGENCY 3% 2230.52 Grand Total 76581.80
86
Behror (IWMP-VI)
P.S Behror ,Distt.-Alwar(Raj)
Road Side Plantation for watershed scheme
Second Year
s.no Particular Unit Quantity Rate Amount 1 Replacement of dead plants of first year
20% 11202.40
2 Pruning of plant No. 200 1.53 306.00 3 Two times weeding and hoeing No. 400 1.2 480.00 4 Irrigation to plant (7 irrigation) no 1400 1.85 2590 5 Purchase and Transportation of water(20
liters per plant) Per tanker
7 510 3570
6 Total 18148.40 CONTENGENCY 3% 544.40 7 Grand Total 18692.80
Behror (IWMP-VI)
P.S Behror ,Distt.-Alwar(Raj)
Road Side Plantation for watershed scheme
Second Year
s.no Particular Unit Quantity Rate Amount 1 Pruning of plant No. 200 1.53 306.00 2 Two times weeding and hoeing No. 400 1.2 480.00 3 Irrigation to plant (7 irrigation) no 1400 1.85 2590 4 Purchase and Transportation of
water(20 liters per plant) Per tanker
7 510 3570
5 Total 6946.00 CONTENGENCY 3% 208.4 6 Grand Total 7154.47 7 Grand Total of Three year 102428190 Say Grand Total of Three year 1.02 lacs
87
Estimate No.-4
FARM POND Behror (IWMP-VI)
P.S Behror ,Distt.-Alwar(Raj)
1 Name of work –Farm Pond 2 Length and width of base = 10m,length and width of top= 20 m, Depth = 2 m 1 particular No. Base
area Top area
Average area
Depth Quantity Unit Rate Amount
1 Excavation of
foundation ,trench upto 1.5m and dressing of base and finishing of sides of disposal of soil upto 50 m
A Hard soil 80% 1 100 400 250 1.6 400 cum 90 36000.00 B Disintegrated
rock/murraham 20%
1 100 7400 250 .4 100 cum 132 13200.00
2 Extra lift 1 100 156.25 128.125 0.50 64.06 cum 11 704.69 3 Extra lead 1 100 400 250 1 250 cum 33.25 8312.50 Total 58217.19 CONTENGENCY
3% 1746.52
Total 59963.71 Material 836.29 Grand Total 60800
88
Estimate No.-5
SUBSURAFCE BARRIER
S.No Particular Qty. Rate Unit Amount
1 Excavation in loose soil or Most & disposal of excavated material within initial lead of 30 m and lift of 1.5m including dressing etc complete 1x30x1x1.75=52.5
52.5 74 cum 3885.00
2 Excavation in hard soil or Most &disposal of excavated material within initial lead of 30 m and lift of 1.5m including dressing etc complete 1x30x1x1.5=45
45 90 cum 4050
3 Excavation in ordinary murram or earth mixed with bajri and kankar or boulder dry or most & disposal of excavated material within intial lead of 30 m and liftof 1.5m including dressing etc complete 1x30x1x1.25=37.5
37.5 132 cum 4950
4 Excavation in Disintegrated rock mixed with bajri and kankar or boulder dry or most&disposal of excavated material within intial lead of 30 m and liftof 1.5m including dressing etc complete 1x30x1x0.5=15.00
15.0 175 cum 2625
5 cement concrete well mixed in cement mortar(1:4:8) laid in position complete including curing Aggregate size up to 50mm. HB 1x30x1x1.75=52.5
52.5 2038 cum 106955
6 Random rubble stone masonry in cement sand mortar(1:6) for foundation 1x30x1x3.25=97.5
97.5 1499 cum 146152.50
7 Random rubble stone masonry in cement sand mortar(1:6) for super structure 1x30x(1+0.6)/2x..45=10.8
10.8 1643 cum 17744.40
89
8 Cement plaster including smooth finishing in cement mortar (1:4)25mm thick 1x30x.45+1x30x.602=21.56
21.56 156 sqm 3363.36
9 Copping in 1:2:4 cement concrete 1x30x.6x.025=.45
.45 3128 cum 1407.60
TOTAL 291132.86 Add 3% Contingency Charges 8733.98 TOTAL 29866.94 Say TOTAL 3 lacs.
90
Estimate No.-6 GULLY CONTROLL STRUCTURE
S.No Particular Qty. Rate Unit Amount
1 Dag belling upto 5-7 cm depth 3x10
30 .25 Rmt 7.5
2 Earth work for bund/embankment in dry or moist soil placing soil in 15 cm layer and compaction by sheep foot roller/hand rammer and disposal of soil upto 50 m 12x(2+10/2)x1.6=
115.20 84 cum 9676.80
3 Sowing of forestry seed by notching method 5x12=
60 0.64 Per No.
38.0
4 Labour charges for establishment of vegetative barrier at the spacing of 10 cm 4x12
48 548.36 km 26.31
5 Planting and dressing 4x12
48 1695.07 km 81.36
6 Application of insecticide/pesticide 4x12
48 365.01 km 17.52
7 Up rooting of vetiver of moonja clumps from natural source 5x12x48
2880 1713.40 1 lacs slip
49.34
TOTAL 9889.70 Add 3% Contingency Charges 296.69 TOTAL 10186.39 Say TOTAL 10000
91
Estimate No.-7
GULLY CONTROLL STRUCTURE
S.No Particular Qty. Rate Unit Amount
1 Dag belling upto 5-7 cm depth 3x15
45 .25 Rmt 11.25
2 Earth work for bund/embankment in dry or moist soil placing soil in 15 cm layer and compaction by sheep foot roller/hand rammer and disposal of soil upto 50 m 15x(1+6/2x1)
55.20 84 cum 4662.00
3 Sowing of forestry seed by notching method 4x15=
60 0.64 Per No.
38.40
4 Labor charges for establishment of vegetative barrier at the spacing of 10 cm 4x15
60 548.36 km 32.89
5 Planting and dressing 4x15
60 1695.07 km 101.36
6 Application of insecticide/pesticide 4x15
60 365.01 km 21.52
7 Up rooting of vetiver of moonja clumps from natural source 5x15x60
3600 1713.40 1 lacs slip
61.68
TOTAL 4929.10 Add 3% Contingency Charges 147.87 TOTAL 5076.97 Say TOTAL 5000
92
Estimate No.-8
W.H.S
S.No Particular Qty. Rate Unit Amount
1 Dag belling upto 5-7 cm depth 4x14
56 .25 Rmt 14.00
2 Earth work for bund/embankment in dry or moist soil placing soil in 15 cm layer and compaction by sheep foot roller/hand rammer and disposal of soil upto 50 m 14x(3+20.5/2)x3.5
575.75 84 cum 48363.00
3 Sowing of forestry seed by notching method 9x14
126 0.64 Per No.
80.64
4 Labor charges for establishment of vegetative barrier at the spacing of 10 cm 9x14
126 548.36 km 69.07
5 Planting and dressing 9x14
126 1695.07 km 213.57
6 Application of insecticide/pesticide 9x14
126 365.01 km 45.99
7 Up rooting of vetiver of moonja clumps from natural source 5x12x126
7560 1713.40 1 lacs slip
129.53
TOTAL 48915.80 Add 3% Contingency Charges 1467.47 TOTAL 50383.27 Say TOTAL 50000