Integrated Risk Management for Africa 1
23

Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

Jan 18, 2016

Download

Documents

Hubert Park
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

Integrated Risk Management for Africa

1

Page 2: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA key data

• European Commission funded Research Project• 3 years• € 3.5M total budget - € 2.5M EC contribution• Started in June 2008

• 9 EU & 6 African Partners – including major players in the IP business– the governments of Luxembourg, Mozambique and

Morocco participate to support the emergency service trials

2

Page 4: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Vision

• ICT-based Environmental Risk Management – Though telecommunication infrastructure is limited– Data is limited

• In addition: new applications in support of regional development:– Environmental management– Regional planning– Next generation IP based networks

Page 5: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Goals

• ICT Multi-Risk Platform (mostly Open Source)• Integrate existing services and technologies (risk

assessment to recovery)• Develop local services• Demonstrate value in 5 scenarios

Page 6: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA technical approach

• Integration and adaptation to the specific conditions of Africa of the best R&D results coming from recent or on-going European R&D projects:– Overall service oriented architecture: WIN & ORCHESTRA– Earth observation service environment : ESA SSE, GENESIS– Sensor network software : SANY– Ad-hoc wireless networks : u2010– IPv6 based solutions : u2010– Automatic handling of network failure: u2010

6

Page 7: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA technical approach

• Integration and adaptation of state-of-the-art tools and services– SAHANA– Google– NASA– OGC Sensor Web Enablement

7

Open Systems!Open Standards!

Mass Market Tools!

Page 8: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Expected Achievements

• A coherent suite of architectural concepts and methodologies applicable to multi-risks management situations in Africa, including advanced multiple vulnerability assessment to cope with complex emergencies.

• An integrated set of tools, compliant with the above mentioned concepts and methodologies and with current and emerging international standards.

8

Page 9: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Expected Achievements

• A pre-operational infrastructure and access-platform, assessed by end-users through operational scenarios serving as reference for further prototyping and future larger scale deployments

• Specific applications (bushfire, flood, desertification and urban risks) dedicated to the demonstration of multi-risks management in Africa.

9

Page 10: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Expected Achievements

• A versatile communications system enabling high and/or low rates Internet transfer.

• A reliable, low cost communications system enabling alert messages and possibly emergency communications in any location of Africa (i.e. even where no electricity is supplied)

• A management concept to monitor and automatically control the functions of services and networks shown as critical through the dependability and vulnerability analysis.

10

Page 11: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

IRMA Communication Network

CSIRCSIR

UTICT UTICT

ENSP ENSP

CSE CSE

CRTSANRT CRTSANRT

ULCCGSESTSF

ULCCGSESTSF

SPBSPB

TAS-F TAS-F

11

Page 13: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.
Page 15: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

The Floods Scenario in Mozambique

Source: USGS/FEWS NET

Page 16: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

The Floods Scenario in Mozambique

Weaknesses in the National Alert System:• Hydrometric and meteorological observation stations in the

countrywide not providing continuous and accurate information enough to make the forecasts;

• Alert information not reaching remote areas, were most of the population lives;

• Communication problems during emergency assistance.

Page 17: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

The Floods Scenario in Mozambique

Targeted improvements:• Share/exchange information with the neighbouring

countries crossed by the same rivers;• Build a reliable robust and secure national communications

infrastructure; • Build Community Information Access Points – RANET

Project (Radio Network), Community Multimedia Centre (includes Community Radio)

Page 18: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

The Floods Scenario in Mozambique

Targeted improvements:• Investment in Capacity Building (Ex. Training in modern

information dissemination mechanisms).• National Meteorological Network (meteorological

observation stations) – INAM• National Hydrometric Network (hydrometric observation

stations) – DNA/ARA (North, South and Center)

Page 22: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

Advanced Fire Information System

Terraand Aqua

Direct BroadcastReceiving StationSatellite Application Centre (SAC)South Africa

GeoDatabase

AFIShttp://wamis.co.za/

SOS

MSG

Direct BroadcastReceiving StationNational Weather ServiceSouth Africa

SOSWeather data

SASFire Detection SOS

Persistent data

WCS

SOSTraffic

End users

Page 23: Integrated Risk Management for Africa 1. IRMA key data European Commission funded Research Project 3 years € 3.5M total budget - € 2.5M EC contribution.

More information on

http://www.irma.lu