INSTITUT TEKNOLOGI PLN PROYEK AKHIR PENGGUNAKAN PERIANG GADIS UNTUK MENGURANGI GANGGUAN DI PT PLN (PERSERO) UP3 DEPOK DISUSUN OLEH: AGUSTIAR 2017-71-050 PROGRAM STUDI DIPLOMA III TEKNOLOGI LISTRIK FAKULTAS KETENAGALISTRIKAN DAN ENERGI TERBARUKAN INSTITUT TEKNOLOGI - PLN JAKARTA, 2020
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
INSTITUT TEKNOLOGI PLN
PROYEK AKHIR
PENGGUNAKAN PERIANG GADIS UNTUK MENGURANGI
GANGGUAN DI PT PLN (PERSERO) UP3 DEPOK
DISUSUN OLEH:
AGUSTIAR
2017-71-050
PROGRAM STUDI DIPLOMA III TEKNOLOGI LISTRIK
FAKULTAS KETENAGALISTRIKAN DAN ENERGI TERBARUKAN
INSTITUT TEKNOLOGI - PLN
JAKARTA, 2020
i
LEMBAR PENGESAHAN
Proyek Akhir dengan Judul
PENGGUNAAN PERIANG GADIS UNTUK MENGURANGI GANGGUAN
DI PT PLN (PERSERO) UP3 DEPOK
Disusun oleh :
AGUSTIAR
2017-71-050
Diajukan untuk memenuhi persyaratan
PROGRAM STUDI DIPLOMA III Teknologi Listrik
FAKULTAS KETENAGALISTRIKAN & ENERGI TERBARUKAN
INSTITUT TEKNOLOGI PLN
Jakarta, 05 September 2020
Mengetahui, Disetujui,
Kepala Program Studi Dosen Pembimbing Utama
D-III Teknologi Listrik
Retno Aita Diantari, ST., MT. Nurmiati Pasra, ST., MT
Dosen Pembimbing Kedua
r
Ibnu Hajar, ST., M.sc
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-09-06 18:01:45Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Ibnu HajarDN: C=ID, OU=Teknik Elektro, O=Institut Teknologi PLN, CN=Ibnu Hajar, [email protected]: I am approving this documentLocation: JakartaDate: 2020-09-08 12:51:11Foxit Reader Version: 9.7.1
Digital ly signed by
Retno Aita
Diantari, S_T_, M_T
Date: 2020-09-14
23:19:06
ii
LEMBAR PENGESAHAN TIM PENGUJI
Nama : Agustiar
NIM : 201771050
Program Studi : D3 Teknologi Listrik
Judul Tugas Akhir : Penggunaan periang gadis untuk mengurangi gangguan di
PT PLN (Persero) UP3 Depok
Telah disidangkan dan dinyatakan Lulus Sidang Proyek Akhir pada Program
Diploma III, Program Studi Teknologi Listrik Institu Teknologi-PLN pada tanggal
26 Agustus 2020
Nama Penguji Jabatan Tanda Tangan
1. Retno Aita Diantari Ketua Penguji
2. Albert Gifson Hutadjulu Sekertaris
3. Muchamad Nur qosim Anggota
Mengetahui :
Kepala Program Studi
D-III Teknologi Listrik
Retno Aita Diantari, ST., MT.
Digitally signed by Albert GifsonDN: C=ID, OU=Fakultas Ketenagalistrikan dan Energi Terbarukan, O=Institut Teknologi PLN, CN=Albert Gifson, [email protected]: I am approving this documentLocation: JakartaDate: 2020-08-30 20:08:23Foxit Reader Version: 9.7.2
Albert Gifson
Digitally signed by Muchamad Nur QosimDN: OU=Fak. K.E.T, O=Jur Elektro, CN=Muchamad Nur Qosim, [email protected]: I am the author of this documentDate: 2020-09-02 09:17:36
Muchamad Nur Qosim
Digital ly signed by Retno
Aita Diantari, S_T_, M_T
Date: 2020-09-10 10:17:
10
Digital ly signed
by Retno Aita D
Date: 2020-09-14
23:18:46
iv
UCAPAN TERIMA KASIH
Dengan ini saya menyampaikan penghargaan dan ucapan terima kasih yang
sebesar-besarnya kepada yang terhormat:
Nurmiati Pasra, ST., MT. Selaku Pembimbing I
Ibnu Hajar, ST.,M.sc. Selaku Pembimbing II
Yang telah memberikan petunjuk, saran-saran serta bimbingannya sehingga
Proyek Akhir ini dapat diselesaikan.
Terima kasih yang sama, saya sampaikan kepada :
1. Bapak Arrafat Alfarisyi, ST. Selaku mentor pembimbing magang
2. Ibu Merry Staff bagian Pemeliharaan PT PLN (Persero) UP3 Depok
3. Yudi Maharsa Sebagai OJT bagian Operasional PT PLN (Persero) UP3
Depok
Yang telah mengijinkan untuk melakukan percobaan di PT PLN (Persero) UP3
Depok
Jakarta, 2020
Agustiar
2017-71-050
v
HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI
TUGAS AKHIR UNTUK KEPENTINGAN AKADEMIS
Sebagai sivitas akademika Institut Teknologi - PLN, saya yang bertanda tangan
di bawah ini:
Nama : Agustiar
NIM 201771050
Program Studi : Teknologi Listrik
Fakultas : Ketenagalistrikan Dan Energi Terbarukan
Jenis karya : Proyek Akhir
Demi pengembangan ilmu pengetahuan, menyetujui untuk memberikan kepada
Institut teknologi - PLN Hak Bebas Royalti Non eksklusif (Non- exclusive Royalty Free Right) atas karya ilmiah saya yang berjudul :
PENGGUNAAN PERIANG GADIS UNTUK MENGURANGI GANGGUAN DI PT PLN (PERSERO) UP3 DEPOK
Beserta perangkat yang ada (jika diperlukan). Dengan Hak Bebas Royalti Non
eksklusif ini Sekolah Tinggi Teknik-PLN berhak menyimpan, mengalih
media/formatkan, mengelola dalam bentuk pangkalan data (database), merawat,
dan mempublikasikan Tugas Akhir saya selama tetap mencantumkan nama saya
sebagai penulis/pencipta dan sebagai pemilik Hak Cipta. Demikian pernyataan
ini saya buat dengan sebenarnya.
Jakarta, 23 Juli 2020
Yang menyatakan
(Agustiar)
vi
PENGGUNAAN PERIANG GADIS UNTUK MENGURANGI
GANGGUAN (PERSERO) UP3 DEPOK
Agustiar 2017-71-050
Di bawah bimbingan Ibu Nurmiati Pasra,S.T., M.T. dan Bapak Ibnu
Hajar,S.T, M.Sc.
ABSTRAK
Pada sistem tenaga listrik untuk menyalurkan daya dari pembangkit tenaga listrik ke konsumen diperlukan suatu jaringan yang terdiri dari saluran transmisi dan distribusi. Salah satu penyaluran daya saluran distribusi adalah Saluran Udara Tegangan Menengah 20 KV. Masalah utama untuk menjalankan fungsi jaringan distribusi tersebut adalah mengatasi dari berbagai gangguan jaringan distribusi, mengingat gangguan yang terbanyak pada sistem tenaga listrik terdapat dalam jaringan distribusi. Istilah keandalan pada jaringan distribusi menggambarkan keamanan distribusi, penghindaran dari gangguan-gangguan yang menyebabkan pemadaman jaringan distribusi khususnya pada jaringan tegangan menengah 20 kV. Agar jaringan distribusi tidak mengalami gangguan atau kerusakan peralatan, maka diadakan pemeliharaan jaringan serta pemasangan peralatan tambahan periang gadis, yang dipasang pada bushing trafo. menentukan lokasi yang pernah terjadi gangguan, khususnya pada gangguan binatang yaitu pada gardu AP tahun 2018 dan gardu SMY juga pada tahun 2018 pada Penyulang Agya. Setelah pemasangan periang gadis pada penyulang agya gardu AP dan gardu SMY, nilai tegangan tembusnya pada gardu AP adalah 45 kV dan pada gardu SMY tegangan tembusnya yaitu 48 kV. Pemeliharaan gardu yang dilakukan pada gardu AP dan gardu SMY telah dilaksanakan dengan kondisi bahwa pemeliharaan telah selesai dilakukan, dengan adanya terpasang dan dipelihara periang gadis baik pada gardu AP maupun pada gardu SMY
Kata kunci : gangguan, periang gadis, pemeliharaan.
vii
USE OF PERIANG GADIS TO REDUCE DISORDERSAT PT. PLN
(PERSERO) UP3 DEPOK
Agustiar 2017-71-050
Under the guidance of Mrs. Nurmiati Pasra,S.T., M.T. and Mr. Ibnu
Hajar,S.T, M.Sc.
ABSTRACT
In the electric power system to channel power from power plants to consumers, a network of transmission and distribution lines is needed. One of the distribution channel power is the 20 KV Medium Voltage Air Line. The main problem to carry out the function of the distribution network is to overcome the various disturbances in the distribution network, given the most disruption in the electric power system contained in the distribution network. The term reliability in the distribution network describes the safety of distribution, avoidance of disturbances that cause the distribution network outages, especially in the 20 kv medium voltage network, especially in animals, kites and trees. So that the distribution network does not experience interference or equipment damage, network maintenance and installation of periang gadis equipment are installed on the transformer bushing and arrester to reduce network disruption.At the substation that has been carried out jolly girl installation namely on the AP substation, and SMY substation. After installing the girl's jolly, the tension value measured meets the jolly girl's specifications. To reduce interference, maintenance of substations is carried out to prevent interference.
Keywords : Trouble, periang gadis, maintenance
viii
DAFTAR ISI
LEMBAR PENGESAHAN ............................................................................ i
LEMBAR PENGESAHAAN TIM PENGUJI .................................................. ii
PERNYATAAN KEASLIAN PROYEK AKHIR .............................................. iii
UCAPAN TERIMA KASIH ............................................................................ iv
PERNYATAAN PERSETUJUAN PUUBLIKASI ........................................... v
ABSTRAK .................................................................................................... vi
ABSTRACT .................................................................................................. vii
DAFTAR ISI ................................................................................................. viii
DAFTAR TABEL .......................................................................................... xi
DAFTAR LAMPIRAN .................................................................................. xii
BAB 1 PENDAHULUAN ............................................................................... 1
1.1 Latar Belakang ................................................................................. 1
Judul Tugas Akhir : Penggunaan periang gadis untuk mengurangi gangguan di PT. PLN(persero) di UP3 Depok
No Tanggal Materi Bimbingan Paraf
Pembimbing
1 19/02/2020 Konsultasi judul yang akan dibahas beserta
kendala yang terdapat di tempat magang
2 7/03/2020 Konsultasi BAB 1-3
3 02/04/2020 Bimbingan proposal proyek akhir secara
Keseluruhan
4 05/04/2020 Bimbingan persiapan sidang propposal proyek akhir
5 09/04/2020 Bimbingan hasil sidang proposal proyek akhir Bimbingan Laporan akhir BAB 1
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:09:59Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:10:11Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:10:22Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:10:33Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:11:11Foxit Reader Version: 9.7.0
Nurmiati Pasra
B1
No Tanggal Materi Bimbingan Paraf
Pembimbing
6 11/05/2020 Bimbingan laporan Akhir BAB 1
7 17/05/2020 Bimbingan laporan Akhir BAB 2
8 27/05/2020 Bimbingan laporan Akhir BAB 2-3
9 07/06/2020 Bimbingan proyek akhir BAB 3
11 27/06/2020 Bimbingan proyek akhir BAB 4
12 18/07/2020 Bimbingan proyek akhir BAB 4
13 24/07/2020 Bimbingan proyek akhir BAB 5 dan
ABSTRAK
14 29/07/2020 Konsultasi proyek akhir keseluruhan
Keterangan:
1. Konsultasi tugas akhir minimal 12 (dua belas) kali pertemuan
termasuk konsultasi proposal dan tugas akhir.
2. Meliputi: Konsultasi Judul/Tema, Materi, Metode Penyelesaian,
Pengujian, Analisis Hasil, Kesimpulan.
3. Setiap konsultasi lembar ini harus dibawa dan di PARAF oleh pembimbing
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:11:33Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:11:45Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:12:09Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:12:22Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:12:35Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:12:52Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:13:13Foxit Reader Version: 9.7.0
Nurmiati Pasra
Digitally signed by Nurmiati PasraDN: C=ID, OU=Wakil Rektor Bidang SDM dan Kemahasiswaan, O=Institut Teknologi PLN, CN=Nurmiati Pasra, [email protected]: I am the author of this documentLocation: 123456Date: 2020-07-30 14:13:27Foxit Reader Version: 9.7.0
Nurmiati Pasra
C1
INSTITUT TEKNOLOGI PLN
LEMBAR BIMBINGAN PROYEK AKHIR
Nama : Agustiar
NIM : 2017-71-050
Program Studi : Teknologi Listrik
Jenjang : Diploma Tiga
Pembimbing Utama : Ibnu hajar, S.T., M.Sc
Judul Tugas Akhir : Penggunaan periang gadis untuk mengurangi gangguan di PT. PLN(persero) di UP3 Depok
No Tanggal Materi Bimbingan Paraf
Pembimbing
1 24 Juli 2020
Tata tulis Proyek Akhir
Digitally signed by Ibnu HajarDN: C=ID, OU=Teknik Elektro, O=Institut Teknologi PLN, CN=Ibnu Hajar, [email protected]: I am the author of this documentLocation: JakartaDate: 2020-07-30 16:02:23Foxit Reader Version: 9.7.1