Top Banner
24

Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling

Dec 24, 2015

Download

Documents

Gasser Gouda

Robots are typically used to manipulate objects in space, and thus a robotic task requires the specification of the mutual position and orientation between the robot’s end effector and an object. Once a base frame is established, a suitable frame attached to the end effector is considered whose position is uniquely described by the Cartesian coordinates of the origin, while its orientation can be represented in various ways. A complete representation of orientation is given by the rotation matrix. Its columns are the unit vectors of the end-effector frame expressed in the base frame, yielding 9 parameters subject to 6 orthonormality constraints.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 2: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 3: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 4: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 5: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 6: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 7: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 8: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 9: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 10: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 11: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 12: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 13: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 14: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 15: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 16: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 17: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 18: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 19: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 20: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 21: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 22: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 23: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling
Page 24: Installation Loading and Stress Analysis Involved With Pipelines Installed by Horizontal Directional Drilling