Top Banner
Version: CR_001INST Rev B Installation Guide | the Conservation Rooflight ® > a roof window range suitable for pitched roofs between 17.5 o and 65 o > details for use with flashing kit January 2014
17

Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

Jun 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

1Version: CR_001INST Rev B

Installation Guide | the Conservation Rooflight®

> a roof window range suitable for pitched roofs between 17.5o and 65o

> details for use with flashing kit

January 2014

Page 2: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

3

SECTION 1 - How to use this manual> Contents

WELCOME

Thank you for choosing the Conservation Rooflight®. We are sure that the Conservation Rooflight® will provide a high-quality finishing touch to your project. This guide is intended to assist building contractors and homeowners in receiving, handling and installing the Conservation Rooflight®. Please take the time to read and carefully follow these instructions. Before you start your installation, please refer to the ‘IMPORTANT INFORMATION’ section at the back of this installation guide.

GENERAL

Please note: the minimum roof angle at which the Conservation Rooflight® can be installed is 17.5 degrees.Please note: the maximum roof angle at which the Conservation Rooflight® can be installed is 65 degrees.Please note: the following installation details pertain to COLD ROOF construction and CLAY tile type installed ‘on the rafters’, with use of the flashing kit. Some installation details may vary depending on the roof construction and tile type being used. Always view this manual in conjunction with the cross sectional installation details relevant to your project. See Section 8 (Pages 25, 26 & 27) ‘Suggested installation details’ towards the back of this manual.

In order to install the Conservation Rooflight® you will need to know:

1. The Conservation Rooflight® model to be installed.2. The type of roof construction to be used, e.g. warm roof or cold roof.3. The type of roof tile to be used, e.g. clay tiles, slate, interlocking tile, pantile, zinc or lead sheet, etc.4. Whether you wish to install ‘on the rafter’ or ‘between the rafter’

TEXT- Highlighted in BOLD indicates a point of special importance.

PPE NOTE

The images in this manual are intended to aid installation and where required the installer must use suitable PPE (which may not be shown) and abide by the applicable Health & Safety requirements. It is assumed that suitable method statements and risk assessments will be undertaken prior to installation.

SECTION 1 - How to use this manual 2

SECTION 2 - Before you get started 4

SECTION 3 - Prior to installation 6

SECTION 4 - Prepare the structural opening 7

SECTION 5 - Preparing the roof 9

SECTION 6 - Installing the roof window 13

SECTION 7 - Finishing the interior 22

SECTION 8 - Suggested installation details 26

SECTION 9 - Important Information 28

q CONTENTS PAGEq

SECTION 1 - How to use this manual> Welcome> General

2

Page 3: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

8. 1x cill lead flashing9. 1x head lead replacement flashing

Description

54

SECTION 2 - Before you get started> Parts List

SECTION 2 - Before you get started> Contents of the box

CONTENTS OF THE BOX PARTS LIST

> The Conservation Rooflight®

1. Casement

4. Fixing Coach Screw

5. Coach Screw Washer

6. 1x right hand jamb flashing & apron

6. 1x left hand jamb flashing & apron

11. 1x jamb flashing off-cut

10. 1x roofing felt

7. 2x soaker

2. Baseplate

> Fixing pack

> Flashing Kit- Purchased seperately

1.

10.

2.

8.

6.

9.

4/5.

7.

7.

6.

3.

DETAIL A SCALE 1 : 2

Detail A

Detail A

Detail B

Detail B

1 Casement .............................................. 12 Baseplate ............................................... 13 Hinge & Fixings.................................... Various4 Fixing coach screw ............................. Various5 Coach screw washer .......................... Various6 Jamb flashing ...................................... 2 & Jamb flashing apron ................ 27 Soaker ..................................................... 28 Cill lead flashing .................................. 19 Head lead replacement flashing ... 110 Roofing felt ........................................... 111 Jamb flashing off-cut......................... 1

Part Number Quantity

NOTE: Please refer to seperate manuals for installation of ironmongery/motors/fixing bracket/blinds

Coach screwCoach washer

Page 4: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

6

SECTION 3 - Prior to installation> Receiving the roof window

> Transport & storage

Before you can derive the structural framing dimensions you will need to understand which of the following options apply to your project:

ON THE RAFTER OR BETWEEN THE RAFTERThe type of tiles used affects how the roof window is installed. One of the following options will be used:

WARM OR COLD ROOF CONSTRUCTION TYPE

INSTALLATION HEIGHT

75 M

AX

Cold roof In a cold roof construction, the insulation layer is placed horizontally, directly above the ceiling of the upper story of the habitable section of the building, usually positioned between the joists in the loft space.

The maximum height that can be used with the flashing kit is 75mm for all tile types. This is measured from the top of the soaker extrusion (part 6) to the top of the structural support (as shown). If your tiles are thicker than this then we recommend the use of lead soakers or mortar bed at the jambs.

NOTE: The flashing kit is only suitable for ‘on the rafter’ installation.

Warm roof In a warm roof construction, the insulation is positioned directly under the external waterproofing (e.g. tiles or slates), following the rafter line.

Between the rafter (Flush Slate Installation):When tile types are thinner and a standard ‘on the rafter’ installation would result in a non-flush installation; a ‘between the rafter’ installation can be used. The roof window is sunk in between the rafters to a depth equal to the height that it would protrude above the finished roof line if a standard installation was used, nominally to a sunk depth of 20mm (Installers are advised to check this dimension prior to installation). Due to the roof window being sunk below the top of the rafters, the associated structural framing sizes increase. Likewise, dependent upon the pitch of the roof, the run-off required at the cill tilting fillet may vary. Nominally quoted framing sizes use the lowest installation pitch and calculate for worst case scenario.

On the Rafter (Standard Installation):This installation (as the name suggests) installs the roof window with it sitting on top of the rafters. For the majority of profiled tiles (Clay, Pantile etc) the roof window remains flush to the top of the tiles and will not project above the finished roof line. For thinner tile types (Slate) the roof window will not be flush and will project above the finished roof line. If a flush detail is required for thin tile types then a ‘between the rafter’ (commonly referred to as Flush Slate) installation is required.

7

SECTION 4 - Prepare the structural opening > Type of roof

RECEIVING THE ROOF WINDOW

We recommend that the roof window packaging is temporarily opened to allow inspection of the goods for damage. Follow the instructions on the delivery checking and advice label.

Once the roof window has been checked, repackage it in the original packaging for safe storage until the roof window is to be installed.

TRANSPORT & STORAGE

Keep the roof window in its original packaging and store off the ground in a secure covered dry place until it is required for installation.

When transporting the roof window in its box, carry the box by lifting it from the underside rather than lifting by its strapping.

Only carry the box if the banding is attached in its original condition. Do not carry by the box if the nylon banding has been cut or appears in any way damaged.

Stack multiple units carefully and only as many units high as is set out on the transport information label on the box.

Only remove the roof window from its packaging when it is required for installation.

Once unpacked carry the roof window by lifting it from the underside of the baseplate.

Mark the original box with the window number/location and keep all accessories and linings in the original box until they are required. When the installation is complete and all accessories/linings are used, recycle all of the packaging materials.

SINGLE ROOF WINDOW AS DELIVERED

product ID & transport information

delivery & checking advice

recyclable cardboard packing

store in a covered dry secure area

do not stack too high or allow to get wet

u

u

u

u

u

u

u

structural opening

structural opening

Page 5: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

8

FORMING THE STRUCTURAL OPENINGThe opening is formed using additional structural members which re-route the structural loads from the roof above, around the structural opening.

NOTE: All structural member sizing and fixings around the structural opening are to be as detailed by the project architect/structural engineer. Our drawings are indicative only.

The Conservation Rooflight® - in a new roof The Conservation Rooflight® - in an existing roof

clear structural width

clear structural length

trimmed rafter

trimming rafters clear

structural width

clear structural length

new trimming rafters added

new structural support rafter

removed rafter section

new trimming rafters added

new structural support rafter

trimming rafters

jamb structural supports

SECTION 4- Prepare the structural opening > Type of installation

In a new roof the structural members can be designed to reduce the necessity for cutting and trimming.

NOTE: The rafters and trimmers are doubled up in the image

In an existing roof the structural opening may require additional structural members to be inserted and/or existing members cut and re-supported in order to facilitate installation in the location required.

NOTE: The rafters and trimmers are doubled up in the image

9

SECTION 5 - Preparing the roof> Forming the structural opening

TYPE OF INSTALLATIONTo derive the structural framing dimensions for the Conservation Rooflight®. You will need to have the following information to hand:

The Conservation Rooflight® model reference number to be installed.The type of roof construction to be used e.g. cold or warm.

Follow the appropriate information pathway to derive the structural framing dimensions below.

u

u

Type of Installation

Between the rafter

Cold Roof Construction

See page 26

Cold Roof Construction

Warm Roof Construction

See page 27

Warm Roof Construction

On the rafter

MODEL REF.CR-1

CR- 1/3

CR- 2/1

CR- 3

CR- 6

CR- 7

CR- 8

CR- 9

CR- 10

CR- 10/1

CR- 11

CR- 13

CR- 14

CR- 14/2

CR- 15

CR- 15/2

*CSW (mm) 565

1021

361

565

412

463

615

717

717

361

869

1021

1021

717

1021

717

*CSW (mm) *CSL (mm) *CSL (mm)725

725

875

1028

520

622

875

1028

1180

1180

1028

1180

1333

1333

1635

1635

* CSW = Clear Structural Width, CSL = Clear Structural Length

(for ‘on the rafter’ installation only)

For between

the rafter

structural

framing

sizes, please

contact our

Commercial

Services

team.

Page 6: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

A

A

u

CSW

CSL

B

B

55

105Min. 5O

RoofingMembrane

Tilting fillet

Section A-A

Section B-B

Tilting fillet

Roofingmembrane

SECTION 5 - Preparing the roof> Prepared opening

> Trim & finish the roofing membrane

SECTION 5 - Preparing the roof> Cill tilting fillet

> Battening up to the cill

Prepared Openingp

Trim & finish the roofing membraneq

Installing a cill tilting filletp

Battening up to the cillq

Trim the opening within the roof to the correct size required for the model of the roof window being installed. For instructions see: Type of Installation (Pg 8) Fold and trim the roofing membrane around the structural opening as

shown. u

It is recommended that the roof is battened up to the cill of the opening at this stage. Batten spacing is determined by the roof covering being used. Adjust the battening and tiling to course and fit around the structural opening.

Install a cill tilting fillet as shown (we recommend hardwood or treated softwood). Fix the cill tilting fillet to the rafters.

1110

Page 7: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

DETAIL A SCALE 1 : 2NOTE: When fixing the roof

window, ensure it is level, straight and untwisted. Failure to check this may lead to the weatherseals insufficiently sealing causing a detrimental affect to air-tightness and may also cause ‘binding’ during opening/closing of the unit.

Coach screwWasher Fixing rails

Lead flashing

Silicone

SECTION 5 - Preparing the roof> Cill lead flashing > Cill silicone fillet

SECTION 6- Installing the roof window> Installing the roof window

> Fix / level

Cill lead Flashingp

Cill silicone filletq

Installing the roof windowp

Fix / levelq

Install cill lead flashing (Part 8) to the cill of the opening as shown. Side lap to be minimum 150mm. Length of flashing to be sufficient to give the tile-recommended headlap. Lay a continuous thick bead of low modulus neutral cure silicone

along the flashing for the cill of the roof window.

Lift the roof window into the opening (Part 1 & 2).

Locate all of the fixing points at the perimeter of the roof window. Drill pilot holes and fix the coach screws (Part 4) with a large flat washer (Part 5) into the structural support. OVER TIGHTENING OF THE COACH SCREWS CAN CAUSE DAMAGE TO THE ROOF WINDOW FRAME, IT MAY BE NECESSARY TO PACK BEHIND THE FIXING RAIL. Ensure an even number of coach screws are used across each jamb.

1312

Page 8: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

C

C

Jamb flashing off-cut

D

Baseplaterollover

Flashing Kit

View on D

JambFlashing

JambFlashing

Silicone

Jamb flashing trim heightpClip the jamb flashing off-cut (Part 11) onto the baseplate rollover and align with the bottom edge of the baseplate (Part 2).

Section C-C

SECTION 6 - Installing the roof window> Perimeter silicone fillet

> Jamb flashing trim height

SECTION 6 - Installing the roof window> Jamb flashing trim height

Perimeter silicone filletp

Jamb flashing trim heightq Jamb flashing trim heightq

Install a thick continuous fillet of low-modulus neutral cure silicone to full length and width of the jambs and head of the roof window perimeter as shown. Tack four rows of battens up one jamb- do not nail home the ends of the

battens next to the roof window.

Dry tile four courses of tiles at the cill. Use the jamb flashing off-cut (Part 11) to determine whether or not it is required to trim down the jamb flashing (Part 6). If the top edge of the off-cut sits above the general line of the roof finish, trimming is required.

1514

Page 9: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

E

E

“Snap”

55

105

Min. 5O

Jamb flashing

Tilting FilletTilting fillet

Section E-E

SECTION 6 - Installing the roof window> Trimming the jamb flashing extrusion

> Installing the jamb flashing

SECTION 6 - Installing the roof window> Battening up the jambs

> Installing the head tilting fillet

Installing the jamb flashingq

Battening up the jambsp

Installing the head tilting filletq

Trimming the jamb flashing extrusionpOrientate one of the jamb flashings (Part 6) and clip onto the baseplate (Part 2) rollover- the excess felt on the jamb flashing should be towards the head of the roof window. Do the same on the opposite side. Ensure the felt attached to the jamb flashing is placed over the general roofing membrane.

Install the battens up the jambs

Install the head tilting fillet as shown (we recommend hardwood or treated softwood). Fix the head tilting fillet to the rafters.

NOTE: The positions for the guide notches were derived from a number of typical roof tiles and roof constructions. Depending on the roof make-up specific to the project. It may be necessary to trim the jamb flashing to a height not specified.

NOTE: If the excess felt attached to the jamb flashing (part 6) meets the next lap in the general roofing membrane, ensure it is tucked into this lap.

Lay the jamb flashing (Part 6) down on a clean and dry surface. Fold back the foam and use a sharp stanley knife to firmly score along the entire length of the extrusion several times. Then break off the excess extrusion.

1716

Page 10: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

Roofing Felt

Lead replacement flashing

SECTION 6 - Installing the roof window> Installing the head lead replacement flashing

> Installing the head roofing felt

SECTION 6 - Installing the roof window> Weathering

> Installing the battens at the head

Installing the head lead replacement flashingp

Installing the head roofing feltq

Weatheringp

Installing the battens at the headq

KEY

General roofing membrane: Installed above,

Roofing felt (Part 10): Installed above,

Head Lead replacement flashing (Part 9): Installed above,

Jamb flashing/ apron (Part 6)

Lay the head lead replacement flashing (Part 9) over the head fillet. Fold, boss and tuck the flashing back into the baseplate rollover. There may be a requirement to trim the head flashing around the jamb battens depending on their position. This can be done with a sharp stanley knife.

Install the head roofing felt (Part 10). Lay the strip of roofing felt over the lead replacement flashing at the head (Part 9) and ensure it tucks under the next lap in the general roofing membrane.

The combination of the lead replacement flashing (Part 9) and the roofing felt (Part10) being lapped in this way, ensures moisture will run over the tilting fillet onto the baseplate and finally down off the roof.

Finish installing the final rows of battens at the head.

NOTE: If this meets the next lap of the general roofing membrane, ensure it is tucked under the lap as shown.

1918

Page 11: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

NOTE: Before completely tiling the roof window in, we recommend that a final inspection of the jamb flashing (Part 6) trim height is carried out. To replace the jamb flashing once tiled is likely to involve stripping back the roof.

Soaker

Soakersp

Tile up the jambsq

Tile up to the cill. Soakers (Part 7) are then required, one per jamb. Lay the soaker flashing over the edge of the cill corner and form the soaker ensuring it tucks behind the jamb flashing extrusion (Part 6) as shown.

Tile the jambs using the edge of the jamb flashing (Part 6) as a guide. Ensure the weathering foam attached to the jamb flashing is folded down and away from the roof window when laying the tiles.

Tile the headp

Complete the tilingq

The head of the roof window can now be tiled. We recommend the use of eaves tiles.

Complete the tiling around the head of the roof window accordingly.

SECTION 6 - Installing the roof window> Soakers

> Tile up the jambs

SECTION 6- Installing the roof window> Tile the head

> Complete the tiling

2120

Page 12: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

I

I

Insulationp

Packers q

Install the insulation between the rafters.Securely fix 50mm timber and insulation packers around the head, cill and jambs of the roof window (we recommend the use of treated softwood).

Ply packerp

Vapour barrierq

Fix 18mm ply packer at the head, cill and jambs of the roof window.

Install the vapour barrier around the roof window. This should finish at the thermoliner as shown.

G

G

F

F

H

H

Thermoliner

Vapour Barrier

Insulation

Ply Packer

18

12.5 Plasterboard

+ Vapour Barrio

r

Timber Packer

Insulation

50

Section F-F Section H-H

Section G-GSection I-I

SECTION 7 - Finishing the interior> Insulation

> Packers

SECTION 7 - Finishing the interior> Ply packer

> Vapour barrier

2322

Page 13: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

K

K

NOTE: Your guarantee may be affected if you fail to undertake this installation step.

Section K-K

SECTION 7 - Finishing the interior> Plasterboard & skim

> Timber reveal & architrave

SECTION 7 - Finishing the interior> Paint the timber lining

> Mounting the ironmongery/ motor(s) / fixing bracket

Plasterboard & Skimp

Timber reveal & architraveq

Install the plasterboard over the ceiling. Ensure there is a 12.5mm overlap with a plaster stop on the corner. Then insert the plasterboard around the head, cill and jambs, behind the bottom left of the thermoliner as shown. Skim the main ceiling plasterboard but NOT the head, jambs and cill.

To complete the installation and provide a frameless internal appearance, fit a timber reveal around the head, cill and jambs, over the plasterboard. Ensure there is no interference with the thermoliner.

Timber Reveal

Paint the timber liningp

Mounting the ironmongery/ motor(s) / fixing bracket

q

For roof windows without a factory painted timber lining- this step must be completed to ensure longevity of this component. Paint the unfinished timber lining with a timber finishing paint. Ensure all four sides are painted.

This completes the installation of the roof window frame. To finish the installation and service the roof window, please refer to the seperately supplied ironmongery/ motor/ fixing bracket installation details.

J

JPlaster Stop

Plasterboard & skim to ceiling

Insert plasterboard

as shown

Plaster Stop

Plasterboard & skim to ceiling

Insert plasterboard

as shown

Section J-J

2524

Page 14: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

A A

BB

20

20

640

70

80

80

20

20

200

20

20

530

80

80

20

20

C

D

SEC

TIO

N A

-A

20

20

7053

0

E

F

SEC

TIO

N B

-B

100

100

Vie

wab

le

3

6

7

2b4

1

1215

9

1019

14

19

1d

13

11

8

1e

5

6b

50

100

Vie

wab

le

Cle

ar s

truct

ural

63

2b

4

1311

9b12

b

1014

b

1d

1b

7

19

1

8

4b

6b

1e

98R

oofli

ght

heig

ht

50

100

10

25

min

.

Cle

ar s

truct

ural

42

36

7

1113

1814

10

16 1d

17

1c

19V

iew

able

1 1e 8 6b

5

74 MAX

Max

imum

inst

alle

d he

ight

fro

m to

p of

soa

ker e

xtru

sion

to

top

of s

truct

ural

sup

port

is 7

5mm

for A

LL ti

le ty

pes.

Cle

ar s

truct

ural

Key

:1.

The

Con

serv

atio

n R

oofli

ght,

with

Iron

mon

gery

Opt

ion

1b fi

xed

tost

ruct

ural

rafte

r sup

ports

2 a

t jam

b us

ing

coac

h bo

lts fi

tted

thro

ugh

fixin

g ra

il 1c

.2.

Stru

ctur

al ra

fter s

uppo

rt at

jam

b an

d st

ruct

ural

trim

mer

supp

ort a

t hea

d an

d ci

ll 2b

.3.

Insu

latio

n fit

ted

betw

een

stru

ctur

al s

uppo

rts.

4. F

ix ti

mbe

r pac

kers

to s

truct

ural

sup

port

2 &

2b

at th

e to

p an

d ba

se o

f the

roof

bui

ld u

p.Th

e ci

ll tim

ber p

acke

r 4b

mus

t be

larg

er to

pro

vide

a s

ecur

e fix

ing

poin

t for

the

ironm

onge

ry.

Fix

18m

m p

ly p

acke

r to

the

timbe

r pac

kers

.5 .

Fit

insu

latio

n be

twee

n th

e tim

ber p

acke

rs 4

.6.

Pla

ster

boar

d lin

ing

with

pla

ster

boar

d st

op 6

b to

pro

ject

the

corn

er. P

last

erbo

ard

fitte

d be

hind

the

ther

mol

iner

of t

he ro

oflig

ht 1

e .7.

Pla

ster

ski

m

8. T

imbe

r rev

eal t

o al

ign

with

roof

light

lini

ngs

1d to

pro

vide

'fra

mel

ess'

inte

rnal

app

eara

nce.

Roo

fligh

t lin

ings

1d

MU

ST B

E PA

INTE

D w

ith a

tim

ber f

inis

hing

pai

nt o

nce

the

roof

light

is in

stal

led

to e

nsur

e lo

ngev

ity o

f thi

s co

mpo

nent

.If

the

linin

gs 1

d ha

ve b

een

fact

ory

pain

ted,

they

do

not r

equi

re a

n ad

ditio

nal p

aint

fini

sh. P

leas

e re

fer t

o la

bel a

ttach

ed to

Roo

f Win

dow

.9.

Hea

d ha

rdw

ood

tiltin

g fil

let.

9b. C

ill h

ardw

ood

tiltin

g fil

let -

to p

rovi

de m

inim

um 5

deg

ree

fall

for s

hedd

ing

rain

wat

er.

10. L

ine

of b

reat

habl

e m

embr

ane.

Roo

fing

mem

bran

e m

ust b

e al

low

ed to

'sag

'bet

wee

n ra

fters

.11

. Sof

twoo

d ba

ttens

.12

. Cod

e 3

(con

side

r usi

ng c

ode

4 an

d cl

ippi

ng d

own

roof

tile

s in

sev

erer

exp

osur

es) l

ead

flash

ing

at h

ead.

C

arry

flas

hing

up

the

roof

and

lap

UN

DER

gen

eral

roof

ing

mem

bran

e 10

and

UN

DER

hea

d m

embr

ane

15.

12b.

Cod

e 4

(con

side

r clip

ping

flas

hing

and

roof

tile

s do

wn

in s

ever

er e

xpos

ures

) lea

d fla

shin

g at

cill

ove

r tilt

ing

fille

t 9b .

Mak

e th

e fla

shin

g lo

ng e

noug

h to

giv

e tri

ple

lap

to th

e til

es b

elow

.13

. R

oofin

g til

es.

14.

Perim

eter

sili

cone

sea

l. S

eal p

erim

eter

of r

oofli

ght 1

JU

ST P

RIO

R T

O in

stal

latio

n of

the

roof

light

usi

ng a

thic

k co

ntin

uous

bea

d of

low

mod

ulus

neu

tral c

ure

silic

one

seal

ant.

Ens

ure

seal

ant t

o ci

ll 14

b is

loca

ted

in a

pos

ition

whe

re it

will

be

cove

red

by th

e ci

ll fla

nge

of th

e ro

oflig

ht.

15. R

oofin

g m

embr

ane

to ro

oflig

ht h

ead.

Dre

ss U

ND

ER g

ener

al ro

ofin

g m

embr

ane

18, U

ND

ER le

ad fl

ashi

ng 1

2 an

d O

VER

gen

eral

roof

ing

mem

bran

e 10

to e

nsur

e su

itabl

e la

p.16

. Jam

b fla

shin

g as

sem

bly

- uPV

C s

oake

r up

stan

d. M

axim

um in

stal

led

heig

ht fr

om to

p of

soa

ker t

o to

p of

stru

ctur

al s

uppo

rt is

75m

m.

Trim

soa

ker t

o ac

com

mod

ate

thin

ner t

ile ty

pes.

Ref

er to

the

flash

ing

kit i

nsta

llatio

n gu

ide

for m

ore

info

rmat

ion.

17. J

amb

wea

ther

ing

foam

whi

ch is

ben

t ove

r and

com

pres

sed

unde

r tile

s as

they

are

fixe

d do

wn.

Add

ition

al fi

xing

hol

es o

r a m

orta

r bed

may

be

requ

ired

unde

r som

e til

es w

here

onl

y on

e ba

tten

fixin

g is

pos

sibl

e.18

. Jam

b fla

shin

g ap

rons

, par

t of t

he ja

mb

flash

ing

asse

mbl

y (s

uppl

ied

as p

art o

f the

Fla

shin

g K

it). T

hey

pass

UN

DER

the

batte

ns b

ut O

VER

the

gene

ral r

oofin

g m

embr

ane.

The

bat

tens

are

tack

ed in

po

sitio

n at

the

roof

light

jam

bs o

nly

until

the

Flas

hing

Kit

is in

stal

led

and

the

jam

b ap

rons

are

slid

und

er th

em. T

hen

they

are

fixe

d ho

me.

19. V

apou

r bar

rier (

Blu

e).

Plea

se N

ote:

Thes

e se

ctio

nal d

etai

ls a

re p

rovi

ded

as a

n in

stal

latio

n su

gges

tion.

Due

to th

e di

fferin

g na

ture

of i

nsta

llatio

ns w

e st

rong

ly a

dvis

e yo

u to

con

sult

your

roof

light

inst

alle

r to

verif

y fit

ness

for p

urpo

se.

This

dra

win

g do

es n

ot c

onst

itute

a

stru

ctur

al p

ropo

sal.

Suf

ficie

ncy

of s

truct

ural

sup

ports

to b

e ch

ecke

d by

roof

light

pur

chas

er's

stru

ctur

al c

onsu

ltant

.

010

020

030

0

Scal

e - m

m

CD

WG

NO

. :

SCA

LE :

REV

ISIO

N:

TITL

E :

CR

_CR

CS_

FK_C

1:5

@ A

3D

O N

OT

SCA

LE

Col

d R

oof |

Cla

y Ti

le |

Flas

hing

Kit

'On

the

rafte

r' in

stal

latio

n de

tail

w: w

ww

.ther

oofli

ghtc

ompa

ny.c

o.uk

t:

019

93 8

33 1

08

e: in

fo@

ther

oofli

ghtc

ompa

ny.c

o.uk

All

info

rmat

ion

cont

aine

d w

ithin

this

dra

win

g is

co

pyrig

ht ©

and

des

ign

right

of t

he R

oofli

ght

Com

pany

. The

inte

llect

ual

prop

erty

righ

ts o

f the

pr

oduc

ts d

etai

led

with

in

this

dra

win

g an

d em

bedd

ed 3

D m

odel

s ar

e ow

ned

by th

e R

oofli

ght

Com

pany

.

This

is a

sugg

este

d in

stal

latio

n d

etai

l whi

ch m

ay n

ot b

e ex

actly

app

licab

le to

all

situa

tions

and

con

stru

ctio

ns. I

t is n

ot a

det

aile

d o

r con

stru

ctio

nal p

ropo

sal.

Inst

alle

rs a

nd

des

igne

rs a

re a

dvi

sed

to c

heck

thei

r ow

n d

etai

ls fo

r com

plia

nce

with

all c

urre

ntly

ap

plic

able

Loc

al A

utho

rity

by-la

ws,

Act

s of P

arlia

men

t and

Brit

ish /

ISO

stan

dar

ds.

SHEE

T N

O. :

1 O

F 1

DA

TE :

08/0

8/20

13

A B C D

12

34

5

12

34

5

A B C

9mm WBP ply spacer removed to insert plaster-board behind thermoliner

DB: EH CB: PD

D

> A

roof

win

dow

rang

e su

itabl

e fo

r pitc

hed

roof

s be

twee

n 17

.5 a

nd 6

5

> D

etai

l app

licab

le O

NLY

to ro

oflig

ht m

odel

s w

ith in

tegr

al c

asem

ent t

imbe

r lin

ings

The

Con

serv

atio

n R

oofl

ight

®

A A

BB

20

20

640

70

80

80

20

20

190

20

20

540

80

80

20

20

C

D

SEC

TIO

N A

-A

20

20

7053

0

E

F

SEC

TIO

N B

-B

100

100

Vie

wab

le

6

7

2b

1

1215

9

10

14

21

1d

19

3b

20

13

11

8

1e

6b

5

100

50

Vie

wab

le

Cle

ar s

truct

ural

6

2b

13

11

9b12

b

1014

b

1d

21

1

3

3b

20

19

1b

8

1e

6b

7

4

5

4b

98R

oofli

ght

heig

ht

50

10

100

25

Min

Cle

ar s

truct

ural

42

67

1113

1814

10

16 1d

17

21V

iew

able

1

193b

3

2c

8 6b51e

75 MAX

Max

imum

inst

alle

d he

ight

from

top

of s

oake

r ext

rusi

on to

top

of s

truct

ural

sup

port

is 7

5mm

for A

LL ti

le ty

pes.

Cle

ar s

truct

ural

010

020

030

0

Key

:1.

The

Con

serv

atio

n R

oofli

ght,

with

Iron

mon

gery

Opt

ion

1b fi

xed

tost

ruct

ural

rafte

r sup

ports

2 a

t jam

b us

ing

coac

h bo

lts fi

tted

thro

ugh

fixin

g ra

il 1c

.2.

Stru

ctur

al ra

fter s

uppo

rt at

jam

b an

d st

ruct

ural

trim

mer

supp

ort a

t hea

d an

d ci

ll 2b

. Bat

ten

bear

er fo

r ins

ulat

ion

2c.

3&3b

. Tim

ber b

eare

r fix

ed o

n to

p of

stru

cura

l sup

ports

. Adj

ust

heig

ht to

cre

ate

a flu

sh in

stal

latio

n w

ith th

e ro

of ti

les.

4. F

ix ti

mbe

r pac

kers

to s

truct

ural

sup

port

2&2b

at t

he to

p an

d th

e ba

se o

f the

roof

bu

ild u

p. T

he c

ill ti

mbe

r pac

ker 4

b at

the

top

of th

e ro

of b

uild

up

shou

ld b

e la

rger

to

prov

ide

a se

cure

fixi

ng p

oint

for t

he ir

onm

onge

ry. F

ix 1

8mm

ply

pac

ker t

o th

e tim

ber p

acke

rs.

5 . In

sula

tion

fitte

d be

twee

n tim

ber p

acke

rs 4

. 6.

Pla

ster

boar

d lin

ing

with

pla

ster

boar

d st

op 5

b to

pro

ject

the

corn

er. P

last

erbo

ard

fitte

d be

hind

the

ther

mol

iner

1e .

7. P

last

er s

kim

8.

Tim

ber r

evea

l to

alig

n w

ith ro

oflig

ht li

ning

s 1d

to p

rovi

de 'f

ram

eles

s' in

tern

al a

ppea

ranc

e.R

oofli

ght l

inin

gs 1

d M

UST

BE

PAIN

TED

with

a ti

mbe

r fin

ishi

ng p

aint

onc

e th

e ro

oflig

ht is

inst

alle

d to

ens

ure

long

evity

of t

his

com

pone

nt.If

the

linin

gs 1

d ha

ve b

een

fact

ory

pain

ted,

they

do

not r

equi

re a

n ad

ditio

nal p

aint

fini

sh.

Plea

se re

fer t

o la

bel a

ttach

ed to

Roo

f Win

dow

fram

e.9.

Hea

d ha

rdw

ood

tiltin

g fil

let.

9b. C

ill h

ardw

ood

tiltin

g fil

let -

to p

rovi

de m

inim

um 5

deg

ree

fall

for s

hedd

ing

rain

wat

er.

10 .

Line

of b

reat

habl

e m

embr

ane.

Roo

f mem

bran

e m

ust b

e al

low

ed to

'sag

' bet

wee

n ra

fters

.11

. Sof

twoo

d ba

ttens

.12

. Cod

e 3

(con

side

r usi

ng c

ode

4 an

d cl

ippi

ng d

own

roof

tile

s in

sev

erer

exp

osur

es) l

ead

flash

ing

at h

ead.

C

arry

flas

hing

up

the

roof

and

lap

UN

DER

gen

eral

roof

ing

mem

bran

e 10

and

UN

DER

hea

d m

embr

ane

15.

12b.

Cod

e 4

(con

side

r clip

ping

flas

hing

and

roof

tile

s do

wn

in s

ever

er e

xpos

ures

) lea

d fla

shin

g at

cill

ove

r tilt

ing

fille

t 9b .

Mak

e th

e fla

shin

g lo

ng e

noug

h to

giv

e tri

ple

lap

to th

e til

es b

elow

.13

. R

oofin

g til

es.

14.

Perim

eter

sili

cone

sea

l. S

eal p

erim

eter

of r

oofli

ght 1

JU

ST P

RIO

R T

O in

stal

latio

n of

the

roof

light

usi

ng a

thic

k co

ntin

uous

bea

d of

low

mod

ulus

neu

tral c

ure

silic

one

seal

ant.

Ens

ure

seal

ant t

o ci

ll 14

b is

loca

ted

in a

pos

ition

whe

re it

will

be

cove

red

by th

e ci

ll fla

nge

of th

e ro

oflig

ht.

15. R

oofin

g m

embr

ane

to ro

oflig

ht h

ead.

Dre

ss U

ND

ER g

ener

al ro

ofin

g m

embr

ane

10, U

ND

ER le

ad fl

ashi

ng 1

2 an

d O

VER

gen

eral

roof

ing

mem

bran

e 10

to e

nsur

e su

itabl

e la

p.16

. Jam

b fla

shin

g as

sem

bly

- uPV

C s

oake

r up

stan

d. M

axim

um in

stal

led

heig

ht fr

om to

p of

soa

ker t

o to

p of

stru

ctur

al s

uppo

rt is

75m

m. T

rim s

oake

r to

acco

mm

odat

e th

inne

r tile

type

s.R

efer

to th

e fla

shin

g ki

t ins

talla

tion

guid

e fo

r mor

e in

form

atio

n.17

. Jam

b w

eath

erin

g fo

am w

hich

is b

ent o

ver a

nd c

ompr

esse

d un

der t

iles

as th

ey a

re fi

xed

dow

n. A

dditi

onal

fixi

ng h

oles

or a

mor

tar b

ed m

ay b

e re

quire

d un

der s

ome

tiles

whe

re o

nly

one

batte

n fix

ing

is p

ossi

ble.

18. J

amb

flash

ing

apro

ns, p

art o

f the

jam

b fla

shin

g as

sem

bly

(sup

plie

d as

par

t of t

he F

lash

ing

Kit)

. The

y pa

ss U

ND

ER th

e ba

ttens

but

OV

ER th

e ge

nera

l roo

fing

mem

bran

e. T

he b

atte

ns a

re ta

cked

in

posi

tion

at th

e ro

oflig

ht ja

mbs

onl

y un

til th

e Fl

ashi

ng K

it is

inst

alle

d an

d th

e ja

mb

apro

ns a

re s

lid u

nder

them

. The

n th

ey a

re fi

xed

hom

e.19

. Ins

ulat

ion

fitte

d on

top

of s

truct

ural

sup

ports

.20

. Cou

nter

bat

ten.

21. V

apou

r bar

rier (

Blu

e)

Scal

e - m

m

Plea

se N

ote:

The

se s

ectio

nal d

etai

ls a

re p

rovi

ded

as a

n in

stal

latio

n su

gges

tion.

Due

to th

e di

fferin

g na

ture

of i

nsta

llatio

ns w

e st

rong

ly a

dvis

e yo

u to

con

sult

your

roof

light

inst

alle

r to

verif

y fit

ness

for p

urpo

se. T

his

draw

ing

does

not

con

stitu

te a

stru

ctur

al p

ropo

sal.

Suf

ficie

ncy

of s

truct

ural

sup

ports

to b

e ch

ecke

d by

roof

light

pur

chas

er's

stru

ctur

al c

onsu

ltant

.

4

3

CD

WG

NO

. :

SCA

LE :

REV

ISIO

N:

TITL

E :

CR

_WR

CS_

FK_C

1:5

@ A

3D

O N

OT

SCA

LE

War

m R

oof |

Cla

y Ti

le |

Flas

hing

Kit

'On

the

rafte

r' in

stal

latio

n de

tail

w: w

ww

.ther

oofli

ghtc

ompa

ny.c

o.uk

t:

019

93 8

33 1

08

e: in

fo@

ther

oofli

ghtc

ompa

ny.c

o.uk

All

info

rmat

ion

cont

aine

d w

ithin

this

dra

win

g is

co

pyrig

ht ©

and

des

ign

right

of t

he R

oofli

ght

Com

pany

. The

inte

llect

ual

prop

erty

righ

ts o

f the

pr

oduc

ts d

etai

led

with

in

this

dra

win

g an

d em

bedd

ed 3

D m

odel

s ar

e ow

ned

by th

e R

oofli

ght

Com

pany

.

This

is a

sugg

este

d in

stal

latio

n d

etai

l whi

ch m

ay n

ot b

e ex

actly

app

licab

le to

all

situa

tions

and

con

stru

ctio

ns. I

t is n

ot a

det

aile

d o

r con

stru

ctio

nal p

ropo

sal.

Inst

alle

rs a

nd

des

igne

rs a

re a

dvi

sed

to c

heck

thei

r ow

n d

etai

ls fo

r com

plia

nce

with

all c

urre

ntly

ap

plic

able

Loc

al A

utho

rity

by-la

ws,

Act

s of P

arlia

men

t and

Brit

ish /

ISO

stan

dar

ds.

SHEE

T N

O. :

1 O

F 1

DA

TE :

08/0

8/20

13

A B C D

12

34

5

12

34

5

A B C

9mm WRP ply spacer removed to insert plaster-board behind thermoliner

DB: EH CB: PD

D

> A

roof

win

dow

rang

e su

itabl

e fo

r pitc

hed

roof

s be

twee

n 17

.5 a

nd 6

5>

Det

ail a

pplic

able

ON

LY to

roof

light

mod

els

with

inte

gral

cas

emen

t tim

ber l

inin

gs

The

Con

serv

atio

n R

oofl

ight

®

Page 15: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

28

To achieve the maximum service life from The Conservation Rooflight® it is important that scheduled care and maintenance is undertaken. Please note that the guarantee may become void if the procedures outlined in the separate maintenance manual are not adhered to. Refer to separate TECHNICAL SPECIFICATION AND MAINTENANCE DETAILS FOR METAL FRAMED ROOF WINDOWS

Refer to separate DECLARATION OF PERFORMANCE DOCUMENTATION

EN 14351-1 : 2006+A1: 2010

Standard roof window: All the information provided in this document refers to a standard specification Conservation Rooflight®.

Install in accordance with national building regulations/codes. This manual is an installation suggestion and installers should verify ‘fitness for purpose’ in accordance with all applicable regulations/ standards at time of installation.

Install in accordance with this manual: The Rooflight Company cannot accept any liability if the Conservation Rooflight® is not installed strictly in accordance with the instructions contained in this manual and implicit in the ‘Suggested Installation Details’.

Structural support: Structural supports for the Conservation Rooflight® are to be designed and supervised during construction by the roof window installer or project Structural Engineer. Nothing in this manual constitutes a structural proposal. Sizing/positioning of structural supports should be determined by the projects suitably qualified structural engineer.

SECTION 9 - Important Information> Care & maintenance

> Conformity

> Advisory

29

SECTION 9 - Important Information> Roof window weight and opening angle

> Further Information

FURTHER INFORMATION

All of the images in this guide are diagrammatic (with some components omitted for clarity). They should be used as a reference and may not be a true representation of the installation.

Installation instructions are regularly reviewed and we reserve the right to update or amend these details without alteration to this guide.

July 2013

ROOF WINDOW WEIGHTSWhen handling and installing the Conservation Rooflight® its weight should be considered and adequate means employed to move the roof window into position to reduce the risk of accidents.

CARE & MAINTENANCE

CONFORMITY

ADVISORY

MODEL REFERENCE NUMBER

APPROXIMATE CASEMENT WEIGHT (KG)

APPROXIMATE BASEPLATE WEIGHT (KG)

OVERALL ROOF WINDOW WEIGHT (KG)

CR - 1 18 18 36

CR - 1/3 22 29 51

CR - 2/1 15 17 32

CR - 3 24 22 46

CR - 6 10 12 22

CR - 7 14 14 28

CR - 8 22 20 42

CR - 9 29 24 53

CR - 10 32 26 58

CR - 10/1 20 22 42

CR - 11 35 25 60

CR - 13 43 30 73

CR - 14 47 33 80

CR - 14/2 35 28 63

CR - 15 57 37 94

CR - 15/2 43 34 77

Serial number:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Model Number: _ _ _ _ _ _ _ _ _ _ _ _

Date of manufacture: _ _ / _ _ / _ _ _ _

PRODUCT IDENTIFICATION DETAILS

Place identification sticker here or fill in the following details.

Page 16: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

30

NOTES

31

NOTES

Page 17: Installation Guide | the Conservation Rooflight...6. 1x right hand jamb flashing & apron 6. 1x left hand jamb flashing & apron 11. 1x jamb flashing off-cut 10. 1x roofing felt 7. 2x

In the interest of continuous product development, it may be necessary to amend specification without alteration to technical literature.All drawings and designs are the Copyright and Design right of The Metal Window Company Ltd.

Designed in the U.K

Assembled in the U.K.

BS EN 1279-2BS EN 1279-3

EN 14351-1 2006+A1 : 2010

Wychwood Business Centre

Milton Road

Shipton-under-Wychwood

OX7 6XU

Tel: 01993 833108

Fax: 01993 831066

Email: [email protected]

www.therooflightcompany.co.uk