Top Banner
CANUSA -CPS CANUSA-CPS is registered to ISO 9001:2008. Installation Guide r e n a e l C r e n a e l C To ensure maximum performance, store Canusa products in a dry, ventilated area. Keep products sealed in original cartons and avoid exposure to direct sunlight, rain, snow, dust or other adverse environmental elements. Avoid prolonged storage at temperatures above 35°C or below -20°C Product installation should be done in accordance with local health and safety regulations. (95°F) (-4°F). Storage & Safety Guidelines Pipeline Repair Products Removal of Damaged Coating 1 4 Coating Repair Patch 2 Remove damaged coating with a knife or hand grinder to prevent crack propagation in the coating. Repair Patch and Butyl Mastic Filler Pipeline Repair Products Equipment List Propane tank, hose, torch & regulator. Appropriate tools for surface abrasion and cleaning, including wire brush, abrasive paper, rags & approved cleaner. Temperature measuring device. Misc. tools such as; knife, putty knife, roller, paint brush or paint roller, tape measure, and marker. Standard safety equipment; gloves, goggles, hard hat, etc. 3 These installation instructions are intended as a guide for standard products. Consult your Canusa representative for specific projects or unique applications. Part No. 99060-011 Mastic Filler Solvent Cleaning 5 Clean exposed steel and adjacent pipe coating with an approved cleaner (as per SSPC-SP-1) to remove the presence of oil, grease and other contaminants. Surface Preparation 6 Remove adhering rust, coating chalk, dirt, and roughen the mill applied coating in the repair zone using an abrasive paper/cloth or wire brush. Repair Zone Damaged Area The Coating Repair Patch (CRP) is typically shipped in bulk rolls and can be cut-to-size in the field. Mastic Fillers are used to repair holidays and/or fill voids. Use a low intensity yellow flame for pre-heating the coating and applying the repair products. With quick back and forth strokes, pre-heat repair area to 60˚C minimum to remove moisture and assist in adhesion. 7b Flame Intensity Fill deeper crevices with UCC Butyl Mastic strip.Unroll thefillermaterialandcutofftherequiredamount,leaving the release paper in place. 7a Mastic Filler Installation
2

Installation Guide Pipeline Repair Products Guide Canusa CRP-65 Repair Patch.pdfCANUSA-CPS CANUSA-CPS is registered to ISO 9001:2008. Installation Guide r e n a e l C r e n a e l C

Mar 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Installation Guide Pipeline Repair Products Guide Canusa CRP-65 Repair Patch.pdfCANUSA-CPS CANUSA-CPS is registered to ISO 9001:2008. Installation Guide r e n a e l C r e n a e l C

CAN

USA-CPS

CANUSA-CPS is registered to ISO 9001:2008.

Installation Guidere

nael

C

rena

elC

To ensure maximum performance, storeCanusa products in a dry, ventilated area. Keepproducts sealed in original cartons and avoidexposure to direct sunlight, rain, snow, dust orother adverse environmental elements. Avoidprolonged storage at temperatures above 35°C

or below -20°C Productinstallation should be done in accordance withlocal health and safety regulations.

(95°F) (-4°F).

Storage & Safety GuidelinesPipeline Repair Products

Removal of Damaged Coating

1

4

CoatingRepair Patch

2

Remove damaged coating with a knife or hand grinder toprevent crack propagation in the coating.

Repair Patch and Butyl Mastic FillerPipeline Repair Products

Equipment List

Propane tank, hose, torch & regulator.Appropriate tools for surface abrasion and cleaning,including wire brush, abrasive paper, rags & approved cleaner.Temperature measuring device. Misc. tools such as; knife,putty knife, roller, paint brush or paint roller, tape measure,and marker.Standard safety equipment; gloves, goggles, hard hat, etc.

3

These installation instructions are intended as a guide forstandard products. Consult your Canusa representativefor specific projects or unique applications.

Part No. 99060-011

Mastic Filler

Solvent Cleaning5

Clean exposed steel and adjacent pipe coating with anapproved cleaner (as per SSPC-SP-1) to remove thepresence of oil, grease and other contaminants.

Surface Preparation6

Remove adhering rust, coating chalk, dirt, and roughen themill applied coating in the repair zone using an abrasivepaper/cloth or wire brush.

RepairZone

DamagedArea

The Coating Repair Patch (CRP) is typically shipped inbulk rolls and can be cut-to-size in the field. Mastic Fillersare used to repair holidays and/or fill voids.

Use a low intensity yellow flame for pre-heating the coatingand applying the repair products. With quick back and forthstrokes, pre-heat repair area to 60˚C minimum to removemoisture and assist in adhesion.

7bFlame Intensity

Fill deeper crevices with UCC Butyl Mastic strip.Unrollthefillermaterialandcutofftherequiredamount,leaving therelease paper in place.

7a

Mastic Filler Installation

Page 2: Installation Guide Pipeline Repair Products Guide Canusa CRP-65 Repair Patch.pdfCANUSA-CPS CANUSA-CPS is registered to ISO 9001:2008. Installation Guide r e n a e l C r e n a e l C

Pipeline Repair Products

Place the filler material onto the damaged area with therelease paper facing up. Firmly press the material into thedamaged area by hand and remove the release paper.

Pre-Heat

Warm the damaged area (repair zone + 50mm (2”)overlap) to remove moisture and assist in adhesion.

9

Overwrap Patch

Spirally overwrap the patch with UCC PVC overwrapextending about 150mm either side of the patch.

13

Patch Installation

After removing the release liner from the cut patch, place thepatch with the adhesive side up on a gloved hand, or on topof the pipe, and heat gently. Heat until the adhesive softensand the surface becomes glossy. Also, reheat the damagedarea to keep it warm.

10

Patch Preparation

Cut a patch of CRP large enough to extend a minimum of50mm (2") beyond the edge of the repair zone. Trim eachcorner of the patch about 10-25mm (½" - 1") at a 45° angle.If the damage has a diameter greater than 10cm (4"), use anappropriate heat-shrinkable sleeve.

810 - 25mm

Repair Zone+ 100mm

+ 100 mmor

+ 2 x 50mmenoZ

riap

eR

mm0

01+

Apply the softened adhesive side of the patch to thedamaged area and press down firmly. Heat the patch with alow intensity flame, and using a roller or a gloved hand, patdown and remove wrinkles. Roll to ensure a good bond.

11

Inspection12

Visually inspect the installed patch for the following:1. Patch is in full contact with the pipe coating.2. There are no loose edges.3. A successful patch has adhesive flow on the edges.4. The patch has fully conformed to the coating.5. No cracks or holes in patch backing.

Backfilling Guidelines

After application, allow the repaired area tocool before backfilling. To prevent damage tothe repaired material, use selected backfillmaterial (no sharp stones or large particles).

14

After filling the damaged area, remove the excess filler tocreate a smooth surface. As an option, use a low intensityyellow flame to warm the filler material and assist insmoothing it out.

7d7c

Tom Naismith Technical Training ManagerSteel Mains Pty Ltd39 Silica Street Carole Park Qld 4300 AustraliaOffice: +61 07 3712 3621Fax: +61 07 3879 [email protected]