This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
- TELIS00-2BELTwo Post Self-Supporting Equipment RackAssembly Instruction
2 or 5
1
1
3
4
6
Page 2/10
B) Floor Layout
10GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B
This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com
C) Installation
Step 1:- Install first rack with a co-worker (referto PX105224 for 10GX IDC X-Conn. Front-to-Back Cross-conn. Cable Management TroughKit)
Page 3/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B
Step 2:- Install end 6" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions
6" verticalmanager
This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com
Step 3:- Install center 12" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions
12" verticalmanager
Page 4/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B
Step 4:- Install as many frames (Step-1) and 12"vertical manager (Step-3) with a co-worker- Refer to IS-8_BELDEN_V1: Belden CableManager Installation Instructions andPX105224 10GX IDC X-Conn. Front-to-Back Cross-Conn. Cable ManagementTrough Kit
This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com
6" verticalmanager
Step 5:- Install end 6" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions
Page 5/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B