    Installation InstructionsforGlasBac/GlasBacRETiles

    These Installation Instructions cover most installation procedures. If you run

    across a situation that isnt addressed in this document or requires moredetailed assistance please contact the Interface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    All carpet tiles should be carefully inspected for damage or defects prior toinstallation. Interface will not be responsible for any cost associated withreplacement or repair as a result of damaged or defective tiles being installedwhen said damage or defects were identifiable prior to installation.

    If you encounter any conditions or defects during installation that couldjeopardize the installation or affect the installation procedure, you shouldSTOP the installation immediately and call the Interface Help Desk. U.S. (877)733-7403 / Canada (888) 224-2972

    The carpet tiles are warranted in accordance with Interfaces Standard ProductWarranty. If you do not have a copy of Interfaces Standard Product Warranty and

    wish to obtain one, call the Interface Help Desk. U.S. (877) 733-7403 / Canada(888) 224-2972 or visit our website at www.interface.com/warranty.

    EXCEPT AS EXPRESSLY PROVIDED IN THE STANDARD PRODUCT

    WARRANTY, INTERFACE MAKES NO REPRESENTATIONS ORWARRANTIES, EXPRESS OR IMPLIED, INCLUDING, WITHOUTLIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESSOF ITS PRODUCTS FOR ANY PARTICULAR PURPOSES, ANDHEREBY DISCLAIMS THE SAME.Without limiting the foregoing, Interfacewill not be responsible for staining, soiling, contamination, tears, burns cuts,pulls or other damage, deterioration or loss caused by abuse, misuse, improperinstallation, improper maintenance or failure to protect carpet tiles duringbuilding construction. Interface shall not be responsible for any damage or lossresulting from failure to strictly follow any part of these Installation Instructions,and such failure shall void any and all portions of the Standard Product Warrantythat are affected by such failure.

    WARNING:IN THE EVENT THAT ANY ASBESTOS-CONTAINING MATERIALSOR OTHER HAZARDOUS MATERIALS ARE ENCOUNTERED DURINGINSTALLATION, YOU SHOULD STOP THE INSTALLATION IMMEDIATELY AND

    OBTAIN ASSISTANCE FROM A QUALIFIED REMEDIATION CONSULTANTOR CONTRACTOR PRIOR TO PROCEEDING.

    Important Notices

    Pre-installation visit

    Moisture and alkalinity test

    New concrete needs at least 90 days to dry under ideal conditions. Lightweightconcrete and concrete poured above grade in metal pans take a considerablylonger time to dry. Installation cannot begin until it is fully dried and in compliancewith moisture and alkalinity requirements.

    The temperature of your job site must stay within 60F (15.5C) and 85F(29.5C) 48 - 72 hours prior to, during, and 48 - 72 hours after installationso be sure the heating and air conditioning system is operating.

    All carpet tiles must be removed from the cartons and allowed to adjust tothe job site temperature for 48 hours prior to installation.

    Before installing Interface GlasBac/GlasBacRE carpet tiles over a new orexisting concrete subfloor, you must test the moisture and alkalinity levels ofthe concrete.

    Moisture conditions of the concrete should be determined by use of the in SituProbe rH test method (ASTM F 2170). Moisture conditions must not exceed

    75% rH except when installing with TacTiles connectors over new or bareconcrete, which allows for installation up to 80% rH.

    Although not as accurate, moisture emission rates can be tested using theCalcium Chloride test method (ASTM F 1869). When using this method, theemission rates must not exceed 3.0lbs/1000sf/24hrs. For warranty purposes,any time an issue related to moisture occurs, the in Situ Probe rH test methodsupersedes the Calcium Chloride method for determining moisture conditionsof the concrete. NOTE: Results obtained by these methods reflect only theconditions of the concrete at the time of testing. If the concrete moistureexceeds these limitations, do not proceed with the installation. Call the InterfaceHelp Desk U.S. (877) 733-7403 / Canada (888) 224-2972. Stated moisture andpH limitation must be maintained for the life of the installation to avoid installa-tion and product failures and to preserve warranty coverage.

    60F (15.5C) - 85F (29.5C)

    90 Days

    NOTE: The required pre-installation moisture and alkalinity tests should beperformed to ASTM standards.

    Per CRI guidelines it is recommended that these tests be performed by aqualified independent testing consultant.

    Interface will not be responsible for failures, problems, or damage arising fromhigh moisture, high alkalinity, or other subfloor conditions.

    NOTE: New or bare concrete is defined as concrete free of adhesive residue,paint, sealers, primers and other applied materials.

    80% rH - Using TacTiles connectorsover new or bare concrete

    75% rH - All other concrete substrates

    1

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    2/12

    Moisture and alkalinity test (continued)

    Product inspection

    All concrete floors, old and new, should be tested for alkalinity by using analkalinity test kit. The pH test papers should be capable of measuring a range of0 - 14. The area to be tested must be weather-tight and conditioned, via thebuildings HVAC system, to a temperature range of 65 - 85 Fahrenheit and arelative humidity range of 40% - 60%. This temperature and humidity rangemust be maintained for at least 48 hours immediately prior to commencing thetest, and at all times during the test. All adhesives, coatings, finishes, dirt, curingcompounds, sealant and other substances that may affect the rate of moisturedissipation must be removed from the area to be tested. Non-chemical methods

    such as abrasive cleaning or bead blasting may be used on existing slabs toachieve an appropriate state for testing.

    Once this criteria has been met:1. Abrade the surface by scratching into the clean slab a minimum of 1/32 but

    no more than 1/8.2. Apply a small amount (approx. 1 in diameter) of de-ionized or distilled water.3. Allow the de-ionized/distilled water to stand for 60 seconds.4. Dip the 0-14 pH test strip into the puddle and remove immediately.5. Compare to the test kits associated pH chart to determine the pH.6. At least one pH test must be performed for every 1,000 square feet of space.

    The slab should have an alkalinity level between 7.0 - 9.0 to be suitable forcarpet installation. Should the pH level be outside of this range, STOP and DONOT proceed with installation.Call the Interface Help Desk. U.S. (877) 7337403 / Canada (888) 224-2972

    NOTE: Test results reflect the condition of the slab at the time of testing.Interface recommends the use of MoistureGard 2.0 prior to installationof the carpet when moisture and pH conditions are outside specified limits.MoistureGard 2.0 provides protection against moisture vapor emission ratesof up to 90%rH and pH up to 12.0. When MoistureGard 2.0 is used, the carpetmust be installed with Interface TacTiles connectors. Moisturegard 2.0and TacTiles cannot be used on stairs, ramps or inclines. Guidelines for theapplication of TacTiles can be found in this document. For more information onMoistureGard 2.0 contact your Interface Account Executive or call theInterface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    INSPECT INTERFACE GLASBAC/GLASBACRE CARPET TILES TOBE SURE THEY MEET THE ORDER SPECIFICATIONS. IF THEWRONG PRODUCT OR COLOR IS INSTALLED, Interface WILL NOTBE RESPONSIBLE FOR CORRECTING THE PROBLEM.

    The labels on each carton indicate product style, pattern, color, run number anddye lot. Be sure the style, pattern and color match the specifications for eacharea of your installation. On larger installations, you may find that some cartonshave different run numbers and/or dye lots. Dye lots may be mixed for Interfacei2styles. To avoid subtle variations in the finished installation of non-i2 styles,do not mix run numbers or dye lots in the same area.

    Check to confirm that you have the right quantity and correct installation method.

    Be sure you also have enough tiles to establish an attic stock for futurereplacements.

    Open all cartons to inspect for damaged or defective tiles. If you find any,call the Interface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    40% - 60% Relative

    Humidity Range

    De-ionized orDistilled Water

    Color

    Label

    Alkalinity Level Between 7.0 - 9.0Test every 1,000 sq. ft. of space

    Temperature Range of 65 - 85F

    2

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    3/12

    Lighting

    Monolithic Installation

    Ashlar Installation

    Brick Installation

    Quarter-Turn Installation

    Non Directional Installation

    Tools

    SQUARE TILES(for Plank Tile Instructions see page 11)

    The lighting to be used by the building occupants must be in service for properinspection of color and joints.

    INSTALLATION OF CARPET TILES SHOULD BE THE LAST ITEM ONTHE CONSTRUCTION SCHEDULE. CAREFULLY CONSIDER THERISKS IF YOU ARE ASKED TO INSTALL CARPET TILES TOO EARLY.IF CARPET TILES ARE INSTALLED BEFORE CONSTRUCTION ISCOMPLETE, ANY STAINING, SOILING OR DAMAGE CAUSED BYOTHER TRADES MAY VOID THE PRODUCT WARRANTY.

    Proper installation requires tools on the following checklist.

    English/Metric Vacuum

    steel measuring tape HammerWhite chalk line ScraperCarpet knife TacTilesCarpet knife replacement OR blades Recommended adhesiveSteel straight edge with 1/2 nap paint rollerCarpenters squareBroomSander

    NOTE: INTERFACE ASSUMES NO LIABILITY FOR ISSUES RELATEDTO OR RESULTING FROM INSTALLING OUT OF SPECIFICATION,INCLUDING, BUT NOT LIMITED TO, RECOMMENDED INSTALLATIONMETHOD.

    An arrow is printed on the

    back of each carpet tile toindicate pile direction. Makesure the arrows point in thesame direction throughoutyour installation.

    Some InterfaceGlasBac/GlasBacRE

    tiles are designed to beinstalled in an ashlar patternby offsetting the front andback tile joints.

    Some InterfaceGlasBac/GlasBacRE

    tiles are designed to beinstalled in a brick patternby offsetting the side jointsof the tiles.

    Some Interface

    GlasBac/GlasBacREtiles are designed to beinstalled in a parquetpattern. In this case, thearrows should be turned90 degrees every other tile.

    Some InterfaceGlasBac/GlasBacRE

    tiles are designed to beinstalled in a non directionalpattern. This pattern allowsinstallation of tiles withoutregard to arrow direction.

    Follow the Arrows

    3

    No Yes

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    4/12

    PREPARING THE SUBFLOOR

    Installing over concrete

    Installing over wood, plywood or particle board

    All concrete floors must comply with moisture and alkalinity requirements priorto proceeding with installation. (See Moisture and Alkalinity Test above.)

    Level the floor to the standards outlined in the American Concrete Institutespecifications for Concrete Building ACI 301 in regards to troweled finish andfinishing tolerances. Leveling compounds must be Portland-based cement.

    Level

    PatchCompound

    Repair

    Sand Barrier Coat

    PlywoodNail 6 Apart

    Sand

    Repair loose or broken boards. Secure with 8-D cement-coated screw nails.

    Patch cracks and holes with one of the following approved patching compounds:Ardex Feather Finish, Ardex K-15, Henrys 547, Armstrong S-184 or similarcement based compound. NOTE: Some patching compounds can be mixedwith water while some must be mixed with latex. Follow the manufacturersspecifications and instructions for use.

    NOTE: Incompatible adhesives, solvent based materials and other contaminantsshould be removed or encapsulated prior to installation of carpet. Contact theInterface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    If the majority of the boards are worn or badly cupped, cover with 5/8 inch(1.6 cm) exterior grade AD plywood secured with 8-D cement-coated screwnails spaced 6 inches (15.2 cm) apart. Sand seams smooth.

    Sand the finish down to bare wood.

    Remove dust by sweeping, then wiping with a tack cloth.

    All wood surfaces should be primed prior to application of an adhesive.Interface recommends XL Brands TriSeal or similar product.

    NOTE: Incompatible adhesives, solvent based materials and other contaminantsshould be removed or encapsulated prior to installation of carpet. Contact theInterface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    4

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    5/12

    Remove Replace

    Installing over vinyl tile, sheet vinyl or natural materials

    Installing over raised floors

    WARNING:EXISTING FLOOR COVERING MAY CONTAIN ASBESTOS OROTHER HAZARDOUS MATERIALS. IN THE EVENT ASBESTOS-CONTAININGMATERIALS OR OTHER HAZARDOUS MATERIALS ARE ENCOUNTERED, YOUSHOULD STOP THE INSTALLATION IMMEDIATELY AND OBTAIN ASSISTANCEFROM A QUALIFIED REMEDIATION CONSULTANT OR CONTRACTOR PRIORTO PROCEEDING.

    Use an appropriate stripper or a sander to remove the wax top coat.

    Remove Replace

    Sand

    Remove

    Remove

    Sand

    Barrier Coat

    Fill

    Replace

    Patch or replace any damaged floor panel inserts.

    Panels should be free of any dirt, grease, oil, paint, sealer, adhesive or othermaterials from floor.

    NOTE: Incompatible adhesives, solvent based materials and other contaminantsshould be removed or encapsulated prior to installation of carpet. Contact theInterface Help Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    Remove any damaged or loose vinyl tiles and replace with comparable thicknesstile or patching compound.

    Remove sheet vinyl with a scraper. Do not install over sheet vinyl. Any existingadhesive remaining on subfloor should be removed by grinding/scraping andresidue encapsulated.

    For natural materials such as granolithic, terrazzo, marble, ceramic tile, etc.,breakout and remove all material or replace damaged areas with substitutematerial of the same thickness.

    Patch and fill cracks and irregularities, including grout lines, with one of thefollowing approved patching compounds: Ardex Feather Finish, Ardex K-15,Henrys 547, Armstrong S-184 or similar cement based compound.

    NOTE: Some patching compounds can be mixed with water while some mustbe mixed with latex. Follow the manufacturers specification and instructionsfor use.

    Sand top surface to remove glaze.

    Remove dust by sweeping, then wiping with a tack cloth.

    All porous surfaces should be primed prior to application of an adhesive.Interface recommends XL Brands TriSeal or similar product.

    5

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    6/12

    ESTABLISHING THE STARTING POINT

    1. Measure to determine the center point and mark. Snap a chalk line.

    2. Measure 8 feet (243.5 cm) out from your center point along the chalk line. Make a mark.

    3. Measure 6 feet (182.9 cm) from your center point at a right angle to yourchalk line and make a mark.

    4. Measure the distance between your marks. It should be exactly 10 feet (304.8 cm). If it is, your quadrants will be square. Snap a chalk line here.

    NOTE: If the room is too small for the above measurements, reduce them byhalf. Measure 4 feet (121.9 cm) vertically and 3 feet (91.4 cm) horizontally. Inthis case, the measurement between your two marks should be exactly 5 feet(152.4 cm).

    Snap a Line

    Measure

    Measure

    Measure

    Determine if center lines need to be offset

    Dry fit (without adhesive) a row of tiles along the entire length of your vertical and horizontal center lines. Go all the way to the walls.If necessary, offset either or both center lines to ensure perimeter tiles will be cut no less than half size, or 9.84 inches (25 cm).

    6

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    7/12

    NOTE:The average TacTile connector application rate is 4 TacTiles per squareyard of carpet. In small spaces a higher per yard application rate may apply.Consult your local Account Executive or the Interface Help Desk. U.S. (877)733-7403 / Canada (888) 224-2972

    TacTiles connectors should not be used on stairs, ramps or inclines

    Lay anchor rows, placing a TacTile connector at every joint. Install carpet usinga step method placing a TacTile connector at every corner.

    Quarter-Turn / Monolithic / Non Directional Installations / Area Rugs Brick / Ashlar Installations

    NOTE: When installing using Interface TacTiles connectors, perimeter tilesshould be cut net to the wall. In the event a wall or other termination point doesnot extend to the subfloor, the perimeter tiles should be installed using anapproved Interface adhesive.

    If needed, TacTiles connectors can be applied at all joints when installingashlar/brick. This is not required but is left to the dealers discretion whenconditions suggest additional TacTiles connectors are necessary.

    CheckSquare

    CheckSquare

    CheckSquare

    Insert tiles based on approved installation method. TacTiles connectors should be applied based on the following diagrams.

    Applying TacTiles connectors

    TacTiles connector placement

    TacTiles Installation System

    SQUARE TILES(for Plank Tile Instructions see page 12)

    A

    B

    A

    B

    CD A

    B

    CD

    E

    7

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    8/12

    If you choose spread adhesive, use only XL Brands 2000 (U.S.) or 2500 (Canada) Pressure Sensitive Adhesive on all areas other than stairs.On stairs, use only vinyl compatible permanent adhesive. For stair nosing, use manufacturers recommended installation method.

    APPLYING ADHESIVE

    Adhesive Installation

    Full spread adhesive application

    Grid adhesive application

    Adhesive in special situations

    Apply adhesive with a 1/2 nap paint roller. Expect a spread rate of 40-45square yards per gallon using a 1/2 nap paint roller.

    For raised floor systems a full spread of adhesive is required.

    FLATWIRENever apply adhesive directly over flatwire. The flatwire may be damaged if thetiles need to be removed.

    UNEVEN AREASAny surface that cannot be leveled may require adhesive or double-sided tapeto hold a tile in place.

    Using a 1/2 nap paint roller, apply adhesive along each base line to anchorthe starting rows.

    Adhesive must also be applied at all room perimeters (each wall).

    The application rate for a grid adhesive method is 180 square yards per gallon.

    Grid size should not exceed 10. Grid size should be adjusted based onexpected traffic flow. Grids can range from 1-10.

    NOTE: A full spread of adhesive must be applied under every cut tileand any adjoining tile to the cut tile. Full spread is also required in anyarea that will be exposed to high foot traffic and/or heavy rolling traffic

    Spread Rate:40 - 45 Sq. Yds./Gallon

    Apply AdhesiveAlong Base Lines

    NO

    Raised Floor Systems

    Apply Adhesive AlongRoom Perimeters

    Full Adhesive Under Cut Tilesand Adjoining Tiles

    8

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    9/12

    LAYING TILES

    Tile Installation

    Tip into place

    Lay tiles in step or pyramid pattern

    Follow the center lines closely. In smaller rooms, your anchor rows may consistof fewer than 11 tiles. Lay an anchor row of 10 additional tiles (11 including theone youve already placed) aligned with the center line.

    Measure your anchor rows. Each should equal 550 cm (11 tiles x 50 cm each,or 216 17/32) with no more than a 3mm (1/8) gain. If the gain is more than3 mm, the tiles arent tight enough and should be laid again. After relaying,measure again. If tiles are less than 550 cm they are too tight and should belayed again.

    Dont position tiles by sliding them across the adhesive. This will cause the

    corner to bend under. Instead, brush the pile back with one hand, then tipa corner of the tile into place. Position the rest of the tile once the corneris properly aligned. Do not catch the pile in the joints.

    1. Lay two tiles vertically, and check that they are square to the anchor rows.

    2. Lay two tiles horizontally, and check that they are square to the anchor rows.

    3. Lay one tile to complete the step.

    4. Follow the ABCD pattern laid out here until you reach the end of your anchorrows. Repeat laying anchor rows and ABCD patterns in all quadrants untilcomplete.

    3mm or 1/8 Gain

    DONT Slide Tip In

    550cm or 216 17/32

    CheckSquare

    CheckSquare

    CheckSquare

    A

    B

    A

    B

    CD A

    B

    CD

    E

    9

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    10/12

    CUTTING TILES

    PREPARING FOR OCCUPATION

    Guidelines for cutting tiles

    Final inspection and vacuum

    Tiles adjacent to fixtures, architectural elements and walls need to be cut.Follow these guidelines:

    If practical, remove the base molding before installing perimeter tiles. Replace molding when finished. Replace blades often. Sharp blades make cutting quicker, easier and more precise. Never use other tiles as a cutting surface. Place tiles on layers of cardboard before cutting. Always secure cut tiles with adhesive.

    Inspect the entire installation, paying close attention to joints and any tilesthat have been cut.

    Vacuum the floor with a pile lifter. If you dont have a pile lifter, use an uprightvacuum cleaner.

    Measure

    Tape StraddleFlatwire

    Straddle

    Seams

    Straddle

    Trench

    CutsSeams

    Vacuum

    Tip In

    Cut

    Floor outlets

    Trench headers

    Flatwire

    Raised floors

    Floor outlets are usually wired aftercarpet tiles have been installed.Consequently, you should install tilesdirectly over floor outlets and mark

    the location with tape. This way, itwill be easy to see which tiles needto be lifted for cutouts later.

    Tile layout should allow trenchheaders to be centered under arow of tile. Secure the tiles on eitherside of trench headers with adhesive.This will prevent the installationfrom shifting while servicing trenchheaders.

    Tile layout should allow flatwire tobe centered under a row of tile.

    Raised floor panels are susceptibleto subtle flexing. To ensure uniformappearance, avoid matching raisedfloor seams with tile joints.

    Follow CRI installation standards

    In addition to the specific floor preparation and installation instructions detailed here, the Carpet and Rug Institutes Carpet Installation Standardmust be followed. Please note that many of the Interface installation requirements may exceed or differ from those in the CRI Standard. In theevent of conflict between the Interface Installation Instructions and the CRI Standard, you should follow the Interface Installation Instructions.

    10

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    11/12

    Quarter-Turn Installation

    Quarter-Turn Installation

    Ashlar Installation

    Herringbone Installation

    Herringbone Installation

    Quarter-Turn is created bylaying two planks side by sideand rotating sets of 2 planksat 90 angles.

    NOTE: Individual plankswithin a set should not belaid in the same direction.

    Quarter-Turn is created bylaying four planks side by sideand rotating sets of 4 planksat 90 angles.

    NOTE: Individual plankswithin a set should not be laidin the same direction.

    Herringbone is created bylaying planks in an L pattern.

    Herringbone is created bylaying planks in an L pattern.

    Ashlar is created by offsettingthe front and back tile joints.

    Follow the Arrows

    Special Product Guide

    (for Square Tile Installation Instructions see page 3)

    50CMX1MPLANK TILES

    25CMX1MPLANK TILES

    11

  • 8/13/2019 Installation GlasBac RE TacTiles 32012

    12/12

    NOTE: When installing using Interface TacTiles connectors, perimeter tilesshould be cut net to the wall. In the event a wall or other termination point doesnot extend to the subfloor, the perimeter tiles should be installed using anapproved Interface adhesive.

    Applying TacTiles connectors

    50CMX1Mplacement

    25CMX1Mplacement

    TacTiles Installation System(for Square Tile Instructions see page 7)

    PLANK TILES

    NOTE:The average number of TacTile connectors needed depends on thesize of the plank and the installation method used.

    50cm x 1m Plank Averages: 25cm x 1m Plank Averages: Quarter-Turn 3/sq. yard Quarter-Turn 8/sq. yard Ashlar 4/sq. yard Ashlar 7/sq. yard Herringbone 5/sq. yard Herringbone 8/sq. yard

    Some applications may require an additional TacTile connector in the centerwhere tile edges meet. Consult your local Account Executive or the InterfaceHelp Desk. U.S. (877) 733-7403 / Canada (888) 224-2972

    TacTiles connectors should not be used on stairs, ramps or inclines

    Lay anchor rows, placing a TacTile connector at every joint. Install carpet usinga step method placing a TacTile connector at every corner.

    Insert tiles based on approved installation method. TacTiles connectors shouldbe applied based on the following diagrams.

    Quarter-Turn Installation

    Quarter-Turn Installation

    Herringbone Installation

    Herringbone Installation Ashlar Installation