Installation Development Plan (IDP) Presented By: Evan Echlin & Adam Kerr Geographer(s) NAVFAC Southeast GeoReadiness Center (GRC)
23

Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

Installation Development Plan (IDP)

Presented By:Evan Echlin & Adam KerrGeographer(s)NAVFAC Southeast GeoReadiness Center (GRC)

Page 2: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

2 2

Key Sections

Presentation Overview

Introduction

Planning Drivers

IDP Steps

GIS Mapping Products

In House / Contracted Labor

Page 3: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

3 3

GeoReadiness Center -

Who We Are

Mission: The GeoReadiness Program provides Navy shore installations with geospatial products and services that improve situational awareness to enhance Naval Shore Readiness and strengthen decision-making.

Vision: Promote geospatial insight to advance the Navy Shore Enterprise

People Systems

ProcessesData

Page 4: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

4 4

An Installation Development Plan (IDP) is the official planning document that guides Installation development activities -influenced and guided by financial limitations.

(IDP Consistency Guide)

An IDP helps: • Address Mission Deficiencies (Ex. lack of training facilities)• Prevent Waste of Resources (Ex. construction vs. consolidation)

What Is An IDP (Master Plan)?

Page 5: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

5 5

An IDP Examines:• Facility Use / Capacity• Traffic Circulation • Support Facilities• Recreation• Installation Layout

An IDP Provides recommendations for future development• Driven by Mission Needs (Ex. NAS Jax requires airfield repairs)• Based on Stakeholder Input (Ex. MWR requests a new gym)

IDP Purpose

Page 6: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

6 6

Priority Ranking1. Mission Support2. Workplace Support3. Housing4. Quality of Life5. Fitness/Recreation6. Aesthetics

Planning Drivers

(IDP Consistency Guide, p. 2)

Page 7: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

7 7

Planning Drivers

Capability Gaps, Mission Changes, Consolidation, Demolition

Page 8: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

8 8

• Stakeholder Interviews–Identify land use planning needs

• Vision Workshops–Develop a Vision for the base

• Area Development Plan (ADP) Workshops–Focus on individual regions of the Installation

• IDP Development–Support future land use planning decisions

IDP Steps

Page 9: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

9 9

Historically, IDPs were contracted out with only a final PDF provided.

GIS

GIS

People

Data

Analysis

Hardware and

Software

In a movement towards smarter planning, NAVFAC SE now utilizes GIS to better plan and serve Installation Stakeholders.

Page 10: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

10 10

GeoReadiness Explorer (GRX)

Planners & Engineers view “live” data and make more educated decisions through the power of GIS.

Web Viewer - GRX

Page 11: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

11 11

GeoReadiness Explorer (GRX)

Page 12: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

12 12

GRC Support For IDP Process

(IDP Consistency Guide, p. 7)

Collect, Analyze, & Compile Data

Page 13: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

13 13

Typical Maps Needed:-Base Maps and Aerial Images

-Operational and Environmental Constraints

-Existing Land Use / Future Projects

-Utilities

-Tenants and Topography

Mapping Products

Page 14: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

14 14

Operational Constraints Map

Ex. Training Areas, Ammo Storage

Page 15: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

15 15

Environmental Constraints Map

Ex. Installation Restoration Sites, Lakes, Wetlands

Page 16: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

16 16

Building Age Map (iNFADS)

iNFADS – the Navy’s Authoritative Real Property Database

Page 17: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

17 17

ADP Workshop Output

Concept Compiled in Workshop using Parchment Paper over base maps.

Page 18: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

18 18

GRC Workshop Output

Page 19: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

19 19

IDP Results

• Approximately 120 maps• 7 workshops, 7 weeks of travel• Approximately 400 pages

Page 20: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

20 20

Installation Stakeholders CO, XO, CPLO, PWO, Fire / Rescue, ENV, MWR, FMD, Air Ops, Public Affairs, Safety, Tenant Commands

In-House Team (Core)3-4 Planners GIS Analyst Architect Civil Engineer

IDP Team

Page 21: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

21 21

Contracted Effort-Contractors produce quicker product (1-2 years) but may be less accurate

-Assist considerably with our workload

In-House Effort-15-30% Cost Savings

-We take more time (2-3 years) but typically produce a more accurate product

-Not enough resources to complete all IDP’s in-house

Producing An IDP

Page 22: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

22 22

Producing An IDP

Cost Savings In-House• No Profit Included for In-House Work • Total Labor Rates are Lower than Contractors• Potential Travel Savings (Proximity to Bases)

Quality Improvements In-House• Team is more familiar with Navy Operations / Missions• More likely to spot errors (Facility Condition Knowledge)• Easier Access to Base / Stakeholders

Page 23: Installation Development Plan (IDP)€¦ · • Vision Workshops –Develop a Vision for the base • Area Development Plan (ADP) Workshops –Focus on individual regions of the Installation

23 23

Questions / Comments?

ContactGeographer (GIS Project Manager)Adam Kerr, [email protected](904) 542-6689

Geographer (GIS Project Manager)Evan Echlin, [email protected](904) 542-6719

Resources;IDP Consistency Guide