1235 201821 86-21-59166868 86-21-59165013 Headquarter: No.1235 Ye Cheng Rd. Jiading District, Shanghai, 201821, China Tel: 86-21-59166868 Fax: 86-21-59165013 60 200434 86-21-65285295 86-21-65923827 Service Centre: No.60 Guang Yue Rd. Shanghai, 200434, China Tel: 86-21-65285295 Fax: 86-21-65923827 77-66883-00 Rev. - Carrier Transicold China Installation and Operation Manual AC112 & CN268/328 Bus Air-Conditioning Units
15
Embed
Installation and Operation Manual Man… · Installation and Operation Manual ... Lay the batteryless dynamo capacitor box close to the dynamo where dry and ... before nitrogen gas
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1235 201821 86-21-59166868 86-21-59165013
Headquarter: No.1235 Ye Cheng Rd. Jiading District, Shanghai, 201821, China Tel: 86-21-59166868 Fax: 86-21-59165013
60 200434 86-21-65285295 86-21-65923827
Service Centre: No.60 Guang Yue Rd. Shanghai, 200434, China Tel: 86-21-65285295 Fax: 86-21-65923827
77-66883-00 Rev. -
Carrier Transicold China
Installation and Operation Manual
AC112 & CN268/328 Bus Air-Conditioning Units
Content
Rooftop Installation
Compressor and Dynamo Installation
Electric Parts
Refrigeration System Piping
Air Channels and Air Openings
Unit Test
Operation Of An Air Conditioning
2
5
7
8
9
10
12
English Version
Attachment
P2 ~ P13
P14 ~ P21
14
16
17
18
19
20
21
P22 ~ P28
AC112 & CN268/328
VII Attachment VII
128
Drivers Control Panel
1 Run Pilot Lamp
2 Failure Pilot Lamp
3 Air Conditioning Switch
4 Fan Switch
5 Temperature Knob
6 Fresh Air Switch
CN268/368
AC112 & CN268/328
AC112
AC112 & CN268/328 AC112 & CN268/328
I II III CN328 268, 112
2 4500cm
2450cm
2650cm
2220cm
60 120
VI
IV
IV
,
2 3
AC112 & CN268/328
20mm
56 - 69111-00
/
(534 120 )
4 5
AC112 & CN268/328
AC112 & CN268/328
800 - 3500 r/min
( 2200 - 8000 r/min )
355
445 80 100
V
250mm
100A 150A CN328&268/AC112
6 7
AC112 & CN268/328
AC112 & CN268/328
50mm 55mm
O
SE55
200mm
120
5mm
8 9
AC112 & CN268/328
15 24
2 2 /
720mm Hg
AC112 & CN268/328
1/4 1/2
:
CN328 10kg
CN268 8.5kg
AC112 4.5kg
10 11
AC112 & CN268/328
AC112 & CN268/328
R134a R22
1
2
350 - 370 psig
270 - 300 psig
3 - 9 psig
22 - 28 psig
VII
A/C
26
15
AC 112
12 13
AC112 & CN268/328
Installation and Operation Manual Installation and Operation Manual
Rooftop Installation Rooftop Installation
1. Definition
2. Roof-top Preparation Before Lay and Installation
Front The heading direction while bus running.
Rear The opposite direction while bus running.
Right The right-hand side when steering.
Left The left-hand side when steering.
Put connecting pipes and compressor in the same side of bus. Lay out air
inlet/outlet of evaporator in vertical center to make the air flow uniform. Make
sketch and choose a suitable position to uniform the weight.
Consider the weight ratio of emergency exits and air channels. The thickness of
seal rubber and sponge must meet the requirement of the match between unit
and roof.
Construct according to the drawings strictly to make the installation precise (See
Attachment I/II/III).
Fix body shell after finishing the framework. Shadow area should be preserved.
Put stainless steel bolts through fix holes and weld them to the framework; fix
holes can be drilled in field.
Suggest using PVC Foam to do adiabatic process. The insulating material should
have adequate thickness and good insulating performance.
The design of air openings and channels is critical, which decides the unit work
performance.
Return inlet design according to the dimension of framework. Use metal grill with
hinges and bolts to make the maintenance easy. The nylon filter with metal edge
inside the grill can reduce dust, and it should be easy to remove and clean.
Attention: The area of return inlet affects the flux of evaporator fan directly; make 2
sure there is no less than 4500cm .
Place main air channels on the both sides inside the bus body, each area should 2
not less than 450cm .Set static opening on the both sides which face the middle 2
porch and windows, and the total area should not less than 650 cm . Set
adjustable air outlets above every seat, and the total area should not less than 220 2
cm .
3. Roof-top Fixation
Paste seal sponge on the roof and cover it by seal pastern (See Attachment VI).
Make the fix holes on evaporator and condenser aim at the fix bolts, put the unit
on the roof (See Attachment IV) and ensure the seal sponge working well.
Fix the U washer to the bolts vertically which extend from the seats of evaporator
and condenser, then the nut. Make sure the seat of evaporator and the roof is
sealed
Cover the seat with seal pastern carefully. Paste seal pastern round each junction
of evaporator, condenser, U washer and base.
Water around to check the leak after silica gel got dried. Eliminate any wrong.
Finally fix the transition duct.
4. Condense Tubes
Cut drain tubes (i.d.20mm) as need, connect the front and the rear joints that in
the same side of evaporator to the T-joint hoop and seal them. Connect the last
end of T-joint to the drain tube and hoop it, lead the tube outside the bus bottom,
seal the joint.
Attention: All the drain tubes should incline down and as short as possible.
Exclude any bend or shrinkage to let the condensate flow out. The tubes must not
touch any sharp thing, or it may break and leak.
14 15
If the dynamo is provided by Shanghai Carrier Transicold, we suggest following
steps:
Put the dynamo beside compressor. It is drived by belt wheel, so the speed can
be satisfied (800-3500r/min) if only the speed of compressor is correct (2200-
8000r/min).
Lay the batteryless dynamo capacitor box close to the dynamo where dry and
convenient for maintenance.
Confirm the upsides and undersides of both compressor and dynamo belt wheels
in a same linearity, make sure the bolts are firm and the belts get suitable tension.
Ensure the two belts are new and replacing together.
Check the other parts.
If the dynamo requires a ventilation hoop, the duct sleeve should be connected to
somewhere dry and clean and get low temperature.
Installation and Operation Manual Installation and Operation Manual
Compressor and Dynamo Installation Electric Parts
1. Compressor Lay and Installation
1. Driver Control BoardWhen design the unit, the lay of compressor and dynamo should be considered
and preserve enough space. It's also need to consider anti-vibration, operating
space in connection, convenience of maintenance.
It should give some maintenance space or doors; air grill make for the airflow and
cooling; attend to keep compressor and dynamo from water.
Compressor usually lay in rear of the bus.
Put the compressor in a suitable position.
Make compressor belt wheel and dynamo crankshaft belt wheel (or intergraded
wheel) in line.
Fix the drive belt (provided by user) into belt wheel; adjust the tension till it reach
534N/120pound.
Keep the upside and underside of compressor belt wheel in a same linearity,
make sure the bolts are firm, and the belts get suitable tension.
Finally, check the whole installation, obviate conflicts; Ensure both two belts are
new.
2. Dynamo Lay and Installation
Driver control board consists of control panel, fan speed control switch,
temperature setting switch, the size of switch showed in control panel dimension
(See Attachment V).
2. Power Cable2
50mm insulated cable.
If the power is provided by bus dynamo, put the main fuse somewhere dry and
convenient for maintenance. Connect wires according to the drawing of unit
connection.
If the power is provided by batterryless dynamo, put the capacitor, fuse control
box somewhere dry and convenient for maintenance. Wiring according to the unit-
wiring sketch.
3. Control Cable
The unit provides two control wire harnesses:
One from driver operating panel to roof-top control panel;
One from rooftop control panel to compressor.
Wire harnesses must be kept far from running and hot parts; Use protect rings
where there are sharp things; Keep suitable tension.
All the connection must be firm. Bolts should have loose taken.
16 17
Installation and Operation Manual Installation and Operation Manual
Refrigeration System Piping Air Channels and Air Openings
Refrigeration system piping (high pressure tube 50mm, low pressure tube
55mm,both with insulated skin) start from the connection of evaporator and
condenser. First, loosen the cap slowly, exhaust nitrogen gas; Remove the cap of
inlet and outlet, then do the connection. (Attention: Must not remove any part
before nitrogen gas exhausted)
Use new seal paper washer instead of old seal parts around the suction and
discharge flange. Connect the flange to the joints on high and low-pressure tubes
All the joints should be covered by insulating material.
Cover the discharge pipes inside bus with insulating material that can endure