Top Banner
3215 W. North Ave. Melrose Park, IL 60160 (800) 729-0307 or (708) 865-8870 Fax: (708) 865-2941 www.peerlessmounts.com ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10 Installation and Assembly: Wall Mount for White Boards Model: IWB600-2SB COMPATIBLE WITH: Max Load Capacity: 70 lb (31.7 kg) ActivBoard 64" ActivBoard 164 78" ActivBoard 178 78" ActivBoard 378 PRO 87" ActivBoard 387 PRO 95" ActivBoard 395 PRO Interwrite 77" Dual Board Hitachi 63" Starboard DUO 77" Starboard DUO 77" Starboard TRIO 88" Starboard DUO Marsh 77" Marsh Board PR4050000 SMART 64" SMART Board SB660 77" SMART Board SB680
13

Installation and Assembly: Wall Mount for White Boards

Jul 23, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Installation and Assembly: Wall Mount for White Boards

3215 W. North Ave. • Melrose Park, IL 60160 • (800) 729-0307 or (708) 865-8870 • Fax: (708) 865-2941 • www.peerlessmounts.com

ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Installation and Assembly:Wall Mount for White Boards Model: IWB600-2SB

COMPATIBLE WITH:

Max Load Capacity: 70 lb (31.7 kg)

ActivBoard• 64" ActivBoard 164• 78" ActivBoard 178• 78" ActivBoard 378 PRO• 87" ActivBoard 387 PRO• 95" ActivBoard 395 PRO

Interwrite • 77" Dual Board

Hitachi• 63" Starboard DUO• 77" Starboard DUO• 77" Starboard TRIO• 88" Starboard DUO

Marsh• 77" Marsh Board PR4050000

SMART• 64" SMART Board SB660 • 77" SMART Board SB680

Page 2: Installation and Assembly: Wall Mount for White Boards

2 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

PARTS LISTDescription Qty. Part #

A wall bracket 1 095-4652B vertical bracket 2 095-4683C 1/4" flat washer 6 540-9444D 1/4-20 x 1" phillips screw 4 510-9110E M4 x 6 mm pphillips screw 2 520-2032F top depth adjusting bracket 2 095-4685G .320 ID x 1 OD x .375 spacer 4 540-2084H bottom depth adjusting bracket 2 095-4684I plastic bushing 4 540-0087J M5 serrated flanged lock nut 4 530-2042K M5 x 12 mm phillips screw 4 520-2039L M6 nylock nut 4 530-9334M M6 x 12 mm phillips screw 4 520-2039N rubber pad 4 590-1124O M5 x 8 mm phillips screw 10 520-2167

Installation to Wall

NOTE: Make sure flange of wall bracket is located on top as shown in detail 1 Be sure wall bracket (A) is level and in desired position. Then use wall bracket (A) as a template to mark center of four mounting holes. Drill four mounting holes. Attach wall bracket (A) to mounting surface using four screws provided by installer and four 1/4 washers (C) if required. Once secure, wall bracket (A) will be flush with the top of the vertical bracket (B). Fasten two M4 x 6 mm phillips screws (E) into wall bracket (A).NOTE: Vertical brackets (B) may be used to determine location of wall bracket (A).

A

• Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.

WARNING

1

Fasteners Supplied by Installer

C Flange

NOTE: Read instruction sheet before you start installation and assembly.

NOTE: Some parts may appear slightly different than illustrated

A B C D E

F

G

H

J

Description Qty. Part #A wall bracket 1 095-4652B vertical bracket 2 095-4669C 1/4 washer 6 540-9444D 1/4 - 20 x 1 phillips screw 4 510-9110E M4 x 6 mm phillips screw 2 520-2032F #10 -32 x 3/8 thumb screw 2 560-2107G .320 ID x 1 OD x .375 spacer 4 540-2084H plastic bushing 4 540-0087I #10 flat washer 2 540-9442J M5 serrated flanged lock nut 4 530-2042K M5 x 12 mm phillips screw 4 520-2008L M6 nylock nut 4 530-9334M M6 x 12 mm phillips screw 4 520-2039N rubber pads 4 590-1124

Parts List

Description Qty. Part #A wall bracket 1 095-4652B vertical bracket 2 095-4669C 1/4 washer 6 540-9444D 1/4 - 20 x 1 phillips screw 4 510-9110E M4 x 6 mm phillips screw 2 520-2032F #10 -32 x 3/8 thumb screw 2 560-2107G .320 ID x 1 OD x .375 spacer 4 540-2084H plastic bushing 4 540-0087I #10 flat washer 2 540-9442J M5 serrated flanged lock nut 4 530-2042K M5 x 12 mm phillips screw 4 520-2008L M6 nylock nut 4 530-9334M M6 x 12 mm phillips screw 4 520-2039N rubber pads 4 590-1124

Parts List

Description Qty. Part #A wall bracket 1 095-4652B vertical bracket 2 095-4669C 1/4 washer 6 540-9444D 1/4 - 20 x 1 phillips screw 4 510-9110E M4 x 6 mm phillips screw 2 520-2032F #10 -32 x 3/8 thumb screw 2 560-2107G .320 ID x 1 OD x .375 spacer 4 540-2084H plastic bushing 4 540-0087I #10 flat washer 2 540-9442J M5 serrated flanged lock nut 4 530-2042K M5 x 12 mm phillips screw 4 520-2008L M6 nylock nut 4 530-9334M M6 x 12 mm phillips screw 4 520-2039N rubber pads 4 590-1124

Parts List

Description Qty. Part #A wall bracket 1 095-4652B vertical bracket 2 095-4669C 1/4 washer 6 540-9444D 1/4 - 20 x 1 phillips screw 4 510-9110E M4 x 6 mm phillips screw 2 520-2032F #10 -32 x 3/8 thumb screw 2 560-2107G .320 ID x 1 OD x .375 spacer 4 540-2084H plastic bushing 4 540-0087I #10 flat washer 2 540-9442J M5 serrated flanged lock nut 4 530-2042K M5 x 12 mm phillips screw 4 520-2008L M6 nylock nut 4 530-9334M M6 x 12 mm phillips screw 4 520-2039N rubber pads 4 590-1124

Parts List

I K L M N

A

DETAIL 1

O

E

Page 3: Installation and Assembly: Wall Mount for White Boards

3 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Installation to SMARTboards.........................................................Skip to Page 4 Installation to Hitachi Starboard..................................................Skip to Page 5Installation to Marsh Board............................................................Skip to Page 7Installation to Interwrite Board...................................................Skip to Page 10Installation to ActivBoard.............................................................Skip to Page 11.

TOP

BOTTOM

Attaching Top and Bottom Depth Adjusting Brackets Attach top and bottom depth adjusting brackets (F and H) onto vertical bracket (B) using four M5 x 8 mm phillips screws (O) as shown below. NOTE: Fully extend and tighten depth adjusting brackets (F and H). Depth can be adjusted after whiteboard is attached to mount. Repeat using second vertical bracket (B) and top and bottom depth adjusting brackets (F and H).

2

F

HB

O

O

Page 4: Installation and Assembly: Wall Mount for White Boards

4 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Hook vertical brackets (B) to wall bracket (A) and secure using two M5 x 8 mm phillips screws (O) as shown in detail 3.

SMARTboardsRest Smart Board face down on a non abrasive surface to prevent scratching.Attach vertical brackets (B) to board using four 1/4 - 20 phillips head screws (D) through plastic bushings (I), and .320 ID x 1 x .375 spacers (G) as shown in detail 2. NOTE: Vertical brackets (B) can be adjusted vertically in 2" increments to change Smartboard position.

3

4

SMARTboard

G

BD

I

DETAIL 2

D

B

I

G

O

SMARTboard

A

SKIP TO PAGE 13

DETAIL 3O

Page 5: Installation and Assembly: Wall Mount for White Boards

5 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Hitachi Starboard

M

BL

Fasten Hitachi bracket (supplied with Hitachi Starboard) to vertical support (B) using two M6 x 12 mm phillips screws (M) and two M6 nylock nuts (L) as shown below.Repeat using second vertical support (B).

3

Hook vertical brackets (B) to wall bracket (A) and secure using two M5 x 8 mm phillips screws (O)as shown in detail 4.

4

(supplied with Hitachi Starboard)

O

B

A

DETAIL 4

O

Page 6: Installation and Assembly: Wall Mount for White Boards

6 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Press four rubber pads (N) into center holes on top and bottom of vertical supports (B) to stabilize board as shown below. Make sure rubber pads (N) line up with existing Hitachi brackets on back of board. Hook Hitachi rail cutouts onto Hitachi bracket at desired height as shown below.

5

TOP

BOTTOM

Hitachi Starboard N

N

Cutouts

Hitachi bracket (supplied with Hitachi Starboard)

SKIP TO PAGE 13

Page 7: Installation and Assembly: Wall Mount for White Boards

7 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Marsh Board

J

K

3

Fasten two support brackets (supplied with Marsh Board) to bottom of vertical supports (B) using four M5 x 12 mm phillips screws (K) and M5 serrated flanged lock nuts (J) as shown below.NOTE: Make sure that the distance between the top of the support bracket and bottom of hole is 1/8". NOTE: Use only the large bottom four mounting holes on vertical support (B).

4

Hook vertical brackets (B) to wall bracket (A) and secure using two M5 x 8 mm phillips screws (O)as shown in detail 5.

1/8"

B

B

support brackets (supplied with Marsh Board)

support brackets (supplied with Marsh Board)

O

B

A

USE LARGE BOTTOM HOLES

DETAIL 5

O

Page 8: Installation and Assembly: Wall Mount for White Boards

8 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

B

Position Marsh Board onto support brackets (supplied with Marsh Board) and mark top of board as shown below. Remove Marsh Board.

Fasten two support brackets (supplied with Marsh Board) to vertical supports (B) using four M5 x 12 mm phillips screws (K) and M5 serrated flanged lock nuts (J) as shown below.

support brackets (supplied with Marsh Board)

support brackets (supplied with Marsh Board)

Mark top of board

J

KB

support brackets (supplied with Marsh Board)

5

6

Page 9: Installation and Assembly: Wall Mount for White Boards

9 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

support bracket (supplied with Marsh Board)

support bracket (supplied with Marsh Board)

Position Marsh Board onto support brackets (supplied with Marsh Board) and align top of board with marked line on vertical support as shown below. Fasten two support brackets (supplied with Marsh Board) to Marsh Board using four support fasteners (supplied with Marsh Board) on top and bottom as shown below.

support fastener (supplied with Marsh Board)

support fastener (supplied with Marsh Board)

TOP BOTTOM

7

SKIP TO PAGE 13

Page 10: Installation and Assembly: Wall Mount for White Boards

10 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

4

O

Hook vertical brackets (B) to wall bracket (A) and secure using two M5 x 8 mm phillips screws (O)as shown in detail 6.

Attach vertical brackets (B) to Interwrite board using four 1/4 - 20 phillips head screws (D) as shown.3

Interwrite Board

D B

A

Interwrite Board

SKIP TO PAGE 13

DETAIL 6

O

USE TOP TWO MOUNTING HOLES

USE BOTTOM TWO MOUNTING HOLES

Page 11: Installation and Assembly: Wall Mount for White Boards

11 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

O

4 Hook vertical brackets (B) to wall bracket (A) and secure using two M5 x 8 mm phillips screws (O)as shown in detail 7.

M

B

Top Support Bracket (supplied with ActivBoard)

Bottom Support Bracket (supplied with ActivBoard)

3 Fasten top and bottom support bracket (supplied with ActivBoard) to vertical bracket (B) using two M6 x 12 mm phillips screws (M), and M6 nylock nuts (L) as shown below. Repeat using second vertical bracket (B). NOTE: Be sure to mount brackets 27.9" apart.

L

A

B

ActivBoard

27.9" (708 mm)

DETAIL 7

O

Page 12: Installation and Assembly: Wall Mount for White Boards

12 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Top Support Bracket (supplied with ActivBoard)

Bottom Support Bracket (supplied with ActivBoard) ActivBoard

5 Hook ActivBoard onto top and bottom support bracket (supplied with ActivBoard) as shown in detail 8.

DETAIL 8

SKIP TO PAGE 13

Page 13: Installation and Assembly: Wall Mount for White Boards

13 of 13 ISSUED: 11-09-10 SHEET #: 125-9154-4 12-21-10

Fasteners Supplied by Installer

C

Secure bottom depth adjusting bracket (H) to mounting surface using screws provided by installer, and 1/4 washers (C) if required as shown below.

O

Loosen eight M5 x 8 mm phillips screws (O) installed in step 2 and adjust to desired depth. Retighten all fasteners.

WHITEBOARD

H

8

9

© 2010, Peerless Industries, Inc. All rights reserved. All other brand and product names are trademarks or registered trademarks of their respective owners.

C