Govt. of India Ministry of Railways Research & Standards Organization Manak Nagar, Lucknow-226 011 Signature of Firm Representative Signature of RDSO Representative QM-C-8.1/Secondary Spring(LHB)/0010 Page 1 of 17 QM-C-8.1/Secondary Spring (LHB)/0010 INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES Specification No: Spec. No. RDSO/2017/CG-01 (Latest), EN 13298& RCF Letter No. MD23151 dated 31.03.2015. Spring Type (Outer/Inner): …………………………. Drawing No.: ….………………………… 1. Firm‟s Name:- 2. Date (period)of Inspection :- 3. Contract Details :- a. Contract no. and date:- b. Order placing authority:- c. Specification no.(as mentioned in contract):- d. Drawing no. (as mentioned in contract) :- 4. Quantity on order:- 5. Quantity previously passed:- 6. Quantity offered for inspection on date:- 7. Quantity balance after this:- 8. Consignee:- 9. Delivery Period:- 10. Document Verification : (a) Review & verification of Internal test reports/documents as per Approved QAP. (b) Copy of dispatch memo of raw material duly signed by inspector with Quantity & Heat No. should be mentioned. Spring Steel round should be annealed condition and grain size must be 6 or finer. (c) Metallographic test report (d) Bar peeling process record (e) Dimensional check Report (f) Record of heat treatment of springs (g) Creep deformation test record (h) Crack detection test report(MPI) of 100% springs offered for inspection (i) Length under test load of 100% springs offered for inspection (j) Spring surface coating test report (k) Calibration record of gauges, measuring instruments & test equipment. (l) Prototype approval letter to be reviewed
17

INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load

May 08, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load

Govt. of India Ministry of Railways Research & Standards Organization Manak Nagar, Lucknow-226 011

Signature of Firm Representative Signature of RDSO Representative

QM-C-8.1/Secondary Spring(LHB)/0010 Page 1 of 17

QM-C-8.1/Secondary Spring (LHB)/0010

INSPECTION & TEST PLAN (CHECK SHEET)

ITEM: SECONDARY SPRING FOR LHB COACHES

Specification No: Spec. No. RDSO/2017/CG-01 (Latest), EN 13298& RCF Letter No. MD23151 dated 31.03.2015.

Spring Type (Outer/Inner): ………………………….

Drawing No.: ….…………………………

1. Firm‟s Name:-

2. Date (period)of Inspection :-

3. Contract Details :-

a. Contract no. and date:-

b. Order placing authority:-

c. Specification no.(as mentioned in contract):-

d. Drawing no. (as mentioned in contract) :-

4. Quantity on order:-

5. Quantity previously passed:-

6. Quantity offered for inspection on date:-

7. Quantity balance after this:-

8. Consignee:-

9. Delivery Period:-

10. Document Verification :

(a) Review & verification of Internal test reports/documents as per Approved QAP.

(b) Copy of dispatch memo of raw material duly signed by inspector with Quantity & Heat No. should be mentioned. Spring Steel round

should be annealed condition and grain size must be 6 or finer.

(c) Metallographic test report

(d) Bar peeling process record

(e) Dimensional check Report

(f) Record of heat treatment of springs

(g) Creep deformation test record

(h) Crack detection test report(MPI) of 100% springs offered for inspection

(i) Length under test load of 100% springs offered for inspection

(j) Spring surface coating test report

(k) Calibration record of gauges, measuring instruments & test equipment.

(l) Prototype approval letter to be reviewed

Page 2: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 3: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 4: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 5: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 6: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 7: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 8: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 9: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 10: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 11: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 12: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 13: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 14: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 15: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 16: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load
Page 17: INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY … · 2019. 6. 7. · INSPECTION & TEST PLAN (CHECK SHEET) ITEM: SECONDARY SPRING FOR LHB COACHES ... Length under test load