Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC Floating Systems www.sofec.com 31 March 2004
17

Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Dec 28, 2015

Download

Documents

Jordan Small
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Turret Mooring Design – Some Challenges and Solutions

FPSO Forum 2004 NUS, Singapore

Arun Duggal

FMC SOFEC Floating Systemswww.sofec.com

31 March 2004

Page 2: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

FPSOs are a Mature & Versatile FPS Technology

• Over 100 units in operation worldwide

• FPSO total > than all other FPS combined

• Water depth range 20 m to > 1,400 meters

• 1 to 100+ risers

• 10,000 bbl – 250,000 bbls/day

• Up to 2,000,000+ bbls storage

• Benign (West Africa) to Extreme Environments (North Atlantic)

• Various flavors:

• Turret-moored

• Spread-moored

• Yoke-moored

• Hawser-moored

Page 3: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Typical Permanent Internal Turret System

Bearing (only upper in this case)

Turret Shaft / Riser Guide Tubes

Chain Table (Hawse Pipes/Chain Supports)

6 Anchor Legs + 34 Risers

Barracuda FPSO: Campos Basin834m, 34 Risers

Swivel Stack (Product/Lift/Controls)

Anchor Leg + Riser Pull-In Equipment

Manifolds + Pig Launching/Receiving

Page 4: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Design Considerations

Mooring System• Anchor Legs• Anchors• Risers• Thrusters & DP

Control

Environment• Water Depth• Waves• Wind• Current

Vessel Particulars• Storage / Tonnage• Topsides Layout• Vessel Motions

Turret Design• Configuration• Size• Location• Loads

Turret Mooring ofProduction Vessels

Fluid-Transfer Requirements• Well Heads• Subsea Manifolding• Risers• Turret Manifolding• Swivels• Offloading• Pigging

Page 5: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Some Current Turret Mooring Challenges

• More Complex Turret Systems

– Large number of risers

– Increased requirements for turret mounted equipment

– High pressures

• Riser Systems for very Shallow or Deep Water

• Project Schedule

– Short, fast-track schedules

– Project Design Basis not well defined

– Interfaces and Communication

• Installation in Deepwater

– Installation engineering, equipment, costs

Page 6: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Example 1: Fast-Track FPSO for Shallow Water

• Su Tu Den FPSO, Vietnam

• MODEC, Inc + FMC SOFEC + ConocoPhillips

• Newbuild FPSO (80,000 bbl oil/day)

• Schedule: Contact to First Oil – 19 months

– Turret Delivery Schedule – 12 months

• Shallow Water (48m water depth)

• Harsh Environment (100-yr wave of 8.1m Hs)

• Large Number of Risers (12)

Page 7: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Project Milestones• 2002 Mar. Contract Award (LOI)(2002/03/21)

• 2002 Apr. Order Long Lead Items – bearing, forgings, process

• 2002 Jun. Mooring Design Complete

• 2002 Aug. Turret Fabrication Begins (MSE)

• 2002 Oct. Hull Fabrication Begins (Samsung)

• 2002 Nov. Preliminary Riser Design Complete

• 2002 Dec. Topside Fabrication Begins

• 2003 Mar. Drydock – Block Assembly Begins

• 2003 Apr. Start Topside Module and Turret Installation

• 2003 May Launching

• 2003 Jul. Start Shipyard Commissioning

• 2003 Sep. Tow Out

• 2003 Oct. Offshore Installation

• 2003 Oct. 1st Oil (2003/10/29)

Page 8: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

STD Turret Mooring Design & Fabrication

• Use Standard Components & Design

– SOFEC Large External Turret Design

• Bearing Capacity exceeds anticipated Design Loads

– Allows order of main components before final loads derived

• Design Riser Configuration Flexibility in Chain Table Design/Fabrication

• Clearly Define all Structural and Fluid transfer Interfaces at Turret Support Structure

• Parallel Design and Fabrication Effort

• Easy / Quick Integration with Vessel

Page 9: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Riser & Mooring Design in Shallow Water

Page 10: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Mooring and Riser Design 2

Page 11: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Integration of Turret & Vessel

Page 12: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

First Oil: November 2003

Page 13: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

• Application– FPSO weathervaning SPM– Large field (>100,000 bbld)– 50 to 100+ risers– Deep to ultra deep water– Worldwide

• Weathervaning advantages– Mooring tensions– Tandem offloading

• Simplified turret structure

– Allows for simple interface with vessel

• Robust bearing system

• Large Decks for Flowline Manifolding, and other Equipment

• Efficient Mooring & Riser Installation Equipment

Example 2: Very Large Turret

Page 14: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Chain

Table

I-Tubes

Support Columns

Chain Supports

Main Deck

TorqueArm

Vertical Bearing

RadialBearing

Swivel Stack & Torque Tube

Piping /Manifolding

Riser Hang-Off

Pull-InDeck

Anchor Legs Risers & Bend Stiffeners

VLT: Deep Water, Large Capacity Internal Turret

Page 15: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

VLT Chain Table

• 3x3 mooring provides 3 riser corridors

• Riser quantity defines chain table (and turret) diameter

– 60 risers - 22 m dia

– 90 risers - 31 m dia

– 120 risers - 40 m dia

• 2 riser rows maximum

• No shadowing to allow inner row installation and replacement

Page 16: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

VLT Main Deck

• Supports all loads, including:

– Riser hang-off loads

– Mooring loads through chain table and support columns

– Turret self weight

• Depth-to-diameter ratio is a key design parameter

– Flexibility to move with vessel

– Strength to support risers, mooring and turret weight loads

– 2.5 m depth / 32 m diameter for a 90 riser VLT

Page 17: Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Innovative Technologies, Creative Solutions

Conclusions

• Turret Moored FPSOs are a Very Mature Technology

– Design for Load Transfer is typically not an issue

– Current challenges mostly associated with Fluid Transfer

Large Number of Risers

High Pressure

Manifolding

Subsea Intervention & Control

• Project Parameters also Impact Turret Mooring Design

– Schedule

Fast-track: 18 – 22 months

Complex systems require more commissioning time

– Communication & Interfaces – among various contractors / client

– Knowledge of others scope of work, issues, etc.