INNOVATIVE PRE-CAST CANTILEVER CONSTRUCTED BRIDGE CONCEPT by Brent Tyler Visscher A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Graduate Department of Civil Engineering University of Toronto © Copyright by Brent Tyler Visscher (2008)