INNOVATION PROJECT CLOSEOUTS Presented by: Dennis Cooley
June 12, 2016
INNOVATION FOR PROJECT CLOSEOUTS PRESENTATION SUMMARY
o Report the status of all project closeouts
o Identify easy projects to close
o Identify high risk projects
o Finding data you need
o Avoid project closeout headaches
o Safely closeout projects with confidence
Copyright © 2016
REPORT THE STATUS OF ALL PROJECT CLOSEOUTS
OBTAIN QUICK STATS AND SUPPORTING DATA
Copyright © 2016
o Identify projects that are ready to be closed out
o Identify the project closeout complexity
o Identify risk to the data in the As-Built section
o Identify if projects need to be closed out in a
certain order
IDENTIFY EASY SAFE PROJECTS TO CLOSEOUT
EASY PROJECTS ARE LOWER RISK TO CLOSE
Copyright © 2016
o Projects with predominately new data / greenfield
o Cancelled projects
o Projects with exclusive data ownership (not shared)
o Projects that have not deleted or renamed
claimed entities
IDENTIFY HIGH RISK PROJECTS
IDENTIFY RISKY ACTIVITIES
Copyright © 2016
o Projects with older data than what is in As-Built
o Projects deleting claimed data
o Projects renaming claimed data
o Projects sharing data
AVOID PROJECT CLOSEOUT HEADACHES
REDUCE CONCURRENT ENGINEERING
Copyright © 2016
o Quickly identify when a project is done; close it
o Identify if projects already have the requested data
o Identify projects that are sharing data
o Claim only what is really needed
FINDING THE DATA YOU NEED
o Where is the information I need?
o What Project(s) have a copy of the information?
o What version of the information is the one I need?
Copyright © 2016
REDUCE CONFUSION RESULTING FROM PROJECTS
TECHNICAL REQUIREMENTS & EXISTING CHALLENGES
EXISTING REPORTING; DOES NOT FULFILL BUSINESS NEEDS
o too much irrelevant information e.g. attribute differences
o not enough relevant information
o a need for SQL scripts or specialized reports, tools would
need to be developed
Using the SPI comparison reports there is:
Copyright © 2016
SPI v2016 offers better reporting at the entity level
PROJECT CLOSEOUT REPORTING OPTIONS
CLOSEOUT PROJECTS USING SPI’S FREE COMPARISON REPORTS
o Protect your data integrity by tracking high risk
project changes
o Improve on-site safety by reducing concurrent
engineering
o Ensure field employees have the latest information
o Close projects with confidence
o Certified by Intergraph as SmartPlant Enabled!!
Copyright © 2016
COOLEYCORE’S BEACONSUITETM PROJECT SOFTWARE
o Provides basic information
ACCESS ACCURATE INFORMATION FOR IMPROVED SAFETY
Copyright © 2016
PROJECT CLOSEOUT RESULTS – ACROSS ENTIRE DATABASE Executive dashboard displays project closeout at a glance
Copyright © 2016
DRILL INTO THE PROJECT RESULTS – VIEW THE RECORDS Easy to use interface
Copyright © 2016
PROJECT CLOSEOUT REPORTING OPTIONS
COOLEYCORE’S BEACONSUITETM MCA SOFTWARE
o Protect your data integrity by executing a pre-merge
analysis
o Tag centric reporting includes pre-merge findings and
recommendations – avoid unwanted consequences
o Efficiently perform project closeouts
Copyright © 2016
CLOSEOUT PROJECTS WITH CONFIDENCE
Copyright © 2016
CLOSING SPI PROJECTS
THE NEW NORMAL – BEACONSUITE DELIVERS
o Increased efficiency
o Increased awareness, and recommendations
o A reduction in monotonous work
o A reduction in mistakes
o A reduction in the need for SQL’s, and special reports
o A competitive advantage
o Innovation, superior results and a good ROI
Copyright © 2016
SAFE EFFICIENT PROJECT CLOSEOUTS – THE NEW NORMAL
How will you efficiently and safely closeout projects going forward?
Copyright © 2016
QUESTIONS?
Copyright © 2016
PROGRESSIVE, INNOVATIVE SOLUTIONS FROM COOLEYCORE
Copyright © 2016
COOLEYCORE – PROFILE HIGHLIGHTS Incorporated: January, 2008 Staff: 17 Average yearly growth: 25% Products: 16 software applications and specialty services Industries: Oil & Gas, Chemicals, Plastics Partnerships: Hexagon – Intergraph Premier Partner
Copyright © 2016
CooleyCore.com Smartstore.CooleyCore.com SPTUF.com
SMARTSTORE.COOLEYCORE.COM
CERTIFIED SMARTPLANT ENABLED
o Get started now!
o Save money
o Save time
o Purchase your software directly from the SmartStore
Copyright © 2016
SMARTSTORE.COOLEYCORE.COM
Copyright © 2016
Request more information on Beaconsuite Project and MCA, by emailing: “PROJECT” and “MCA” to:
Copyright © 2016
Slide Number 1INNOVATION PROJECT CLOSEOUTSINNOVATION FOR PROJECT CLOSEOUTSREPORT THE STATUS OF ALL PROJECT CLOSEOUTSIDENTIFY EASY SAFE PROJECTS TO CLOSEOUTIDENTIFY HIGH RISK PROJECTSAVOID PROJECT CLOSEOUT HEADACHESFINDING THE DATA YOU NEEDTECHNICAL REQUIREMENTS & EXISTING CHALLENGESPROJECT CLOSEOUT REPORTING OPTIONSACCESS ACCURATE INFORMATION FOR IMPROVED SAFETYPROJECT CLOSEOUT RESULTS – ACROSS ENTIRE DATABASEDRILL INTO THE PROJECT RESULTS – VIEW THE RECORDSPROJECT CLOSEOUT REPORTING OPTIONSCLOSEOUT PROJECTS WITH CONFIDENCECLOSING SPI PROJECTSSAFE EFFICIENT PROJECT CLOSEOUTS – THE NEW NORMALQUESTIONS?PROGRESSIVE, INNOVATIVE SOLUTIONS FROM COOLEYCORECOOLEYCORE – PROFILE HIGHLIGHTSSMARTSTORE.COOLEYCORE.COMSMARTSTORE.COOLEYCORE.COMRequest more information on Beaconsuite Project and MCA, by emailing: “PROJECT” and “MCA” to:Slide Number 24