Top Banner
24

INNOVATION PROJECT CLOSEOUTS - SPI-LTUF SPI Innovations from CooleyCore.pdf · oIdentify projects that are ready to be closed out oIdentify the project closeout complexity oIdentify

Oct 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • INNOVATION PROJECT CLOSEOUTS Presented by: Dennis Cooley

    June 12, 2016

  • INNOVATION FOR PROJECT CLOSEOUTS PRESENTATION SUMMARY

    o Report the status of all project closeouts

    o Identify easy projects to close

    o Identify high risk projects

    o Finding data you need

    o Avoid project closeout headaches

    o Safely closeout projects with confidence

    Copyright © 2016

  • REPORT THE STATUS OF ALL PROJECT CLOSEOUTS

    OBTAIN QUICK STATS AND SUPPORTING DATA

    Copyright © 2016

    o Identify projects that are ready to be closed out

    o Identify the project closeout complexity

    o Identify risk to the data in the As-Built section

    o Identify if projects need to be closed out in a

    certain order

  • IDENTIFY EASY SAFE PROJECTS TO CLOSEOUT

    EASY PROJECTS ARE LOWER RISK TO CLOSE

    Copyright © 2016

    o Projects with predominately new data / greenfield

    o Cancelled projects

    o Projects with exclusive data ownership (not shared)

    o Projects that have not deleted or renamed

    claimed entities

  • IDENTIFY HIGH RISK PROJECTS

    IDENTIFY RISKY ACTIVITIES

    Copyright © 2016

    o Projects with older data than what is in As-Built

    o Projects deleting claimed data

    o Projects renaming claimed data

    o Projects sharing data

  • AVOID PROJECT CLOSEOUT HEADACHES

    REDUCE CONCURRENT ENGINEERING

    Copyright © 2016

    o Quickly identify when a project is done; close it

    o Identify if projects already have the requested data

    o Identify projects that are sharing data

    o Claim only what is really needed

  • FINDING THE DATA YOU NEED

    o Where is the information I need?

    o What Project(s) have a copy of the information?

    o What version of the information is the one I need?

    Copyright © 2016

    REDUCE CONFUSION RESULTING FROM PROJECTS

  • TECHNICAL REQUIREMENTS & EXISTING CHALLENGES

    EXISTING REPORTING; DOES NOT FULFILL BUSINESS NEEDS

    o too much irrelevant information e.g. attribute differences

    o not enough relevant information

    o a need for SQL scripts or specialized reports, tools would

    need to be developed

    Using the SPI comparison reports there is:

    Copyright © 2016

    SPI v2016 offers better reporting at the entity level

  • PROJECT CLOSEOUT REPORTING OPTIONS

    CLOSEOUT PROJECTS USING SPI’S FREE COMPARISON REPORTS

    o Protect your data integrity by tracking high risk

    project changes

    o Improve on-site safety by reducing concurrent

    engineering

    o Ensure field employees have the latest information

    o Close projects with confidence

    o Certified by Intergraph as SmartPlant Enabled!!

    Copyright © 2016

    COOLEYCORE’S BEACONSUITETM PROJECT SOFTWARE

    o Provides basic information

  • ACCESS ACCURATE INFORMATION FOR IMPROVED SAFETY

    Copyright © 2016

  • PROJECT CLOSEOUT RESULTS – ACROSS ENTIRE DATABASE Executive dashboard displays project closeout at a glance

    Copyright © 2016

  • DRILL INTO THE PROJECT RESULTS – VIEW THE RECORDS Easy to use interface

    Copyright © 2016

  • PROJECT CLOSEOUT REPORTING OPTIONS

    COOLEYCORE’S BEACONSUITETM MCA SOFTWARE

    o Protect your data integrity by executing a pre-merge

    analysis

    o Tag centric reporting includes pre-merge findings and

    recommendations – avoid unwanted consequences

    o Efficiently perform project closeouts

    Copyright © 2016

  • CLOSEOUT PROJECTS WITH CONFIDENCE

    Copyright © 2016

  • CLOSING SPI PROJECTS

    THE NEW NORMAL – BEACONSUITE DELIVERS

    o Increased efficiency

    o Increased awareness, and recommendations

    o A reduction in monotonous work

    o A reduction in mistakes

    o A reduction in the need for SQL’s, and special reports

    o A competitive advantage

    o Innovation, superior results and a good ROI

    Copyright © 2016

  • SAFE EFFICIENT PROJECT CLOSEOUTS – THE NEW NORMAL

    How will you efficiently and safely closeout projects going forward?

    Copyright © 2016

  • QUESTIONS?

    Copyright © 2016

  • PROGRESSIVE, INNOVATIVE SOLUTIONS FROM COOLEYCORE

    Copyright © 2016

  • COOLEYCORE – PROFILE HIGHLIGHTS Incorporated: January, 2008 Staff: 17 Average yearly growth: 25% Products: 16 software applications and specialty services Industries: Oil & Gas, Chemicals, Plastics Partnerships: Hexagon – Intergraph Premier Partner

    Copyright © 2016

    CooleyCore.com Smartstore.CooleyCore.com SPTUF.com

  • SMARTSTORE.COOLEYCORE.COM

    CERTIFIED SMARTPLANT ENABLED

    o Get started now!

    o Save money

    o Save time

    o Purchase your software directly from the SmartStore

    Copyright © 2016

  • SMARTSTORE.COOLEYCORE.COM

    Copyright © 2016

  • Request more information on Beaconsuite Project and MCA, by emailing: “PROJECT” and “MCA” to:

    [email protected]

    Copyright © 2016

  • Slide Number 1INNOVATION PROJECT CLOSEOUTSINNOVATION FOR PROJECT CLOSEOUTSREPORT THE STATUS OF ALL PROJECT CLOSEOUTSIDENTIFY EASY SAFE PROJECTS TO CLOSEOUTIDENTIFY HIGH RISK PROJECTSAVOID PROJECT CLOSEOUT HEADACHESFINDING THE DATA YOU NEEDTECHNICAL REQUIREMENTS & EXISTING CHALLENGESPROJECT CLOSEOUT REPORTING OPTIONSACCESS ACCURATE INFORMATION FOR IMPROVED SAFETYPROJECT CLOSEOUT RESULTS – ACROSS ENTIRE DATABASEDRILL INTO THE PROJECT RESULTS – VIEW THE RECORDSPROJECT CLOSEOUT REPORTING OPTIONSCLOSEOUT PROJECTS WITH CONFIDENCECLOSING SPI PROJECTSSAFE EFFICIENT PROJECT CLOSEOUTS – THE NEW NORMALQUESTIONS?PROGRESSIVE, INNOVATIVE SOLUTIONS FROM COOLEYCORECOOLEYCORE – PROFILE HIGHLIGHTSSMARTSTORE.COOLEYCORE.COMSMARTSTORE.COOLEYCORE.COMRequest more information on Beaconsuite Project and MCA, by emailing: “PROJECT” and “MCA” to:Slide Number 24