Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Mar 08, 2018

Download

Documents

vandien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either
Page 2: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

Recommendation  BUY  Snap shot Incorporated  in 1985, BGR energy system Ltd (BGR)  is one of the fastest growing Engineering company in Power sector especially in BOP and EPC space. The company carries the business operation under two segments namely, supply of equipments & Turnkey Engineering Project.  In August 2010,  the  company  announced  JV  with  Hitachi  group  Ltd  for manufacturing of Boiler and Turbines (BTG) for super critical power plants up to the capacities of 660 MW, 800 MW and 1000 MW. BGR Energy will hold more  than  70%  stake  in  JV.   With  this  JV,  BGR will  turn  into  full fledge integrated power equipment player.  

Investment Rationale  Near term hiccups in the Industry, but long term promising ‐ In 

recent past, we had seen delay  in getting new orders by Power Engineering  companies  like  BGR  and  that  is  one  of  the  key reason  for  the  correction  in  the  stock  prices.  But  the  sector potential is enormous,  as per CRISIL, market opportunity in BOP  alone  is     Rs 1.6  trillion    in next  five years.   FY12 being  the  last financial  year of 11th plan,  govt & other govt  related  company will be  clearing  the backlog which will  result  into higher order inflow for power engineering  companies  

Healthy order book provides revenue visibility. BGR has healthy order  book of  Rs.  9317  Crs.  (1.91x  FY11E  revenues), providing reasonable revenue visibility.  BGR has bided for orders worth of Rs. 36000 crs & expect to get  good share in this bid during FY12. 

Transforming  into  Premium  League  of  BTG.  – Over  the  years BGR has emerged  from  a  small BOP player  to  full  fledged EPC player.  Recently BGR has formed a JV with Hitachi group to set up  a  4,000  MW  of  manufacturing  facility  each  for  Boiler  & Turbine  sets.   Notably, BGR  is  the  third player  (after BHEL and L&T) to set up domestic facility for the entire BTG package.  

Robust  Financials: Over  the  past  few  years,  the  company  has grown at a phenomenal pace by bagging some  large  ticket size orders.    We  believe  the  company  is  likely  to  continue  with similar pace over next  few years. Entry  into  the BTG space will add more fuel to growth going forward.  We expect company to grow  at  a CAGR of 32.6%  at  top  line & 30.9% CAGR PAT  level from FY10‐12E.   

The stock  is  trading at attractive valuation of 9.8 FY12E earnings with EPS of Rs. 47.3 We  Initiate coverage on BGR Energy with a BUY rating and  target  price  of  Rs.662,  which  implies  around  40%  upside  from current levels.  

CMP (23/03/2011)  Rs 472 

Target  Rs 662 

Sector  Engineering 

Stock Details  

BSE Code  

NSE Code 

Bloomberg Code 

Market Cap (Rs. cr) 

Free Float (%) 

52‐ wk HI/Lo 

Avg. volume (monthly) 

Face Value ( Rs.) 

Dividend (FY10) 

Shares o/s (Nos. in cr)               

 

532930

BGR

BGRL IN

3693

19.9%

817/434

77583

10.0

70%

7.20 

Relative Performance   1 Mth  3 Mth  1 Yr 

BGR  ‐16.1%  ‐33.2%  0.5% 

Sensex  ‐3.1%  ‐10%  13.9% 

Shareholding Pattern as on 31/12/2010 

Promoters Holding  81.1% 

FII, Banks & Institutions  13.1% 

Corporate Bodies  0.9% 

Public & others   4.8% 

Anand Vyas, Research Analyst  (022‐39268173) [email protected] 

Year Net Sales ( Rs. Crs) 

Growth (%) 

EBIDTA( Rs. Crs) 

 Margin (%) 

PAT    ( Rs. Crs) 

Margin (%)  EPS ( Rs.)  P/E  (x)  P/BV (x) 

FY 2009  1922.1  26.4%          204.0   10.6%          111.2  5.8%            15.4   30.6             6.06  

FY 2010  3,069.2   59.7%          341.9   11.1%        198.7  6.5%          27.6   17.1            4.83 

FY2011E  4,788.1   56.0%          552.2   11.5%        324.9  6.8%          45.1   10.5            3.60 

FY2012E  5,394.5   12.7%          605.6   11.2%        340.4  6.3%          47.3    9.9            2.83 

     

Page 3: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

   Investment Rationale 

Industry: ‐ Long term promising, but near term hiccups  

India has  come a  long way  in  terms   of  Installed power  capacity, which has increased  from  1362  MW  during  Independence    to  over  165000  MW presently.   However, fact remains that the annual per capita consumption of electricity in India is still one of the lowest in the world.  India has experienced a peak power shortage of 16‐17% in recent times. With burgeoning economy, pushing  the  demand  of  power  to  all  time  high  ,  the  GOI  has  initiated  for 1,00,000 MW of  additional capacity by 2017 ( 12th Plan). 

 As per CRISIL, around 66 GW of power generation capacity  is expected to be added in next fiive year ( 2009‐10‐2013‐14), an average of 13.2 GW per year. BOP (Balance of Plant) accounts for around 40% of total project cost. Over the next 5 years (2010‐11 to 2014‐15), CRISIL Research estimates the BoP segment to accounts  for Rs 1.6 trillion; this translates to a CAGR of almost 15 per cent. 

   .                               Opportunity in BOP Over Next 5 years.                   

                                          Sources:‐ Industry, CRISIL,  Nirmal Bang Research 

  

Although power sector gives  immense opportunity for next five years,       but, near  term,    there  are  few  hiccups  like:‐  (1)  Rising  Interest    rate which will result  into  delay  in  orders  from  IPP’s  (2)  Lack  of  funds  with  SEB’s  (3) Environmental Clearance for projects, (4) Shortage of Coal, etc .  All the above factors have resulted into lack orders inflow for the Industry. However, above factored are short term and we expect Industry to witness huge order inflow going forward.  

     

 According to CRISIL, 66000 MW of capacity addition is planned by 2014E.   

BOP (Balance of Plant) accounts for 40% of total capex of Power Plant.   

Page 4: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

 

Jv with Hitachi‐ takes BGR to Premium League In  August  2010,  BGR  formed  a  Joint  Venture  with  Hitachi  Group  for  both supercritical  boilers  and  steam  turbine  generators,  thereby  completing  the final leg of value chain in power plant. . With this JV, BGR is the only company (after BHEL and Larsen & Turbo)  to set up a domestic manufacturing  facility for  the entire BTG  (Boilers & Turbine Generators  sets) package. The  JV with Hitachi  will  provide  BGR  credible  support  for  its  EPC  bidding,  eventually establishing itself as integrated power equipment player 

Third Indian player to manufacturer entire BTG package   

                    

    Sources:‐ Industry, Nirmal Bang Research 

JV details:- BGR has signed  two JV with Hitachi group one each  for  super critical boilers  and  turbines.    For boilers  its has  sign with Hitachi  Power  Europe  (HTE) Germany, and  for  turbine &  generators  sets  it has  signed with Hitachi  ,  Japan.  BGR would  hold majority  of  stake  in  both  the  JV’s with  70% &  74%  share  in boilers and turbine respectively.  Capacity & Capex:‐ Both JV’s will have capacity of 4000 MW each and will have capacity  to  manufacture  5  units  per  annum  of  either  660MW,  800MW  and 1000MW.    Total  capex  for  entire  JV  is  around  Rs.  4400  Crs  (Rs.  3000  Crs  for Boilers and Rs. 1400 Crs for turbine).  BGR plans to fund this capex in the ratio of 70:30   (debt/equity), which results in BGR’s equity contribution for total JV to be around Rs. 950 crs.  For JV BGR, has already taken principal approval from banks to  funds  its  debt.  It  has  already  identified  the  land  near  Chennai  for manufacturing  facility  of  boilers  and  is  likely  to  proceed  for  land  acquisition shortly for turbine sets space.   

Indian Companies 

International Players 

JV Ratio  Boilers ( MW) 

Turbines (MW) 

Capex(Rs. In Crs) 

Expected Commissioning   

Location

L&T  Mitsubishi  49:51  4000 4000 3600 FY11‐12  Hazira

BHEL  NA  NA  150005000 

150005000  3000 

 

Existing FY13 

At  Current Facilities  

BGR  Hitachi  74:26  4000 4000 4400 FY12‐FY13  Chennai

JSW  Toshiba  24:76  ‐ 3000 1200 FY12‐13  Tamil Nadu

Bharat Forge  Alstom  49:51  ‐ 5000 2400 FY12‐13  Mundra

Gammon  Ansaldo  15:85    2000 1000 NA  Trichy

Thermax  Babcock   

51:49  3000 3000 FY12‐13  Pune

BTG accounts for 60% of Power plant Capex  

JV  will  lead  BGR  to  full  fledge  Power equipment supply (after BHEL & Larsen)  

Page 5: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

Robust order book gives revenue visibility BGR has healthy order book of Rs. 9,371 Crs (1.91x FY1E revenues) providing near term  revenue  visibility  to  the  company.  Though  company  operates  in  five business verticals, power projects is its core revenue contributor and accounts for 93‐95% of  total order backlog.   The growth  in order  inflow has been robust  for BGR in past 2‐3 years as company has been able grab large ticket size orders. 

                                                                 

BGR  is expecting strong order  from  its pipeline as several SEBs  (State Electricity Boards) and  IPPS’s  (Independent Power producer) are expected  to  roll out EPC and  BOP  orders  cumulating  Rs35000‐36000  Crs,  during  the  next  few  quarters. Company has already bided for the orders & expect reasonable share in it. . The company has currently placed bids for two EPC projects of 2x660MW in Rajasthan in which, BHEL is L1 bidder & and BGR is L2. The tender had a condition to allot 1 project  to L2 bidder  if  it matches the L1 price. The management  is confident of getting at  least one order worth of Rs. 6100 crs  from RRVUNL.   BGR  is already technically qualified for NTPC 11x 660 MW bulk tenders for boilers.                                                 

                                                            Sources:‐ Company Presentation, Nirmal Bang Research  

Order  inflow  for  the  company has been muted  in  FY10  and 9MFY11  so  far on account of management focus on execution of its large project and lack of orders from Industry.  Going forward, we expect BGR to witness order inflow of Rs. 2800 Crs in FY11 and Rs. 10,625 Crs in FY12E.    Assumption  1:‐  We  have  not  factored  in  order  worth  of  Rs.  6000  Crs  from Rajasthan in our assumption, as BHEL is L1 Bidder  Assumption 2:‐As show  in above chart,  If BGR get order from RRVUNL worth of Rs. 6000 Crs.,  (as Customer has a choice  to give order  to L2 & BGR has already executed  some  projects  for  Rajasthan  govt.)  then  its  total  order  inflow  will increase to Rs. 8800 Crs & order backlog will  increase to Rs. 14196 Crs  in FY11E and Rs. 18815 Crs in FY12E.  

  

BGR  has  placed  bids worth  for  Rs.  35000‐36000  Crs.   & we  expect  BGR  to  get  25%‐30% of above orders. 

Page 6: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

 Risk Concerns Slowdown in economic growth may impact business:‐ BGR’s  growth  is  directly  correlated  to  investment  in  core  sector  of  Indian economy.  Any  slowdown  in  the  Indian  economy  may  hamper  the  capital expenditure  plans  of  the  core  sector  industries  and  could  adversely  affect  the company’s business.   Execution delay:‐   Timely  execution  of  projects  is  the  key  to  success  for  BGR.  The  company  is undertaking execution of large scale projects, any major hiccups or delays in the execution  timeline  could  negatively  impact  our  revenue  and  profitability estimates.  Order inflow:‐    BGR has done well to grab  large ticket size order post 2007‐08, to scale up   the operation  and  to    become  the  full  fledge  player  in  EPC.  Thus,  to  sustain  the earnings growth order inflow becomes crucial. Although we are fairly confident of BGR‘s ability to bag large size order, but any failure in winning fresh order could hamper the growth.  

 

Peer Comparison  We are comparing BGR Energy with BHEL, Thermax,& Tecpro as  these companies are  having  presence  in  either  BOP  or  EPC  or    BOP+EPC. On  forward  earnings, (FY12) BGR is trading at attractive valuation of 9.9x, against average 13‐14x.   

        

      Sources: * ‐ Bloomberg consensus, ** Nirmal Bang Estimates 

 

Companies  CMP 

Sales  EBIDTA Margin(%)  PAT  PAT Margin (%)  EPS  P/E 

FY11  FY12  FY11  FY12  FY11  FY12  FY11  FY12  FY11  FY12  FY11  FY12 

BHEL  1995       

40,747.50                

49,477.60   19.3%  19.4%       

5,541.20       

6,639.80  13.6%  13.4%  113.4  138.1           

17.59             

14.45  

Thermax  586          

4,701.70                 

5,915.80   11.6%  11.5%           

368.70             

461.80   7.8%  7.8%  30.86  38.6           

18.99             

15.18  

BGR  472          

4,788.10                 

5,394.49   11.5%  11.2%           

324.87             

340.42   6.8%  6.3%            

45.12             

47.28            

10.46             

9.98  

Tecpro  243          

1,864.26                 

2,670.68   14.3%  13.8%           

121.16             

171.27   6.5%  6.4%            

23.90             

33.90            

10.17             

7.17  

Page 7: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

Outlook & Valuation  BGR Energy  (BGR) has  taken several  'bigger'  leaps over  the years,  from being a mere manufacturer  of  a  few  BOP  (Balance  of  Plant)  components  to  executing Turnkey BOP projects, & executing EPC contract to a integrated power equipment player   The  government's  thrust  to  the  core  power  sector  of  the  economy  has  led  to power  generation  targets  being  bigger  than  ever,  translating  into  a  huge opportunity for BOP players. We believe that BGR Energy, being one of the very few established players would be key beneficiary of the same.  With its successful entry  into BTG space (JV with Hitachi group) BGR has moved to  last  leg of value chain.    BGR has an order book of Rs. 9713 Crs.  (1.91xFY11E  revenue), provides decent near  term  revenue visibility. During  the FY10‐FY12E, we expect BGR  to  register 32.6% CAGR on top line and 30.9% on bottom line.     We have not factored Order worth of Rs. 6000 Crs from RRVUNL (2x660 MW) in our  assumption.    However, management  is  confident  of  bagging  the  order  in Q4FY11.    

Particulars ( Rs. In crs) FY12E Without Rajasthan Order 

FY12E , including Rajasthan Order 

Revenue 5394.5 5994.4

PAT 340.4 360.1

EPS (Rs.) 47.28 50.1

Order backlog  13416 18815

                                                                      Sources:, Nirmal Bang Research  If BGR gets the Order, then it revenue for FY12E will increase to approximately Rs. 5994.49 Crs and PAT will increase to Rs around 360.1 Crs, which will result in EPS of Rs. 50.1 against 47.28.                

Page 8: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

 

1 Year Forward P/E Chat  

  Sources:‐ (Company Presentation, Nirmal Bang Research)  

 Since listing (Jan. 2008), the company has traded in wide forward P/E band range with an average P/E of 13‐14x.   We are assigning the multiple of 14x, higher side on historical     average due to  its evolution from a small BOP contractor to a full fledge power equipment Player.   At  CMP,  stock  is  trading  at  9.9xFY12E  earnings with  an  EPS  of  Rs.  47.28. We Initiate coverage on BGR Energy with a BUY rating and a target price of Rs. 662, which implies around 40 % upside from current levels 

   

   

 

 

 

 

 

 

 

Page 9: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

  Business & Background 

BGR was incorporated in 1985, as JV between GEA Energietechnik GmbH and Mr. B  G  Raghupathy  (promoter)  to  manufacture  specific  boiler  auxiliary  and components  for  thermal  and  nuclear  power  plants.      From  a  small  equipment manufacturer, BGR has emerged as a prime player  in BOP & EPC  space.   Apart from  operating  in  BOP &  EPC  space,  BGR  also manufacturer  products  like  air cooled  condensers,  de‐aerators  etc,  which  caters  to  both  Power  &  Industrial sector.   

 Technology Tie‐Ups 

Year  Partner  Product

1996  GEA Energietechnik, Germany Dry & Wet Cooling System 

2003  American  Engineering  services, USA Waste water  treatment and Reclamation  

2007  INIMA and Aqualia, Spain  Desalination plant  on EPC  on EPC/BOOT Basis 

2008  Termomeccanica TME, Italy  Condensate Polishing  Plants 

2010  Nooter / Eriksen Inc, USA  Heat Recovery  Steam Generator ( HRSG) 

       Sources:‐ Company Presentation, Nirmal Bang Research 

 Apart  from  Turnkey  projects,  BGR  also  manufactures  about  50%  of  the  BOP package  requirements  in‐house, which gives an edge both  in  terms of cost and lesser sub‐vendor management. Additionally, its proven track record in managing equipment  and  turnkey  projects  helps  the  company  to  further  strengthen  its position against new entrants.  

  ……. Transformed into full fledge power equipment player 

 BGR was primarily a small BOP player. But in 2008, BGR won two large contracts on EPC &  thereon  it  started  focusing on  its  core  skills  from BOP  to  entire  EPC package (Sourcing BTG from Chinese player).  Then in Aug 2010, BGR announced JV with Hitachi  group  for  setting up  entire manufacturing  facility of  4000 MW BTG.  

  

 

Page 10: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

    …. Established track record 

Over  the  years,  BGR  has  gradually  increased  its  expertise  from  a  small  BOP company to undertaking turnkey contracts for large sized   units of 600 MW 

 Impressive list of List of BOP projects. 

       Sources:‐ Company Presentation, Nirmal Bang Research 

 In 2008‐09, BGR marched ahead to the next  level of expertise and bagged   two  major  order  full  fledge    EPC  contract    (  Rs.  8000  Crs).  These  contract  include 1x600 MW from Mettur Power plant & 2x600 Mw from Jhalawar, Rajasthan 

  

  EPC:‐  Orders from  Kalisinadh & Mettur taking BGR to next Level value chain.      

      

Sources:‐ Company Presentation, Nirmal Bang Research 

 The BOP portfolio of these projects  is being handled by BGR  itself, whereas the BTG package  is being sourced  from Dongfang, China. Both  the EPC projects are presently  on  scheduled  and  by  the  end  of  FY11E, management  expects  is  to complete more than 75% of RRUVNL and 90% of Mettur Project. 

  

Project  Size ( MW) Value  status

CSPGCL, Marwa TPS, Chattisgarh  2x500  1633 Under Execution 

MAHAGENCO, Chandrapur, Maharashtra  2x500  1632 Under Execution 

APGENCO, Kothagudam, AP  1x500  793 Under Execution 

MAHAGENCO,Kaperkheda, Maharashtra  1x500  998 Under Execution 

APGENCO, kakatiya, AP  1x500  694.9  Completed 

RRVUNL, Dholpur, Rajasthan   330  209.5  Completed 

APGENCO, Vijaywada, AP   1x500  578.8  Completed 

TNEB‐CCPP Valathur ( ohase‐I), T.N   95  59.4  Completed 

Project  Size ( MW) Value  status

RRUVNL, Kalisinadh TPS, Jhalawar, Rajasthan  2x600  4900 Under construction 

TNEB, Mettur Thermal Power plant  1x600  3100 Under construction 

Aban Power ‐CCPP, Karuppur, T.N   120  269.7  Completed 

TNEB‐CCPP Valathur ( Phase ‐II), Tamil nadu  92.2  355.3  Completed 

Page 11: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

Business Division:‐  BGR operates its business through five primary business division:‐  

Power Division:‐ Division  provides    turnkey  EPC  and BOP  services    for  coal based thermal power plant & Gas based  combined  cycle plant.  The division remains  the key  revenue driver  for  the  company and accounts 94% of FY10 total revenue, & 93% of total order book. Current Order book power division is around Rs. 8525 Crs.    Oil & Gas Equipment Division:    It designs and manufactures  storage  tanks,  gas  conditioning and metering  skids, pipeline pig  launching   gas compressor packages, gas processing complexes etc., related to oil & gas  Industry , for the company  in India and abroad. Total order book of the division is Rs. 433.8 Crs.   Air Fin Coolers: ‐ it supplies air cooled heat exchanger for Oil & Gas and Power Industry.    BGR  has  turnkey  capabilities  in  the  design, manufacture,  supply commissioning and erection of air  fin coolers/  tube bundles/  tubes. Division accounts for Rs. 181.7 Crs of current order book  Environmental Engineering: ‐ Division manufactures and provides deaerators, effluent  treatment  and  recycling  plant,  desalination  plant, water  treatment plants, which have application in the power and in other industrial use. Total order book Environmental division is around Rs. 60.6 Crs.  Electrical  Project:‐    The  Electrical  Project  division    designs    and  supplies  electrical  systems    and  equipment  such  as    optical  fibre  wires,  EHVS, transmission  lines, gas  insulated switchgear substation s to power, refineries & petrochemical plants. Total order book of the division is Rs. 114.6 crs 

 

Revenues Break up          Order backlog break up                

    Sources:‐ Company Presentation, Nirmal Bang Research 

   

Power Division94%

Oil & gas2%

Air Fin Coolor3%

Electrical project division

0%

Enviornmental Engg.

1%

Oil & Gas Eq. 5%

Power Division91%

Enviromental Engg.1%

Electrical Project1%

Air Fin Coolers2%

Page 12: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

Financials ( Standalone) Y/E ‐ March FY09 FY10 FY11E FY12E Financial Health (Rs. In FY09A FY10A FY11E FY12E

Revenues ‐ Net  1,922.1     3,069.2     4,788.1     5,394.5     Share Capital 72.0 72.0 72.0 72.0

% change 26.4% 59.7% 56.0% 12.7% Reserves & Surplus 489.1 631.2 871.9 1128.0

EBITDA 204.0        341.9        552.2        605.6        Net Worth 561.1 703.2 943.9 1200.0

% change in EBIDTA  31% 68% 62% 10% Total Loans 707.8 932.6 1440.1 1596.3

Interest 57.9          53.8          64.8          75.8          Deferred Tax Liab 78.5 158.9 158.9 158.9

EBDT 228.7        357.1        549.7        599.5        Total Liabilities 1347.4 1794.7 2542.9 2955.2

Depreciation 7.0            9.8            14.5          18.0          Net Fixed Assets 96.5 149.4 169.6 201.6

Other Income 31.7          25.0          12.0          12.0          Investments 4.8 4.8 154.8 554.8

PBT 170.8        303.3        484.9        523.7        Inventories 12.5 15.4 29.6 33.4

Tax 59.6          104.7        160.0        183.3        Debtors 1278.0 1978.7 2992.6 3371.6

PAT 111.2        198.7        324.9        340.4        Cash & Bank 610.8 1023.4 1449.2 1273.2

Equity(in Cr.) 72 72 72 72 Loans & Adv 645.4 727.0 855.4 1009.0

EPS 15.45        27.60        45.12        47.28        Other Current  Assets 18.6 18.9 26.3 31.1

Cash EPS  16.42        28.95        47.13        49.79        Current Assets  2565.3 3763.5 5353.0 5718.3

Current Liabilities 1229.0 1889.8 2882.2 3244.4

Operational Ratio FY09 FY10 FY11E FY12E Provisions 90.2 233.2 252.3 275.0

EBITDA margin (%) 10.6% 11.1% 11.5% 11.2% Current liab & Prov 1319.1 2123.0 3134.5 3519.4

PAT margin (%) 5.8% 6.5% 6.8% 6.3% Working Capital  1246.2 1640.5 2218.5 2198.9

EPS Growth (%) 25.7% 78.6% 63.5% 4.8% Total Assets 1347.4 1794.7 2542.9 2955.2

Price Earnings (x) 30.56        17.10        10.46        9.98          Cash Flow (Rs. In Cr) FY09A FY10A FY11E FY12E

Book Value (Rs.) 77.94        97.67        131.09      166.67      Operating

ROE (%) 19.8% 28.3% 34.4% 28.4% Operating Income 174.7 304.7 484.9 523.7

ROCE (%) 9.4% 12.6% 15.0% 12.4% Change in WC ‐153.9 ‐66.9 ‐137.4 ‐146.7

Debt Equity Ratio  1.26          1.33          1.53          1.33          Other Adjustment 77.9 158.7 78.7 118.9

Price / Book Value (x) 6.06          4.83          3.60          2.83          Tax Paid ‐59.6 ‐104.7 ‐160.0 ‐183.3

EV / Sales  2.29          1.51          1.07          0.98          CF from Opeartion 39.0 291.8 266.1 312.6

EV / EBIDTA  21.60        13.55        9.31          8.74          Investment

Orderbook/ Sales 5.16          3.10          1.71          2.48          Capex ‐54.3 ‐58.8 ‐45.0 ‐50.0

Qtrly Q4FY10 Q1FY11 Q2FY11 Q3FY11 Other Investment 150.9 0.0 ‐150.0 ‐400.0

Revenue 1,659.8     905.7        1,134.9     1,256.8     Total Investment 96.6 ‐58.8 ‐195.0 ‐450.0

Total Exp. 1,484.6     802.9        1,003.3     1,109.7     Financing

EBIDTA 175.2        102.8        131.6        147.1        Dividend Paid ‐14.4 ‐21.6 ‐84.2 ‐84.2

EBIDTA Margin (%) 10.6% 11.3% 11.6% 11.7% Premium / Reserve 1.4 2.3 0.0 0.0

Depreciation 3.1            3.1            3.3            3.4            Borrowing 206.2 224.8 506.5 156.2

Interest 11.8          11.6          13.8          16.8          Other Income 31.7 25.0 12.0 12.0

Other Income 3.9            2.6            2.6            1.7            Interest ‐57.7 ‐53.5 ‐79.6 ‐122.6

EBT 164.2        90.7          117.1        128.6        Total Financing 167.3 177.0 354.7 ‐38.7

Tax 55.9          31.2          31.2          40.0          Net Chg.  in Cash 302.9 410.0 425.8 ‐176.0

PAT 108.3        59.5          59.5          77.1          Cash at beginning 307.9 610.8 1023.4 1449.2

EPS 15.05        8.27          8.27          10.70        Cash at end 610.8 1023.4 1449.2 1273.2

 

Page 13: Initiating - Nirmal Bang Energy Ltd_IC_230311.pdf · Initiating Coverage ... supercritical boilers and steam turbine generators ... capacity to manufacture 5 units per annum of either

Initiating Coverage                                                                                            BGR Energy Systems  Ltd.  

 

 

  

   

NOTE       

Disclaimer This Document has been prepared by Nirmal Bang Research (A Division of Nirmal Bang Securities Pvt Ltd). The information, analysis and estimates contained herein are based on Nirmal Bang Research assessment and have been obtained from sources believed to be reliable. This document is meant for the use of the intended recipient only. This document, at best, represents Nirmal Bang Research opinion and is meant for general information only. Nirmal Bang Research, its directors, officers or employees shall not in any way be responsible for the contents stated herein. Nirmal Bang Research expressly disclaims any and all liabilities that may arise from information, errors or omissions in this connection. This document is not to be considered as an offer to sell or a solicitation to buy any securities. Nirmal Bang Research, its affiliates and their employees may from time to time hold positions in securities referred to herein. Nirmal Bang Research or its affiliates may from time to time solicit from or perform investment banking or other services for any company mentioned in this document