12th Seminar 21-24 May 2003 National Contact Point FP6 EU http://www.6pr.pl Information Society Technologies New Instruments of 6th Framework Programme in the Information Society Technology Thematic Area Krzysztof Trojanowski National Contact Point 6th Framework Programme EU mailto:[email protected]http://www.6pr.pl
37
Embed
Information Society Technologies 12th Seminar 21-24 May 2003 National Contact Point FP6 EU New Instruments of 6th Framework Programme.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
12th Seminar21-24 May 2003
National Contact Point FP6 EUhttp://www.6pr.pl
Information Society Technologies
New Instruments of 6th Framework Programme in the Information Society
Presentation Plan – Way from General Idea to Details
Main Idea nad Fundamental Rules of FP Structure of 6th Framework Programme Thematic Priorities within IST in 6th FP Types of Projects of 6FP, specific features Partners, Consortia 6FP Projects Evaluation Criteria Search for Partners – IDEAL_IST Calls in FP6 Info sources and Contacts
12th Seminar21-24 May 2003 3
National Contact Point FP6 EUhttp://www.6pr.pl
1,8
2,0
2,2
2,4
2,6
2,8
3,0
3,2
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
Research: an Increasing Gap – Need of European Research: an Increasing Gap – Need of European Integration within Framework ProgrammesIntegration within Framework Programmes
Japan: 3.1
USA: 2.7
EU-15: 1.8
Total expenditure on R&D, % of GDP
12th Seminar21-24 May 2003 4
National Contact Point FP6 EUhttp://www.6pr.pl
ERA
in tegra tingresearch
strengthen ingbasis
structuring
anticipation of scientific & technological needs;JRC;cooperative research;collective research
networks of excellenceintegrated projectsm ultinational projects
networking national research activities;cooperation w ith COST, ESF, CERN,...;studies;research benchm arking
start-up;hum an resourcesm obility;infrastructures;science/society
Research Integration PolicyResearch Integration Policy
12th Seminar21-24 May 2003 5
National Contact Point FP6 EUhttp://www.6pr.pl
FP 6 - Priority Thematic Areas
Genomics and biotechnology for health Information society technologies Nanotechnologies, inteligent materials and new production processes Aeronautics and space Food safety and health risks Sustainable development and global change Citizen and governance in the European knowledge-based society
12th Seminar21-24 May 2003 6
National Contact Point FP6 EUhttp://www.6pr.pl
FP 6-Priority Thematic Areas - Bugdets: meur
12795Total
2345Anticipating the EU’s needs + JRC
225Citizen and governance
1700Sustainable development/global change
600Food safety and health risks
1000Aeronautics and space
1300Nanotechnologies, materials, production
3625Information society technologies
2000Genomics and biotechnology for health
12th Seminar21-24 May 2003 7
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.1: Genomics and biotechnology for health
Fundamental knowledge and basic tools for functional genomicsGene expression and proteomicsStructural genomicsComparative genomics and population geneticsBioinformatics
Applications of genomics and biotechnology for healthTechnological platforms for the development of new diagnostic, prevention and therapeutic toolsSupport for innovative research in genomics start-up companies
Applications in medicine and public healthCombating cancer, cardiovascular disease and rare diseasesCombating resistance to drugs Studying the brain and combating degenerative diseases of the nervous system
Confronting the major communicable diseases linked to poverty.HIV/AIDS, malaria and tuberculosis
12th Seminar21-24 May 2003 8
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.2 Information Society technologies
Applied IST research addressing major societal and economic challenges Research on technologies for trust and confidenceResearch addressing societal challenges (“e-inclusion”, environment, cultural heritage)Research addressing work and business challenges: e-business and e-government, e-Work systems, e-Learning Complex problem solving in science, engineering, businesses and for the society
Communication and computing infrastructuresCommunication and network technologies: (mobile and wireless systems, networked audio-visual systems), Software technologies, services and distributed systems
Components and microsystems, Micro, Nano and Opto-electronics Micro and Nano Technologies, Microsystems, Displays
Knowledge and interface technologiesKnowledge technologies and digital content Intelligent surfaces and interfaces (multilingual and multicultural access and communication)
12th Seminar21-24 May 2003 9
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.3: Nanotechnologies, Intelligent Materials and New Production Processes
NanotechnologiesLong-term interdisciplinary research into understanding phenomena, harnessing processes and developing research toolsNanobiotechnologiesNanometre-scale engineering techniques to create materials and componentsDevelopment of handling and control devices and instrumentsApplications in areas such as health, chemistry, energy, optics and the environment
Intelligent MaterialsDevelopment of fundamental knowledgeTechnologies associated with the production and transformation of new materialsEngineering support for materials development
New Production ProcessesDevelopment of flexible and intelligent manufacturing systems Systems research hazard controlOptimising the life-cycle of industrial systems, products and services
12th Seminar21-24 May 2003 10
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.4: Aeronautics and space
AeronauticsStrengthening competitivenessImproving environmental impact with regard to engine emissions and noiseImproving aircraft safetyIncreasing operational capacity and safety of the air transport system
SpaceGalileoGMES Satellite telecommunications
12th Seminar21-24 May 2003 11
National Contact Point FP6 EUhttp://www.6pr.pl
Thematic Programme IST: Main Idea and Goals
Creation of Information Society Technologies – IST
Vision: „Our surroundings is an interface to the world of integrated Information Technology
Services
Targets:
Enabling anywhere any time natural and enjoyable access to IST services for ALL
Natural way of interaction and co-operation Life and work quality Improvement, new ways of activity New standards: products, services, applications, business
processes, organization practicies.
12th Seminar21-24 May 2003 12
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.2 Information Society technologies (1)
Applied IST Research Addressing Major Societal and Economic Challenges
- Research on technologies for trust and confidence, protection of people and property
- Research addressing societal challenges (“e-inclusion”, environment, cultural heritage, entertainment, transport and tourism)
- Research addressing work and business challenges: e-business and e-government, e-Work systems, e-Learning
- Complex problem solving in science, engineering, businesses and for the society
12th Seminar21-24 May 2003 13
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.2 Information Society technologies (2)
Communication and Computing Infrastructures, Communication and Network Technologies:
- Mobile and Wireless Systems
- Networked Audio-Visual Systems
- Software Technologies
- Services and Distributed Systems
12th Seminar21-24 May 2003 14
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.2 Information Society technologies (3)
Miniaturised, Low Cost, Low Power Components and Microsystems
- Micro, Nano and Opto-electronics
- Micro and Nano Technologies, Microsystems, Displays
12th Seminar21-24 May 2003 15
National Contact Point FP6 EUhttp://www.6pr.pl
TP 1.2 Information Society technologies (4)
Knowledge and interface technologies
- Knowledge Technologies and Digital Content
- Intelligent Surfaces and Interfaces (Multilingual and Multicultural Access and Communication)
DemonstrationDemonstrationRTD – FET OpenRTD – FET Open
12th Seminar21-24 May 2003 17
National Contact Point FP6 EUhttp://www.6pr.pl
Nowe Instrumenty (typy projektów) w 6PR
Specific Targeted Research Projects - Projekty „Celowe”
Integrated Projects (IP) - Projekty Zintegrowane
Networks of Excellence (NoE) - Sieci Doskonałości
Support Actions (conferences, seminars etc.) Projekty Towarzyszące, Akcje Wspierające
Co-ordination Actions – działania koordynujące np.. Sieci Tematyczne
12th Seminar21-24 May 2003 18
National Contact Point FP6 EUhttp://www.6pr.pl
Types of Projects - 6FP , STREP (1)
Specific Targeted Research Projects (STREPs)
- Clearly defined objectives and results
- Budgets (European Contribution): 100 Keuro to several mil. Eur
- Consortium : min. 3 independent partners from (member, NAS or NIS)
- Cost models : FC/FCF/AC
- Duration : 1-4 years
- European Contribution : 50% for RTD activities, 35% for Demonstration activities,
100% for management (up to 7% of the total RTD+Dem. EC contribution)
The same model as in 5FP (RTD and Demonstration projects)
12th Seminar21-24 May 2003 19
National Contact Point FP6 EUhttp://www.6pr.pl
Types of Projects - 6FP, IP (1)
Integrated Projects
- Clearly defined ambitious objectives and results
- Budgets (European Contribution): 2 mil. Eur to tens of mil. Euro
- Consortium : min. 3 independent partners from different countries (member, NAS or NIS),
in practice many more
- Cost models : FC/FCF/AC
- Duration : 3-5 years or more
The new, different model than models of 5FP
12th Seminar21-24 May 2003 20
National Contact Point FP6 EUhttp://www.6pr.pl
Integrated Projects – FP6, IP(2)
Integrated (IP) versus Targeted Projects (STREP) - differecies
- IP: knowledge, tests, implementation activities within one project
- TP: concentration on one activity
- IP: Multidisciplinary objectives (large scale)
- TP: concentrated on one strictly defined problem
- IP: Multisectorial (research institutes/industry) problem solutions
- IP: Funding (public and private sector)
12th Seminar21-24 May 2003 21
National Contact Point FP6 EUhttp://www.6pr.pl
FP6 Integrated Project Features , IP(3)
Integrated Projects (IP) Open Formula :
- IP: Tasks, Partners and Budgets all identified (the same as in FP5)
- IP: Tasks and Budgets identified, not all partners in (different than in FP5)
- IP: Objectives and Budgets identified, Number of Tasks and Partners can be enlarged
(different than in FP5)
12th Seminar21-24 May 2003 22
National Contact Point FP6 EUhttp://www.6pr.pl
Types of Projects - 6FP, NoE (1)
Networks of Excellence
- Goal: to enhance the co-operation of researchers around a specific theme
- Budgets (European Contribution): few hundred keuro
- min. one organisation, in practice many (open structure)
- Funding : 100% of AC (Additional Cost), for networking and research activities
- Duration : several years
To some extend similar to model of 5FP
12th Seminar21-24 May 2003 23
National Contact Point FP6 EUhttp://www.6pr.pl
FP6 Networks of Excellence, NoE (2)
Networks of Excellence (NoE) – Main Goal:
To integrate the fragmented European Research Efforts, existing problem: - national and „local” research fragmentation - „multi coverage” of the same scientific and research area - complementarity of research and scientific efforts To create critical mass to become a competitive force Important: Preparation of Joint Programme of Activity JPA
12th Seminar21-24 May 2003 24
National Contact Point FP6 EUhttp://www.6pr.pl
FP6 Networks of Excellence, NoE (3)
Networks of Excellence (NoE) – Financing:
NoE financing is based on Grant model :
Number of researchers engaged on joint programme of activities
Grant per researcher
Duration of the project
12th Seminar21-24 May 2003 25
National Contact Point FP6 EUhttp://www.6pr.pl
FP6 Networks of Excellence, NoE (4)
Networks of Excellence (NoE) – Financing:
NoE financing on Grant per researcher model, examples : 1) - Number of researchers: 50 - Grant per researcher : 20 kEuro per year per researcher
- Grant value per year : 1 mEuro 2) - Number of researchers: 500 - Grant per researcher : 10 kEuro per year per researcher - Grant value per year : 5 mEuro
12th Seminar21-24 May 2003 26
National Contact Point FP6 EUhttp://www.6pr.pl
Types of Projects - 6FP, SA (1)
Support Actions (Conferences, Seminars, Studies, Analyses, Working and Expert Group)
- Goal: to complement Programme Implementation
- Budgets (European Contribution): few hundred keuro
- min. one organisation, in practice many (open structure)
- Funding : 50-100% of costs, or grant, cost model FC/FCF/AC
- Duration : several years
To some extend similar to model of 5FP
12th Seminar21-24 May 2003 27
National Contact Point FP6 EUhttp://www.6pr.pl
Evaluation Criteria
Evaluation Criteria :
Relevance to IST programme Objectives
Scientific and Technological Excellence
Critical Mass
Dissemination and Use Plan
Resources, Competence and Organisation
12th Seminar21-24 May 2003 28
National Contact Point FP6 EUhttp://www.6pr.pl
Partner Search – Ideal-IST
Main Goals of IDEAL-IST:
- Active and Passive Partner Search (Building up project consortia)
Ideal-IST Polish Co-ordinator : Dr Tadeusz Grabowiecki : Instytut Elektroniki Politechniki Śląskiej E-mail: [email protected]
Tel.: (+48) 32 237 1665, Fax: (+48) 32 237 2225
NCP Polish Co-ordinator Krzysztof Trojanowski: e-mail: [email protected]
12th Seminar21-24 May 2003 30
National Contact Point FP6 EUhttp://www.6pr.pl
Fundamental Information and Documents in all Priorities of FP6
Information and documents indispensable for consortium preparing a proposal:
- Calls: openning and closure dates (information on NCP web pages and in Cordis data base), document: Call Text
- Description of the thematic scope of the particular call (which action lines will be open in the call) document : Call Text
- Description of all Action Lines: Work Programme 200x and information which instruments (types of projects) will be valid – the scope of the project must fit to the open topic (action line) described in the workprogramme
- Guide documents (requirements, advice) concerning the formal rules and the structure of the project proposal, document: Guide for Proposers of the right instrument (type of project) e.g. Integrated Project
- Hierarchy of topics (within the Workprogramme) :
In IST of 6FP : Priority – Subpriority – Action Line (subtopic)
12th Seminar21-24 May 2003 31
National Contact Point FP6 EUhttp://www.6pr.pl
Calls of IST Priority
Call 1 - Date of publication : 17.12.2002- Closure date (deadline of proposal submission: 24.04.2003 (17:00 Brussels local time) - Total indicative budget: 1070 MEuro All available Instruments (IP, NoE, STREPs, SSA, CAs) are valid
Call 2 - Date of publication : 17.06.2002 ???- Closure date (deadline of proposal submission): 15.10.2003 (17:00 Brussels local time) - Total indicative budget: 525 MeuroAll available Instruments (IP, NoE, STREPs, SSA, CAs) are valid
Continous Submission Call - Date of publication : 17.12.2002 - Date from which proposals are receivable: 10.02.2003 (17:00 Brussels local time) - Closure date (deadline of proposal submission): 31.12.2004 - Total indicative budget: 60 MeuroAvailable Instruments : STREPs, SSA, CAs are valid
12th Seminar21-24 May 2003 32
National Contact Point FP6 EUhttp://www.6pr.pl
IST 6FP – Call 1, Pierwszy konkurs IST 6PR
Call 1 Pre-allocated
1. Strategic Objectives
Pushing the limits of CMOS, preparing for post-CMOS 75
Micro and nano systems 85
Broadband for all 60
Mobile and wireless systems beyond 3G 90
Towards a global dependebility and security framework 55
Multimodal interfaces 65
Semantic-base knowledge systems 55
Networked audio-visual systems and home platforms 60
Networked business and governments 75
eSafety of road and air transport 65
eHealth 70
Technology enhanced learning and access to cultural heritage 65
12th Seminar21-24 May 2003 33
National Contact Point FP6 EUhttp://www.6pr.pl
IST 6FP – Call 1, Pierwszy konkurs IST 6PR
Call 1 Pre-allocated
2. Future and emerging Technologies
Proactive initiatives (i) Beyond robotics (ii) Complex systems research (iii) The Disappearing Computer
Open development platforms for software and services 55
Cognitive systems 25
Applications and services for the mobile user and worker 60
Cross media content for leisure and entertainment 55
GRID-base systems and solving complex problems 45
Improving risk management 30
eInclusion 30
12th Seminar21-24 May 2003 35
National Contact Point FP6 EUhttp://www.6pr.pl
IST 6FP – Call 2
Call 2 Pre-allocated
2. Research Networking
Research Networking test beds 25
3. General Accompanying actions
2.3.6 General Accompanying actions 8
12th Seminar21-24 May 2003 36
National Contact Point FP6 EUhttp://www.6pr.pl
Source of Information – IST Priority
European Commision Data Base - Cordis (all information of 5 i 6th Framework programme) http://www.cordis.lu/Ist : web page derived from 5FP http://www.cordis.lu/fp6 : New (actual) EC web page, http://europa.eu.int/comm/research : EC web page
concentrating on science and research
Web Page of IDEALIST project (services of partner search for IST projects, brokerage events, links with Cordis) http://www.ideal-ist.net http://www.idealist-east.polsl.gliwice.pl
12th Seminar21-24 May 2003 37
National Contact Point FP6 EUhttp://www.6pr.pl
National Contact Point – Web Pages
National Contact Point 6FP
http://www.6pr.pl – active, valid web page, Polish v.
http://www.fp6.pl – active, valid web page, English v.