voestalpine Stahl GmbH www.voestalpine.com/stahl Information and Safety Rules for Visitors Version: March 2012 voestalpine Stahl GmbH voestalpine-Straße 3 4020 Linz, Austria T. +43/50304/15-0 F. +43/50304/55-DW www.voestalpine.com/stahl Technically more advanced. Successful together. voestalpine Steel Division – the partner you can trust. High-quality materials are the basis for our products. We strive to be the best partner for our customers and want to provide them with the best-possible solution. We focus our expertise on two aspects: The personal aspect, with dedicated and highly competent employees The technical aspect, with high-quality methods, products and services The companies in the voestalpine Steel Division and their employees understand partnership to be the following: Understanding for their customers’ business Expertise and reliability Responsibility for satisfactory project completion Partnerships based on trust Many years of successful partnerships with our customers prove our point. Heavy Truck Docking Stations LogServ Directory of Plant Facilities LC01 Mühlbach Office Building C10 LC02 LogServ Engine and Railcar Workshop A6 LC03 Heavy-load Vehicles B6 LC04 LogServ River Port Management F3 LC05 Customs building Gaisenbergerstraße B9 LC06 Automotive Workshop + Filling Station A6 LC07 Mühlbach Office Building C9 A Plant Upkeep Main Workshop F6 AH Showroom – voestalpine Cultural Organization B9 B Heavy Plate Shipping, Gate 19 D8 C Receipt of Goods B9 D Push-pull Pickling Line – Regeneration E7 E Desulfurization Plant C5 E1 Pelleting and Briquetting Plant B4 F Neuson B8 F1 Auinger – Cerveny A6 G1 OÖGKK – Dental Clinic, APK A2 H Electrical Plate Manufacturing D7 I Baar B8 ILL Industrial Logistics Information Point B9 K Hot-dip Galvanizing Line 1 C8 K1 Hot-dip Galvanizing Line 2 C6 K2 Strip Coating Line D9 K3 Electro-galvanizing Line C7 K4 Iron-oxide Shipping C9 K5 Iron Sulfate Loading D6 L Hydraulic Testing Stand F6 M VAM Center G7 N Heavy Load Port G8 O1 Brick-making Plant D5 P1 External Rolling Mill Storage Area, Bay 4 B6 P2 Rolling Mill Storage Area 11 D7 P3 Blast Furnace Storage Area 06 D4 P4 Coking Plant, Repairable Spares Storage 07 C3 Q Shipment and Storage Entry 33 A7 R Central Storage 01, Storage Area 01 A6 R1 Storage 3 Foundry Auxiliary Materials Ld B6 R3 LogServ – Automobile Filling Station A6 S VAM Corrosion Protection F6 T Wuppermann – Steel Strip E8 U Foundry Storage 2501 F6 U1 Refractory Material Storage 12 – Zapf, East Baustoffstraße F5 U2 Refractory Material Brick Storage 2 E5 U3 Refractory Material Brick Storage 1 East F4 U4 Refractory Material Storage LD3 West B5 U5 Alloy Storage 59 E5 U6 voestalpine Giesserei Mold Yard G7 V AE – Pressure Die Casting G6 W Bauschutz, Sand Blasting Plant G7 Y Linde C6 Z Scale – Granulation E4 Z1 Lentia Concrete G6 Z2 COGNOR – Stahlhandel GmbH F7 Z4 Kremsmüller E8 Z6 voestalpine Kindergarten E9 voestalpine Anarbeitung A3 Strip Coating Line 2 C7 Vocational Health Center/Ambulance E7 Works Fire Department A6 Strip Coating Line 1, colofer ® D8 Electrical Technical Center C4 Electrical Engineering Center F6 Electro-galvanizing Line C7 voestalpine Europlatine B7 Hot-dip Galvanizing Line 1 C8 Hot-dip Galvanizing Line 2 D7 Hot-dip Galvanizing Line 3 C6 Hot-dip Galvanizing Line 4 C7 Hot-dip Galvanizing Line 5 C6 Scarfing Bay C6 FMA D8 Forum.Zukunft/Apprentice Workshop A5 voestalpine Giesserei E6 voestalpine Grobblech E7 Blast Furnaces 4–6 C4 Blast Furnace A D4 ILL B3 ILL i0 C8 ILL i2+i3 B8 Cold-rolling Mill 1 D7 Cold-rolling Mill 2 C8 Coking Plant B2 Continuous Tandem Rolling Mill C7 LD3 B5 Non-iron-metal Casting Plant F6 Regeneration E7 Push-pull Pickling Line E7 Screening Plant C2/D2 Sinter Plant E4 Brick Yard 2 E5 East Brick Yard F4 Works Security B8 Materials Center G6 ZAPF E5/F5
4
Embed
Information and Safety Heavy Truck Docking Stations ... · LC04 LogServ River Port Management F3 LC05 Customs building Gaisenbergerstraße B9 LC06 Automotive Workshop + Filling Station
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
voestalpine Stahl GmbHwww.voestalpine.com/stahl
Information and Safety Rules for VisitorsVersion: March 2012
Technically more advanced. Successful together. voestalpine Steel Division – the partner you can trust.
High-quality materials are the basis for our products. We strive to be the best
partner for our customers and want to provide them with the best-possible
solution. We focus our expertise on two aspects:
The personal aspect, with dedicated and highly competent employees
The technical aspect, with high-quality methods, products and services
The companies in the voestalpine Steel Division and their employees
understand partnership to be the following: Understanding for their customers’ business Expertise and reliability Responsibility for satisfactory project completion Partnerships based on trust
Many years of successful partnerships with our customers prove our point.
Heavy Truck Docking Stations LogServ
Directory of Plant Facilities
LC01 Mühlbach Offi ce Building C10LC02 LogServ Engine and
Railcar WorkshopA6
LC03 Heavy-load Vehicles B6LC04 LogServ River Port Management F3LC05 Customs building
GaisenbergerstraßeB9
LC06 Automotive Workshop + Filling Station
A6
LC07 Mühlbach Offi ce Building C9
A Plant Upkeep Main Workshop
F6
AH Showroom – voestalpine Cultural Organization
B9
B Heavy Plate Shipping, Gate 19 D8C Receipt of Goods B9D Push-pull Pickling Line –
K Hot-dip Galvanizing Line 1 C8K1 Hot-dip Galvanizing Line 2 C6K2 Strip Coating Line D9K3 Electro-galvanizing Line C7K4 Iron-oxide Shipping C9K5 Iron Sulfate Loading D6L Hydraulic Testing Stand F6M VAM Center G7N Heavy Load Port G8O1 Brick-making Plant D5P1 External Rolling Mill Storage
Area, Bay 4B6
P2 Rolling Mill Storage Area 11 D7P3 Blast Furnace Storage Area 06 D4P4 Coking Plant, Repairable Spares
Storage 07C3
Q Shipment and Storage Entry 33 A7R Central Storage 01, Storage Area 01 A6R1 Storage 3
voestalpine Anarbeitung A3Strip Coating Line 2 C7Vocational Health Center/Ambulance E7Works Fire Department A6Strip Coating Line 1, colofer® D8Electrical Technical Center C4Electrical Engineering Center F6Electro-galvanizing Line C7voestalpine Europlatine B7Hot-dip Galvanizing Line 1 C8Hot-dip Galvanizing Line 2 D7Hot-dip Galvanizing Line 3 C6Hot-dip Galvanizing Line 4 C7Hot-dip Galvanizing Line 5 C6Scarfi ng Bay C6FMA D8Forum.Zukunft/Apprentice Workshop A5voestalpine Giesserei E6voestalpine Grobblech E7Blast Furnaces 4–6 C4Blast Furnace A D4ILL B3ILL i0 C8ILL i2+i3 B8Cold-rolling Mill 1 D7Cold-rolling Mill 2 C8Coking Plant B2Continuous Tandem Rolling Mill C7LD3 B5Non-iron-metal Casting Plant F6Regeneration E7Push-pull Pickling Line E7Screening Plant C2/D2Sinter Plant E4Brick Yard 2 E5East Brick Yard F4Works Security B8Materials Center G6ZAPF E5/F5
Welcome to voestalpine Stahl GmbH Linz Site
Your safety while visiting our production site is very important to us. Please
make your own contribution by complying with the instructions given to you
by voestalpine personnel and by abiding by the rules contained herein.
Procedures in the event of an emergency
Please call one of the in-house emergency services in the event of an emer-gency (accident, fi re, medical incident, etc.). Our in-house emergency person-nel are most familiar with the conditions and circumstances in our facilities.
Ambulance Tel.: +43/50304/15-144 Fire Department Tel.: +43/50304/15-122 Works Security Tel.: +43/50304/15-133
!!!!
!!
<
¾ ÆÈ PÅã
Haf
en
Ritt
al
ICO
N
voestalpineAnarbeitung
SG
52
ILL
APK
UWT
ZAP
FLD
3
WA
B1
BG
90
BG
39
SG
38
BG
05S
G41
SG
40
BG
81S
G08
BG
24
BG
19
9
BG
51
BG
47
BG57
SG
39SG
01B
G03
BG
88
BG
76
BG
45
BG
77B
G44
SG45
BG
74
SG
13
SG
02
BG
72B
G38
BG
02
BG
73S
G09
BG
48
BG21
SG
07
BG
67
BG
56S
G32
BG
61B
G83
SG
23
BG
75
BG
41
SG
25
BG
18
BG
49
SG
49
voes
talp
ine
Sta
hlw
elt
Gäs
teha
us, K
üche
VW
Z
Siem
ens
VAI
Ausbildungszentrum
Forum.Zukunft
Siem
ens
VAI
Linde
Andr
itz H
ydro
ZE
R
U2
E1
U1
P3
P4
G1
O1
U3
U5
U4
54321
O0
150
300
450
600
75
Met
er
Par
kpla
tz
¾ ÆÈ PP
arkh
aus,
Tie
fgar
age
!!A
llgem
eine
s Fa
hrve
rbot
!! ##
4,0 m
Dur
chfa
hrts
höhe
!§# Z
oll -
Dou
ane
! (GR
ettu
ngss
telle
"-In
fo P
oint
für L
KW
LKW
-Lad
este
llen
!AW
erks
einf
ahrt
Wer
kssi
cher
ung
!!BE
infa
hrt f
ür M
itarb
eite
r mit
Tran
spon
derk
arte
!! E
Geh
tor
"" !! E
Geh
- und
Rad
tor
Bla
st F
urna
ce A
Ser
vice
zon
eC
okin
g P
lant
Riv
er P
ort
Man
agem
ent –
LC
04M
echa
troni
cs Z
one
Riv
er p
ort
Scr
eeni
ng P
lant
Danube
Gue
st S
ervi
ces,
Kitc
hen
VW
ZB
last
Fur
nace
s 4–
6S
inte
r Pla
nt
Ele
ctric
al T
echn
ical
Cen
ter
Ref
ract
ory
Mat
eria
l B
rick
Sto
rage
2
Cen
tral L
adle
Ref
ract
ory
Lini
ng S
ervi
ce
Sla
b de
scal
ing
Eas
t bric
k ya
rd
n,shop
Lege
ndW
orks
fenc
eG
ener
al a
cces
s pr
ohib
ited
Am
bula
nce
stat
ion
Wor
ks e
ntra
nce/
Wor
ks s
ecur
ity
Wor
ks e
ntra
nce/
Wor
ks s
ecur
ity
Ped
estri
an g
ate
Ped
estri
an a
nd b
icyc
le g
ate
Truc
k lo
adin
g po
ints
met
ers
Info
rmat
ion
poin
t for
tru
ck d
river
sVe
hicl
e cl
eara
nce
Cus
tom
s
Ext
erna
l acc
ess
road
s
Inte
rnal
acc
ess
road
s
Par
king
lot
Par
king
gar
age,
un
derg
roun
d pa
rkin
g
1 2 3 4 5
1 2 3 4 5
GF
ED
CB
A<
!!
<
¾ ÆÈ P
Mühlba
ch
Felb
erm
ayr
Felb
erm
ayr
LogServ/BM
Alpine Bau
Euro
plat
inen
Neuson
Lisa
gFu
nkbe
ton
TMS
LVZ
BIS V
AM
Cog
nor
Stah
lhan
del
BIS VAM
voes
talp
ine
Anar
beitu
ng
voestalpine Grobblech
Bilfi
nger
Berg
er
Bilfi
nger
Ber
ger
SG
85
Andriz
Hyd
ro
Feuerverzinkung 2
WFL
ASA
NEM
THZ
ILL i2+i3
ILL i0
LC03
BG
24S
G34
BG
58
BG82
BG37
SG59
BG17
BG33
BG
20S
G20
BG55
BG09
SG17
BG
74
BG
32
SG
54
BG
11
SG
36
BG
36
BG
13S
G15SG
14
BG69
SG27
BG
BG
29B
G31
BG
22
BG63
BG64
BG08
BG12
BG
54
BG
15
SG
37
BG
66
SG
60
BG
26
BG
27
BG
35
LC06
SG
50
LC02
BG
80
BG
40B
G34
BG
04
BG65
BG
06
BG
85
LC07
LC01
Saso
l Wax
Au
LogServ
MCE Maschinenbau
FMA
Lin
IK
D
S
YL
U
C
T
W
M NV
R
Q
F
B
H
A
Z4
AH
Z2
U6
P2
P1
R3
Z6
K5
Z1
R1
F1
K4K2
K1
K3
109876
Standortservice7.3.2012 Tel. 6575Stand:
Filling Station,Automotive Workshop
Wor
ks F
ire
Dep
artm
ent
Hot-dip Galvanizing Line 5
Hot-dip Galvanizing Line 4
Hot-dip Galvanizing Line 3
Hot-dip Galvanizing Line 2
Strip Coating Line 2
Electro-galvanizing Line
Scarfing Bay
Cold-rolling Mill 1
Voca
tiona
l Hea
lth C
ente
r
Push-pull Pickling Line
Electrical Engineering Center
Corrosion Protection
Materials C
enter
Col
d-ro
lling
Mill
2
colofer®
Hot-dip Galvanizing Line 1
Con
cret
e re
info
rcem
ent
cent
er
Continuous Annealing Plant
Linz AGSorting station
Wor
ks n
urse
ry
Sou
th
cons
truc
tion
yard
Railway
cente
r of c
ompe
tence
Continuous Tandem Rolling Mill
Truc
k/IL
LLKW
-Ter
min
al
Nighttim
e tru
ck lo
ading
term
inal
Spo
rts
club
, Kre
ksi,
Sch
wai
ghof
erTr
aun
TMS
offi
ce
Heavy-load Vehicles
Foun
dry
Linz
AG
Dis
tric
t hea
ting
pow
er p
lant
6 7 8 9 10
6 7 8 9 10
GF
ED
CB
A
Personal conduct on the works premises
p Entrance to the works premises and production plants is at the visitor‘s own risk. To the extent legally permitted, voestalpine Stahl GmbH assumes no liability for damage of any kind occurring on the works premises.
p Any person in the possession of a duly issued entrance badge will be held liable for misuse of any access authorization.
p Children under fi fteen years of age and animals are strictly forbidden on the works premises.
p Alcoholic beverages, weapons and explosives are strictly forbidden on the works premises.
p Instructions issued by works security personnel must be followed.
p The company reserves the right to conduct inspections of baggage, vehicles and access badges and to check materials and tools carried on and through the works premises. Such materials and tools may be rejected for transport to and/or from the premises.
Buildings
BG02 Steelmaking Plant, TWS, voestalpine group-IT
A5
BG03 Coking Plant, Environment and Process Analysis
A2
BG04 SF/TK, Test Engineering TSP D6BG06 WFL A7BG08 Felbermayr F7/E8BG09 Central Storage 01, Kontext Print
BG44 Guest Services, Kitchen VWZ A4BG45 Siemens VAI A4BG47 Siemens VAI A5BG48 Siemens VAI A4BG49 Andritz Hydro F5/F6BG51 Blast Furnace Ambulance Station D4BG54 Scrap Yard Offi ce B6BG55 voestalpine Giesserei GmbH E6BG57 Forum.Zukunft A5BG58 LogServ Automotive Workshop B6BG60/A Works Entrance A – Stahlstraße B8BG60/B Works Entrance B – Lunzerstraße D9BG60/C Works Entrance C – Franckstraße A2BG60/D Works Entrance D – Steyregger
SG36 South Rolling Mill C8SG37 North Rolling Mill C6SG38 Blast Furnace Operations B4SG39 LD Steelmaking Plant B5SG40 Granulation Materials Center E4SG41 Maintenance
Blast Furnace/Ore PreparationD4
SG45 Training Center A5SG49 LogServ River Port Management
– LC04F3
SG50 Works Fire Department A6SG52 Central Ladle Refractory Lining
Service (ZAPF)E5/F5
SG54 Scrap Handling B6SG59 ELO Bay Engineering C8SG60 Materials Center G6SG85 voestalpine Europlatine Production B7/B8
Site Directory
Persons with pacemakers prohibited!
Unauthorized entry
prohibited!
Fire, open light and smoking prohibited!
Beware of hot
surfaces!
Beware of floor-level transports!
Beware of hanging loads!
Safety Precautions
p All visitors must register with their contact partner at the designated site of their visit. Visitors must comply with the instructions of their contact partner and must follow all traffic, restrictive and warning signs in ent-rances and facilities. Pay special attention to traffic lights and acoustic signals such as the honking of crane drivers.
p Entrance to the production and storage facilities is not permitted without being accompanied by your contact partner.
p In many areas of our production site, you will be re-quired to wear personal protective equipment (PPE).
Your signature in the PDA (personal digital assistant) confi rms your acceptance of these rules.
p Transported materials and tools are to be listed in a materials/tools protocol and submitted to the works security at the time of entry.
p Any person who does not comply with these safety rules and regulati-ons or with applicable laws will be denied access to the works premi-ses. Persons denied access will not be permitted to enter the works premises at a later date.
p Hazardous and dangerous goods of all classes must be registered at the time of entry. This also applies to exempted quantities according to ADR regulations (≤ 1000 points) or exemptions for construction workers.
p Each visitor, including accompanying persons, is issued an access authorization badge and must be registered at the security checkpoint.
p Wear your badge so that it remains clearly visible at all times.
p Your visit is limited to a specific target area as well as to the roads and pathways that lead you to this point. When traveling to and from the area you visit, you must use the shortest possible route in both directions.
p Shortcuts on unauthorized travel routes are prohibited.
p Parking is permitted exclusively on designated parking lots.
p The road traffi c regulations of Austria (StVO) are applicable throug-hout the entire works premises.
p Beware of frequent crossing of special vehicles carrying hot slabs, other hot materials and extremely heavy loads. Special caution is required when encountering special transport vehicles, which need more time to stop and in which the drivers have limited vision of other vehicles in their path.
p Filming or photographing on the works premises or the publishing of anything heard or seen is strictly prohibited. Special permission must be obtained from Corporate Communications. Picture taking