30. Jan. 2006 :T. Steiger, ID / SD, Beowulf Day Informatikdienste / IT- Services Status Report of Implementations Gonzales
30. Jan. 2006 :T. Steiger, ID / SD, Beowulf Day
Informatikdienste / IT-Services
Status Report of Implementations
Gonzales
30. Jan. 2006, T. Steiger, ID / SD
ID / SD Statusreport
Status Report of Implementations
• Installation of the Racks• Installation of the Nodes• Installation of the Network(s)
30. Jan. 2006, T. Steiger, ID / SD
ID / SD Statusreport
Status Report of Implementations
•RacksThe power density of the Gonzales nodes makes water cooled racks neccessary in order to cover the thermal requirements
"CoolTrans“Cool Transfer Unit
30. Jan. 2006, T. Steiger, ID / SD
ID / SD Statusreport
Status Report of Implementations
•Racksthe temperature and humidity of the racks can be remotely controlled
30. Jan. 2006, T. Steiger, ID / SD
ID / SD Statusreport
Status Report of Implementations
•Nodes• All new nodes and 20% of the
existing are already installed in the water cooled racks.
• 40 nodes per rack • New nodes are already installed
and configured• Wednesday all Gonzales nodes
will be moved
30. Jan. 2006, T. Steiger, ID / SD
ID / SD Statusreport
Status Report of Implementations
• Network(s)
• EthernetCabling has been temporarily done for installation of the OS and to run the burn-in procedure
• Quadrics Node level switches have been delivered to DALCO and are to be installed within today
• Clock modules will be expected within this week
• It is scheduled to have the 288 Nodes up and running within next week
30. Jan. 2006 :T. Steiger, ID / SD, Beowulf Day
Informatikdienste / IT-Services
Status Report of Implementations
Thank you for your attention!