Page 1: Informasi bendungan dolok

Bendungan Randugunting

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYATDIREKTORAT JENDERAL SUMBER DAYA AIRBALAI BESAR WILAYAH SUNGAI PEMALI JUANA

Page 2: Informasi bendungan dolok

LOKASI BENDUNGAN DOLOK

Balai Besar Wilayah Sungai Pemali Juana

GAMBARAN UMUM

Bendungan Dolok terletak di Wilayah Sungai Jratunseluna dan termasuk pada sistem Dolok-Penggaron Lokasi Bendungan Dolok secara administratif terletak di Desa Banyumeneng, Kecamatan Mranggen, Kabupaten Demak Luas DAS 32.87 Km²Luas Genangan 110.37 HaVolume 13.72 Juta m³

Elevasi puncak mercu BendunganDolok Alternatif 3 adalah padalevel +93mSPB.

Elevasi Muka Air MaksimumBendungan Dolok Alternatif 3terdapat pada elevasi + 90 SPB.dengan luas area genangan + 176Ha dan volume tampungan sebesar23juta m³.

Area Genangan

Page 3: Informasi bendungan dolok

Layout Bendungan DolokAlternatif 3dan 4

A

A

B

B

C

C

LAYOUT BENDUNGAN DOLOK ALTERNATIF 3 DAN 4

CROSS SECTION A-A

CROSS SECTION B-B

CROSS SECTION C-C

ALT. 1 ALT. 2 ALT. 3 ALT. 4Crest of dam 110 103 93 96

Full supplylevel 103 110 90 93Gross storage 57million m³ 47million m³ 23million m³ 29million m³Dead storage 14million m³ 14million m³ 0million m³ 7million m³Life storage 43 million m³ 34 million m³ 23 million m³ 22 million m³Type of spillway Fixed Fixed Gated GatedLevel of spillway n.a n.a At 82 At 85Breaching section None None At 90.5 At 93.5Sediment sluicing None None Low outlet NoneLevel of intake n.a n.a At 55 At 76Main function - Storage

- Flood control- Hydropower

- Storage- Flood control- Hydropower

- Flood control - Storage- Flood control- Hydropower

Cost of Construction -US$ 33.5 million -US$ 28.7 million -US$ 22.3 million -US$ 24.2 millionStudyby PRC/ ECI, 1980 Study by DHV, 1991

ALT. 1 ALT. 2 ALT. 3 ALT. 4Crest of dam 110 103 93 96

Full supplylevel 103 110 90 93Gross storage 57million m³ 47million m³ 23million m³ 29million m³Dead storage 14million m³ 14million m³ 0million m³ 7million m³Life storage 43 million m³ 34 million m³ 23 million m³ 22 million m³Type of spillway Fixed Fixed Gated GatedLevel of spillway n.a n.a At 82 At 85Breaching section None None At 90.5 At 93.5Sediment sluicing None None Low outlet NoneLevel of intake n.a n.a At 55 At 76Main function - Storage

- Flood control- Hydropower

- Storage- Flood control- Hydropower

- Flood control - Storage- Flood control- Hydropower

Cost of Construction -US$ 33.5 million -US$ 28.7 million -US$ 22.3 million -US$ 24.2 millionStudyby PRC/ ECI, 1980 Study by DHV, 1991

Balai Besar Wilayah Sungai Pemali Juana

DATA TEKNISBendungan Dolok di desain menggunakan 4 (empat) alternatif, dua diantaranya merupakan hasil desain dari studi yang dilaksanakan oleh PRC/ECI (1980) dan dua desain yang lain dilakukan oleh DHV (1991).

Hasil studi dari DHV (1991) dapat disimpulkan bahwa Alternatif 4 terpilih sebagai lokasi rencana Bendungan Dolok.

Page 4: Informasi bendungan dolok

Balai Besar Wilayah Sungai Pemali Juana

DENAH WADUK LOGUNG

Irigasi

Peningkatan potensial irigasi dengan areal irigasi seluas 1.970 ha dan peningkatan intensitas tanam mencapai 200%..

Air Baku

Potensi penyediaan air baku dengan DEBIT 1 m³/dt

Pengendalian Banjir

Mengurangi debit periode ulang 100 th sebesar 100 m³/dt.

MANFAAT

Page 5: Informasi bendungan dolok

Tahun Luas (Ha)

Hutan jati 231.2 Hutan mahoni 13.9 Tegalan kayu (bukan jati) 53.1 Lapangan 0.6 Jalan dalam kawasan hutan 1.92 Jalan lori 0.78 Jalan dinas Perhutani (di luar kawasan hutan)

0.15

Rumah dinas Perhutani 1.1629 Total 302.8129

Balai Besar Wilayah Sungai Pemali Juana

Bendungan Dolok diperkirakan menggenangi kawasan hutan dengan total luas lahan yang dibutuhkan adalah 302.8129 Ha dengan rincian sebagai

KEBUTUHAN LAHAN

Jadwal Pelaksanaan