Top Banner
Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant Superintendent for Facili=es & Opera=ons Mee=ng #2 November 9, 2017
41

Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Mar 06, 2018

Download

Documents

builien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Informa(on and Proposal for 2018 Bond Program

Dr.BrianT.Woods,SuperintendentLeroySanMiguel,AssistantSuperintendentforFacili=es&Opera=ons

Mee=ng#2

November9,2017

Page 2: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Presenta(on Overview

• RegulatoryRequirements•  Whatarethey•  Howdotheyimpactconstruc4onandcost

• CostConsidera=ons•  Wheredotheycomefrom•  Whatisincludedintheprojectcost•  Whydoschoolscostmoretobuild

• Poten=alProjectsLis=ng•  Wheredidthelistcomefrom•  Factorsconsidered•  Lis4ngofprojects

2

Page 3: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

Regulatory Requirements

- MunicipalCompliance•  CityofSanAntonio•  CityofHelotes•  CityofLeonValley•  CityofShavanoPark

-CountyCompliance•  BexarCounty•  MedinaCounty•  BanderaCounty

3

Page 4: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

-  Federal

•  AmericanwithDisabili4esAct(ADA)

§  District&DesignProfessionalCompliance•  CulturalResources:HistoricStructures,Ar4facts•  EndangeredSpeciesAct:

§  9KarstFeatureInvertebrates§  2Birds:Black-cappedVireo&Golden-cheekedWarbler

- State•  TCEQ(TexasCommissiononEnvironmentalQuality)

§  WaterQualityPonds–reviews&approvals•  TexasHistoricalCommission

§  ArchaeologicalReview–reviews&approvals4

Regulatory Requirements

Page 5: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

-  State(con=nued)•  TexasAccessibilityStandards(TAS)§  District&DesignProfessionalCompliance

•  TexasEduca4onalAgency(TEA)§  District&DesignProfessionalComplianceØ  Educa4onalProgramsØ  Educa4onalSpecifica4onsØ  Design&Construc4onCer4fica4onsØ  CompliancewithDesignØ  CompliancewithSpaceStandards

5

Regulatory Requirements

Page 6: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

-  State(con=nued)•  TexasEduca4onAgency(TEA)

Example:Generalclassrooms.

i.  Classrooms for prekindergarten-Grade 1 shall have a minimum of 800square feet per room. School districts with small class sizes may haveclassroomsthatprovideaminimumof36squarefeetperstudent.

ii.  ClassroomsattheelementaryschoollevelforGrades2andupshallhaveaminimum of 700 square feet per room. School districts with small classsizesmayhaveclassroomsthatprovideaminimumof32squarefeetperstudent.

iii.  Classrooms at the secondary school level shall have a minimum of 700square feet per room. School districts with small class sizes may haveclassroomsthatprovideaminimumof28squarefeetperstudent.

6

ExcerptTEA–TexasAdministra=veCode,Title19,Part2,Chapter61,SubchapterCC,(RULE§61.1036-SchoolFacili=esStandardsforConstruc=ononora[erJanuary1,2004

Wha

tareth

ey?

Regulatory Requirements

Page 7: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Regulatory Requirements -  State(con=nued)

•  TexasEduca4onAgency(TEA)

Example:Combina/onScienceLaboratories/Classrooms,whereeachstudenthasalabsta4on and where typically there is a clearly defined laboratory area and a clearlydefinedlecturearea.

i.  Combina4onsciencelaboratories/classroomsshallhaveaminimumof900squarefeetperroomattheelementaryschoollevel.Theminimumroomsizeisadequatefor22students;41squarefeetperstudentshallbeaddedtotheminimumsquarefootageforeachstudentinexcessof22.

ii.  Combina4on science laboratories/classrooms shall have a minimum of1,200squarefeetperroomatthemiddleschoollevel.Theminimumroomsizeisadequatefor24students;50squarefeetperstudentshallbeaddedtotheminimumsquarefootageforeachstudentinexcessof24.

iii.  Combina4on science laboratories/classrooms shall have a minimum of1,400square feetper roomat thehighschool level.Theminimumroomsizeisadequatefor24students;58squarefeetperstudentshallbeaddedtotheminimumsquarefootageforeachstudentinexcessof24.

7 ExcerptTEA–TexasAdministra=veCode,Title19,Part2,Chapter61,SubchapterCC,RULE§61.1036-SchoolFacili=esStandardsforConstruc=ononora[erJanuary1,2004

Wha

tareth

ey?

Page 8: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

Regulatory Requirements -  County/Municipal

•  Pla5ng:submitaplat•  Permi5ng:building,trades,specialpermits•  Building/FireCodes:IBC,NFPA,NEC,etc…

8

Page 9: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

Regulatory Requirements - County/Municipal(con=nued)

•  Drainage:deten4onpond

Example:Dr.FolksMiddleSchool9

Page 10: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

Regulatory Requirements

- County/Municipal(con=nued)•  Drainage:waterqualitypond

Example:BrandeisHighSchool 10

Page 11: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Wha

tareth

ey?

Regulatory Requirements

- County/Municipal(con4nued)•  Ordinances

§ TreePreserva4onandLandscaping

Example:EllisonElementarySchool11

Page 12: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

-County/Municipal(con4nued)•  Ordinances(con4nued)

§  NoisePollu4on•  TrafficImpactAnalysis(TIA)

•  InterlocalAgreements(ILA)–CityofSanAntonio

&CityofHelotes•  Stormwater&Pollu4onControl

-NISD(NorthsideISD)•  FacilityDesignStandards•  GreenIni4a4ve

Regulatory Requirements

12

Page 13: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons

•  Thecostpresentedisallinclusive–totalcost•  Wheredocostscomefrom?•  Howwasthecostdetermined?•  Howmuch?•  Whydoschoolscostmoretoday?

13

Page 14: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons Whe

redotheycom

efrom

?TypicalPre-PurchaseFees

•  ESA (Environmental Site Assessment): determinehistoryofsiteandpoten4alimpacts

•  Developmental Engineering Studies: determineissues with the site (sewer, drainage, stormwater,etc...)

•  Appraisal(s): determine the cost of the proposedproperty

•  Endangered Species Studies: determine if there areanyissues,KARSTfeatures(caves),etc…

•  An4qui4es/Culturalresources:archaeologicalstudiestodetermineoldstructures,burialsites,etc…

14

Page 15: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons Whe

redotheycom

efrom

?TypicalProjectRelated

•  Consultant Fees: compensa4on to consultants fordesign (Architects, Engineers, etc...) and other fees(geotechnical&materialtes4ng,civiloff-site,etc...)

•  Municipal/County:plakng&permitfees•  U4lity Fees: payment to connect u4li4es (SAWSSewer&WaterandCPSElectrical)

•  Surveys:conductatree,topography,etc…•  Drainage:TCEQ fees for reviewandconstruc4onofdeten4on&waterqualityponds

•  TIA:conductatrafficanalysis

15

Page 16: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons TypicalProjectRelated

•  Furniture/Equipment/Supplies: classroom desk, libraryfurniture,shopequipment,fineartsfurnishings,athle4cequipment, administra4on furniture, library books, AVequipment,somware,etc.

•  Infrastructure: tree preserva4on, tree mi4ga4on,easements,off-sitework(roads,u4li4es,etc...)

•  Technology:cabling,computers,somware,etc…•  Con4ngencies: to support budget overages and anyotherimpacts

16

Whe

redotheycom

efrom

?

Page 17: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons TypicalProjectRelated

-Howwasthecostdetermined•  Historicalcost–informa4onfromrecentlybid

projects•  Informa4onfromlocalcontractorsandsub-

contractors•  Informa4onfromconsultants•  Informa4onfromotherschooldistricts•  Infla4on:

•  Infla4onarycosthasbeenincluded.•  Theimpactsduetorecentnaturaldisasters

playsacri4calpartines4matedcost.

Howwasth

ecostdetermined

?

17

Page 18: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons Ho

wm

uch?

TypicalDistribu=on–BudgetforNewSchools

18

IndirectCosts:•  ConsultantFees•  Jurisdic4onalFees

•  Furniture•  Equipment•  Technology

DirectCosts:•  Construc4on

20%

80%

Page 19: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons Ho

wm

uch?

Historical–DirectCostConstruc=on–DollarsperSquareFeet

19

$250

$200

$150

$100

$50

$0

$113

$138

$186$176

$228

BeardES2002

MurninES2005

KuentzES2007

FranklinES2012

FieldsES2015

Page 20: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Cost Considera(ons Schoolscostmoretobuildtoday…

why?

- Technology–Mul4plecomputer labsandcomputersin all classrooms and infrastructure (cable, wiring,electrical)

- Fuel/Petroleum – Affects construc4on via products,produc4onanddeliveryofallmaterials

- School Sites – More challenging sites (topography,lack of useable area) than most school districts,especiallyastheDistrictexpandstotheHillCountry

- Hurricane Impacts – Impacts of material and laborresources

- Laws/Ordinances/Code Compliance – Increase inrulesimpactcosts

20

Howm

uch?

Page 21: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

-Howweretheprojectsselected?•  InputfromStakeholders

v  ResourcePlanning–growthprojec4ons(newschools)v  SchoolAdministra4on–surveyofschoolprincipals

v  DepartmentalReviews–con4nua4onofupgrades(libraries,science,athle4cs,finearts,etc...)

v  MaintenanceDepartment–condi4onalassessment(HVACequipment,electrical,paving,roofing,etc…)

v  Construc4onandEngineeringStaff–surveyofbuildingcondi4ons

Selec=on

Process

21

Page 22: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Selec=on

Process•  InputfromStakeholderscon4nued

v  MinorConstruc4onProjectRequests(MCPR)process-requests

v  Reviewofpreviousbonds–itemsnotconsideredorincluded

22

Page 23: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

•  Factorsconsidered v  Impacttostudentpopula4on-growth

v  Safety/Security-enhancementsv  Cri4calschoolitems–opera4onalv  Currentdistrictstandards–longtermgoalv  Cleanandhealthyenvironmentsv  ADAcompliance–enhancements/opera4onalv  Longtermcostavoidances–energyefficienciesv  Buildingstructuralissues–longtermconcernsv  NewInstruc4onalprograms,i.e.magnetschool

23

ListingInform

a=on

Page 24: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

ListingInform

a=on

•  Lis4ng presented has been condensed for

presenta4onpurposes

•  There will be a more comprehensive anddetailed lis4ngofprojectsprovidedatnextmee4ng

24

Page 25: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

•  Lis4ngofProjectsconsistsof8Categories

v  NewSchoolsv  Renova4ons/Reconstruc4on/Upgradesv  Infrastructure(Maintenance)v  Roofing&Waterproofingv  Safety&Securityv  Technologyv  Transporta4onv  BondIssuance&Management

25

ListingInform

a=on

Page 26: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

New

Schoo

ls•  1HighSchool•  1MiddleSchool•  2ElementarySchools

►$280,300,000

26

Page 27: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s-  1MSFineArtsUpgrade

►$3,300,000-  1HSFineArtsUpgrade

►$47,800,000- FineArtsKilnUpgrade

1ES ►$600,000

27

Page 28: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s-  FootballFieldSynthe4cTurfReplacements

•  4HS&1Stadium

-  BrandeisTrackReplacement- ResurfaceSynthe4cTracks

•  9HS

►$5,000,000

28

►$2,000,000

►$1,300,000

Page 29: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s-  Athle4c/PEMinorUpgrades

•  3HS&5MS

-  Athle4cMajorFieldRenova4ons

•  2baseball,&4somballHS&16MSfootball

-  DistrictAthle4cFields•  1baseball/1somballfieldsynthe4cturf

29

►$8,500,000

►$3,000,000

►$12,000,000

Page 30: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s-  Ext./Int.BleacherReplacements

•  1HS&5MS

-  Code-RelatedUpgrades•  3ES

-  AgriculturalFacilityUpgrades

►$1,100,000

►$2,400,000

30

►$1,600,000

Page 31: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s

-  BuildingUpgrades•  2ES(Administra4onSuite)•  1HS(Magnet/CTE)

-  CafeteriaUpgrade•  1MS

-  ClassroomsReplacement•  1ES

-  Library/ClassroomsUpgrades•  1ES

►$14,000,000

31

►$5,900,000

►$15,400,000

►$5,700,000

►$45,000,000

Page 32: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s

-  Athle4cFields/ClassroomUpgrade•  1HS

-  Cafeteria/GymUpgrades•  2ES

-  PaintBoothReplacements•  2HS

►$48,800,000

32

►$25,800,000

►800,000

-  Bus/StudentCoveredWalkways•  3ES&1MS

►$4,300,000

-  SpecialEduca4onALE•  4ES

►$10,600,000

Page 33: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Reno

va=o

ns

Reconstruc=o

ns

Upgrade

s- WindowUpgrades&ADAAccessibility

•  8ES ►$2,200,000-  ShadesOverPlaygrounds

•  AllES-  Kitchen/CafeteriaRenova4ons

•  2ES&1MS

►$11,000,000

33

►$6,200,000

-  LibraryAddi4ons/Renova4ons•  1HS&2ESUpgrades ►$9,200,000•  FurnitureReplacements ►$3,800,000

-  ScienceLabAddi4ons/Renova4ons•  2MS•  VenthoodReplacementatHS

►$12,900,000►$5,500,000

Page 34: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

-  Factorsconsideredformajorityofinfrastructureprojects:

•  Lifecyclereplacements•  Toimprovelearningenvironment•  Beqerenergyefficiency–energysavings•  Toreplaceoutdatedsystem/equipment

•  Removeasbestosfromfacili4es

Infrastructure

34

Page 35: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Infrastructure

-  MechanicalUpgrades•  150sites

-  BoilerUpgrades •  5sites

►$49,800,000

►$4,600,000-  EnergyControlsUpgrades •  11sites ►$3,300,000

35

Page 36: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Infrastructure

-  PlumbingUpgrades•  5sites

-  Paving/Drainage/EmergencyAccessUpgrades•  21sites

►$600,000

$15,500,000►

36

•  23sites ►$2,600,000-  Ligh4ngUpgrades

•  6sites

-  ElectricalUpgrades►$1,700,000

Page 37: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Infrastructure

-  Roofing/Waterproofing•  16sites ►$20,450,000

37

•  15sites ►$1,100,000

-ClockReplacements•  11sites ►$3,000,000

-FlooringReplacements•  7sites ►$3,000,000

-  TennisCourtUpgrades

Page 38: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Safety/Security

-FireAlarmSystems•  14sites

-ESSecurityLobbies•  44sites&PoliceDept.

-PAIntercomSystems•  12sites

-DoorHardware•  14sites

►$5,000,000

►$10,000,000

►$2,000,000

►$1,700,000

38

Page 39: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Safety/Security

-  ISMS(IntegratedSecurityManagementSystem)•  VideoSurveillance/Server/AccessControl/Cabling

►$16,000,000

39

-  Technology•  CampusTechnologyReplacements•  ProjectorReplacements•  MSLanguageLabs•  NetworkSwitchReplacements•  ServerReplacements•  StorageUpgrades•  WirelessNetworkUpgrades•  Copper/FiberUpgrades

►$73,800,000

Page 40: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Safety/Security

-Transporta4on•  85buses•  32minibuses•  5suburbans

►$15,000,000

40

Page 41: Informa(on and Proposal for 2018 Bond Program - nisd.net Facilities... · Informa(on and Proposal for 2018 Bond Program Dr. Brian T. Woods, Superintendent Leroy San Miguel, Assistant

Poten(al Projects

Bond

Issuan

ce&

Man

agem

ent

•  BondIssuance&Management

►$835,150,000

41

►$10,000,000

Total