Top Banner
INFOMØTE 22.MARS INNFØRING AV ASAP NYTT VFR MØNSTER RY
11

INFOMØTE 22.MARS

Jan 18, 2016

Download

Documents

nusa

INFOMØTE 22.MARS. INNFØRING AV ASAP NYTT VFR MØNSTER RY. 7. April 2011. Oslo ASAP AIRSPACE Operational objectives:. Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INFOMØTE 22.MARS

INFOMØTE 22.MARS

INNFØRING AV ASAP

NYTT VFR MØNSTER RY

Page 2: INFOMØTE 22.MARS

7. April 2011

Page 3: INFOMØTE 22.MARS

Oslo ASAP AIRSPACE Operational objectives:

• Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA.

• Ensure adequate capacity in Oslo and Farris TMAs and in Oslo ACC while keeping:– Safety at a high standard;– Controllers’ workload at an acceptable level.

• Ensure efficiency of operations so as to:– Reduce CO2 emission;– Accommodate Noise Abatement Procedures (ENGM).

Page 4: INFOMØTE 22.MARS

Proposed Sectors and Positions

OSLO and Farris TMAs

APPWEST APP

EAST

FIN

DIR(DIRW / DIRE)

FARRISWEST

FARRISEAST

Sectorisation ACC

S1

S2

S3

S4

S5

S6

S7

S8

(FARRIS) 124,35134,05

Page 5: INFOMØTE 22.MARS

Principles of Point Merge

STRUCTURE

AB

M

STRUCTURE

AB

M

STRUCTURE

AB

M

333

Page 6: INFOMØTE 22.MARS

444

555

Page 7: INFOMØTE 22.MARS

666

777

Page 8: INFOMØTE 22.MARS

FL100 FL110

FL120

Page 9: INFOMØTE 22.MARS

ENTO RWY 36

Page 10: INFOMØTE 22.MARS

ENRY RWY 30

Page 11: INFOMØTE 22.MARS

BUKTEN

SALTNES

MAX

1000

MAX

1500

MAX 1500

BEVØYA592941N

0103745E

TOR R 030 22,5NM

592702N

0105116E

TOR R 047 24,7NM

591740N

0104458N

TOR R 063 16,7 NM