SUB-GERENCIA DE OBRAS

INFORME MENSUAL N°10 DE OBRA (AVANCE FÍSICO Y FINANCIERO)

“RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE -

TACNA”

Ing. RENE CHURA HUISARESIDENTE DE OBRA

TACNA ENERO 2013

Page 2: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

ÍNDICE DE CONTENIDOS(Informe Técnico)

I. FICHA TÉCNICA

II. MEMORIA DESCRIPTIVA

2.1 GENERALIDADES

2.2 ANTECEDENTES

2.3 MARCO LEGAL

2.4 OBJETIVOS

2.5 METAS TOTALES DEL PROYECTO.

A. INFRAESTRUCTURA.

B. MOBILIARIO Y EQUIPAMIENTO.

C. CAPACITACIÓN.

2.6 MODIFICACIONES DEL PROYECTO.

A. MODIFICACIONES AL PRESUPUESTO.

B. MODIFICACIONES AL CALENDARIO DE EJECUCIÓN

2.7 METAS ALCANZADAS -METRADO ACTUAL, ACUMULADO Y SALDO A EJECUTAR

III. RESUMEN EJECUTIVO

3.1 AVANCE FISICO SEGÚN VALORIZACIONES

3.2 AVANCE FINANCIERO PRESUPUESTAL.

IV. EJECUCIÓN DEL PRESUPUESTO ANALÍTICO.

V. VALORIZACIONES DE OBRA

5.1 VALORIZACIÓN FÍSICA DE LAS METAS ALCANZADAS (RESUMEN).

5.2 CONTROL DE VALORIZACIÓN FÍSICA POR MES.

VI. REPORTE DE RECURSOS EMPLEADOS

6.1 MATERIALES: INSUMOS Y SERVICIOS.

6.2 MANO DE OBRA: PERSONAL OBRERO.

6.3 MAQUINARIA Y EQUIPO.

6.4 EQUIPAMIENTO.

VII. CRONOGRAMA VALORIZADO DE EJECUCIÓN POR PARTIDAS.VIII. PRUEBAS Y ENSAYOS.IX. CONCLUSIONESX. RECOMENDACIONESXI. ANEXOS

Page 3: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

INFORME MENSUAL DE OBRA Nº 10 PERIODO: 01 al 31/ENERO/2013

C A P Í T U L O I :P A R T E T É C N I C A - F I N A N C I E R A

I. FICHA TÉCNICA.

Nombre del Proyecto:“Reconstrucción e Implementación de la I.E. Fortunato Zora Carbajal, Provincia De Candarave – Tacna.

Código Snip : 87772 Unidad Ejecutora : GOBIERNO REGIONAL DE TACNA Presupuesto Perfil Técnico: S/. 3,498,522.90 N.S.

(A) PPTO. Asignado Exp. Téc. Base: S/. 2’994,829.29 - R.G.R. Nº305-2011-GRI-G.R.

TACNA

(B) Presupuesto Deductivo Nº01: S/. 749,272.83 - R.G.R. Nº304-2012-GRI-G.R. TACNA

(C) Presupuesto Adicional Nº01: S/. 1’563,509.71 - R.G.R. Nº545 -2012-GRI-G.R. TACNA

(D) Presupuesto Consolidado =(A-B+C) S/. 3,809,066.18 Nuevos Soles.

Modalidad de Ejecución : ADMINISTRACION DIRECTA Fuente de Financiamiento : Canon y Sobre Canon, Regalías. Programa : 061 INFRAESTRUCTURA EDUCATIVA Función : 09 EDUCACION Y CULTURA Sub Programa : 714 EDIFICACIONES ESCOLARES. Componente : INFRAESTRUCTURA Meta Presupuestal 2013 : 093 Localización Geográfica de la Obra : Dist. Candarave, Prov. Candarave, Región Tacna

Nuevo Plazo de Ejecución del Proyecto : 379 Días Calendarios. (Incluye Ampliación de Plazo 01) Fecha de Inicio del Proyecto : 16 de Abril del 2012 Fecha de Culminación del Proyecto : 29 Abril 2013

Costo Total del Proyecto Modificado : 3’831,066.18 Nuevos Soles. Porcentaje de Incidencia del Proyecto (Consolidado) al PIP: 109.51%

Costo de la Meta Anual (PPTO. PLAN TRABAJO 2013):S/.1’478,386.67 N.S. (R.G.R.Nº040-2013-GRI-G.R. TACNA)

Residente de Obra : Ing. Rene Chura Huisa Inspector de Obra : Ing. Salvador Espinoza Liu

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 3 / 80

Page 4: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CONCLUSIONES GENERALES DEL AVANCE FÍSICO A COSTO DIRECTO (EXP.BASE + ADICIONAL 01 - DEDUCTIVO 01)

- EL AVANCE FÍSICO EJECUTADO DEL MES ENERO 2013 291,248.17 9.15% - EL AVANCE FÍSICO EJECUTADO ACUMULADO HASTA ENERO 2013 1,321,677.29 41.53% - EL SALDO FÍSICO ACUMULADO HASTA ENERO 2013 1,860,960.83 58.47%

TOTAL ACUMULADO y SALDO FINANCIERO Ejecutado S/. % Saldo S/. %

La Valorización Financiera para Componente Nº01 INFRAESTRUCTURA es = 2,725,390.96 75.78% 870,990.12 24.22%

La Valorización Financiera para Componente Nº02 CAPACITACIÓN es = 0.00 - 37,640.00 100.00%

La Valorización Financiera para SUPERVISIÓN. = 0.00 - 127,305.52 100.00%

La Valorización Financiera para LIQUIDACIÓN. = 0.00 - 47,739.57 100.00%

TOTAL EJECUTADO DEL PROYECTO S/. 2,725,390.96 71.55% 1,083,675.21 28.45%

II. MEMORIA DESCRIPTIVA

2.1 GENERALIDADES .

En el Transcurso de la Ejecución del Proyecto, esta ha ido variando en la Componente de Infraestructura, de tal forma que algunas partidas han sido deducidas, otras incrementadas en mayores metrados y Partidas Nuevas; generándose así presupuestos para cada una de las mencionadas.

La actual Residencia asume el cargo a partir del 11 de enero del 2013 y en su verificación encuentra la obra con un retraso en su avance físico, desabastecimiento de materiales para la obra, incongruencias en los metrados de Ejecución física manifestados en todos los informes mensuales presentados del inicio de la obra hasta el 30 de enero 2013 con relación a lo manifestado en el cuaderno de obra; dando como resultado diferencias entre las metas y costos ejecutados a los meses anteriores con respecto a su siguiente mes. Los Expedientes de Adicional de Obra 01 por mayores metrados y partidas Nuevas no guardan relación con la codificación de ítems del Presupuesto base, generándose así conflictos de continuidad y ubicación de las partidas así mismo el desorden para su control. Por otro lado se ha encontrado que en la emisión de la resolución de la ampliación de plazo Nº 01 existen omisiones referente a la fecha de culminación de la obra; en la que se da como 109 días calendarios de ampliación de plazo y haciendo la sumatoria con el plazo contractual inicial del Expediente Técnico esta da como resultado el día 29 de Abril del 2013 como fecha de culminación, pero erróneamente en el documento de resolución se fija como nueva fecha culminación el día 30 de marzo del 2013

De lo mencionado anteriormente esta Residencia está priorizando la atención de la gestión administrativa para el abastecimiento de los materiales de obra a fin de que la mano de obra contratada justifique su permanencia.

Se ha recodificado las metas a Ejecutar del Presupuesto Adicional 01 a fin de que guarden relación con los criterios de continuidad (Ver Cuadro N°01).

Se pone de conocimiento al Supervisor que los metrados inscritos en el cuaderno de Obra confrontados con los informes mensuales presentados y verificados en campo se muestran en el Cuadro N°02; véase las diferencias en los montos y consecuentemente los porcentajes de avances mensuales.

Se pone de conocimiento al Supervisor que según las Resoluciones Aprobadas para la ejecución del proyecto la fecha de culminación es el 29 de Abril, y que la presentación del informe final no corresponde a la ejecución del mismo ya que es un tema meramente administrativo (véase ítem 2.6,B “Modificaciones al Calendario de Ejecución Cuadro N°04).

Las Componentes de Capacitación para el Personal Docente de la I.E. y la Componente de Equipamiento a la fecha no han sido tramitadas por los anteriores Residentes; Teniendo en cuenta de ello, la Actual Residencia está procediendo a su reprogramación para posterior Ejecución a la brevedad.

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 4 / 80

Page 5: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

Cuadro N°01

Fuente: Cuaderno de Obra, Informes mensuales presentado y verificación en campo.

Cuadro N°02RECODIFICACION DE ITEM AL PPTO. DEL ADICIONAL Nº 01 - PARTIDAS NUEVAS

ENTIDAD : GOBIERNO REGIONAL TACNA OBRA : RECONST. E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.UBICACIÓN : TACNA - CANDARAVE – CANDARAVE RESIDENTE : ING. RENE CHURA HUISA

INSPECTOR : ING. SALVADOR ESPINOZA LIU

ITEMANTERIOR

ITEMRECODIFIC DESCRIPCION DE LOS TRABAJOS ADICIONALES UND

PRESUPUESTO SEGÚN EXPEDIENTE TECNICO

METRADO P.UNIT. MONTO

01 OBRAS PROVISIONALES 01.01 01.00.00 TRABAJOS PRELIMINARES

01.01.01 01.06 TRAZO Y NIVELACION DE TERRENO m2 504.97 3.47 1,752.25

01.02 01.07 MOVILIZACION Y MONTAJE DE MODULOS PREFABRICADOS - AULAS

01.02.01 01.07.01 MOVILIZACION Y DESMOVILIZACION DE AMBIENTES PRE-FABRICADOS und 8.00

147.03 1,176.24

01.02.02 01.07.02 MONTAJE DE MODULOS PRE-FABRICADOS und 8.00 330.28 2,642.24

01.03 01.08 OBRAS DE CONCRETO SIMPLE

01.03.01 01.08.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.18 38.17 1,457.33

01.03.02 01.08.02 FALSO PISO E = 3", MEZCLA C:H 1:8, ACABADO PULIDO. m2 504.97 33.30 16,815.50

02 02.00.00 CONSTRUCCION DE 03 AMBIENTES PARA AULAS - PABELLON C 02.01 02.02.00 MOVIMIENTO DE TIERRAS 02.01.01 02.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 19.45 750.96

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 5 / 80

Page 6: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

38.61 02.02 02.03.00 OBRAS DE CONCRETO SIMPLE

02.02.01 02.03.07 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 28.18 311.96 8,791.03

02.02.02 02.03.08 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 81.32

45.71 3,717.14

02.02.03 02.03.09 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 1.86

346.73 644.92

02.02.04 02.03.10 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 145.59 39.40 5,736.25

02.02.05 02.03.11 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 106.19

5.15 546.88

02.03 02.04.00 OBRAS DE CONCRETO ARMADO 02.03.01 02.04.01 ZAPATAS

02.03.01.01 02.04.01.05 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 12.50 430.74 5,384.25

02.03.01.02 02.04.01.06 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 37.50 6.01 225.38

02.03.02 02.04.02 VIGA DE CIMENTACION

02.03.02.01 02.04.02.05 VIGA DE CIMENTACION: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 6.35 418.92 2,660.14

02.03.02.02 02.04.02.06 IMPERMEABILIZACION DE CIMENTACION: VIGAS DE CIMENTACION m2 50.83

6.15 312.60

02.03.03 02.04.03 SOBRECIMIENTO ARMADO

02.03.03.01 02.04.03.05 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 2.28

410.59 936.15

02.03.03.02 02.04.03.06 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 18.24

81.39 1,484.55

02.03.03.03 02.04.03.07 IMPERMEABILIZACION PARA SOBRECIMIENTOS ARMADO m2 18.24 6.08 110.90

02.03.04 02.04.07 MUROS DE ARMADO

02.03.04.01 02.04.07.01 MURO ARMADO : CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 6.90 410.59 2,833.07

02.03.04.02 02.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO ARMADO m2 55.07 45.71 2,517.25

02.03.04.03 02.04.07.03 ACERO FY=4200KG/CM2 GRADO 60 EN MURO ARMADO kg 296.22 4.94 1,463.33

02.03.05 02.04.04 COLUMNAS

02.03.05.01 02.04.04.05 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 9.71 478.17 4,643.03

02.03.05.02 02.04.04.06 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 117.47

86.78 10,194.05

02.03.05.03 02.04.04.07 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 48.48 6.08 294.76

02.03.06 02.04.05 VIGAS

02.03.06.01 02.04.05.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 7.53 481.18 3,623.29

02.03.06.02 02.04.05.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 80.45 90.26 7,261.42

02.03.07 02.04.06 COLUMNETAS Y VIGUETAS DE AMARRE

02.03.07.01 02.04.06.04 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 1.94

478.17 927.65

02.04 02.06.00 REVOQUES ENLUCIDO Y MOLDADURA

02.04.01 02.06.03 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 213.06 13.95 2,972.19

02.05 02.15.00 INSTALACIONES ELECTRICAS

02.05.01 02.15.09 SALIDA PARA INTERRUPTORES DOBLES pto 1.00 45.34 45.34

02.05.02 02.15.10 SALIDA PARA INTERRUPTORES SIMPLES pto 3.00 44.60 133.80

02.05.03 02.15.11 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 18.00 43.54 783.72

02.05.04 02.15.12 SALIDA PARA TOMACORRIENTES DOBLES pto 9.00 20.57 185.13

02.05.05 02.15.13 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 57.30 7.25 415.43

02.05.06 02.15.14 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 36.90 11.10 409.59

02.05.07 02.15.15 CONDUCTOR DE COBRE THW 2.5 MM2 m 203.40 907.16

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 6 / 80

Page 7: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

4.46

02.05.08 02.15.16 CONDUCTOR DE COBRE THW 4.00 MM2 m 305.00 5.14 1,567.70

02.05.09 02.15.17 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 21.45 21.45

02.05.10 02.15.18 TABLERO DE DISTRIBUCION TD 7 und 1.00 781.05 781.05

02.05.11 02.15.19 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 18.00 182.95 3,293.10

02.05.12 02.15.20 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 9.00 30.66 275.94

02.05.13 02.15.21 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 3.00 30.66 91.98

02.05.14 02.15.22 SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE und 1.00 32.66 32.66

02.06 02.16.00 VARIOS Y LIMPIEZA

02.06.01 02.16.03 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 22.50

18.43 414.68

02.06.02 02.16.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 515.05 4.76 2,451.64

03 03.00.00 CONSTRUCCION DE 01 AMBIENTE PARA S.U.M. 03.01 03.02.00 MOVIMIENTO DE TIERRAS

03.01.01 03.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 23.36 38.61 901.93

03.02 03.03.00 OBRAS DE CONCRETO SIMPLE

03.02.01 03.03.07 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 22.24 311.96 6,937.99

03.02.02 03.03.08 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 67.82

45.71 3,100.05

03.02.03 03.03.09 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 1.27

346.73 440.35

03.02.04 03.03.10 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 111.45 39.40 4,391.13

03.02.05 03.03.11 IMPERMEABILIZACION DE CIMIENTO CORRIDO m2 67.82 5.96 404.21

03.03 03.04.00 OBRAS DE CONCRETO ARMADO 03.03.01 03.04.01 ZAPATAS

03.03.01.01 03.04.01.05 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 13.64 430.74 5,875.29

03.03.02 03.04.02 SOBRECIMIENTO ARMADO

03.03.02.01 03.04.02.05 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 1.68

410.59 689.79

03.03.02.02 03.04.02.06 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 13.40

81.39 1,090.63

03.03.03 03.04.03 COLUMNAS

03.03.03.01 03.04.03.05 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 12.38 478.17 5,919.74

03.03.03.02 03.04.03.06 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 128.08

86.78 11,114.78

03.03.04 03.04.04 VIGAS

03.03.04.01 03.04.04.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 5.81 481.18 2,795.66

03.03.04.02 03.04.04.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 61.35 90.26 5,537.45

03.03.05 03.04.05 COLUMNETAS Y VIGUETAS DE AMARRE

03.03.05.01 03.04.05.04 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 1.92

478.17 918.09

03.04 03.06.00 REVOQUES ENLUCIDO Y MOLDADURA

03.04.01 03.06.03 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 202.84 13.95 2,829.62

03.05 03.16.00 INSTALACIONES ELECTRICAS

03.05.01 03.16.11 SALIDA PARA INTERRUPTORES DOBLES pto 1.00 45.34 45.34

03.05.02 03.16.12 SALIDA PARA INTERRUPTORES TRIPLE pto 1.00 44.54 44.54

03.05.03 03.16.13 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 19.00 51.50 978.50

03.05.04 03.16.14 SALIDA PARA TOMACORRIENTES DOBLES pto 8.00 43.60 348.80

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 7 / 80

Page 8: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

03.05.05 03.16.15 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 80.60 7.33 590.80

03.05.06 03.16.16 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 44.57 11.18 498.29

03.05.07 03.16.17 CONDUCTOR DE COBRE THW 2.5 MM2 m 186.00 4.45 827.70

03.05.08 03.16.18 CONDUCTOR DE COBRE THW 4.00 MM2 m 152.00 5.13 779.76

03.05.09 03.16.19 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 21.45 21.45

03.05.10 03.16.20 TABLERO DE DISTRIBUCION TD 1 und 1.00 701.05 701.05

03.05.11 03.16.21 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 16.00 182.95 2,927.20

03.05.12 03.16.22 COLOCACION DE BRAQUETE 18W C/ESFERA DE POLICARBONATO und 3.00

52.90 158.70

03.05.13 03.16.23 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 8.00 30.66 245.28

03.05.14 03.16.24 SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE und 1.00 32.66 32.66

03.05.15 03.16.25 SUMINISTRO E INSTALACION DE INTERRUPTOR TRIPLE und 1.00 35.66 35.66

03.06 03.17.00 VARIOS Y LIMPIEZA

03.06.01 03.17.03 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 22.30

18.43 410.99

03.06.02 03.17.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 530.11 4.76 2,523.32

04 04.00.00 CONSTRUCCION DE 01 AMBIENTE PARA COCINACOMEDOR Y 01 AMBIENTE PARA ZONA ADMINISTRATIVA

04.01 04.02.00 MOVIMIENTO DE TIERRAS

04.01.01 04.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 5.34 38.61 206.18

04.02 04.03.00 OBRAS DE CONCRETO SIMPLE

04.02.01 04.03.06 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 19.64 311.96 6,126.89

04.02.02 04.03.07 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 57.07

45.71 2,608.67

04.02.03 04.03.08 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 1.28

346.73 443.81

04.02.04 04.03.09 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 96.10 39.40 3,786.34

04.02.05 04.03.10 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 58.45

5.15 301.02

04.03 04.04.00 OBRAS DE CONCRETO ARMADO 04.03.01 04.04.01 ZAPATAS

04.03.01.01 04.04.01.03 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 18.63 430.74 8,024.69

04.03.01.02 04.04.01.04 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 45.60 45.71 2,084.38

04.03.01.03 04.04.01.05 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 45.60 6.01 274.06

04.03.02 04.04.07 VIGA DE CIMENTACION

04.03.02.01 04.04.07.01 VIGA DE CIMENTACION: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 3.34 418.92 1,399.19

04.03.02.02 04.04.07.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO NORMAL m2 26.74

45.71 1,222.29

04.03.02.03 04.04.07.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS DE CIMENTACION kg 470.15

4.85 2,280.23

04.03.02.04 04.04.07.04 IMPERMEABILIZACION DE CIMENTACION: VIGAS DE CIMENTACION m2 26.74

6.08 162.58

04.03.03 04.04.02 SOBRECIMIENTO ARMADO

04.03.03.01 04.04.02.04 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 1.58

410.59 648.73

04.03.03.02 04.04.02.05 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 12.96

81.39 1,054.81

04.03.03.03 04.04.02.06 IMPERMEABILIZACION PARA SOBRECIMIENTOS ARMADO m2 12.96 6.08 78.80

04.03.04 04.04.03 COLUMNAS 04.03.04.01 04.04.03.04 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 19.98 9,553.84

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 8 / 80

Page 9: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

478.17

04.03.04.02 04.04.03.05 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 179.10

86.78 15,542.30

04.03.04.03 04.04.03.06 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 33.03 6.08 200.82

04.03.05 04.04.04 VIGAS

04.03.05.01 04.04.04.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 15.09 487.85 7,361.66

04.03.05.02 04.04.04.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 122.71 90.26 11,075.80

04.03.06 04.04.05 LOSAS ALIGERADAS

04.03.06.01 04.04.05.05 LOSA ALIGERADA, CONCRETO F'C= 210 KG/CM2. C/ADITIVO und 9.55 487.85 4,658.97

04.03.07 04.04.08 COLUMNETAS Y VIGUETAS DE AMARRE

04.03.07.01 04.04.08.01 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 4.03

478.17 1,927.03

04.03.07.02 04.04.08.02 COLUMNETA Y VIGUETAS DE AMARRE: ENCOFRADO Y DESENCOFRADO NORMAL m2 46.75

45.71 2,136.94

04.03.07.03 04.04.08.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNETAS Y VIGUETAS kg 549.58

4.90 2,692.94

04.03.07.04 04.04.08.04 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNETAS m2 18.50 6.08 112.48

04.03.08 04.04.06 MESON DE CONCRETO

04.03.08.01 04.04.06.04 MESON: CONCRETO F'C = 210 Kg/cm2 C/ADITIVO m3 0.26 478.17 124.32

04.04 04.06.00 REVOQUES ENLUCIDO Y MOLDADURA

04.04.01 04.06.05 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 314.78 13.95 4,391.18

04.05 04.18.00 INSTALACIONES ELECTRICAS

04.05.01 04.18.10 SALIDA PARA INTERRUPTORES SIMPLES pto 14.00 44.48 622.72

04.05.02 04.18.11 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 23.00 52.30 1,202.90

04.05.03 04.18.12 SALIDA PARA TOMACORRIENTES DOBLES pto 23.00 51.22 1,178.06

04.05.04 04.18.13 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 189.00 8.13 1,536.57

04.05.05 04.18.14 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 192.00 11.10 2,131.20

04.05.06 04.18.15 CONDUCTOR DE COBRE THW 2.5 MM2 m 390.00 4.45 1,735.50

04.05.07 04.18.16 CONDUCTOR DE COBRE THW 4.00 MM2 m 610.00 5.13 3,129.30

04.05.08 04.18.17 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 2.00 21.45 42.90

04.05.09 04.18.18 TABLERO DE DISTRIBUCION TD 6 und 1.00 781.05 781.05

04.05.10 04.18.19 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 3.00 182.95 548.85

04.05.11 04.18.20 COLOCACION DE FLUORESCENTE CIRCULAR 32 W INC/EQUIPO Y PANTALLA und 20.00

172.95 3,459.00

04.05.12 04.18.21 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 22.00 30.66 674.52

04.05.13 04.18.22 INSTALACION DE TOMACORRIENTE DOBLE A PRUEBA DE AGUA C/LINEA A TIERRA und 1.00

35.66 35.66

04.05.14 04.18.23 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 14.00 30.66 429.24

04.06 04.19.00 VARIOS Y LIMPIEZA

04.06.01 04.19.04 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 40.60

16.32 662.59

04.06.02 04.19.05 CURADO DE CONCRETO CON ADITIVO CURADOR m2 600.92 4.76 2,860.38

05 05.00.00 CONSTRUCCION DE 01 ESCALERA 05.01 05.02.00 MOVIMIENTO DE TIERRAS

05.01.01 05.02.06 EXCAVACION DE ZANJA PARA ZAPATA m3 20.94 30.36 635.74

05.01.02 05.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 8.73 38.61 337.07

05.02 05.03.00 OBRAS DE CONCRETO SIMPLE

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 9 / 80

Page 10: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

05.02.01 05.03.05 CONCRETO PARA SUB CIMIENTO C:H CON 1:12 + 30% P.G. m3 10.62 278.54 2,958.09

05.02.02 05.03.06 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 4.96 311.96 1,547.32

05.02.03 05.03.07 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 18.81

45.71 859.81

05.02.04 05.03.08 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 5.12

346.73 1,775.26

05.02.05 05.03.09 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 54.62

5.15 281.29

05.03 05.04.00 OBRAS DE CONCRETO ARMADO 05.03.01 05.04.04 ZAPATAS

05.03.01.01 05.04.04.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 5.90 430.74 2,541.37

05.03.01.02 05.04.04.02 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 10.00 45.71 457.10

05.03.01.03 05.04.04.03 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 10.00 6.01 60.10

05.03.01.04 05.04.04.04 ZAPATAS: ACERO FY=4200 KG/CM2 GRADO 60 kg 238.13 4.85 1,154.93

05.03.02 05.04.01 COLUMNAS

05.03.02.01 05.04.01.04 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 10.10 478.17 4,829.52

05.03.02.02 05.04.01.05 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 63.60

86.78 5,519.21

05.03.02.03 05.04.01.06 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 24.03 6.08 146.10

05.03.03 05.04.02 VIGAS

05.03.03.01 05.04.02.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 5.40 487.85 2,634.39

05.03.03.02 05.04.02.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 46.60 90.26 4,206.12

05.03.04 05.04.03 ESCALERAS

05.03.04.01 05.04.03.04 ESCALERA CONCRETO F'C=210 KG/CM2. C/ADITIVOS m3 6.21 478.17 2,969.44

05.04 05.07.00 PISOS Y PAVIMENTOS

05.04.01 05.07.03 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 19.57 39.40 771.06

05.05 05.06.00 REVOQUES ENLUCIDO Y MOLDADURA

05.05.01 05.06.05 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 110.00 13.95 1,534.50

05.06 05.15.00 INSTALACIONES ELECTRICAS

05.06.01 05.15.07 SALIDA PARA INTERRUPTORES SIMPLES pto 4.00 44.48 177.92

05.06.02 05.15.08 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 3.00 52.30 156.90

05.06.03 05.15.09 SALIDA PARA TOMACORRIENTES DOBLES pto 2.00 51.22 102.44

05.06.04 05.15.10 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 27.00 8.13 219.51

05.06.05 05.15.11 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 35.00 11.10 388.50

05.06.06 05.15.12 CONDUCTOR DE COBRE THW 2.5 MM2 m 95.00 4.45 422.75

05.06.07 05.15.13 CONDUCTOR DE COBRE THW 4.00 MM2 m 105.00 5.13 538.65

05.06.08 05.15.14 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 21.45 21.45

05.06.09 05.15.15 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 2.00 30.66 61.32

05.06.10 05.15.16 ACONDICIONAMIENTO DE TABLERO DE DISTRIBUCION PABELLON D und 1.00

276.14 276.14

05.06.11 05.15.17 SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION und 2.00

42.76 85.52

05.06.12 05.15.18 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 2.00 30.66 61.32

05.07 05.16.00 ARTEFACTOS

05.07.01 05.16.04 COLOCACION DE FLUORESCENTE CIRCULAR 32 W INC/EQUIPO Y PANTALLA und 1.00

172.95 172.95

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 10 / 80

Page 11: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

05.07.02 05.16.05 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO PRISMATICO und 1.00

169.13 169.13

05.07.03 05.16.06 COLOCACION DE FLUORESCENTE ADOSADO 2 X 20W und 1.00 162.95 162.95

05.08 05.17.00 VARIOS Y LIMPIEZA

05.08.01 05.17.01 CURADO DE CONCRETO CON ADITIVO CURADOR m2 190.55 4.76 907.02

05.08.02 05.17.02 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 3.60

16.32 58.75

05.08.03 05.17.03 LIMPIEZA FINAL DE OBRA m2 22.00 0.27 5.94

06.00.00 06.00.00 CONSTRUCCION DE 02 BATERIAS SS.HH. 06.01 06.02.00 MOVIMIENTO DE TIERRAS

06.01.01 06.02.07 EXCAVACION DE ZANJA PARA ZAPATA m3 20.22 30.36 613.88

06.01.02 06.02.08 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 8.73 38.61 337.07

06.02 06.03.00 OBRAS DE CONCRETO SIMPLE

06.02.01 06.03.04 CONCRETO PARA SUB CIMIENTO C:H CON 1:12 + 30% P.G. m3 13.00 278.54 3,621.02

06.02.02 06.03.05 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 11.88 311.96 3,706.08

06.02.03 06.03.06 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 55.15

45.71 2,520.91

06.02.04 06.03.07 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 5.21

346.73 1,806.46

06.02.05 06.03.08 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 107.96

5.15 555.99

06.03 06.04.00 OBRAS DE CONCRETO ARMADO 06.03.01 06.04.03 ZAPATAS

06.03.01.01 06.04.03.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 7.22 430.74 3,109.94

06.03.01.02 06.04.03.02 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 29.20 45.71 1,334.73

06.03.01.03 06.04.03.03 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 29.20 6.01 175.49

06.03.01.04 06.04.03.04 ZAPATAS: ACERO FY=4200 KG/CM2 GRADO 60 kg 220.66 4.85 1,070.20

06.03.02 06.04.01 COLUMNAS

06.03.02.01 06.04.01.04 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 5.91 478.17 2,825.98

06.03.02.02 06.04.01.05 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 54.29

86.78 4,711.29

06.03.02.03 06.04.01.06 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 14.68 6.08 89.25

06.03.03 06.04.02 VIGAS

06.03.03.01 06.04.02.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 2.87 487.85 1,400.13

06.03.03.02 06.04.02.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 118.75 90.26 10,718.38

06.04 06.07.00 PISOS Y PAVIMENTOS

06.04.01 06.07.04 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 63.74 39.40 2,511.36

06.05 06.06.00 REVOQUES ENLUCIDO Y MOLDADURA

06.05.01 06.06.06 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 33.43 13.95 466.35

06.06 06.19.00 INSTALACIONES ELECTRICAS

06.06.01 06.19.04 SALIDA PARA INTERRUPTORES SIMPLES pto 5.00 44.48 222.40

06.06.02 06.19.05 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 6.00 52.30 313.80

06.06.03 06.19.06 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 2.00 21.45 42.90

06.06.04 06.19.07 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 37.94 8.13 308.45

06.06.05 06.19.08 CONDUCTOR DE COBRE THW 2.5 MM2 m 90.00 4.45 400.50

06.06.06 06.19.09 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 5.00 30.66 153.30

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 11 / 80

Page 12: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

06.07 06.20.00 ARTEFACTOS

06.07.01 06.20.03 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 4.00 182.95 731.80

06.07.02 06.20.04 COLOCACION DE FLUORESCENTE CIRCULAR 32 W INC/EQUIPO Y PANTALLA und 2.00

172.95 345.90

06.08 06.21.00 VARIOS Y LIMPIEZA

06.08.01 06.21.01 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 8.00

16.32 130.56

06.08.02 06.21.02 CURADO DE CONCRETO CON ADITIVO CURADOR m2 244.74 4.76 1,164.96

06.08.03 06.21.03 LIMPIEZA FINAL DE OBRA m2 70.00 0.27 18.90

07 07.00.00 CONSTRUCCION DE 01 AMBIENTE PARA GUARDIANIA 07.01 07.02.00 MOVIMIENTO DE TIERRAS

07.01.01 07.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 2.08 38.61 80.31

07.02 07.03.00 OBRAS DE CONCRETO SIMPLE

07.02.01 07.03.06 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 5.78 311.96 1,803.13

07.02.02 07.03.07 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 1.10

346.73 381.40

07.02.03 07.03.08 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 63.32

45.71 2,894.36

07.02.04 07.03.09 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 18.65 39.40 734.81

07.02.05 07.03.10 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 63.32

5.15 326.10

07.03 07.04.00 OBRAS DE CONCRETO ARMADO 07.03.01 07.04.01 ZAPATAS

07.03.01.01 07.04.01.03 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 2.43 430.74 1,046.70

07.03.01.02 07.04.01.04 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 10.80 45.71 493.67

07.03.01.03 07.04.01.05 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 10.80 6.01 64.91

07.03.02 07.04.02 COLUMNAS

07.03.02.01 07.04.02.04 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 2.58 478.17 1,233.68

07.03.02.02 07.04.02.05 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 26.20

86.78 2,273.64

07.03.02.03 07.04.02.06 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 9.75 6.08 59.28

07.03.03 07.04.03 VIGAS

07.03.03.01 07.04.03.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 2.37 487.85 1,156.20

07.03.03.02 07.04.03.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 17.01 90.26 1,535.32

07.04 07.06.00 REVOQUES ENLUCIDO Y MOLDADURA

07.04.01 07.06.03 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 43.21 13.95 602.78

07.05 07.18.00 INSTALACIONES ELECTRICAS

07.05.01 07.18.08 SALIDA PARA INTERRUPTORES SIMPLES pto 2.00 44.48 88.96

07.05.02 07.18.09 SALIDA PARA INTERRUPTORES DOBLES pto 1.00 45.22 45.22

07.05.03 07.18.10 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 4.00 52.30 209.20

07.05.04 07.18.11 SALIDA PARA TOMACORRIENTES DOBLES pto 4.00 51.22 204.88

07.05.05 07.18.12 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 21.45 21.45

07.05.06 07.18.13 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 15.00 8.13 121.95

07.05.07 07.18.14 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 13.00 11.10 144.30

07.05.08 07.18.15 CONDUCTOR DE COBRE THW 2.5 MM2 m 29.00 4.45 129.05

07.05.09 07.18.16 CONDUCTOR DE COBRE THW 4.00 MM2 m 34.00 5.13 174.42

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 12 / 80

Page 13: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

07.05.10 07.18.17 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 2.00 30.66 61.32

07.05.11 07.18.18 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 4.00 30.66 122.64

07.05.12 07.18.19 SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE und 1.00 32.66 32.66

07.05.13 07.18.20 TABLERO DE DISTRIBUCION STD 7.1 und 1.00 555.27 555.27

07.06 07.20.00 ARTEFACTOS

07.06.01 07.20.01 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 1.00 182.95 182.95

07.06.02 07.20.02 COLOCACION DE FLUORESCENTE CIRCULAR 32 W INC/EQUIPO Y PANTALLA und 3.00

172.95 518.85

07.07 07.19.00 VARIOS Y LIMPIEZA

07.07.01 07.19.02 CURADO DE CONCRETO CON ADITIVO CURADOR m2 100.88 4.76 480.19

08 08.00.00 CONSTRUCCION DE 01 AMBIENTE PARA TALLER DE CARPINTERIA

08.01 08.02.00 MOVIMIENTO DE TIERRAS

08.01.01 08.02.07 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 5.18 38.61 200.00

08.02 08.03.00 OBRAS DE CONCRETO SIMPLE

08.02.01 08.03.06 CONCRETO PARA SUB CIMIENTO C:H CON 1:12 + 30% P.G. m3 32.26 278.54 8,985.70

08.02.02 08.03.07 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 30.77 311.96 9,599.01

08.02.03 08.03.08 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 18.35

346.73 6,362.50

08.02.04 08.03.09 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 76.93

45.71 3,516.47

08.02.05 08.03.10 FALSO PISO E = 4", MEZCLA C:H 1:8 C/ADITIVO m2 118.27 39.40 4,659.84

08.02.06 08.03.11 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 122.80

5.15 632.42

08.03 08.04.00 OBRAS DE CONCRETO ARMADO 08.03.01 08.04.01 ZAPATAS

08.03.01.01 08.04.01.03 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 17.92 430.74 7,718.86

08.03.01.02 08.04.01.04 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 44.80 45.71 2,047.81

08.03.01.03 08.04.01.05 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 44.80 6.01 269.25

08.03.02 08.04.02 SOBRECIMIENTO ARMADO

08.03.02.01 08.04.02.04 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 1.68

410.59 689.79

08.03.02.02 08.04.02.05 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 13.40

81.39 1,090.63

08.03.02.03 08.04.02.06 IMPERMEABILIZACION PARA SOBRECIMIENTOS ARMADO m2 13.40 6.08 81.47

08.03.03 08.04.03 COLUMNAS

08.03.03.01 08.04.03.04 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 8.11 478.17 3,877.96

08.03.03.02 08.04.03.05 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 62.84

86.78 5,453.26

08.03.03.03 08.04.03.06 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNA m2 17.16 6.08 104.33

08.03.04 08.04.04 VIGAS

08.03.04.01 08.04.04.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 6.42 487.85 3,132.00

08.03.04.02 08.04.04.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 41.58 90.26 3,753.01

08.03.05 08.04.05 COLUMNETAS Y VIGUETAS DE AMARRE

08.03.05.01 08.04.05.01 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 2.44

478.17 1,166.73

08.03.05.02 08.04.05.02 COLUMNETA Y VIGUETAS DE AMARRE: ENCOFRADO Y DESENCOFRADO NORMAL m2 32.55

45.71 1,487.86

08.03.05.03 08.04.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNETAS Y VIGUETAS kg 327.21

4.90 1,603.33

08.03.05.04 08.04.05.04 IMPERMEABILIZACION DE ESTRUCTURA: COLUMNETAS m2 26.50 161.12

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 13 / 80

Page 14: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

6.08 08.04 08.06.00 REVOQUES ENLUCIDO Y MOLDADURA

08.04.01 08.06.05 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 104.43 13.95 1,456.80

08.05 08.18.00 INSTALACIONES ELECTRICAS

08.05.01 08.18.10 SALIDA PARA INTERRUPTORES SIMPLES pto 9.00 44.48 400.32

08.05.02 08.18.11 SALIDA PARA CENTRO DE LUZ: FLUORESCENTE pto 17.00 52.30 889.10

08.05.03 08.18.12 SALIDA PARA TOMACORRIENTES DOBLES pto 14.00 51.22 717.08

08.05.04 08.18.13 SUMINISTRO Y COLOCACION DE TUBERIA PVC SEL 3/4'' X 3M m 45.00 8.13 365.85

08.05.05 08.18.14 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 20mm X 3M m 110.00 11.10 1,221.00

08.05.06 08.18.15 CONDUCTOR DE COBRE THW 2.5 MM2 m 190.00 4.45 845.50

08.05.07 08.18.16 CONDUCTOR DE COBRE THW 4.00 MM2 m 200.00 5.13 1,026.00

08.05.08 08.18.17 COLOCACION DE CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 2.00 21.45 42.90

08.05.09 08.18.18 TABLERO DE DISTRIBUCION TD 6 und 1.00 781.05 781.05

08.05.10 08.18.19 COLOCACION DE FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 14.00 182.95 2,561.30

08.05.11 08.18.20 COLOCACION DE FLUORESCENTE CIRCULAR 32 W INC/EQUIPO Y PANTALLA und 3.00

172.95 518.85

08.05.12 08.18.21 INSTALACION DE TOMACORRIENTE DOBLE C/LINEA A TIERRA und 11.00 30.66 337.26

08.05.13 08.18.22 INSTALACION DE TOMACORRIENTE DOBLE A PRUEBA DE AGUA C/LINEA A TIERRA und 3.00

35.66 106.98

08.05.14 08.18.23 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 9.00 30.66 275.94

08.06 08.19.00 VARIOS Y LIMPIEZA

08.06.01 08.19.03 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 23.20

16.32 378.62

08.06.02 08.19.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 259.77 4.76 1,236.51

09 10.00.00 CONSTRUCCION DE CERCO PERIMETRICO 09.01 10.02.00 MOVIMIENTO DE TIERRAS

09.01.01 10.02.05 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 3.67 38.61 141.70

09.02 10.03.00 OBRAS DE CONCRETO SIMPLE

09.02.01 10.03.06 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 9.08 311.96 2,832.60

09.02.02 10.03.07 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 36.32

45.71 1,660.19

09.02.03 10.03.08 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. C/ADITIVO m3 1.95

346.73 676.12

09.02.04 10.03.09 IMPERMEABILIZACION DE CIMIENTO CORRIDO Y SOBRECIMIENTO m2 72.63

5.15 374.04

09.03 10.04.00 OBRAS DE CONCRETO ARMADO 09.03.01 10.04.01 ZAPATAS

09.03.01.01 10.04.01.03 ZAPATAS: CONCRETO F'C= 210 KG/CM2 C/ADITIVO m3 3.72 430.74 1,602.35

09.03.01.02 10.04.01.04 ZAPATAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 18.10 45.71 827.35

09.03.01.03 10.04.01.05 IMPERMEABILIZACION DE CIMENTACION: ZAPATAS m2 18.10 6.01 108.78

09.03.02 10.04.02 COLUMNAS

09.03.02.01 10.04.02.05 COLUMNAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 1.98 478.17 946.78

09.03.02.02 10.04.02.06 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 19.80

86.78 1,718.24

09.03.03 10.04.03 VIGAS

09.03.03.01 10.04.03.04 VIGAS: CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 1.75 487.85 853.74

09.03.03.02 10.04.03.05 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 17.52 90.26 1,581.36

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 14 / 80

Page 15: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

09.04 10.06.00 REVOQUES ENLUCIDO Y MOLDADURA

09.04.01 10.06.02 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 37.32 13.95 520.61

09.05 10.08.00 VARIOS Y LIMPIEZA

09.05.01 10.08.03 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 16.50

16.32 269.28

09.05.02 10.08.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 103.30 4.76 491.71

10 11.00.00 CONSTRUCCION DE 02 GRADERIAS EN ZONA DEPORTIVA 10.01 11.02.00 MOVIMIENTO DE TIERRAS

10.01.01 11.02.06 RELLENO CON MATERIAL DE PRESTAMO SELECCIONADO C/EQUIPO. m3 193.77

39.11 7,578.34

10.01.02 11.02.07 RELLENO COMPACTADO BAJO GRADERIAS C/MAT. AFIRMADO C/EQUIPO m3 87.78

162.76 14,287.07

10.02 11.03.00 OBRAS DE CONCRETO SIMPLE

10.02.01 11.03.04 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 42.56 311.96 13,277.02

10.02.02 11.03.05 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 168.60

45.71 7,706.71

10.02.03 11.03.06 CONCRETO F'C=140 KG/CM2 EN PASOS DE ACCESO C/ADITIVO m3 1.02 345.34 352.25

10.02.04 11.03.07 PASOS DE ACCESO: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 5.85

81.39 476.13

10.02.05 11.03.08 IMPERMEABILIZACION DE CIMIENTO CORRIDO m2 168.60 5.96 1,004.86

10.03 11.04.00 OBRAS DE CONCRETO ARMADO

10.03.01 11.04.04 GRADERIAS : CONCRETO F'C=210 KG/CM2 C/ADITIVO m3 61.71 478.17 29,507.87

10.03.02 11.04.05 GRADERIAS : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m3 489.10

81.39 39,807.85

10.04 11.06.00 REVOQUES ENLUCIDO Y MOLDADURA

10.04.01 11.06.02 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 294.18 13.95 4,103.81

10.05 11.09.00 VARIOS Y LIMPIEZA

10.05.01 11.09.03 JUNTA DE DILATACION CON TECKNOPORT Y JEBE MICROPOROSO m 30.12

16.32 491.56

10.05.02 11.09.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 657.48 4.76 3,129.60

11 12.00.00 CONSTRUCCION DE PATIO DE HONOR, 02 LOSAS DEPORTIVAS Y AREAS DE CIRCULACION

11.01 12.03.00 CONCRETO SIMPLE 11.01.01 12.03.04 CIMIENTOS

11.01.01.01 12.03.04.01 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 46.86 311.96 14,618.45

11.01.01.02 12.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 112.27

45.71 5,131.86

11.01.01.03 12.03.04.03 IMPERMEABILIZACION DE CIMIENTO CORRIDO m2 112.27 5.96 669.13

11.01.02 12.03.01 RAMPAS DE CONCRETO

11.01.02.01 12.03.01.03 RAMPA PARA INGRESO VEHICULAR C/ADITIVO m2 365.32 88.38 32,286.98

11.01.03 12.03.02 VEREDA DE CONCRETO

11.01.03.01 12.03.02.04 VEREDA DE PIEDRA LAVADA E=4" CONCRETO F'C=140 KG/CM2 INC/ACAB. Y BRUÑADO C/ADITIVO m2 570.85

58.88 33,611.65

11.01.04 12.03.03 PATIO Y PLATAFORMA DEPORTIVA

11.01.04.01 12.03.03.03 PISO DE CEMENTO EN PATIO C/ADITIVO m2 2,861.11 50.32 143,971.06

11.02 12.04.00 CONCRETO ARMADO 11.02.01 12.04.01 MUROS DE CONTENCION

11.02.01.01 12.04.01.04 MURO DE CONTENCION: CONCRETO F'C=210 KG/CM2 C/ADITIVO. m3 113.61 478.17 54,324.89

11.02.01.02 12.04.01.05 MURO DE CONTENCION: ENCOFRADO Y DESENCOFRADO NORMAL m2 26.84

50.41 1,353.00

11.02.01.03 12.04.01.06 MURO DE CONTENCION: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 277.44

81.39 22,580.84

11.02.01.04 12.04.01.07 IMPERMEABILIZACION DE MURO DE CONTENCION m2 322.73 36.17 11,673.14

11.02.02 12.04.02 ESCALINATA

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 15 / 80

Page 16: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

11.02.02.01 12.04.02.04 ESCALINATA: CONCRETO F'C=175 KG/CM2 C/ADITIVO m3 8.37 552.08 4,620.91

11.02.02.02 12.04.02.05 ESCALINATA: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 20.24

81.39 1,647.33

11.02.03 12.04.03 SARDINEL ARMADO EN RAMPA Y ESCALINATA 04

11.02.03.01 12.04.03.04 SARDINEL ARMADO: CONCRETO F'C=210 KG/CM2 C/ADITIVO. m3 48.74 478.17 23,306.01

11.02.03.02 12.04.03.05 SARDINEL ARMADO: ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO. m2 487.41

478.17 233,064.84

11.02.03.03 12.04.03.06 IMPERMEABILIZACION DE CIMENTACION: SARDINEL ARMADO m2 327.95 5.15 1,688.94

11.02.04 12.04.04 CANALETAS

11.02.04.01 12.04.04.04 CANAL P/EVACUACION PLUVIAL R=0.15M: CONCRETO F'C=210 kg/cm2 C/ADITIVO m3 23.13

430.74 9,963.02

11.02.04.02 12.04.04.05 CANAL P/EVACUACION PLUVIAL R=0.15M: ENCOFRADO Y DESENCOFRADO NORMAL m2 233.65

50.41 11,778.30

11.03 12.07.00 REVOQUES ENLUCIDO Y MOLDADURA

11.03.01 12.07.01 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 785.09 13.95 10,952.01

11.03.02 12.07.02 TARRAJEO IMPERMABILIZADO EN CANALETAS R=10 m m2 108.73 45.90 4,990.71

11.04 12.08.00 DRENAJE 11.04.01 12.08.01 TRABAJOS PRELIMINARES

11.04.01.01 12.08.01.01 TRAZO Y REPLANTEO m2 32.44 3.39 109.97

11.04.02 12.08.02 MOVIMIENTO DE TIERRAS

11.04.02.01 12.08.02.01 EXCAVACION DE ZANJAS m3 86.01 35.42 3,046.47

11.04.02.02 12.08.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO. m3 72.45 38.61 2,797.29

11.04.02.03 12.08.02.03 REFINE Y NIVELACION DE ZANJAS m 100.54 1.35 135.73

11.04.02.04 12.08.02.04 PREPARACION DE CAMA DE ARENA h=0.10 m2 32.44 14.40 467.14

11.04.02.05 12.08.02.05 MATERIAL DE PIEDRA CLASIFICADA 1/4'' A 1'' m3 4.55 137.92 627.54

11.04.02.06 12.08.02.06 ACARREO DE MATERIAL EXCEDENTE m3 13.55 15.18 205.69

11.04.02.07 12.08.02.07 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 13.55 13.27 179.81

11.04.03 12.08.03 RED DE DRENAJE

11.04.03.01 12.08.03.01 ELABORACION E INSTALACION DE TUBERIA CRIBADA PVC DE 4'' PARA DRENAJE m 22.75

33.35 758.71

11.04.03.02 12.08.03.02 TUBERIA PVC 4" PVC SALIDA DE DRENAJE m 77.79 13.32 1,036.16

11.04.03.03 12.08.03.03 SUMINISTRO E INSTALACION DE BUZONES DE CONCRETO C/TAPA und 4.00

234.53 938.12

11.05 12.06.00 VARIOS

11.05.01 12.06.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 3,797.28 4.76 18,075.05

12 13.00.00 AREAS VERDES 12.01 13.02.00 SARDINELES DE CONCRETO 12.01.01 13.02.02 OBRAS DE CONCRETO SIMPLE

12.01.01.01 13.02.02.05 CIMIENTO CORRIDO C:H CON 1:10 + 30% P.G. C/ADITIVO m3 11.15 311.96 3,478.35

12.01.01.02 13.02.02.06 ENCOFRADO Y DESENCOFRADO NORMAL DE CIMIENTO CORRIDO m2 27.87

45.71 1,273.94

12.01.02 13.02.03 OBRAS DE CONCRETO ARMADO

12.01.02.01 13.02.03.01 SARDINEL : CONCRETO DE F'C=140 KG/CM2 C/ADITIVO m3 21.43 345.34 7,400.64

12.01.02.02 13.02.03.02 SARDINEL : ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO m2 246.05

81.39 20,026.01

12.01.02.03 13.02.03.03 SARDINEL : ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 kg 972.35 4.90 4,764.52

12.01.02.04 13.02.03.04 IMPERMEABILIZACION DE CIMENTACION: SARDINEL ARMADO m2 246.05 5.15 1,267.16

12.02 13.03.00 REVOQUES ENLUCIDO Y MOLDADURA 12.02.01 13.03.01 SOLAQUEADO EN SUPERFICIES CARAVISTAS m2 246.05 3,432.40

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 16 / 80

Page 17: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

13.95 12.03 13.04.00 VARIOS Y LIMPIEZA

12.03.01 13.04.01 SUMINISTRO Y COLOCACION DE CESPED m2 81.62 9.91 808.85

12.03.02 13.04.02 CURADO DE CONCRETO CON ADITIVO CURADOR m2 273.92 4.76 1,303.86

12.03.03 13.04.03 LIMPIEZA FINAL DE OBRA EN AREA VERDE m2 81.62 1.17 95.50

13 16.00.00 DESMONTAJE Y DEMOLICIONES 13.01 16.02.00 DEMOLICION DE AULAS Y SS.HH

13.01.01 16.02.13 DEMOLICION DE CIMENTACION EXISTENTE m3 55.90 350.67 19,602.45

13.01.02 16.02.14 ACARREO DE MATERIAL DEMOLIDO EN CIMIENTOS m3 72.68 21.26 1,545.18

13.01.03 16.02.15 ELIMINACION DE MATERIAL DEMOLIDO EN CIMIENTOS m3 72.68 15.24 1,107.64

COSTO DIRECTO 1,314,508.00 GASTOS GENERALES (13%) 170,886.04 GASTO DE SUPERVISION (4%) 52,580.32 GASTO DE LIQUIDACION (1.5%) 19,717.62 COSTO PARCIAL DEL PROYECTO 1,557,691.98 COSTO EXPEDIENTE TECNICO 0.00 ASISTENCIA TECNICA Y CAPACITACION 0.00 COSTO TOTAL DEL PROYECTO 1,557,691.98

2.2 ANTECEDENTES .

2.2.1 DE LOS EXPEDIENTES TECNICOS.

Mediante Resolución Gerencial N° 305-2011-GRI-G.R.TACNA, de fecha 26 de Diciembre 2011, se Aprueba el EXPEDIENTE TÉCNICO de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, con un Presupuesto de S/. 2’994,829.29 Nuevos Soles para un Plazo de Ejecución de 270 días calendarios, de Modalidad de Ejecución por Administración Directa.

Mediante Resolución Gerencial N° 244-2012-GRI-G.R.TACNA, de fecha 15 de Agosto 2012, se Aprueba el documento Técnico Expediente DUCTIVO N°01 de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, con un Presupuesto de S/. 749,272.83 Nuevos Soles.

Mediante Resolución Gerencial N° 245-2012-GRI-G.R.TACNA, de fecha 15 de Agosto 2012, se Aprueba el documento Técnico Expediente ADICIONAL N°01 de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, con un Presupuesto de S/. 1’563,509.71 Nuevos Soles.

2.2.2 DEL PLAN DE TRABAJO.

Mediante Resolución Gerencial N°064-2012-GRI-G.R.TACNA, de fecha 31 de Enero 2012, se Aprueba el PLAN DE TRABAJO 2012 de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, con un Presupuesto de S/.2’994,829.29 Nuevos Soles para Ejecutarse en 270 días Calendarios.

Mediante Resolución Gerencial N°040-2013-GRI-G.R.TACNA, de fecha 18 de Enero 2013, se Aprueba el PLAN DE TRABAJO 2013 de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, con un Presupuesto de S/.1’478,386.67 Nuevos Soles para Ejecutarse en 109 días Calendarios (días de la Ampliación de Plazo 01).

2.2.3 DE LAS AMPLIACIONES DE PLAZO.

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 17 / 80

Page 18: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

Mediante Resolución Gerencial N°339-2012-GRI-G.R.TACNA, de fecha 26 de Noviembre 2012, se Aprueba el Documento Técnico AMPLIACIÓN DE PLAZO Nº01 por 109 días calendarios de la Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”, Proyectándose para el día 30 de Marzo del 2013, como Nueva fecha de Culminación de Obra.

2.2.4 DE LOS RESIDENTES DE OBRA.

Mediante Resolución Gerencial Nº 034-2012-GRI-GOB.REG.TACNA, se designa a partir de la fecha al Ing. Walter David Rios Valdivia como Residente de Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”.

Mediante Resolución Gerencial Nº 105-2012-GRI-G.R.TACNA, de fecha 12 de Marzo del 2012, se designa a partir de la fecha al Ing. Jose Delius Vargas Catacora como Residente de Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”; designación que tiene carácter de eficacia anticipada a partir del 01 de Marzo 2012.

Mediante Resolución Gerencial Nº 256-2012-GRI-GOB.REG.TACNA, se designa a partir de la fecha al Ing. Oscar Tito Torrejon Salas como Residente de Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”.

Mediante Resolución Gerencial Nº304-2012-GRI-G.R.TACNA, de fecha 29 de Octubre del 2012, se designa a partir de la fecha al Ing. Seleny Rocio Pozo Espinoza, como Residente de Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”; designación que tiene carácter de eficacia anticipada a partir del 25 de Octubre 2012.

Mediante Resolución Gerencial Nº065-2013-GRI-G.R.TACNA, de fecha 05 de Febrero del 2013, se designa a partir de la fecha al Ing. René Chura Huisa, como Residente de Obra: “RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”; designación que tiene carácter de eficacia anticipada a partir del 11 de Enero 2013.

2.2.5 DE LOS INSPECTORES DE OBRA.

Mediante Resolución Gerencial General Regional Nº -2012-GGR/G.R.TACNA, de fecha Febrero del 2012, se designa al ING. Salvador Espinoza Liu como Inspector de la Obra“RECONSTRUCCIÓN E IMPLEMENTACIÓN DE LA I.E. FORTUNATO ZORA CARBAJAL-PROVINCIA DE CANDARAVE”

2.3 MARCO LEGAL .

Para la Elaboración del Presente Informe Mensual, se ha tomado como referencia:

- Manual para la Ejecución de los Proyectos de Inversión Pública en el Gobierno Regional de Tacna; Resolución Gerencial General Regional N°513-2012-G.G.R./GOB.REG.TACNA de fecha 02-10-2012.

- Ley 27293 Ley del Sistema Nacional de Inversión Pública- Directiva General del Sistema Nacional de Inversión Pública- Directiva Nº 003-2011-EF/68.01- Resolución de Contraloría Nº 195-88-CG que aprueba las Normas que regulan la ejecución de

Obras Públicas por Administración Directa

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 18 / 80

Page 19: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

2.4 OBJETIVOS .

El Objetivo del presente Informe Mensual es de dar a conocer la Situación Actual de la Ejecución del Proyecto, al presente mes tanto en su aspecto de Avance de Ejecución física y como Avance de Ejecución Financiera. Para tal caso la Supervisión deberá Evaluar y contestar el presente.

2.5 METAS TOTALES DEL PROYECTO

Las Metas físicas es de realizar los trabajos proyectados del Plan de Trabajo al 100% y que estas están comprendidas en las Componentes :

A. COMPONENTE INFRAESTRUCTURA:

1 Trabajos Preliminares2 Construcción de 03 ambientes para aulas-Pabellón C 3 Construcción de 01 ambiente para SUM. 4 Construcción de 01 ambiente para cocina comedor (1er nivel)-Pabellón B y Construcción de 01 ambiente para zona administrativa (2do nivel) Pabellón B 5 Construcción de 02 escaleras 6 Construcción de 02 baterías SS.HH. 7 Construcción de 01 ambiente para guardianía 8 Construcción de 01 ambiente para taller de carpintería 9 Construcción de 02 ambientes para SS.HH. en zona de lozas deportivas, 01 ambiente de educación física10 Construcción de cerco perimétrico 11 Construcción de 02 graderías 12 Construcción de patio de honor, 02 losa múltiple y áreas de circulación 13 Áreas verdes 14 Cobertura de malla rashell 15 Red de agua, desagüe e instalaciones eléctrica 16 Desmontaje y demoliciones 17 Mejoramiento de Pabellón D (02 niveles: 05 aulas, 02 SS.HH.) 18 Mejoramiento del tanque elevado 19 Acondicionamiento de 01 aula (1er nivel) - Pabellón B

B. EQUIPAMIENTO BÁSICO :

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 19 / 80

Page 20: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

MOBILARIO Y EQUIPAMIENTO PEDAGOGICO - PRIMARIA

1 MODULOS DE MOBILARIO ESCOLAR - NIVEL PRIMARIO (01 MESA Y 01 SILLA) 134 Unidades2 MODULO DOCENTE (01 ESCRITORIO Y SILLA) 10 Unidades3 PIZARRA ACRILICA 10 Unidades4 ARMARIO 10 Unidades5 EXTINTOR 5 Unidades6 BOTIQUIN DE PRIMEROS AUXILIOS IMPLEMENTADO 10 Unidades

MOBILARIO Y EQUIPAMIENTO PEDAGOGICO - SECUNDARIO

7 MODULOS DE MOBILARIO ESCOLAR - NIVEL SECUNADRIO (01 MESA Y 01 SILLA) 134 Unidades8 MODULO DOCENTE (01 ESCRITORIO Y SILLA) 10 Unidades9 PIZARRA ACRILICA 10 Unidades

10 ARMARIO 10 Unidades11 EXTINTOR 5 Unidades12 BOTIQUIN DE PRIMEROS AUXILIOS IMPLEMENTADO 10 Unidades

MOBILARIO Y EQUIPAMIENTO ADMINISTRATIVO

13 ESCRITORIOS DE MADERA 1.20 x 0.60 M 3 Unidades14 SILLA DE MADERA 6 Unidades15 COMPUTADORA MODERNA COMPLETA 3 Unidades16 MODULO DE COMPUTADORA 3 Unidades17 IMPRESORA MULTIFUNCIONAL 1 Unidad18 ESTANTES 2 Unidades19 ARMARIOS 2 Unidades20 SET DE LIBROS VARIOS (04 LIBROS POR SET) 8 Unidades

MOBILARIO Y EQUIPAMIENTO PARA COCINA COMEDOR

21 MESA DE MADERA (COMEDOR) 4 Unidades22 SILLA DE MADERA 40 Unidades23 FRIGIDER 1 Unidad24 COCINA SEMIINDUSTRIAL 02 HORNILLAS (COMPLETA INCLUYE BIDON DE GAS) 2 Unidades25 BIDON DE GAS 2 Unidades26 MENAJE (VARIADO) 1 Unidad

MOBILARIO Y EQUIPAMIENTO GUARDIANIA

27 CAMA DE MADERA 1 Unidad28 COLCHON 1 Unidad29 MESA DE NOCHE 1 Unidad30 ARMARIO 1 Unidad31 HERBIDOR DE AGUA ELECTRICO 1 Unidad32 COCINA ELECTRICA PEQUEÑA 1 Unidad33 JUEGO DE COMEDOR (MESA Y 04 SILLAS DE PLASTICO) 1 Unidad34 JUEGOS DE SABANA 8 Unidades35 FRAZADAS 4 Unidades

MOBILARIO Y EQUIPAMIENTO SALA AUDIOVISUAL

36 SILLAS DE MADERA 50 Unidades37 LAP TOP 1 Unidad38 CAÑON MULTIMEDIA PROYECTOR 1 Unidad39 MUEBLE PARA CAÑON MULTIMEDIA PROYECTOR 1 Unidad40 ECRAN (PANEL PARA PROYECTOR INCLEYE TRIPODE) 1 Unidad41 TV 29" 1 Unidad42 DVD 1 Unidad43 EQUIPO DE SONIDO 1 Unidad44 MUEBLE METALICO MULTIPLE (TV, DVD, EQUIPO DE SONIDO) 1 Unidad

MOBILARIO Y EQUPAMIENTO TALLER DE CARPINTERIA

45 PIZARRA ACRILICA 1 Unidad46 MODULO DOCENTE (01 ESCRITORIO Y SILLA) 2 Unidades47 MESA DE BANCO DE CARPINTERO CON PRENSA ADAPTADA 5 Unidades48 BANCOS DE MADERA 18 Unidades49 TV 1 Unidad50 DVD 1 Unidad51 MUEBLE PARAS TV, DVD. 1 Unidad52 ARMARIOS METALICOS 3 Unidades53 TABURETE PARA GUARDAR HERRAMIENTAS 2 Unidades54 TORNO PARA MADERA 1000x356 MM DE 0.5 HP MONOFASICO 5 Unidades55 SIERRA CIRCULAR 3 HP 3 Unidades56 MAQUINA SIERRA DE CINTA DE 16" 1 Unidad57 GARPOLA DE 12" 2 Unidades58 CEPILLO AUTOMATICO 20" 1 Unidad59 MAQUINA TUPI 5 Unidades60 ESMERIL DE BANCO 8" DE 0.5 HP 137 WATTS MONOFASICA 2 Unidades61 AMOLADORA 4.5" 850 WATTS 2 Unidades62 TALADRO ELECTRICO 1/2" 500 WATTS 8 Unidades63 CEPILLO MANUAL 10 Unidades64 GARPOLA MANUAL Nº 06 10 Unidades65 GARPOLA MANUAL Nº 07 10 Unidades66 PRENSA TIPO G DE 1.8 M DE LARGO 6 Unidades67 PRENSA TIPO G PEQUEÑAS 10 Unidades68 ESCUADRAS DE CARPINTERIA GRANDE 20 Unidades69 ESCUADRA GRANDE 20 Unidades70 MARTILLOS DE UÑA 20 Unidades71 ALICATES 15 Unidades

MOBILARIO Y EQUIPAMIENTO AREA DE EDUCACION FISICA Y JUEGOS

72 PELOTAS DE FUTBOL 10 Unidades73 PELOTAS DE VOLEYBOL 8 Unidades74 PELOTAS DE BALONCESTO 8 Unidades75 CONOS SEÑALADORES DE PLATICO 30 Unidades76 JUEGOS DE AJEDREZ 20 Unidades77 COLCHONETAS DE GIMNASIA 15 Unidades78 TABURETE DE MADERA CHICO 1 Unidad79 TABLA DE PIQUE 1 Unidad80 AROS DE GIMNASIA 20 Unidades81 CLAVAS DE MADERA 15 Unidades82 CUERDAS DE GIMNASIA 15 Unidades83 NET DE VOLEYBOL 3 Unidades

MOBILARIO Y EQUIPAMIENTO BANDA DE MUSICA

84 TROMPETAS 6 Unidades85 BAJOS 3 Unidades86 SAXOS 3 Unidades87 TAROLAS 6 Unidades88 REDOBLANTES 2 Unidades89 TROMBONES DE VARA 2 Unidades90 BOMBOS 1 Unidad91 PLATILLOS 16" (PAR) 1 Unidad92 TUBAS 2 Unidades93 LIRAS 6 Unidades94 CLARINETES 3 Unidades

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 20 / 80

Page 21: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

MOBILARIO Y EQUIPAMIENTO SALA AUDIOVISUAL

36 SILLAS DE MADERA 50 Unidades37 LAP TOP 1 Unidad38 CAÑON MULTIMEDIA PROYECTOR 1 Unidad39 MUEBLE PARA CAÑON MULTIMEDIA PROYECTOR 1 Unidad40 ECRAN (PANEL PARA PROYECTOR INCLEYE TRIPODE) 1 Unidad41 TV 29" 1 Unidad42 DVD 1 Unidad43 EQUIPO DE SONIDO 1 Unidad44 MUEBLE METALICO MULTIPLE (TV, DVD, EQUIPO DE SONIDO) 1 Unidad

MOBILARIO Y EQUPAMIENTO TALLER DE CARPINTERIA

45 PIZARRA ACRILICA 1 Unidad46 MODULO DOCENTE (01 ESCRITORIO Y SILLA) 2 Unidades47 MESA DE BANCO DE CARPINTERO CON PRENSA ADAPTADA 5 Unidades48 BANCOS DE MADERA 18 Unidades49 TV 1 Unidad50 DVD 1 Unidad51 MUEBLE PARAS TV, DVD. 1 Unidad52 ARMARIOS METALICOS 3 Unidades53 TABURETE PARA GUARDAR HERRAMIENTAS 2 Unidades54 TORNO PARA MADERA 1000x356 MM DE 0.5 HP MONOFASICO 5 Unidades55 SIERRA CIRCULAR 3 HP 3 Unidades56 MAQUINA SIERRA DE CINTA DE 16" 1 Unidad57 GARPOLA DE 12" 2 Unidades58 CEPILLO AUTOMATICO 20" 1 Unidad59 MAQUINA TUPI 5 Unidades60 ESMERIL DE BANCO 8" DE 0.5 HP 137 WATTS MONOFASICA 2 Unidades61 AMOLADORA 4.5" 850 WATTS 2 Unidades62 TALADRO ELECTRICO 1/2" 500 WATTS 8 Unidades63 CEPILLO MANUAL 10 Unidades64 GARPOLA MANUAL Nº 06 10 Unidades65 GARPOLA MANUAL Nº 07 10 Unidades66 PRENSA TIPO G DE 1.8 M DE LARGO 6 Unidades67 PRENSA TIPO G PEQUEÑAS 10 Unidades68 ESCUADRAS DE CARPINTERIA GRANDE 20 Unidades69 ESCUADRA GRANDE 20 Unidades70 MARTILLOS DE UÑA 20 Unidades71 ALICATES 15 Unidades

MOBILARIO Y EQUIPAMIENTO AREA DE EDUCACION FISICA Y JUEGOS

72 PELOTAS DE FUTBOL 10 Unidades73 PELOTAS DE VOLEYBOL 8 Unidades74 PELOTAS DE BALONCESTO 8 Unidades75 CONOS SEÑALADORES DE PLATICO 30 Unidades76 JUEGOS DE AJEDREZ 20 Unidades77 COLCHONETAS DE GIMNASIA 15 Unidades78 TABURETE DE MADERA CHICO 1 Unidad79 TABLA DE PIQUE 1 Unidad80 AROS DE GIMNASIA 20 Unidades81 CLAVAS DE MADERA 15 Unidades82 CUERDAS DE GIMNASIA 15 Unidades83 NET DE VOLEYBOL 3 Unidades

MOBILARIO Y EQUIPAMIENTO BANDA DE MUSICA

84 TROMPETAS 6 Unidades85 BAJOS 3 Unidades86 SAXOS 3 Unidades87 TAROLAS 6 Unidades88 REDOBLANTES 2 Unidades89 TROMBONES DE VARA 2 Unidades90 BOMBOS 1 Unidad91 PLATILLOS 16" (PAR) 1 Unidad92 TUBAS 2 Unidades93 LIRAS 6 Unidades94 CLARINETES 3 Unidades

C. CAPACITACIÓN.

Las Metas para este componente es Mejorar la Calidad del Trabajo Técnico pedagógico que realiza los docentes de la I.E., Actualizando a los docentes en el manejo de técnicas y estrategias para el desarrollo de sus capacidades de comprensión lectora, razonamiento lógico matemático.

CARACTERÍSTICAS DE LA CAPACITACIÓN:

Se encuentra en proceso de elaboración y estarán sujetas al Perfil Técnico Aprobado.

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 21 / 80

Page 22: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

2.6 MODIFICACIONES DEL PROYECTO.

El Proyecto ha sido modificado a Razón de la existencia de mayores metrados, Partidas Nuevas y otras de deducción de Partidas, los mismos que generaron Presupuestos DEDUCTIVO Nº01 y ADICIONAL Nº01; Tales variaciones del proyecto y otras razones indicadas dieron origen a la Modificación del Plazo de Ejecución, teniendo así una AMPLIACIÓN DE PLAZO 01.

A. MODIFICACIONES AL PRESUPUESTO.

El Cuadro siguiente muestra como se ha sido modificando el Presupuesto Base, hasta quedar en un Presupuesto Consolidado 1.

Cuadro Nº0 3

> METRADO P.NUEVAS PARCIAL

COSTO DIRECTO (B) 2,845,584.95 2,495,518.39 4,909.48 1,314,508.00 1,319,417.48 632,297.75 3,182,638.12

GASTOS GENERALES 10y13.0% B 284,558.50 324,417.39 638.23 170,886.04 171,524.27 82,198.71 413,742.96

A. TOTAL INFRAESTRUCTURA 3,130,143.45 2,819,935.78 5,547.71 1,485,394.04 1,490,941.75 714,496.45 3,596,381.08

02 CAPACITACIÓN-ASISTENCIA TÉCNICA DOCENTE 37,640.00 37,640.00 - - - - 37,640.00

03 SUPERVISION 4.0% (B) 56,911.70 99,820.74 196.38 52,580.32 52,776.70 25,291.91 127,305.52

04 LIQUIDACIÓN 1.5% (B) 8,536.75 37,432.78 73.64 19,717.62 19,791.26 9,484.47 47,739.57

05 EXPEDIENTE TEC. 28,455.85 - - - - - -

06 MOBILIARIO Y EQUIPAMIENTO 231,143.98

07 IMPREVISTOS 5,691.17 - - - - -

TOTAL COSTO DEL PROYECTO 3,498,522.90 2,994,829.29 5,817.73 1,557,691.98 1,563,509.71 749,272.83 3,809,066.18

Fuente: Expediente Técnico Base, Documento Técnico Adicional 01, Doc. Técnico Duductivo 01

01 INFRAESTRUCTURA

PPTO.DEDUCTIVO

01

COSTOPIP VIABLE

PPTO.ADICIONAL 01

SEG. EXP. TEC.

PPTO BASE

EXPED. TÉCN.

CONSOLIDA

MODIFICACIÓN DEL PRESUPUESTO BASE AL CONSOLIDADO TOTAL

ITEM COMPONENTE DESCRIPCIÓN

Del cuadro podemos concluir que el Presupuesto Modificado Total “Consolidado” es S/. 3,809,066.18 Nuevos Soles.

B. MODIFICACIONES AL CALENDARIO DE EJECUCIÓN.

El Calendario de Ejecución del Proyecto, ha sido modificado por las razones sustentadas en el Expediente Técnico de Ampliación de Plazo Nº01, del cual Extraemos el Siguiente Cuadro:

Cuadro Nº0 4

Obra RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.

Programa Infraestructura EducativaU.Ejecutora Gobierno Regional TacnaMod.Ejec. Administración Directa

FECHAS DE EJ ECUCIÓN Y SUS MODIFICACIONESDÍAS

PROGRAMADINICIO FINAL OBSERVACIONES

EXPEDIENTE TÉCNICO BASE 270 16 abril 2012 10 enero 2013 PLAN TRAB. 2012: R.G.G. N°064-2012-GRI-G.R. TACNA d' 31/01/12

AMPLIACIÓN DE PLAZO Nº01 109 11 enero 2013 29 abril 2013 AMPL. PLAZO 01 : R.G.G. N°339-2012-GRI-G.R. TACNA d' 26/11/12

TOTAL DÍAS DEL PROYECTO 379 16 abril 2012 29 abril 2013 CULMINACIÓN DEL PROYECTO

Fuente: Expediente Técnico Base y Documento Técnico de Ampliación de Plazo N°01

DOCUMENTOS TÉCNICOS

Del cuadro anterior podemos concluir que el Proyecto debe Culminar el 29 de ABRIL 2013

2.7 METAS ALCANZADAS -METRADO ACTUAL, ACUMULADO Y SALDO A EJECUTAR Cuadro N°0 4

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 22 / 80

Page 23: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

ENER O 2013

INF. MENSUAL - VALORIZACION N° 10Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional Tacna PLAZO EJECUC. DPTOFecha ENERO 2013 FECHA INICIO PROVMod.Ejec. Administración Directa FECHA TERMINO DISTFuente:

METR. % METR.10 % METRAD % METRADO %

1.00 TRABAJOS PRELIMINARES01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 2.40M.und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

01.02 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m2 100.00 100.00 100.00% 0.00 0.00% 100.00 100.00% 0.00 0.00%

01.03 MOVILIZACION Y TRASNPORTE DE MATERIALES, EQUIPOS Y MAQUINARIASGLB 1.00 0.85 85.00% 0.05 5.00% 0.90 90.00% 0.10 10.00%

01.04 CERCO PERIMETRICO PROVISIONAL DE ESTERAS m 100.00 100.00 100.00% 0.00 0.00% 100.00 100.00% 0.00 0.00%

01.05 AGUA Y ELECTRICIDAD PROVISIONAL PARA LA OBRA mes 8.00 4.00 50.00% 0.00 0.00% 4.00 50.00% 4.00 50.00%

2.00 CONSTRUCCION DE 03 AMBIENTES PARA AULAS - PABELLON C02.01.00 TRABAJOS PRELIMINARES02.01.01 LIMPIEZA DE TERRENO MANUAL m2 159.11 159.11 100.00% 0.00 0.00% 159.11 100.00% 0.00 0.00%

02.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 159.11 159.11 100.00% 0.00 0.00% 159.11 100.00% 0.00 0.00%

02.02.00 MOVIMIENTO DE TIERRAS02.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 42.50 42.50 100.00% 0.00 0.00% 42.50 100.00% 0.00 0.00%

02.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 23.15 23.15 100.00% 0.00 0.00% 23.15 100.00% 0.00 0.00%

02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 19.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.45 100.00%

02.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 55.44 55.44 100.00% 0.00 0.00% 55.44 100.00% 0.00 0.00%

02.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 55.44 55.44 100.00% 0.00 0.00% 55.44 100.00% 0.00 0.00%

02.02.06 AFIRMADO DE 6" PARA PISOS m2 145.59 145.59 100.00% 0.00 0.00% 145.59 100.00% 0.00 0.00%

02.03.00 OBRAS DE CONCRETO SIMPLE02.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 41.94 41.94 100.00% 0.00 0.00% 41.94 100.00% 0.00 0.00%

02.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 16.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 16.74 100.00%

02.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.86 100.00%

02.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 24.86 24.86 100.00% 0.00 0.00% 24.86 100.00% 0.00 0.00%

02.03.05 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 24.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 24.86 100.00%

02.03.06 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 145.59 0.00 0.00% 0.00 0.00% 0.00 0.00% 145.59 100.00%

02.04.00 OBRAS DE CONCRETO ARMADO02.04.01 ZAPATAS02.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 12.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.50 100.00%

02.04.01.02 ZAPATAS : ENCOFRADO Y DESENCOFRADO NORMAL m2 37.50 37.50 100.00% 0.00 0.00% 37.50 100.00% 0.00 0.00%

02.04.01.03 IMPERMEABILIZACION DE ZAPATAS m2 37.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 37.50 100.00%

02.04.01.04 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 306.61 306.61 100.00% 0.00 0.00% 306.61 100.00% 0.00 0.00%

02.04.02 VIGAS DE CIMENTACION02.04.02.01 VIGA DE CIMENTACION: CONCRETO F'C=210 KG/CM2 m3 6.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.35 100.00%

02.04.02.02 VIGA DE CIMENTACION:ENCOFRADO Y DESENCOFRADO NORMALm2 50.83 50.83 100.00% 0.00 0.00% 50.83 100.00% 0.00 0.00%

02.04.02.03 IMPERMEABILIZACION DE VIGAS DE CIMENTACION m2 50.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 50.83 100.00%

02.04.02.04 VIGA DE CIMENTACION: ACERO GRADO 60 FY= 4200 KG/CM2.kg 856.01 856.01 100.00% 0.00 0.00% 856.01 100.00% 0.00 0.00%

02.04.03 SOBRECIMIENTO ARMADO02.04.03.01 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2m3 2.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.28 100.00%

02.04.03.02 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 18.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.24 100.00%

02.04.03.03 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 18.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.24 100.00%

M ETAS ALCANZADAS

MES ACTUAL ENERO 2013

13/01/1901

16/04/2012

TACNA

CANDARAVE

UBICACIÓN

ACTUAL ACUMULADO SALDO A EJEC.

29/04/2013

ITEM TRABAJOS EJECUTADOS UNDMETRADO

EXP.TEC

ANT.ACUMULADO

CANDARAVE

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 23 / 80

Page 24: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

02.04.03.04 SOBRECIMIENTO ARMADO: ACERO GRADO 60 FY= 4200 KG/CM2kg 271.10 271.10 100.00% 0.00 0.00% 271.10 100.00% 0.00 0.00%

02.04.04 COLUMNAS02.04.04.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 8.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.60 100.00%

02.04.04.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 92.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 92.92 100.00%

02.04.04.03 IMPERMEABILIZACION DE COLUMNAS m2 92.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 92.92 100.00%

02.04.04.04 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,158.42 1,158.42 100.00% 0.00 0.00% 1,158.42 100.00% 0.00 0.00%

02.04.05 VIGAS02.04.05.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 7.53 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.53 100.00%

02.04.05.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 80.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 80.45 100.00%

02.04.05.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 900.82 900.82 100.00% 0.00 0.00% 900.82 100.00% 0.00 0.00%

02.04.06 COLUMNETAS Y VIGUETAS DE AMARRE02.04.06.01 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2m3 1.94 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.94 100.00%

02.04.06.02 COLUMNETA Y VIGUETAS DE AMARRE: ENCOFRADO Y DESENCOFRADOm2 30.61 30.61 100.00% 0.00 0.00% 30.61 100.00% 0.00 0.00%

02.04.06.03 COLUMNETA Y VIGUETAS DE AMARRE ACERO F'Y=4,200 KG/CM2.kg 203.76 203.76 100.00% 0.00 0.00% 203.76 100.00% 0.00 0.00%

02.05.00 MUROS Y TABIQUES DE ALBAÑILERIA02.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 27.36 43.28 158.19% 0.00 0.00% 43.28 158.19% -15.92 -58.19%

02.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 97.19 89.19 91.77% 0.00 0.00% 89.19 91.77% 8.00 8.23%

02.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 31.14 31.14 100.00% 0.00 0.00% 31.14 100.00% 0.00 0.00%

02.06.00 REVOQUES ENLUCIDOS Y MOLDURAS02.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 208.04 208.04 100.00% 0.00 0.00% 208.04 100.00% 0.00 0.00%

02.06.02 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 77.76 77.76 100.00% 0.00 0.00% 77.76 100.00% 0.00 0.00%

02.07.00 CIELO RASOS02.07.01 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 140.82 0.00 0.00% 0.00 0.00% 0.00 0.00% 140.82 100.00%

02.08.00 ZOCALOS Y CONTRAZOCALOS02.08.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (INCLUYE RODON)m 58.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 58.30 100.00%

02.08.02 CONTRAZOCALO DE CEMENTO PULIDO H= 0.40 MTS m 56.30 56.30 100.00% 0.00 0.00% 56.30 100.00% 0.00 0.00%

02.09.00 PISOS Y PAVIMENTOS02.09.01 PISO DE PARQUET DE 6x30 CM m2 145.59 0.00 0.00% 0.00 0.00% 0.00 0.00% 145.59 100.00%

02.10.00 CARPINTERIA DE MADERA02.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 7.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.56 100.00%

02.10.02 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 25.53 0.00 0.00% 0.00 0.00% 0.00 0.00% 25.53 100.00%

02.11.00 ESTRUCTURAS DE MADERA Y COBERTURA02.11.01 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 23.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.36 100.00%

02.11.02 TIJERAL PRIINCIPAL DE MADERA TIPO 01 - SECCION VARIABLEund 9.00 3.00 33.33% 0.00 0.00% 3.00 33.33% 6.00 66.67%

02.11.03 CORREAS DE MADERA TORNILLO DE 3" X 2" m 280.32 0.00 0.00% 280.32 100.00% 280.32 100.00% 0.00 0.00%

02.11.04 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 206.74 0.00 0.00% 206.74 100.00% 206.74 100.00% 0.00 0.00%

02.12.00 CERRAJERIA02.12.01 BISAGRA ALUMINIZADA 4" pza 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

02.12.02 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

02.12.03 CERROJO DE 8" ALUMINIZADO PARA PUERTA und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

02.12.04 JALADORES DE 3" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

02.12.05 PICAPORTES DE 4" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

02.13.00 VIDRIOS, CRISTALES Y SIMILARES02.13.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 251.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 251.44 100.00%

02.14.00 PINTURA02.14.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 423.69 0.00 0.00% 0.00 0.00% 0.00 0.00% 423.69 100.00%

02.14.02 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN VENTANASm2 23.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.36 100.00%

02.14.03 PINTURA BARNIZ EN CARPIINTERIA DE MADERA m2 40.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 40.65 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 24 / 80

Page 25: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

02.14.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 29.96 0.00 0.00% 0.00 0.00% 0.00 0.00% 29.96 100.00%

02.14.05 PINTURA ESMALTE 2 MANOS INTERIOR/LAVABLE H=1.0 MTS.m 28.21 0.00 0.00% 0.00 0.00% 0.00 0.00% 28.21 100.00%

02.15.00 INSTALACIONES ELECTRICAS02.15.01 SALIDA PARA INTERRUPTORES pto 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

02.15.02 SALIDA PARA CENTRO DE LUZ pto 18.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.00 100.00%

02.15.03 SALIDA PARA TOMACORRIENTES pto 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.00 100.00%

02.15.04 CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

02.15.05 TABLERO DE DISTRIBUCION und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

02.15.06 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 18.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.00 100.00%

02.15.07 INTERRUPTOR SIMPLE und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

02.15.08 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.00 100.00%

02.16.00 VARIOS Y LIMPIEZA02.16.01 LIMPIEZA FINAL DE OBRA m2 159.11 70.00 43.99% 15.00 9.43% 85.00 53.42% 74.11 46.58%

02.16.02 JUNTA DE DILATACION CON ESPUMA PLASTICA Y JEBE MICROPOROSOm 22.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 22.50 100.00%

3.00 CONSTRUCCION DE 01 AMBIENTE PARA S.U.M.03.01.00 TRABAJOS PRELIMINARES03.01.01 LIMPIEZA DE TERRENO MANUAL m2 120.40 120.40 100.00% 0.00 0.00% 120.40 100.00% 0.00 0.00%

03.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 120.40 120.40 100.00% 0.00 0.00% 120.40 100.00% 0.00 0.00%

03.02.00 MOVIMIENTO DE TIERRAS03.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 46.38 46.38 100.00% 0.00 0.00% 46.38 100.00% 0.00 0.00%

03.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 17.97 17.97 100.00% 0.00 0.00% 17.97 100.00% 0.00 0.00%

03.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 23.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.36 100.00%

03.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 49.19 49.19 100.00% 0.00 0.00% 49.19 100.00% 0.00 0.00%

03.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 49.19 49.19 100.00% 0.00 0.00% 49.19 100.00% 0.00 0.00%

03.02.06 AFIRMADO DE 6" PARA PISOS m2 111.45 111.45 100.00% 0.00 0.00% 111.45 100.00% 0.00 0.00%

03.03.00 OBRAS DE CONCRETO SIMPLE03.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 27.28 27.28 100.00% 0.00 0.00% 27.28 100.00% 0.00 0.00%

03.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 22.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 22.24 100.00%

03.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.27 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.27 100.00%

03.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 16.94 16.94 100.00% 0.00 0.00% 16.94 100.00% 0.00 0.00%

03.03.05 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 16.94 16.94 100.00% 0.00 0.00% 16.94 100.00% 0.00 0.00%

03.03.06 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 111.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 111.45 100.00%

03.04.00 OBRAS DE CONCRETO ARMADO03.04.01 ZAPATAS03.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 13.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.64 100.00%

03.04.01.02 ZAPATAS : ENCOFRADO Y DESENCOFRADO NORMAL m2 32.80 32.80 100.00% 0.00 0.00% 32.80 100.00% 0.00 0.00%

03.04.01.03 IMPERMEABILIZACION DE ZAPATAS m2 32.80 32.80 100.00% 0.00 0.00% 32.80 100.00% 0.00 0.00%

03.04.01.04 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 259.86 259.86 100.00% 0.00 0.00% 259.86 100.00% 0.00 0.00%

03.04.02 SOBRECIMIENTO ARMADO03.04.02.01 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2m3 1.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.68 100.00%

03.04.02.02 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 13.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.40 100.00%

03.04.02.03 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 13.40 13.40 100.00% 0.00 0.00% 13.40 100.00% 0.00 0.00%

03.04.02.04 SOBRECIMIENTO ARMADO: ACERO GRADO 60 FY= 4200 KG/CM2kg 192.46 192.46 100.00% 0.00 0.00% 192.46 100.00% 0.00 0.00%

03.04.03 COLUMNAS03.04.03.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 12.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.23 100.00%

03.04.03.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 125.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 125.65 100.00%

03.04.03.03 IMPERMEABILIZACION DE COLUMNAS m2 125.65 125.65 100.00% 0.00 0.00% 125.65 100.00% 0.00 0.00%

03.04.03.04 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,885.13 1,885.13 100.00% 0.00 0.00% 1,885.13 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 25 / 80

Page 26: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

03.04.04 VIGAS 0.00

03.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 5.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.81 100.00%

03.04.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 61.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 61.35 100.00%

03.04.04.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 673.88 673.88 100.00% 0.00 0.00% 673.88 100.00% 0.00 0.00%

03.04.05 COLUMNETAS Y VIGUETAS DE AMARRE03.04.05.01 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2m3 1.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.24 100.00%

03.04.05.02 COLUMNETA Y VIGUETAS DE AMARRE: ENCOFRADO Y DESENCOFRADOm2 27.05 27.05 100.00% 0.00 0.00% 27.05 100.00% 0.00 0.00%

03.04.05.03 COLUMNETA Y VIGUETAS DE AMARRE ACERO F'Y=4,200 KG/CM2.kg 148.05 148.05 100.00% 0.00 0.00% 148.05 100.00% 0.00 0.00%

03.05.00 MUROS Y TABIQUES DE ALBAÑILERIA03.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 32.16 44.72 139.05% 0.00 0.00% 44.72 139.05% -12.56 -39.05%

03.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 27.47 20.20 73.53% 0.00 0.00% 20.20 73.53% 7.27 26.47%

03.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 14.91 14.91 100.00% 0.00 0.00% 14.91 100.00% 0.00 0.00%

03.06.00 REVOQUES ENLUCIDOS Y MOLDURAS03.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 129.81 129.81 100.00% 0.00 0.00% 129.81 100.00% 0.00 0.00%

03.06.02 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 74.16 74.16 100.00% 0.00 0.00% 74.16 100.00% 0.00 0.00%

03.07.00 CIELO RASOS03.07.01 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 157.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 157.14 100.00%

03.08.00 ZOCALOS Y CONTRAZOCALOS03.08.01 CONTRAZOCALO DE CEDRO DE 4" RODON 1" m 45.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 45.68 100.00%

03.08.02 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 43.88 43.88 100.00% 0.00 0.00% 43.88 100.00% 0.00 0.00%

03.09.00 PISOS Y PAVIMENTOS03.09.01 PISO DE PARQUET DE 6x30 CM m2 111.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 111.45 100.00%

03.10.00 CARPINTERIA DE MADERA03.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 5.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.04 100.00%

03.10.02 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 25.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 25.90 100.00%

03.11.00 CARPINTERIA METALICA Y HERRERIA03.11.01 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 31.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 31.28 100.00%

03.12.00 ESTRUCTURAS DE MADERA Y COBERTURA03.12.01 TIJERAL PRIINCIPAL DE MADERA TIPO 02 - SECCION VARIABLEund 3.00 1.50 50.00% 1.50 50.00% 3.00 100.00% 0.00 0.00%

03.12.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 250.54 0.00 0.00% 250.54 100.00% 250.54 100.00% 0.00 0.00%

03.12.03 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 344.24 0.00 0.00% 344.24 100.00% 344.24 100.00% 0.00 0.00%

03.13.00 CERRAJERIA03.13.01 BISAGRA ALUMINIZADA 4" pza 8.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.00 100.00%

03.13.02 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

03.13.03 CERROJO DE 8" ALUMINIZADO PARA PUERTA und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

03.13.04 JALADORES DE 3" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

03.13.05 PICAPORTES DE 4" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

03.14.00 VIDRIOS, CRISTALES Y SIMILARES03.14.01 VIDRIO TEMPLADO TRANSPARENTE p2 278.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 278.83 100.00%

03.15.00 PINTURA03.15.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 354.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 354.98 100.00%

03.15.02 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN VENTANASm2 25.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 25.90 100.00%

03.15.03 PINTURA BARNIZ EN CARPIINTERIA DE MADERA m2 30.94 0.00 0.00% 0.00 0.00% 0.00 0.00% 30.94 100.00%

03.15.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 43.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 43.88 100.00%

03.15.05 PINTURA ESMALTE 2 MANOS INTERIOR/LAVABLE H=1.0 MTS.m 46.48 0.00 0.00% 0.00 0.00% 0.00 0.00% 46.48 100.00%

03.16.00 INSTALACIONES ELECTRICAS03.16.01 SALIDA PARA INTERRUPTORES pto 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

03.16.02 SALIDA PARA CENTRO DE LUZ pto 19.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.00 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 26 / 80

Page 27: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

03.16.03 SALIDA PARA TOMACORRIENTES pto 8.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.00 100.00%

03.16.04 CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

03.16.05 TABLERO DE DISTRIBUCION und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

03.16.06 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 16.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 16.00 100.00%

03.16.07 SPOT - LIGHT INC/ACCESORIOS und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

03.16.08 INTERRUPTOR DOBLE und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

03.16.09 INTERRUPTOR TRIPLE und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

03.16.10 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 8.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.00 100.00%

03.17.00 VARIOS Y LIMPIEZA03.17.01 LIMPIEZA FINAL DE OBRA m2 120.40 120.40 100.00% 0.00 0.00% 120.40 100.00% 0.00 0.00%

03.17.02 JUNTA DE DILATACION CON ESPUMA PLASTICA Y SELLADORm 22.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 22.30 100.00%

4.00 CONSTRUCCION DE 01 AMBIENTE PARA COCINA-COMEDOR Y 01 AMBIENTE PARA ZONA ADMINISTRATIVA04.01.00 TRABAJOS PRELIMINARES04.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 105.53 105.53 100.00% 0.00 0.00% 105.53 100.00% 0.00 0.00%

04.01.02 LIMPIEZA DE TERRENO MANUAL m2 105.53 105.53 100.00% 0.00 0.00% 105.53 100.00% 0.00 0.00%

04.02.00 MOVIMIENTO DE TIERRAS04.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 21.29 21.29 100.00% 0.00 0.00% 21.29 100.00% 0.00 0.00%

04.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 14.50 14.50 100.00% 0.00 0.00% 14.50 100.00% 0.00 0.00%

04.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 5.34 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.34 100.00%

04.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 19.14 19.14 100.00% 0.00 0.00% 19.14 100.00% 0.00 0.00%

04.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 19.14 19.14 100.00% 0.00 0.00% 19.14 100.00% 0.00 0.00%

04.02.06 AFIRMADO DE 6" PARA PISOS m2 95.62 95.62 100.00% 0.00 0.00% 95.62 100.00% 0.00 0.00%

04.03.00 OBRAS DE CONCRETO SIMPLE04.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 42.89 42.89 100.00% 0.00 0.00% 42.89 100.00% 0.00 0.00%

04.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 14.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.50 100.00%

04.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 0.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.35 100.00%

04.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 1.28 1.28 100.00% 0.00 0.00% 1.28 100.00% 0.00 0.00%

04.03.05 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 119.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 119.50 100.00%

04.04.00 OBRAS DE CONCRETO ARMADO04.04.01 ZAPATAS04.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 21.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.44 100.00%

04.04.01.02 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 299.80 299.80 100.00% 0.00 0.00% 299.80 100.00% 0.00 0.00%

04.04.02 SOBRECIMIENTO ARMADO04.04.02.01 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2m3 4.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.66 100.00%

04.04.02.02 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 37.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 37.26 100.00%

04.04.02.03 SOBRECIMIENTO ARMADO: ACERO GRADO 60 FY= 4200 KG/CM2kg 672.26 672.26 100.00% 0.00 0.00% 672.26 100.00% 0.00 0.00%

04.04.03 COLUMNAS04.04.03.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 14.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.25 100.00%

04.04.03.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 87.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 87.64 100.00%

04.04.03.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,831.60 1,831.60 100.00% 0.00 0.00% 1,831.60 100.00% 0.00 0.00%

04.04.04 VIGAS04.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 9.71 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.71 100.00%

04.04.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 51.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 51.65 100.00%

04.04.04.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 1,991.47 1,991.47 100.00% 0.00 0.00% 1,991.47 100.00% 0.00 0.00%

04.04.05 LOSAS ALIGERADAS04.04.05.01 LOSA ALIGERADA, CONCRETO F'C= 210 KG/CM2. m3 9.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.54 100.00%

04.04.05.02 LOSA ALIGERADA, ENCOFRADO Y DESENC. NORMAL m2 109.06 109.06 100.00% 0.00 0.00% 109.06 100.00% 0.00 0.00%

04.04.05.03 LOSA ALIGERADA, ACERO DE REFUERZO Fy= 4200 KG/CM2.kg 626.80 626.80 100.00% 0.00 0.00% 626.80 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 27 / 80

Page 28: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

04.04.05.04 LOSA ALIGERADA, LADRILLO HUECO H= 0.15 M. und 625.00 625.00 100.00% 0.00 0.00% 625.00 100.00% 0.00 0.00%

04.04.06 MESON DE CONCRETO04.04.06.01 MESON: CONCRETO F'C = 210 Kg/cm2 m3 0.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.26 100.00%

04.04.06.02 MESON: ENCOFRADO Y DESENCOFRADO NORMAL m2 2.56 2.56 100.00% 0.00 0.00% 2.56 100.00% 0.00 0.00%

04.04.06.03 MESON: ACERO FY=4200 KG/CM2 kg 54.50 54.50 100.00% 0.00 0.00% 54.50 100.00% 0.00 0.00%

04.05.00 MUROS Y TABIQUES DE ALBAÑILERIA04.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 83.70 95.54 114.15% 0.00 0.00% 95.54 114.15% -11.84 -14.15%

04.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 85.98 71.18 82.79% 0.00 0.00% 71.18 82.79% 14.80 17.21%

04.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 322.70 322.70 100.00% 0.00 0.00% 322.70 100.00% 0.00 0.00%

04.06.00 REVOQUES ENLUCIDOS Y MOLDURAS04.06.01 TARRAJEO DE COLUMNAS m2 87.64 87.64 100.00% 0.00 0.00% 87.64 100.00% 0.00 0.00%

04.06.02 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 339.35 339.35 100.00% 0.00 0.00% 339.35 100.00% 0.00 0.00%

04.06.03 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 27.43 27.43 100.00% 0.00 0.00% 27.43 100.00% 0.00 0.00%

04.06.04 TARRAJEO DE VIGAS m2 41.87 41.87 100.00% 0.00 0.00% 41.87 100.00% 0.00 0.00%

04.07.00 CIELO RASOS04.07.01 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=0.25 mts). m2 94.50 94.50 100.00% 0.00 0.00% 94.50 100.00% 0.00 0.00%

04.07.02 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 94.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 94.50 100.00%

04.08.00 ZOCALOS Y CONTRAZOCALOS04.08.01 ZOCALO DE CERAMICO DE 20 x 30 cm. m2 22.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 22.98 100.00%

04.08.02 CONTRAZOCALO DE CERAMICO DE H=0.10 m. m 53.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 53.54 100.00%

04.08.03 CONTRAZOCALO DE CEDRO DE 3/4" X 4" RODON 3/4" m 77.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 77.70 100.00%

04.08.04 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 43.14 43.14 100.00% 0.00 0.00% 43.14 100.00% 0.00 0.00%

04.09.00 PISOS Y PAVIMENTOS04.09.01 PISO DE CERAMICO DE 0.30 X 0.30 MTS. m2 97.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 97.24 100.00%

04.09.02 PISO DE PARQUET DE 6x30 CM m2 87.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 87.85 100.00%

04.10.00 CARPINTERIA DE MADERA04.10.01 PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO CEDRO 2X3"m2 12.18 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.18 100.00%

04.10.02 PUERTAS DE MADERA TABLERO REBAJADO m2 11.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.97 100.00%

04.10.03 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 52.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 52.54 100.00%

04.11.00 ESTRUCTURAS DE MADERA Y COBERTURA04.11.01 TIJERAL PRIINCIPAL DE MADERA TIPO 4 - SECCION VARIABLEund 3.00 1.50 50.00% 1.50 50.00% 3.00 100.00% 0.00 0.00%

04.11.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 215.55 0.00 0.00% 215.55 100.00% 215.55 100.00% 0.00 0.00%

04.11.03 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 155.20 0.00 0.00% 155.20 100.00% 155.20 100.00% 0.00 0.00%

04.11.04 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 28.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 28.14 100.00%

04.12.00 CERRAJERIA04.12.01 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

04.12.02 CERRADURA TIPO PERILLA und 7.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.00 100.00%

04.12.03 BISAGRA ALUMINIZADA 4" pza 44.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 44.00 100.00%

04.12.04 CERROJO DE 8" ALUMINIZADO PARA PUERTA und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

04.12.05 JALADORES DE 3" und 11.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.00 100.00%

04.12.06 PICAPORTES DE 4" und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

04.13.00 VIDRIOS, CRISTALES Y SIMILARES04.13.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 566.41 0.00 0.00% 0.00 0.00% 0.00 0.00% 566.41 100.00%

04.14.00 PINTURA04.14.01 PINTURA LATEX EN CIELO RASO (INC. VIGAS Y FONDO ESCALERA)m2 109.06 0.00 0.00% 0.00 0.00% 0.00 0.00% 109.06 100.00%

04.14.02 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 387.09 0.00 0.00% 0.00 0.00% 0.00 0.00% 387.09 100.00%

04.14.03 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 48.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 48.30 100.00%

04.14.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 43.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 43.14 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 28 / 80

Page 29: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

04.15.00 APARATOS Y ACCESORIOS SANITARIOS04.15.01 LAVADERO DE ACERO INOXIDABLE PARA COCINA und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.15.02 INODORO TANQUE BAJO BLANCO pza 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

04.15.03 LAVATORIOS DE PEDESTAL BLANCO pza 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

04.15.04 URINARIO DE PARED BLANCO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.15.05 PAPELERA DE CERAMICA und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

04.16.00 INSTALACIONES SANITARIAS04.16.01 EXCAVACION DE ZANJA PARA RED DE DESAGUE m3 1.55 1.55 100.00% 0.00 0.00% 1.55 100.00% 0.00 0.00%

04.16.02 RELLENO CON MATERIAL PROPIO : MANUAL m3 1.55 1.55 100.00% 0.00 0.00% 1.55 100.00% 0.00 0.00%

04.16.03 SALIDA DE DESAGUE DE 2" pto 5.00 5.00 100.00% 0.00 0.00% 5.00 100.00% 0.00 0.00%

04.16.04 SALIDA DE DESAGUE DE 4" pto 2.00 2.00 100.00% 0.00 0.00% 2.00 100.00% 0.00 0.00%

04.16.05 TUBERIA DE PVC SAL 2" m 5.50 5.50 100.00% 0.00 0.00% 5.50 100.00% 0.00 0.00%

04.16.06 TUBERIA DE PVC SAL 4" m 11.60 11.60 100.00% 0.00 0.00% 11.60 100.00% 0.00 0.00%

04.16.07 SUMIDERO DE 2" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

04.16.08 VENTILACION C/TUBERIA PVC SAL 2" und 2.00 2.00 100.00% 0.00 0.00% 2.00 100.00% 0.00 0.00%

04.16.09 REGISTRO DE BRONCE 4" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.16.10 REGISTRO DE BRONCE 2" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.16.11 CAJA DE REGISTRO 12" X 24" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.17.00 SISTEMA DE AGUA FRIA04.17.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto 6.00 0.00 0.00% 6.00 100.00% 6.00 100.00% 0.00 0.00%

04.17.02 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 14.50 14.50 100.00% 0.00 0.00% 14.50 100.00% 0.00 0.00%

04.17.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 21.10 21.10 100.00% 0.00 0.00% 21.10 100.00% 0.00 0.00%

04.17.04 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 2.00 0.00 0.00% 2.00 100.00% 2.00 100.00% 0.00 0.00%

04.17.05 VALVULA COMPUERTA DE BRONCE DE 3/4" und 1.00 0.00 0.00% 1.00 100.00% 1.00 100.00% 0.00 0.00%

04.17.06 PRUEBA HIDRAULICA GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

04.18.00 INSTALACIONES ELECTRICAS04.18.01 SALIDA PARA INTERRUPTORES pto 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

04.18.02 SALIDA PARA CENTRO DE LUZ pto 23.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.00 100.00%

04.18.03 SALIDA PARA TOMACORRIENTES pto 23.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.00 100.00%

04.18.04 CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

04.18.05 TABLERO DE DISTRIBUCION und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

04.18.06 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

04.18.07 FLUORESCENTE CIRCUL. 32 W C/EQUIPO+PANT und 20.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 20.00 100.00%

04.18.08 INTERRUPTOR SIMPLE und 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

04.18.09 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 23.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 23.00 100.00%

04.19.00 VARIOS Y LIMPIEZA04.19.01 LIMPIEZA FINAL DE OBRA m2 105.53 50.00 47.38% 0.00 0.00% 50.00 47.38% 55.53 52.62%

04.19.02 JUNTA DE DILATACION CON JEBE MICROPOROSO DE 1" m 40.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 40.60 100.00%

04.19.03 INSTALACION DE PUENTE METALICO L=1.80 INCLUYE ANCLAJESGBL 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

5.00 CONSTRUCCION DE 01 ESCALERA05.01.00 TRABAJOS PRELIMINARES05.01.01 LIMPIEZA DE TERRENO MANUAL m2 25.25 25.25 100.00% 0.00 0.00% 25.25 100.00% 0.00 0.00%

05.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 25.25 25.25 100.00% 0.00 0.00% 25.25 100.00% 0.00 0.00%

05.02.00 MOVIMIENTO DE TIERRAS05.02.01 EXCAVACION DE ZANJAS TERRENO NORMAL m3 28.73 28.73 100.00% 0.00 0.00% 28.73 100.00% 0.00 0.00%

05.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 8.73 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.73 100.00%

05.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 36.05 36.05 100.00% 0.00 0.00% 36.05 100.00% 0.00 0.00%

05.02.04 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 36.05 36.05 100.00% 0.00 0.00% 36.05 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 29 / 80

Page 30: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

05.02.05 AFIRMADO DE 6" PARA PISOS m2 25.25 0.00 0.00% 25.25 100.00% 25.25 100.00% 0.00 0.00%

05.03.00 OBRAS DE CONCRETO SIMPLE05.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 12.00 12.00 100.00% 0.00 0.00% 12.00 100.00% 0.00 0.00%

05.03.02 CIMIENTOS CORRIDOS C:H 1:10 + 30% P.G. m3 6.67 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.67 100.00%

05.03.03 SOBRECIMIENTO: CONCRETO 1:8 + 25 % P.M. m3 4.03 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.03 100.00%

05.03.04 SOBRECIMIENTO :ENCOFRADO Y DESENCOFRADO NORMALm2 34.37 34.37 100.00% 0.00 0.00% 34.37 100.00% 0.00 0.00%

05.04.00 OBRAS DE CONCRETO ARMADO05.04.01 COLUMNAS05.04.01.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 8.91 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.91 100.00%

05.04.01.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 63.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 63.60 100.00%

05.04.01.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,035.74 1,035.74 100.00% 0.00 0.00% 1,035.74 100.00% 0.00 0.00%

05.04.02 VIGAS05.04.02.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 5.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.40 100.00%

05.04.02.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 46.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 46.40 100.00%

05.04.02.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 633.66 633.66 100.00% 0.00 0.00% 633.66 100.00% 0.00 0.00%

05.04.03 ESCALERAS05.04.03.01 ESCALERA CONCRETO F'C=210 KG/CM2. m3 6.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.20 100.00%

05.04.03.02 ESCALERA: ENCOFRADO Y DESENCOFRADO m2 37.59 37.59 100.00% 0.00 0.00% 37.59 100.00% 0.00 0.00%

05.04.03.03 ESCALERA: ACERO CORRUGADO Fy=4200 kg/cm² kg 246.39 246.39 100.00% 0.00 0.00% 246.39 100.00% 0.00 0.00%

05.05.00 MUROS Y TABIQUES DE ALBAÑILERIA05.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 51.05 51.05 100.00% 0.00 0.00% 51.05 100.00% 0.00 0.00%

05.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 6.17 3.50 56.73% 2.67 43.27% 6.17 100.00% 0.00 0.00%

05.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 12.84 10.00 77.88% 2.84 22.12% 12.84 100.00% 0.00 0.00%

05.06.00 REVOQUES ENLUCIDOS Y MOLDURAS05.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 118.94 118.94 100.00% 0.00 0.00% 118.94 100.00% 0.00 0.00%

05.06.02 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:5 m2 8.47 8.47 100.00% 0.00 0.00% 8.47 100.00% 0.00 0.00%

05.06.03 VESTIDURA EN FONDO DE ESCALERA m2 21.15 10.58 50.02% 10.57 49.98% 21.15 100.00% 0.00 0.00%

05.06.04 BRUÑAS SEGUN DETALLE m 62.48 62.48 100.00% 0.00 0.00% 62.48 100.00% 0.00 0.00%

05.07.00 PISOS Y PAVIMENTOS05.07.01 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 12.61 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.61 100.00%

05.07.02 PISO DE CEMENTO PULIDO Y BRUÑADO E= 2" S/COLOREAR (VEREDA)m2 12.61 0.00 0.00% 19.57 155.19% 19.57 155.19% -6.96 -55.19%

05.08.00 CONTRAZOCALOS05.08.01 CONTRAZOCALO CEMENTO PULIDO H = 10 CM m 11.72 0.00 0.00% 11.72 100.00% 11.72 100.00% 0.00 0.00%

05.08.02 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM m 14.73 7.20 48.88% 7.53 51.12% 14.73 100.00% 0.00 0.00%

05.09.00 COBERTURA DE CALAMINA05.09.01 COBERTURA CON CALAMINA OND. GALVANIZADA m2 37.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 37.23 100.00%

05.09.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 50.49 0.00 0.00% 0.00 0.00% 0.00 0.00% 50.49 100.00%

05.10.00 CARPINTERIA DE MADERA05.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 2.43 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.43 100.00%

05.11.00 CARPINTERIA METALICA05.11.01 VENTANA DE FIERRO C/PERFIL DE 1"X1/8"+HOJA BAST."L"3/4"m2 2.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.23 100.00%

05.11.02 BARANDA METALICA DE F°G°, D=2" m 7.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.60 100.00%

05.11.03 CANTONERA DE FIERRO EN ESCALERA m 38.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 38.00 100.00%

05.11.04 TAPAJUNTA METALICA ENTRE MODULOS(VERTICAL) m 13.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.00 100.00%

05.12.00 CERRAJERIA05.12.01 BISAGRA ALUMINIZADA 4" PESADA EN PUERTA und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

05.12.02 CERROJO DE 3" ALUMINIZADA PARA PUERTA pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

05.12.03 CERRADURA FORTE DOS GOLPES CON TIRADOR EN PUERTApza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 30 / 80

Page 31: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

05.13.00 VIDRIOS, CRISTALES Y SIMILARES05.13.01 VIDRIOS SEMIDOBLES, INC/COLOCACION p2 29.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 29.90 100.00%

05.14.00 PINTURA05.14.01 PINTURA LATEX 2 MANOS EN MUROS m2 107.82 0.00 0.00% 0.00 0.00% 0.00 0.00% 107.82 100.00%

05.14.02 PINTURA LATEX EN CIELO RASO m2 8.61 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.61 100.00%

05.14.03 PINTURA BARNIZ EN CARPIINTERIA DE MADERA m2 4.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.86 100.00%

05.14.04 PINTURA ESMALTE EN CARPINTERIA METALICA m2 2.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.23 100.00%

05.15.00 INSTALACIONES ELECTRICAS05.15.01 SALIDA DE TECHO (CENTRO DE LUZ) pto 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

05.15.02 SALIDA PARA TOMACORRIENTES pto 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

05.15.03 SALIDA PARA INTERRUPTOR DOBLE pto 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

05.15.04 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

05.15.05 SALIDA PARA BRAQUETE ( PARED) pto 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

05.15.06 CAJA DE PASE GALVANIZADA DE 4"X4"X2" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

05.16.00 ARTEFACTOS05.16.01 FLUORESCENTE LINEAL 2 X 40 w und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

05.16.02 FLUORESCENTE CIRCUL. 32 W C/EQUIPO+PANT und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

05.16.03 FLUORESCENTE CIRCUL. 2X18W. EMPOTRADO MARCO ALUMBRADO (DIF)und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

6.00 CONSTRUCCION DE 02 BATERIAS SS.HH.06.01.00 TRABAJOS PRELIMINARES06.01.01 LIMPIEZA DE TERRENO m2 65.57 65.57 100.00% 0.00 0.00% 65.57 100.00% 0.00 0.00%

06.01.02 TRAZO Y REPLANTEO GENERAL DE OBRA m2 65.57 65.57 100.00% 0.00 0.00% 65.57 100.00% 0.00 0.00%

06.02.00 MOVIMIENTO DE TIERRAS06.02.01 EXCAVACION PARA CIMIENTOS-ZAPATAS EN TERRENO NORMAL"C"m3 21.78 21.78 100.00% 0.00 0.00% 21.78 100.00% 0.00 0.00%

06.02.02 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 8.73 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.73 100.00%

06.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS. m3 16.31 16.31 100.00% 0.00 0.00% 16.31 100.00% 0.00 0.00%

06.02.04 ELIMINACION DE MATERIAL EXEDENTE C/MAQUINARIA m3 16.31 16.31 100.00% 0.00 0.00% 16.31 100.00% 0.00 0.00%

06.02.05 NIVELACION Y COMPACTACION CON EQUIPO PARA PISOS m2 57.10 57.10 100.00% 0.00 0.00% 57.10 100.00% 0.00 0.00%

06.02.06 AFIRMADO e = 0.10 mts. PARA PISOS INTERIORES Y EXTERIORESm2 57.10 57.10 100.00% 0.00 0.00% 57.10 100.00% 0.00 0.00%

06.03.00 OBRAS DE CONCRETO SIMPLE06.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% P.G.m3 13.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.04 100.00%

06.03.02 SOBRECIMIENTO: CONCRETO 1:8 + 25 % P.M. m3 5.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.56 100.00%

06.03.03 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 44.94 44.94 100.00% 0.00 0.00% 44.94 100.00% 0.00 0.00%

06.04.00 OBRAS DE CONCRETO ARMADO06.04.01 COLUMNAS06.04.01.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 7.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.10 100.00%

06.04.01.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 64.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 64.80 100.00%

06.04.01.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 756.46 756.46 100.00% 0.00 0.00% 756.46 100.00% 0.00 0.00%

06.04.02 VIGAS06.04.02.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 3.21 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.21 100.00%

06.04.02.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 188.75 0.00 0.00% 0.00 0.00% 0.00 0.00% 188.75 100.00%

06.04.02.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 328.33 328.33 100.00% 0.00 0.00% 328.33 100.00% 0.00 0.00%

06.05.00 MUROS Y TABIQUES DE ALBAÑILERIA06.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 81.49 81.49 100.00% 0.00 0.00% 81.49 100.00% 0.00 0.00%

06.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 62.23 62.23 100.00% 0.00 0.00% 62.23 100.00% 0.00 0.00%

06.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 78.65 78.65 100.00% 0.00 0.00% 78.65 100.00% 0.00 0.00%

06.06.00 REVOQUES ENLUCIDOS Y MOLDURAS06.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 162.78 162.78 100.00% 0.00 0.00% 162.78 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 31 / 80

Page 32: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

06.06.02 TARRAJEO CIELO RASO m2 52.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 52.80 100.00%

06.06.03 TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5m2 119.85 119.85 100.00% 0.00 0.00% 119.85 100.00% 0.00 0.00%

06.06.04 BRUÑAS SEGUN DETALLE m 25.60 25.60 100.00% 0.00 0.00% 25.60 100.00% 0.00 0.00%

06.06.05 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 65.40 65.40 100.00% 0.00 0.00% 65.40 100.00% 0.00 0.00%

06.07.00 PISOS Y PAVIMENTOS06.07.01 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 71.51 0.00 0.00% 0.00 0.00% 0.00 0.00% 71.51 100.00%

06.07.02 PISO DE CEMENTO PULIDO Y BRUÑADO E= 2" S/COLOREARm2 6.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.20 100.00%

06.07.03 PISO DE CERAMICO DE 30 x 30 cm. m2 47.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 47.87 100.00%

06.08.00 CONTRAZOCALOS06.08.01 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM. MZ 1:2 E=1.5CM.m 22.70 22.70 100.00% 0.00 0.00% 22.70 100.00% 0.00 0.00%

06.09.00 ZOCALOS06.09.01 ZOCALO DE CERAMICO 20x30cm m2 119.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 119.85 100.00%

06.10.00 CIELO RASOS 0.00

06.10.01 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 65.57 0.00 0.00% 0.00 0.00% 0.00 0.00% 65.57 100.00%

06.11.00 ESTRUCTURAS DE MADERA Y COBERTURA06.11.01 TIJERAL PRIINCIPAL DE MADERA TIPO 4 - SECCION VARIABLEund 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

06.11.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 215.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 215.55 100.00%

06.11.03 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 155.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 155.20 100.00%

06.11.04 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 28.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 28.14 100.00%

06.12.00 CARPINTERIA DE MADERA06.12.01 PUERTAS DE MADERA TABLERO REBAJADO m2 9.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.66 100.00%

06.12.02 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 9.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.84 100.00%

06.12.03 PUERTA CONTRAPLACADA DE 45 MM TRIPLAY MARCO CEDRO 1 1/2"x3 1/2" ACAB. LACAm2 11.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.76 100.00%

06.13.00 CERRAJERIA06.13.01 CERRADURA TIPO PARCHE TRES GOLPES und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

06.13.02 BISAGRA ALUMINIZADA 4" PESADA EN PUERTA und 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

06.13.03 CERROJO "SAPITO" SEGURIDAD VENTANA und 14.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.00 100.00%

06.13.04 CERRADURA TIPO PERILLA und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

06.13.05 CERROJO DE 3" ALUMINIZADA PARA PUERTA pza 14.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.00 100.00%

06.14.00 VIDRIOS, CRISTALES Y SIMILARES06.14.01 VIDRIO SEMIDOBLE EN VENTANAS p2 106.18 0.00 0.00% 0.00 0.00% 0.00 0.00% 106.18 100.00%

06.15.00 PINTURA06.15.01 PINTURA LATEX EN INTERIORES Y EXTERIORES m2 162.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 162.78 100.00%

06.15.02 PINTURA LATEX EN VIGAS Y COLUMNAS m2 63.11 0.00 0.00% 0.00 0.00% 0.00 0.00% 63.11 100.00%

06.15.03 PINTURA BARNIZ EN CARPIINTERIA DE MADERA m2 52.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 52.68 100.00%

06.16.00 APARATOS Y ACCESORIOS SANITARIOS06.16.01 INODORO TANQUE BAJO C/BLANCO pza 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

06.16.02 INODORO BLANCO D/LOSA 1era.NAC.+T.ALTO DE PVC INCL. ACCESORIOSpza 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

06.16.03 LAVATORIO C/BLANCO 1 LLAVE pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

06.16.04 URINARIO CORRIDO SEGUN DISEÑO REV. C/MAYOLICA 20X20m 3.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.50 100.00%

06.16.05 BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA 20X20m 8.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.90 100.00%

06.16.06 GRIFERIA PARA BOTADERO und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

06.16.07 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

06.16.08 PAPELERA DE CERAMICA und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

06.17.00 INSTALACIONES SANITARIAS06.17.01 SALIDA DE DESAGUE DE 2" pto 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

06.17.02 SALIDA DE DESAGUE DE 4" pto 14.00 14.00 100.00% 0.00 0.00% 14.00 100.00% 0.00 0.00%

06.17.03 TUBERIA DE PVC SAL 2" m 10.50 10.50 100.00% 0.00 0.00% 10.50 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 32 / 80

Page 33: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

06.17.04 TUBERIA DE PVC SAL 3" m 11.05 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.05 100.00%

06.17.05 TUBERIA DE PVC SAL 4" m 12.80 12.80 100.00% 0.00 0.00% 12.80 100.00% 0.00 0.00%

06.17.06 SUMIDERO DE BRONCE 3" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

06.17.07 SALIDA PVC SAL 2" PARA VENTILACION pto 7.00 7.00 100.00% 0.00 0.00% 7.00 100.00% 0.00 0.00%

06.17.08 REGISTRO DE BRONCE 2" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

06.17.09 REGISTRO DE BRONCE 3" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

06.17.10 CAJA SUMIDERO CON REJILLA DE FIERRO und 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.00 100.00%

06.17.11 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA DE CONCRETOpza 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

06.18.00 REDES DE DISTRIBUCION DE AGUA06.18.01 SALIDA DE AGUA FRIA PVC pto 33.00 20.00 60.61% 13.00 39.39% 33.00 100.00% 0.00 0.00%

06.18.02 TUBERIA PVC CLASE A-10- 1/2" m 11.75 11.75 100.00% 0.00 0.00% 11.75 100.00% 0.00 0.00%

06.18.03 TUBERIA PVC CLASE A-10 3/4" m 26.55 26.55 100.00% 0.00 0.00% 26.55 100.00% 0.00 0.00%

06.18.04 TUBERIA PVC CLASE A-10- 1" m 16.50 16.50 100.00% 0.00 0.00% 16.50 100.00% 0.00 0.00%

06.18.05 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 2.00 0.00 0.00% 2.00 100.00% 2.00 100.00% 0.00 0.00%

06.18.06 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 4.00 0.00 0.00% 4.00 100.00% 4.00 100.00% 0.00 0.00%

06.18.07 VALVULA DE COMPUERTA DE BRONCE DE 1" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

06.18.08 VALVULA GLOBO 1/2" und 1.00 0.00 0.00% 1.00 100.00% 1.00 100.00% 0.00 0.00%

06.19.00 INSTALACIONES ELECTRICAS06.19.01 SALIDA PARA CENTRO DE LUZ pto 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

06.19.02 SALIDA PARA INTERRUPTORES pto 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.00 100.00%

06.19.03 CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

06.20.00 ARTEFACTOS06.20.01 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.00 100.00%

06.20.02 FLUORESCENTE CIRCULAR 1 X 32 w ADOSABLE und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

7.00 CONSTRUCCION DE 01 AMBIENTE PARA GUARDIANIA07.01.00 TRABAJOS PRELIMINARES07.01.01 LIMPIEZA DE TERRENO MANUAL m2 28.65 28.65 100.00% 0.00 0.00% 28.65 100.00% 0.00 0.00%

07.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 28.65 28.65 100.00% 0.00 0.00% 28.65 100.00% 0.00 0.00%

07.02.00 MOVIMIENTO DE TIERRAS07.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 2.92 2.92 100.00% 0.00 0.00% 2.92 100.00% 0.00 0.00%

07.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 5.78 5.78 100.00% 0.00 0.00% 5.78 100.00% 0.00 0.00%

07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 2.08 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.08 100.00%

07.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 5.00 5.00 100.00% 0.00 0.00% 5.00 100.00% 0.00 0.00%

07.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 5.00 5.00 100.00% 0.00 0.00% 5.00 100.00% 0.00 0.00%

07.02.06 AFIRMADO DE 6" PARA PISOS m2 10.50 10.50 100.00% 0.00 0.00% 10.50 100.00% 0.00 0.00%

07.03.00 OBRAS DE CONCRETO SIMPLE07.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 4.86 4.86 100.00% 0.00 0.00% 4.86 100.00% 0.00 0.00%

07.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 5.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.78 100.00%

07.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.10 100.00%

07.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 14.62 14.62 100.00% 0.00 0.00% 14.62 100.00% 0.00 0.00%

07.03.05 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 18.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.65 100.00%

07.04.00 OBRAS DE CONCRETO ARMADO07.04.01 ZAPATAS07.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 2.43 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.43 100.00%

07.04.01.02 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 38.20 38.20 100.00% 0.00 0.00% 38.20 100.00% 0.00 0.00%

07.04.02 COLUMNAS07.04.02.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 7.63 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.63 100.00%

07.04.02.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 21.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.36 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 33 / 80

Page 34: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

07.04.02.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 537.10 537.10 100.00% 0.00 0.00% 537.10 100.00% 0.00 0.00%

07.04.03 VIGAS07.04.03.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 2.08 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.08 100.00%

07.04.03.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 17.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 17.36 100.00%

07.04.03.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 278.90 278.90 100.00% 0.00 0.00% 278.90 100.00% 0.00 0.00%

07.05.00 MUROS Y TABIQUES DE ALBAÑILERIA07.05.01 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 51.82 51.82 100.00% 0.00 0.00% 51.82 100.00% 0.00 0.00%

07.05.02 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 10.43 10.43 100.00% 0.00 0.00% 10.43 100.00% 0.00 0.00%

07.06.00 REVOQUES ENLUCIDOS Y MOLDURAS07.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 107.92 107.92 100.00% 0.00 0.00% 107.92 100.00% 0.00 0.00%

07.06.02 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 7.17 7.17 100.00% 0.00 0.00% 7.17 100.00% 0.00 0.00%

07.07.00 CIELO RASOS07.07.01 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 20.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 20.20 100.00%

07.08.00 ZOCALOS Y CONTRAZOCALOS07.08.01 ZOCALO DE CERAMICO DE 20 x 30 cm. m2 3.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.20 100.00%

07.08.02 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 38.37 38.37 100.00% 0.00 0.00% 38.37 100.00% 0.00 0.00%

07.09.00 PISOS Y PAVIMENTOS07.09.01 PISO DE CEMENTO PULIDO Y BRUÑADO E= 2" S/COLOREAR (VEREDA)m2 18.65 18.65 100.00% 0.00 0.00% 18.65 100.00% 0.00 0.00%

07.10.00 CARPINTERIA DE MADERA07.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 3.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.36 100.00%

07.10.02 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 3.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.81 100.00%

07.11.00 ESTRUCTURAS METALICAS Y COBERTURAS07.11.01 TIJERAL PRIINCIPAL DE MADERA TIPO 03 - SECCION VARIABLEund 3.00 0.00 0.00% 1.00 33.33% 1.00 33.33% 2.00 66.67%

07.11.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 51.10 0.00 0.00% 51.10 100.00% 51.10 100.00% 0.00 0.00%

07.11.03 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 37.23 0.00 0.00% 37.23 100.00% 37.23 100.00% 0.00 0.00%

07.11.04 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 7.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.40 100.00%

07.12.00 CERRAJERIA07.12.01 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.12.02 CERRADURA TIPO PERILLA und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.12.03 BISAGRA ALUMINIZADA 4" pza 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

07.12.04 JALADORES DE 3" und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

07.13.00 VIDRIOS, CRISTALES Y SIMILARES07.13.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 41.07 0.00 0.00% 0.00 0.00% 0.00 0.00% 41.07 100.00%

07.14.00 PINTURA07.14.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 69.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 69.20 100.00%

07.14.02 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 7.17 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.17 100.00%

07.14.03 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 38.37 0.00 0.00% 0.00 0.00% 0.00 0.00% 38.37 100.00%

07.15.00 APARATOS Y ACCESORIOS SANITARIOS07.15.01 INODORO TANQUE BAJO C/BLANCO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.15.02 LAVATORIO C/BLANCO 1 LLAVE pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.15.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.15.04 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

07.16.00 INSTALACIONES SANITARIAS07.16.01 EXCAVACION DE ZANJA PARA RED DE DESAGUE m3 3.09 3.09 100.00% 0.00 0.00% 3.09 100.00% 0.00 0.00%

07.16.02 RELLENO CON MATERIAL PROPIO : MANUAL m3 3.09 3.09 100.00% 0.00 0.00% 3.09 100.00% 0.00 0.00%

07.16.03 SALIDA DE DESAGUE DE 2" pto 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

07.16.04 SALIDA DE DESAGUE DE 4" pto 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.16.05 TUBERIA DE PVC SAL 2" m 6.20 6.20 100.00% 0.00 0.00% 6.20 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 34 / 80

Page 35: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

07.16.06 TUBERIA DE PVC SAL 4" m 14.80 14.80 100.00% 0.00 0.00% 14.80 100.00% 0.00 0.00%

07.16.07 SUMIDERO DE BRONCE 2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.16.08 SALIDA PVC SAL 2" PARA VENTILACION pto 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.16.09 REGISTRO ROSCADO DE BRONCE 4" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.16.10 CAJA DE REGISTRO 12" X 24" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.17.00 SISTEMA DE AGUA FRIA07.17.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

07.17.02 SUMINISTRO Y COLOCACION DE ACCESORIOS PARA RED DE AGUA FRIApza 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

07.17.03 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 4.25 4.25 100.00% 0.00 0.00% 4.25 100.00% 0.00 0.00%

07.17.04 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2"und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.17.05 PRUEBA HIDRAULICA GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

07.18.00 INSTALACIONES ELECTRICAS07.18.01 SALIDA PARA INTERRUPTORES pto 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

07.18.02 SALIDA PARA CENTRO DE LUZ pto 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.00 100.00%

07.18.03 SALIDA PARA TOMACORRIENTES pto 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

07.18.04 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

07.18.05 FLUORESCENTE CIRCUL. 2X18W. EMPOTRADO MARCO ALUMBRADO (DIF)und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

07.18.06 INTERRUPTOR SIMPLE und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

07.18.07 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

07.19.00 VARIOS Y LIMPIEZA07.19.01 LIMPIEZA FINAL DE OBRA m2 28.65 28.65 100.00% 0.00 0.00% 28.65 100.00% 0.00 0.00%

8.00 CONSTRUCCION DE 01 AMBIENTE PARA TALLER DE CARPINTERIA 0.00

08.01.00 TRABAJOS PRELIMINARES08.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 161.60 161.60 100.00% 0.00 0.00% 161.60 100.00% 0.00 0.00%

08.01.02 LIMPIEZA DE TERRENO MANUAL m2 161.60 161.60 100.00% 0.00 0.00% 161.60 100.00% 0.00 0.00%

08.02.00 MOVIMIENTO DE TIERRAS08.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 26.24 26.24 100.00% 0.00 0.00% 26.24 100.00% 0.00 0.00%

08.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 11.23 11.23 100.00% 0.00 0.00% 11.23 100.00% 0.00 0.00%

08.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 5.18 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.18 100.00%

08.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 49.08 49.08 100.00% 0.00 0.00% 49.08 100.00% 0.00 0.00%

08.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 49.08 49.08 100.00% 0.00 0.00% 49.08 100.00% 0.00 0.00%

08.02.06 AFIRMADO DE 6" PARA PISOS m2 161.60 161.60 100.00% 0.00 0.00% 161.60 100.00% 0.00 0.00%

08.03.00 OBRAS DE CONCRETO SIMPLE08.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 4.37 4.37 100.00% 0.00 0.00% 4.37 100.00% 0.00 0.00%

08.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 11.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.23 100.00%

08.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 13.30 13.30 100.00% 0.00 0.00% 13.30 100.00% 0.00 0.00%

08.03.05 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 118.27 0.00 0.00% 0.00 0.00% 0.00 0.00% 118.27 100.00%

08.04.00 OBRAS DE CONCRETO ARMADO08.04.01 ZAPATAS08.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 21.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.87 100.00%

08.04.01.02 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 393.80 393.80 100.00% 0.00 0.00% 393.80 100.00% 0.00 0.00%

08.04.02 SOBRECIMIENTO ARMADO 0.00

08.04.02.01 SOBRECIMIENTO ARMADO : CONCRETO F'C=175 KG/CM2m3 2.05 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.05 100.00%

08.04.02.02 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 16.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 16.40 100.00%

08.04.02.03 SOBRECIMIENTO ARMADO: ACERO GRADO 60 FY= 4200 KG/CM2kg 272.10 272.10 100.00% 0.00 0.00% 272.10 100.00% 0.00 0.00%

08.04.03 COLUMNAS08.04.03.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 13.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.74 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 35 / 80

Page 36: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

08.04.03.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 57.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 57.02 100.00%

08.04.03.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,600.20 1,600.20 100.00% 0.00 0.00% 1,600.20 100.00% 0.00 0.00%

08.04.04 VIGAS08.04.04.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 6.61 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.61 100.00%

08.04.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 52.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 52.88 100.00%

08.04.04.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 846.80 846.80 100.00% 0.00 0.00% 846.80 100.00% 0.00 0.00%

08.05.00 MUROS Y TABIQUES DE ALBAÑILERIA08.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 31.20 31.20 100.00% 0.00 0.00% 31.20 100.00% 0.00 0.00%

08.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 106.04 106.04 100.00% 0.00 0.00% 106.04 100.00% 0.00 0.00%

08.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 12.05 12.05 100.00% 0.00 0.00% 12.05 100.00% 0.00 0.00%

08.06.00 REVOQUES ENLUCIDOS Y MOLDURAS08.06.01 TARRAJEO DE COLUMNAS m2 57.02 57.02 100.00% 0.00 0.00% 57.02 100.00% 0.00 0.00%

08.06.02 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 317.54 317.54 100.00% 0.00 0.00% 317.54 100.00% 0.00 0.00%

08.06.03 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 51.29 51.29 100.00% 0.00 0.00% 51.29 100.00% 0.00 0.00%

08.06.04 TARRAJEO DE VIGAS m2 52.88 52.88 100.00% 0.00 0.00% 52.88 100.00% 0.00 0.00%

08.07.00 CARPINTERIA METALICA08.07.01 CANALETA DE EVACUACION SEMICIRCULAR PLANCHA GALVANIZADAm 32.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 32.72 100.00%

08.08.00 ZOCALOS Y CONTRAZOCALOS08.08.01 ZOCALO DE CERAMICO DE 20 x 30 cm. m2 7.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.20 100.00%

08.08.02 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 64.20 64.20 100.00% 0.00 0.00% 64.20 100.00% 0.00 0.00%

08.09.00 PISOS Y PAVIMENTOS08.09.01 PISO DE CEMENTO PULIDO COLOREADO m2 115.42 115.42 100.00% 0.00 0.00% 115.42 100.00% 0.00 0.00%

08.09.02 PISO DE CERAMICO DE 0.30 X 0.30 MTS. m2 2.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.85 100.00%

08.10.00 CARPINTERIA DE MADERA08.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 7.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.56 100.00%

08.10.02 PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO CEDRO 2X3"m2 4.41 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.41 100.00%

08.10.03 VENTANA DE MADERA CEDRO CON MARCO DE 2" x 4" m2 39.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 39.32 100.00%

08.11.00 ESTRUCTURAS DE MADERA Y COBERTURA08.11.01 TIJERAL PRIINCIPAL DE MADERA TIPO 5 - SECCION VARIABLEund 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

08.11.02 CORREAS DE MADERA TORNILLO DE 3" X 2" m 178.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 178.40 100.00%

08.11.03 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 186.59 0.00 0.00% 0.00 0.00% 0.00 0.00% 186.59 100.00%

08.11.04 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 160.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 160.50 100.00%

08.12.00 CERRAJERIA08.12.01 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

08.12.02 CERRADURA TIPO PERILLA und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

08.12.03 BISAGRA ALUMINIZADA 4" pza 24.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 24.00 100.00%

08.12.04 CERROJO DE 8" ALUMINIZADO PARA PUERTA und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

08.12.05 JALADORES DE 3" und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

08.12.06 PICAPORTES DE 4" und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

08.13.00 VIDRIOS, CRISTALES Y SIMILARES08.13.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 423.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 423.87 100.00%

08.14.00 PINTURA08.14.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 317.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 317.54 100.00%

08.14.02 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 11.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.97 100.00%

08.14.03 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 19.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.26 100.00%

08.15.00 APARATOS Y ACCESORIOS SANITARIOS08.15.01 LAVADERO DE ACERO INOXIDABLE PARA COCINA und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.15.02 INODORO TANQUE BAJO BLANCO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 36 / 80

Page 37: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

08.15.03 LAVATORIOS DE PEDESTAL BLANCO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.15.04 URINARIO DE PARED BLANCO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.15.05 PAPELERA DE CERAMICA und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.16.00 INSTALACIONES SANITARIAS08.16.01 EXCAVACION DE ZANJA PARA RED DE DESAGUE m3 5.28 5.28 100.00% 0.00 0.00% 5.28 100.00% 0.00 0.00%

08.16.02 RELLENO CON MATERIAL PROPIO : MANUAL m3 5.28 5.28 100.00% 0.00 0.00% 5.28 100.00% 0.00 0.00%

08.16.03 SALIDA DE DESAGUE DE 2" pto 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

08.16.04 SALIDA DE DESAGUE DE 4" pto 2.00 2.00 100.00% 0.00 0.00% 2.00 100.00% 0.00 0.00%

08.16.05 TUBERIA DE PVC SAL 2" m 3.84 3.84 100.00% 0.00 0.00% 3.84 100.00% 0.00 0.00%

08.16.06 TUBERIA DE PVC SAL 4" m 20.60 20.60 100.00% 0.00 0.00% 20.60 100.00% 0.00 0.00%

08.16.07 SUMIDERO DE 2" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.16.08 VENTILACION C/TUBERIA PVC SAL 2" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.16.09 REGISTRO DE BRONCE 4" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.16.10 REGISTRO DE BRONCE 2" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.16.11 CAJA DE REGISTRO 12" X 24" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

08.17.00 SISTEMA DE AGUA FRIA08.17.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

08.17.02 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 3.85 3.85 100.00% 0.00 0.00% 3.85 100.00% 0.00 0.00%

08.17.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 17.60 17.60 100.00% 0.00 0.00% 17.60 100.00% 0.00 0.00%

08.17.04 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.17.05 VALVULA COMPUERTA DE BRONCE DE 3/4" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.17.06 PRUEBA HIDRAULICA GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

08.18.00 INSTALACIONES ELECTRICAS08.18.01 SALIDA PARA INTERRUPTORES pto 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.00 100.00%

08.18.02 SALIDA PARA CENTRO DE LUZ pto 17.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 17.00 100.00%

08.18.03 SALIDA PARA TOMACORRIENTES pto 14.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.00 100.00%

08.18.04 CAJA DE PASE GALVANIZADA DE 6"X6"X3" und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.18.05 TABLERO DE DISTRIBUCION und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

08.18.06 FLUORESCENTE RECTO 2X40 W. INC/EQUIPO und 14.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.00 100.00%

08.18.07 FLUORESCENTE CIRCUL. 32 W C/EQUIPO+PANT und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

08.18.08 INTERRUPTOR SIMPLE und 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9.00 100.00%

08.18.09 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 14.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.00 100.00%

08.19.00 VARIOS Y LIMPIEZA08.19.01 LIMPIEZA FINAL DE OBRA m2 161.60 79.00 48.89% 0.00 0.00% 79.00 48.89% 82.60 51.11%

08.19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA Y SELLADORm 11.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.60 100.00%

9.00 CONSTRUCCION DE 02 AMBIENTES PARA SS.HH. EN ZONA DE LOSAS DEPORTIVAS Y 01 AMBIENTE DE EDUCACION FISICA09.01.00 TRABAJOS PRELIMINARES09.01.01 LIMPIEZA DE TERRENO MANUAL m2 121.41 121.41 100.00% 0.00 0.00% 121.41 100.00% 0.00 0.00%

09.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 121.41 121.41 100.00% 0.00 0.00% 121.41 100.00% 0.00 0.00%

09.02.00 MOVIMIENTO DE TIERRAS09.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 22.42 22.42 100.00% 0.00 0.00% 22.42 100.00% 0.00 0.00%

09.02.02 EXCAVACION DE ZANJAS TERRENO NORMAL m3 13.39 13.39 100.00% 0.00 0.00% 13.39 100.00% 0.00 0.00%

09.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 16.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 16.74 100.00%

09.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 62.93 62.93 100.00% 0.00 0.00% 62.93 100.00% 0.00 0.00%

09.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 62.93 0.00 0.00% 0.00 0.00% 0.00 0.00% 62.93 100.00%

09.02.06 AFIRMADO DE 6" PARA PISOS m2 56.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 56.10 100.00%

09.03.00 OBRAS DE CONCRETO SIMPLE09.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 11.76 11.76 100.00% 0.00 0.00% 11.76 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 37 / 80

Page 38: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

09.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 11.96 11.96 100.00% 0.00 0.00% 11.96 100.00% 0.00 0.00%

09.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.74 1.74 100.00% 0.00 0.00% 1.74 100.00% 0.00 0.00%

09.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 18.61 18.61 100.00% 0.00 0.00% 18.61 100.00% 0.00 0.00%

09.03.05 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 18.61 18.61 100.00% 0.00 0.00% 18.61 100.00% 0.00 0.00%

09.03.06 FALSO PISO E = 4", MEZCLA C:H 1:8 m2 56.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 56.10 100.00%

09.04.00 OBRAS DE CONCRETO ARMADO09.04.01 ZAPATAS09.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 7.01 7.01 100.00% 0.00 0.00% 7.01 100.00% 0.00 0.00%

09.04.01.02 ZAPATAS : ENCOFRADO Y DESENCOFRADO NORMAL m2 11.88 11.88 100.00% 0.00 0.00% 11.88 100.00% 0.00 0.00%

09.04.01.03 IMPERMEABILIZACION DE ZAPATAS m2 11.88 11.88 100.00% 0.00 0.00% 11.88 100.00% 0.00 0.00%

09.04.01.04 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 505.44 505.44 100.00% 0.00 0.00% 505.44 100.00% 0.00 0.00%

09.04.02 VIGAS DE CIMENTACION09.04.02.01 VIGA DE CIMENTACION: CONCRETO F'C=210 KG/CM2 m3 1.28 1.28 100.00% 0.00 0.00% 1.28 100.00% 0.00 0.00%

09.04.02.02 VIGA DE CIMENTACION:ENCOFRADO Y DESENCOFRADO NORMALm2 10.20 10.20 100.00% 0.00 0.00% 10.20 100.00% 0.00 0.00%

09.04.02.03 IMPERMEABILIZACION DE VIGAS DE CIMENTACION m2 10.20 10.20 100.00% 0.00 0.00% 10.20 100.00% 0.00 0.00%

09.04.02.04 VIGA DE CIMENTACION: ACERO GRADO 60 FY= 4200 KG/CM2.kg 216.26 216.26 100.00% 0.00 0.00% 216.26 100.00% 0.00 0.00%

09.04.03 SOBRECIMIENTO 09.04.03.01 SOBRECIMIENTO: CONCRETO F'C=175 KG/CM2 m3 1.74 1.74 100.00% 0.00 0.00% 1.74 100.00% 0.00 0.00%

09.04.03.02 SOBRECIMIENTO : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 18.61 18.61 100.00% 0.00 0.00% 18.61 100.00% 0.00 0.00%

09.04.03.03 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 18.61 18.61 100.00% 0.00 0.00% 18.61 100.00% 0.00 0.00%

09.04.04 COLUMNAS09.04.04.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 3.44 3.44 100.00% 0.00 0.00% 3.44 100.00% 0.00 0.00%

09.04.04.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 32.64 32.64 100.00% 0.00 0.00% 32.64 100.00% 0.00 0.00%

09.04.04.03 IMPERMEABILIZACION DE COLUMNAS m2 11.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.80 100.00%

09.04.04.04 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 711.10 711.10 100.00% 0.00 0.00% 711.10 100.00% 0.00 0.00%

09.04.05 VIGAS09.04.05.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 8.18 8.18 100.00% 0.00 0.00% 8.18 100.00% 0.00 0.00%

09.04.05.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 46.80 46.80 100.00% 0.00 0.00% 46.80 100.00% 0.00 0.00%

09.04.05.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 1,219.46 1,219.46 100.00% 0.00 0.00% 1,219.46 100.00% 0.00 0.00%

09.04.06 COLUMNETAS Y VIGUETAS DE AMARRE09.04.06.01 COLUMNETA Y VIGUETAS DE AMARRE: CONCRETO F'C=210 KG/CM2m3 2.79 2.79 100.00% 0.00 0.00% 2.79 100.00% 0.00 0.00%

09.04.06.02 COLUMNETA Y VIGUETAS DE AMARRE: ENCOFRADO Y DESENCOFRADOm2 42.48 42.48 100.00% 0.00 0.00% 42.48 100.00% 0.00 0.00%

09.04.06.03 COLUMNETA Y VIGUETAS DE AMARRE ACERO F'Y=4,200 KG/CM2.kg 304.87 304.87 100.00% 0.00 0.00% 304.87 100.00% 0.00 0.00%

09.04.07 LOSAS ALIGERADAS09.04.07.01 LOSA ALIGERADA: CONCRETO F'C=210 KG/CM2 m3 12.56 12.56 100.00% 0.00 0.00% 12.56 100.00% 0.00 0.00%

09.04.07.02 LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO m2 143.45 143.45 100.00% 0.00 0.00% 143.45 100.00% 0.00 0.00%

09.04.07.03 LOSA ALIGERADA: ACERO DE REFUERZO Fy= 4,200 Kg/Cm2. GRADO 60kg 720.48 720.48 100.00% 0.00 0.00% 720.48 100.00% 0.00 0.00%

09.04.07.04 LOSA ALIGERADA: LADRILLO HUECO DE 20X30X30 CM. und 1,194.94 1,194.94 100.00% 0.00 0.00% 1,194.94 100.00% 0.00 0.00%

09.05.00 MUROS Y TABIQUES DE ALBAÑILERIA09.05.01 MURO DE CABEZA LADRILLO ARCILLA HERCULES I (JUNTA 1.5 CM.)m2 68.14 68.14 100.00% 0.00 0.00% 68.14 100.00% 0.00 0.00%

09.05.02 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 148.70 122.00 82.04% 26.70 17.96% 148.70 100.00% 0.00 0.00%

09.05.03 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 24.75 23.00 92.93% 1.75 7.07% 24.75 100.00% 0.00 0.00%

09.06.00 REVOQUES ENLUCIDOS Y MOLDURAS09.06.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 117.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 117.98 100.00%

09.06.02 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 315.71 0.00 0.00% 58.00 18.37% 58.00 18.37% 257.71 81.63%

09.06.03 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 82.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 82.74 100.00%

09.07.00 CIELO RASOS09.07.01 CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=0.25 mts). m2 143.45 0.00 0.00% 53.00 36.95% 53.00 36.95% 90.45 63.05%

09.08.00 ZOCALOS Y CONTRAZOCALOS09.08.01 ZOCALO DE CERAMICO DE 20 x 30 cm. m2 117.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 117.98 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 38 / 80

Page 39: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

09.08.02 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 26.40 0.00 0.00% 26.40 100.00% 26.40 100.00% 0.00 0.00%

09.09.00 PISOS Y PAVIMENTOS09.09.01 PISO DE CERAMICO DE 0.30 X 0.30 MTS. m2 143.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 143.45 100.00%

09.10.00 CARPINTERIA DE MADERA09.10.01 PUERTAS DE MADERA TABLERO REBAJADO m2 12.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.60 100.00%

09.10.02 VENTANA DE MADERA CON HOJAS DE CEDRO m2 4.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.20 100.00%

09.11 CARPINTERIA METALICA Y HERRERIA09.11.01 VENTANA METALICA INC. PROTECCION m2 10.06 0.00 0.00% 0.00 0.00% 0.00 0.00% 10.06 100.00%

09.11.02 PUERTA METALICA m2 13.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.44 100.00%

09.11.03 DIVISIONES METALICAS C/PLANCHA S/SS.HH m2 21.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.60 100.00%

09.12 CERRAJERIA09.12.01 BISAGRA ALUMINIZADA 4" pza 60.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 60.00 100.00%

09.12.02 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

09.12.03 CERROJO DE 8" ALUMINIZADO PARA PUERTA und 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.00 100.00%

09.12.04 JALADORES DE 3" und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

09.12.05 PICAPORTES DE 4" und 20.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 20.00 100.00%

09.13 VIDRIOS, CRISTALES Y SIMILARES09.13.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 154.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 154.74 100.00%

09.14 PINTURA09.14.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 738.08 0.00 0.00% 0.00 0.00% 0.00 0.00% 738.08 100.00%

09.14.02 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN VENTANASm2 10.06 0.00 0.00% 0.00 0.00% 0.00 0.00% 10.06 100.00%

09.14.03 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 12.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 12.60 100.00%

09.14.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 26.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 26.40 100.00%

09.15 APARATOS Y ACCESORIOS SANITARIOS09.15.01 INODORO TANQUE BAJO C/BLANCO pza 8.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.00 100.00%

09.15.02 LAVATORIO C/BLANCO 1 LLAVE pza 13.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.00 100.00%

09.15.03 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS und 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

09.15.04 SUMINISTRO Y COLOCACION DE ACCESORIOS SANITARIOS pza 25.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 25.00 100.00%

09.16 INSTALACIONES SANITARIAS09.16.01 EXCAVACION DE ZANJA PARA RED DE DESAGUE m3 3.96 3.96 100.00% 0.00 0.00% 3.96 100.00% 0.00 0.00%

09.16.02 RELLENO CON MATERIAL PROPIO : MANUAL m3 2.97 2.97 100.00% 0.00 0.00% 2.97 100.00% 0.00 0.00%

09.16.03 SALIDA DE DESAGUE DE 2" pto 22.00 22.00 100.00% 0.00 0.00% 22.00 100.00% 0.00 0.00%

09.16.04 SALIDA DE DESAGUE DE 4" pto 22.00 22.00 100.00% 0.00 0.00% 22.00 100.00% 0.00 0.00%

09.16.05 SALIDA PVC SAL 2" PARA VENTILACION pto 8.00 8.00 100.00% 0.00 0.00% 8.00 100.00% 0.00 0.00%

09.16.06 TUBERIA DE PVC SAL 2" m 70.85 70.85 100.00% 0.00 0.00% 70.85 100.00% 0.00 0.00%

09.16.07 TUBERIA DE PVC SAL 4" m 26.10 26.10 100.00% 0.00 0.00% 26.10 100.00% 0.00 0.00%

09.16.08 SUMINISTRO Y COLOCACION DE ACCESORIOS SANITARIOS pza 95.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 95.00 100.00%

09.17 SISTEMA DE AGUA FRIA09.17.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto 38.00 26.00 68.42% 12.00 31.58% 38.00 100.00% 0.00 0.00%

09.17.02 SUMINISTRO Y COLOCACION DE ACCESORIOS PARA RED DE AGUA FRIApza 96.00 78.00 81.25% 18.00 18.75% 96.00 100.00% 0.00 0.00%

09.18 INSTALACIONES ELECTRICAS09.18.01 SALIDA PARA INTERRUPTORES pto 8.00 8.00 100.00% 0.00 0.00% 8.00 100.00% 0.00 0.00%

09.18.02 SALIDA PARA CENTRO DE LUZ pto 6.00 6.00 100.00% 0.00 0.00% 6.00 100.00% 0.00 0.00%

09.18.03 SALIDA PARA TOMACORRIENTES pto 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

09.18.04 FLUORESCENTE CIRCUL. 2X18W. EMPOTRADO MARCO ALUMBRADO (DIF)und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

09.18.05 INTERRUPTOR SIMPLE und 8.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.00 100.00%

09.18.06 TOMACORRIENTE DOBLE C/LINEA A TIERRA und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

09.19 VARIOS Y LIMPIEZA09.19.01 LIMPIEZA FINAL DE OBRA m2 108.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 108.04 100.00%

09.19.02 JUNTA DE DILATACION CON ESPUMA PLASTICA Y SELLADORm 51.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 51.04 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 39 / 80

Page 40: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

10.00 CONSTRUCCION DE CERCO PERIMETRICO10.01.00 TRABAJOS PRELIMINARES10.01.01 LIMPIEZA DE TERRENO MANUAL m2 29.25 29.25 100.00% 0.00 0.00% 29.25 100.00% 0.00 0.00%

10.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 29.25 43.87 149.98% 0.00 0.00% 43.87 149.98% -14.62 -49.98%

10.02.00 MOVIMIENTO DE TIERRAS10.02.01 EXCAVACION DE ZANJAS TERRENO NORMAL m3 14.66 18.48 126.06% 0.00 0.00% 18.48 126.06% -3.82 -26.06%

10.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 3.67 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.67 100.00%

10.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 13.18 30.00 227.62% 0.00 0.00% 30.00 227.62% -16.82 -127.62%

10.02.04 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 13.18 13.18 100.00% 0.00 0.00% 13.18 100.00% 0.00 0.00%

10.03.00 OBRAS DE CONCRETO SIMPLE10.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 7.44 9.02 121.24% 0.00 0.00% 9.02 121.24% -1.58 -21.24%

10.03.02 CIMIENTOS CORRIDOS C:H 1:10 CON 30% P.G. m3 6.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.97 100.00%

10.03.03 SOBRECIMIENTO MEZCLA DE CONCRETO C:H (1:8) + 25 % P.M. m3 1.49 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.49 100.00%

10.03.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMALm2 19.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.90 100.00%

10.03.05 IMPERMEABILIZACION PARA SOBRECIMIENTOS m2 19.90 10.50 52.76% 0.00 0.00% 10.50 52.76% 9.40 47.24%

10.04.00 OBRAS DE CONCRETO ARMADO10.04.01 ZAPATAS10.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 3.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.72 100.00%

10.04.01.02 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 75.48 75.48 100.00% 0.00 0.00% 75.48 100.00% 0.00 0.00%

10.04.02 COLUMNAS10.04.02.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 1.62 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.62 100.00%

10.04.02.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 22.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 22.68 100.00%

10.04.02.03 IMPERMEABILIZACION DE COLUMNAS m2 2.52 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.52 100.00%

10.04.02.04 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 249.34 249.34 100.00% 0.00 0.00% 249.34 100.00% 0.00 0.00%

10.04.03 VIGAS10.04.03.01 VIGAS, CONCRETO F'C=210 KG/CM2 m3 1.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.58 100.00%

10.04.03.02 VIGAS: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 10.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 10.50 100.00%

10.04.03.03 VIGAS: ACERO DE REFUERZO Fy= 4,200 Kg/cm2. kg 117.77 117.77 100.00% 0.00 0.00% 117.77 100.00% 0.00 0.00%

10.05.00 MUROS Y TABIQUES DE ALBAÑILERIA10.05.01 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 55.13 55.13 100.00% 0.00 0.00% 55.13 100.00% 0.00 0.00%

10.05.02 ALAMBRE Nº 8 REFUERZO HORIZONTAL EN MUROS kg 4.95 4.95 100.00% 0.00 0.00% 4.95 100.00% 0.00 0.00%

10.06.00 REVOQUES ENLUCIDOS Y MOLDURAS10.06.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 55.13 55.13 100.00% 0.00 0.00% 55.13 100.00% 0.00 0.00%

10.07.00 PINTURA10.07.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 88.31 0.00 0.00% 0.00 0.00% 0.00 0.00% 88.31 100.00%

10.07.02 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 26.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 26.25 100.00%

10.08.00 VARIOS Y LIMPIEZA 0.00

10.08.01 LIMPIEZA FINAL DE OBRA m2 29.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 29.25 100.00%

10.08.02 JUNTAS DE DILATACION TEKNOPOR 1" m 13.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.50 100.00%

11.00 CONSTRUCCION DE 02 GRADERIAS EN ZONA DEPORTIVA11.01.00 TRABAJOS PRELIMINARES11.01.01 LIMPIEZA DE TERRENO MANUAL m2 217.85 435.70 200.00% 0.00 0.00% 435.70 200.00% -217.85 -100.00%

11.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 217.85 435.70 200.00% 0.00 0.00% 435.70 200.00% -217.85 -100.00%

11.02.00 MOVIMIENTO DE TIERRAS11.02.01 EXCAVACION DE ZANJAS TERRENO NORMAL m3 26.74 39.34 147.12% 0.00 0.00% 39.34 147.12% -12.60 -47.12%

11.02.02 RELLENO COMPACTADO SELECCIONADO MAT/PRESTAMO C/EQUIPOm3 66.79 35.50 53.15% 0.00 0.00% 35.50 53.15% 31.29 46.85%

11.02.03 RELLENO COMPACTADO SELECCIONADO MAT/PROPIO C/EQUIPOm3 4.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.76 100.00%

11.02.04 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 26.37 26.37 100.00% 0.00 0.00% 26.37 100.00% 0.00 0.00%

11.02.05 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 26.37 0.00 0.00% 0.00 0.00% 0.00 0.00% 26.37 100.00%

11.03.00 OBRAS DE CONCRETO SIMPLE

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 40 / 80

Page 41: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

11.03.01 CIMIENTOS CORRIDOS C:H 1:10 + 30% P.G. m3 42.39 0.00 0.00% 0.00 0.00% 0.00 0.00% 42.39 100.00%

11.03.02 CONCRETO F'C=140 KG/CM2 EN PASOS DE ACCESO m3 1.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.02 100.00%

11.03.03 ENCOFRADO Y DESENCOFRADO EN PASOS DE ACCESO m2 4.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.97 100.00%

11.04.00 OBRAS DE CONCRETO ARMADO11.04.01 GRADERIAS : CONCRETO F'C=210 KG/CM2 m3 60.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 60.55 100.00%

11.04.02 GRADERIAS : ENCOFRADO Y DESENCOFRADO NORMAL m2 439.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 439.84 100.00%

11.04.03 GRADERIAS : ACERO DE REFUERZO Fy= 4,200 Kg/cm2 kg 2,887.23 403.00 13.96% 677.63 23.47% 1,080.63 37.43% 1,806.60 62.57%

11.05.00 MUROS Y TABIQUES DE ALBAÑILERIA11.05.01 MURO DE SOGA LADRILLO DE ARCILLA HERCULES (JUNTA 1.5 CM.)m2 22.62 0.00 0.00% 22.62 100.00% 22.62 100.00% 0.00 0.00%

11.06.00 REVOQUES ENLUCIDOS Y MOLDURAS11.06.01 TARRAJEO EN MUROS INTERIORES Y EXTERIORES m2 487.19 0.00 0.00% 203.00 41.67% 203.00 41.67% 284.19 58.33%

11.07.00 PINTURA11.07.01 PINTURA LATEX PARA GRADERIAS m2 278.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 278.24 100.00%

11.08.00 COBERTURA METALICA11.08.01 TIJERAL METALICO T-1 und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

11.08.02 COBERTURA CON PLANCHAS POLICARBONATO m2 141.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 141.45 100.00%

11.09.00 VARIOS Y LIMPIEZA11.09.01 LIMPIEZA FINAL DE OBRA m2 217.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 217.85 100.00%

11.09.02 JUNTAS DE DILATACION TEKNOPOR 1" m 30.12 0.00 0.00% 0.00 0.00% 0.00 0.00% 30.12 100.00%

12.00 CONSTRUCCION DE PATIO DE HONOR, 02 LOSAS DEPORTIVAS Y AREAS DE CIRCULACION12.01.00 TRABAJOS PRELIMINARES12.01.01 DEMOLICION DE PISOS Y VEREDAS m2 1,645.52 1,645.52 100.00% 0.00 0.00% 1,645.52 100.00% 0.00 0.00%

12.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 197.46 197.46 100.00% 0.00 0.00% 197.46 100.00% 0.00 0.00%

12.01.03 ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICION m3 197.46 197.46 100.00% 0.00 0.00% 197.46 100.00% 0.00 0.00%

12.01.04 LIMPIEZA DE TERRENO m2 3,738.47 3,738.47 100.00% 0.00 0.00% 3,738.47 100.00% 0.00 0.00%

12.01.05 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 3,738.47 3,663.47 97.99% 75.00 2.01% 3,738.47 100.00% 0.00 0.00%

12.02.00 MOVIMIENTO DE TIERRAS12.02.01 EXCAVACION DE ZANJAS TERRENO NORMAL m3 967.73 967.73 100.00% 0.00 0.00% 967.73 100.00% 0.00 0.00%

12.02.02 TERRAPLEN PARA PISOS Y VEREDAS MAT/PRESTAMO E=4" C/EQUIPOm2 3,738.47 2,921.50 78.15% 816.97 21.85% 3,738.47 100.00% 0.00 0.00%

12.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS. m3 1,161.27 890.38 76.67% 270.89 23.33% 1,161.27 100.00% 0.00 0.00%

12.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAm3 1,161.27 1,102.78 94.96% 58.49 5.04% 1,161.27 100.00% 0.00 0.00%

12.03.00 CONCRETO SIMPLE12.03.01 RAMPAS DE CONCRETO12.03.01.01 RAMPA PARA INGRESO VEHICULAR m2 356.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 356.83 100.00%

12.03.01.02 ENCOFRADO Y DESENCOFRADO DE RAMPAS m2 52.95 0.00 0.00% 52.95 100.00% 52.95 100.00% 0.00 0.00%

12.03.02 VEREDA DE CONCRETO12.03.02.01 VEREDA DE PIEDRA LAVADA E=4" CONCRETO F'C=140 KG/CM2 INC/ACAB. Y BRUÑADOm2 570.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 570.85 100.00%

12.03.02.02 VEREDA ENCOFRADO Y DESENCOFRADO NORMAL m2 90.87 73.87 81.29% 0.00 0.00% 73.87 81.29% 17.00 18.71%

12.03.02.03 SOLAQUEADO EN BORDES DE VEREDAS m2 90.87 63.25 69.60% 0.00 0.00% 63.25 69.60% 27.62 30.40%

12.03.03 PATIO Y PLATAFORMA DEPORTIVA12.03.03.01 PISO DE CEMENTO EN PATIO. m2 2,810.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,810.80 100.00%

12.03.03.02 PATIO ENCOFRADO Y DESENCOFRADO NORMAL m2 328.59 233.29 71.00% 58.36 17.76% 291.65 88.76% 36.94 11.24%

12.04.00 CONCRETO ARMADO12.04.01 MURO DE CONTENCION12.04.01.01 CONCRETO F'C=210 KG/CM2 m3 166.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 166.97 100.00%

12.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 260.28 23.58 9.06% 0.00 0.00% 23.58 9.06% 236.70 90.94%

12.04.01.03 ACERO DE REFUERZO Fy=4,200 KG/CM2 kg 4,633.27 5,276.37 113.88% 0.00 0.00% 5,276.37 113.88% -643.10 -13.88%

12.04.02 ESCALINATA12.04.02.01 CONCRETO F'C=175 KG/CM2 m3 6.57 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.57 100.00%

12.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 19.32 100.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 41 / 80

Page 42: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

12.04.02.03 ACERO DE REFUERZO Fy=4,200 KG/CM2 kg 139.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 139.20 100.00%

12.04.03 SARDINEL ARMADO EN RAMPA12.04.03.01 CONCRETO F'C=210 KG/CM2 m3 11.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 11.02 100.00%

12.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 110.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 110.20 100.00%

12.04.03.03 ACERO DE REFUERZO Fy=4,200 KG/CM2 kg 4,177.00 0.00 0.00% 620.79 14.86% 620.79 14.86% 3,556.21 85.14%

12.04.04 CANALETAS12.04.04.01 CANAL P/EVACUACION PLUVIAL R=0.15 M. m3 15.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 15.76 100.00%

12.04.04.02 CANAL P/ EVACUACION DE AGUAS PLUVIALES: ENCOFRADO Y DESENCOFRADOm2 63.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 63.04 100.00%

12.04.04.03 CANAL: ACERO CORRUGADO Fy=4200 kg/cm² kg 393.94 240.00 60.92% 0.00 0.00% 240.00 60.92% 153.94 39.08%

12.05.00 CARPINTERIA METALICA12.05.01 ASTA DE BANDERA TIPICO pza 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

12.06.00 VARIOS12.06.01 CURADO EN LOSA Y VIAS DE CIRCULACION m2 3,738.47 2,750.00 73.56% 360.00 9.63% 3,110.00 83.19% 628.47 16.81%

12.06.02 JUNTA ASFALTICAS 1" EN PISO m 2,032.57 1,260.00 61.99% 170.00 8.36% 1,430.00 70.35% 602.57 29.65%

12.06.03 LIMPIEZA FINAL DE OBRA m2 3,738.47 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,738.47 100.00%

13.00 AREAS VERDES13.01.00 TRABAJOS PRELIMINARES13.01.01 PREPARACION DE TERRENO PARA JARDIN m2 109.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 109.55 100.00%

13.01.02 SUMINISTRO Y COLOCACION DE ARBOLES und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

13.01.03 PLACA RECORDATORIA DE ALUMINIO FUNDIDO GLB 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

13.02.00 SARDINELES DE CONCRETO13.02.01 MOVIMIENTO DE TIERRAS13.02.01.01 EXCAVACION DE ZANJAS TERRENO NORMAL m3 2.51 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.51 100.00%

13.02.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 3.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.14 100.00%

13.02.01.03 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 3.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.14 100.00%

13.02.02 OBRAS DE CONCRETO SIMPLE13.02.02.01 SARDINEL : CONCRETO DE F'C=140 KG/CM2 m3 3.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.45 100.00%

13.02.02.02 SARDINEL : ENCOFRADO Y DESENCOFRADO CARAVISTA m2 69.09 0.00 0.00% 0.00 0.00% 0.00 0.00% 69.09 100.00%

13.02.02.03 IMPERMEABILIZACION DE SARDINELES EN JARDINES m2 34.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 34.55 100.00%

13.02.02.04 JUNTAS ASFALTICAS m 8.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.64 100.00%

14.00 COBERTURA CON MALLA RASHELL14.01.00 TRABAJOS PRELIMINARES14.01.01 LIMPIEZA DE TERRENO MANUAL m2 542.50 542.50 100.00% 0.00 0.00% 542.50 100.00% 0.00 0.00%

14.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 542.50 542.50 100.00% 0.00 0.00% 542.50 100.00% 0.00 0.00%

14.01.03 DEMOLICION DE LOSAS m2 27.00 27.00 100.00% 0.00 0.00% 27.00 100.00% 0.00 0.00%

14.02.00 MOVIMIENTO DE TIERRAS14.02.01 EXCAVACION PARA ZAPATAS TERRENO NORMAL m3 56.70 56.70 100.00% 0.00 0.00% 56.70 100.00% 0.00 0.00%

14.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 37.80 37.80 100.00% 0.00 0.00% 37.80 100.00% 0.00 0.00%

14.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30 MT. m3 24.57 24.57 100.00% 0.00 0.00% 24.57 100.00% 0.00 0.00%

14.02.04 ELIMINACION MATERIAL EXCEDENTE DE EXCAVACIONES m3 24.57 24.57 100.00% 0.00 0.00% 24.57 100.00% 0.00 0.00%

14.03.00 OBRAS DE CONCRETO SIMPLE14.03.01 SOLADO MEZCLA C:H 1:10 e=4" m2 27.00 27.00 100.00% 0.00 0.00% 27.00 100.00% 0.00 0.00%

14.04.00 OBRAS DE CONCRETO ARMADO14.04.01 ZAPATAS14.04.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 16.20 16.20 100.00% 0.00 0.00% 16.20 100.00% 0.00 0.00%

14.04.01.02 ZAPATAS: ACERO DE REFUERZO Fy= 4200 KG/CM2. kg 252.63 252.63 100.00% 0.00 0.00% 252.63 100.00% 0.00 0.00%

14.04.01.03 IMPERMEABILIZACION DE ZAPATAS m2 43.20 43.20 100.00% 0.00 0.00% 43.20 100.00% 0.00 0.00%

14.04.02 COLUMNAS14.04.02.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 15.17 15.17 100.00% 0.00 0.00% 15.17 100.00% 0.00 0.00%

14.04.02.02 COLUMNAS : ENCOFRADO Y DESENCOFRADO CARAVISTAm2 151.68 151.68 100.00% 0.00 0.00% 151.68 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 42 / 80

Page 43: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

14.04.02.03 COLUMNAS: ACERO DE REFUERZO Fy = 4200 kg/cm2. kg 1,211.79 1,211.79 100.00% 0.00 0.00% 1,211.79 100.00% 0.00 0.00%

14.04.02.04 IMPERMEABILIZACION DE COLUMNAS m2 26.88 26.88 100.00% 0.00 0.00% 26.88 100.00% 0.00 0.00%

14.05.00 CARPINTERIA METALICA14.05.01 TIJERAL T-1 PARA MALLA RASCHELL m 65.96 0.00 0.00% 0.00 0.00% 0.00 0.00% 65.96 100.00%

14.05.02 TENSOR DE CABLE GALVANIZADO 1/4" PARA MALLA RASCHELLm 263.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 263.20 100.00%

14.06.00 CUBIERTAS14.06.01 COBERTURA CON MALLA RACHELL m2 542.52 0.00 0.00% 0.00 0.00% 0.00 0.00% 542.52 100.00%

14.07.00 PINTURA14.07.01 PINTURA ESMALTE EN COLUMNAS Y VIGAS m2 124.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 124.80 100.00%

14.07.02 PINTURA ANTICORROSIVA EN TIJERAL TIPO 1 DE MALLA RASCHELLm 65.96 0.00 0.00% 0.00 0.00% 0.00 0.00% 65.96 100.00%

15.00 RED DE AGUA DESAGUE E ISTALACIONES ELECTRICAS15.01.00 INSTALACIONES SANITARIAS - DESAGUE15.01.01 TRABAJOS PRELIMINARES15.01.01.01 TRAZO, NIVELES C/EQUIPO P/DESAGUE m2 212.41 212.41 100.00% 0.00 0.00% 212.41 100.00% 0.00 0.00%

15.01.02 MOVIMIENTO DE TIERRAS15.01.02.01 EXCAVACION DE ZANJAS EN RED DE DESAGUE m3 191.17 191.17 100.00% 0.00 0.00% 191.17 100.00% 0.00 0.00%

15.01.02.02 REFINE Y NIVELACION EN TERRENO ZANJAS m 212.41 212.41 100.00% 0.00 0.00% 212.41 100.00% 0.00 0.00%

15.01.02.03 COLOCACION DE CAMA Y SOBRECAMA PARA RED DE DESAGUEm 212.41 212.41 100.00% 0.00 0.00% 212.41 100.00% 0.00 0.00%

15.01.02.04 RELLENO Y COMP.MAT.PROPIO EN ZANJAS m3 191.17 191.17 100.00% 0.00 0.00% 191.17 100.00% 0.00 0.00%

15.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 63.72 63.72 100.00% 0.00 0.00% 63.72 100.00% 0.00 0.00%

15.01.03 REDES DE ALCANTARILLADO15.01.03.01 RED DE DESAGUE DE PVC SAP DE 4" m 171.62 171.62 100.00% 0.00 0.00% 171.62 100.00% 0.00 0.00%

15.01.03.02 REDES DE DESAGUE PVC DE 6" m 40.79 40.79 100.00% 0.00 0.00% 40.79 100.00% 0.00 0.00%

15.01.03.03 PRUEBA HIDRAULICA GENERAL DE DESAGUE GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.01.03.04 BUZON TAPA Y MARCO F.F. HASTA 2.00MT. und 2.00 2.00 100.00% 0.00 0.00% 2.00 100.00% 0.00 0.00%

15.01.03.05 CAJA DE REGISTRO DE 12" X 24" und 6.00 6.00 100.00% 0.00 0.00% 6.00 100.00% 0.00 0.00%

15.01.03.06 CAJA DE REGISTRO DE 24" X 24" und 6.00 6.00 100.00% 0.00 0.00% 6.00 100.00% 0.00 0.00%

15.01.03.07 CONEXION EXTERIOR A RED DE DESAGUE GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.00 INSTALACIONES SANITARIAS - AGUA15.02.01 TRABAJOS PRELIMINARES15.02.01.01 TRAZO, NIVELES C/EQUIPO P/AGUA m2 246.99 246.99 100.00% 0.00 0.00% 246.99 100.00% 0.00 0.00%

15.02.02 MOVIMIENTO DE TIERRAS15.02.02.01 EXCAVACION DE ZANJAS PARA RED DE AGUA m3 74.10 74.10 100.00% 0.00 0.00% 74.10 100.00% 0.00 0.00%

15.02.02.02 REFINE Y NIVELACION EN TERRENO ZANJAS P/AGUA m 246.99 246.99 100.00% 0.00 0.00% 246.99 100.00% 0.00 0.00%

15.02.02.03 COLOCACION DE CAMA Y SOBRECAMA PARA RED DE AGUAm 246.99 246.99 100.00% 0.00 0.00% 246.99 100.00% 0.00 0.00%

15.02.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 61.75 61.75 100.00% 0.00 0.00% 61.75 100.00% 0.00 0.00%

15.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 12.35 12.35 100.00% 0.00 0.00% 12.35 100.00% 0.00 0.00%

15.02.03 RED DE AGUA POTABLE15.02.03.01 TUBERIA DE 1 1/2" PVC C-10 C/R m 169.70 169.70 100.00% 0.00 0.00% 169.70 100.00% 0.00 0.00%

15.02.03.02 TUBERIA DE 2" PVC C-10 C/R m 77.29 77.29 100.00% 0.00 0.00% 77.29 100.00% 0.00 0.00%

15.02.03.03 PRUEBA HIDRAULICA GENERAL DE AGUA GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.03.04 CONEXION EXTERIOR A RED DE AGUA GLB 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04 ACCESORIOS DE REDES15.02.04.01 VALVULA COMPUERTA DE 2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04.02 VALVULA CHECK DE 2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04.03 CODO 2"X2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04.04 TEE PVC AGUA C-10 C/R 2" und 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

15.02.04.05 REDUCCION PVC DE 2" A 1" und 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

15.02.04.06 REDUCCION PVC DE 1 1/2" A 3/4" und 4.00 4.00 100.00% 0.00 0.00% 4.00 100.00% 0.00 0.00%

15.02.04.07 REDUCCION PVC DE 3/4" A 1/2" und 3.00 3.00 100.00% 0.00 0.00% 3.00 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 43 / 80

Page 44: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

15.02.04.08 VALVULA COMPUERTA DE 1 1/2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04.09 VALVULA CHECK DE 1 1/2" und 1.00 1.00 100.00% 0.00 0.00% 1.00 100.00% 0.00 0.00%

15.02.04.10 TEE PVC AGUA C-10 1 1/2" und 7.00 7.00 100.00% 0.00 0.00% 7.00 100.00% 0.00 0.00%

15.02.04.11 CODO PVC 1 1/2" und 4.00 4.00 100.00% 0.00 0.00% 4.00 100.00% 0.00 0.00%

15.03.00 INSTALACIONES ELECTRICAS EXTERIORES15.03.01 INSTALACION DE RED ELECTRICA EN MEDIA TENSION Gbl 1.00 0.20 20.00% 0.30 30.00% 0.50 50.00% 0.50 50.00%

16.00 DESMONTAJES Y DEMOLICIONES16.01.00 DESMONTAJES DE 04 AMBIENTES PREFABRICADOS16.01.01 DESMONTAJE DE PUERTAS m2 25.20 25.20 100.00% 0.00 0.00% 25.20 100.00% 0.00 0.00%

16.01.02 DESMONTAJE DE VENTANAS m2 31.50 31.50 100.00% 0.00 0.00% 31.50 100.00% 0.00 0.00%

16.01.03 DESMONTAJE DE ARTEFACTOS ELECTRICOS und 18.00 18.00 100.00% 0.00 0.00% 18.00 100.00% 0.00 0.00%

16.01.04 DESMONTAJE DE AULAS PREFABRICADAS m2 784.95 784.95 100.00% 0.00 0.00% 784.95 100.00% 0.00 0.00%

16.01.05 ACARREO DE MATERIAL DEMOLIDO m3 126.24 126.24 100.00% 0.00 0.00% 126.24 100.00% 0.00 0.00%

16.01.06 ELIMINACION DE MATERIAL DEMOLIDO m3 126.24 126.24 100.00% 0.00 0.00% 126.24 100.00% 0.00 0.00%

16.02.00 DEMOLICIONES DE AULAS Y SS.HH.16.02.01 DESMONTAJE DE PUERTAS m2 21.60 21.60 100.00% 0.00 0.00% 21.60 100.00% 0.00 0.00%

16.02.02 DESMONTAJE DE VENTANAS m2 36.00 36.00 100.00% 0.00 0.00% 36.00 100.00% 0.00 0.00%

16.02.03 DESMONTAJE DE ARTEFACTOS ELECTRICOS und 10.00 10.00 100.00% 0.00 0.00% 10.00 100.00% 0.00 0.00%

16.02.04 DEMOLICION DE COLUMNAS DE CONCRETO m3 5.76 5.76 100.00% 0.00 0.00% 5.76 100.00% 0.00 0.00%

16.02.05 DEMOLICION DE MUROS DE ALBAÑILERIA m3 52.38 52.38 100.00% 0.00 0.00% 52.38 100.00% 0.00 0.00%

16.02.06 DEMOLICION DE VIGAS DE CONCRETO ARMADO m3 14.42 14.42 100.00% 0.00 0.00% 14.42 100.00% 0.00 0.00%

16.02.07 DEMOLICION DE SOBRECIMIENTO m3 6.21 6.21 100.00% 0.00 0.00% 6.21 100.00% 0.00 0.00%

16.02.08 DEMOLICION DE LOSAS m2 154.59 154.59 100.00% 0.00 0.00% 154.59 100.00% 0.00 0.00%

16.02.09 DESMONTAJE DE COBERTURA LIVIANA m2 154.49 154.49 100.00% 0.00 0.00% 154.49 100.00% 0.00 0.00%

16.02.10 DEMOLICION DE PISOS DE CONCRETO SIMPLE E=0.15 m. m2 41.33 41.33 100.00% 0.00 0.00% 41.33 100.00% 0.00 0.00%

16.02.11 ACARREO DE MATERIAL DEMOLIDO m3 161.97 161.97 100.00% 0.00 0.00% 161.97 100.00% 0.00 0.00%

16.02.12 ELIMINACION DE MATERIAL DEMOLIDO m3 161.97 161.97 100.00% 0.00 0.00% 161.97 100.00% 0.00 0.00%

16.03.00 DEMOLICIONES DE ESCALERAS16.03.01 DEMOLICION DE COLUMNAS DE CONCRETO m3 2.80 2.80 100.00% 0.00 0.00% 2.80 100.00% 0.00 0.00%

16.03.02 DEMOLICION DE MUROS DE ALBAÑILERIA m3 20.64 20.64 100.00% 0.00 0.00% 20.64 100.00% 0.00 0.00%

16.03.03 DEMOLICION DE VIGAS DE CONCRETO ARMADO m3 1.20 1.20 100.00% 0.00 0.00% 1.20 100.00% 0.00 0.00%

16.03.04 DEMOLICION DE SOBRECIMIENTO m3 2.06 2.06 100.00% 0.00 0.00% 2.06 100.00% 0.00 0.00%

16.03.05 DEMOLICION DE PISOS DE CONCRETO SIMPLE E=0.15 m. m2 18.99 18.99 100.00% 0.00 0.00% 18.99 100.00% 0.00 0.00%

16.03.06 ACARREO DE MATERIAL DEMOLIDO m3 30.50 30.50 100.00% 0.00 0.00% 30.50 100.00% 0.00 0.00%

16.03.07 ELIMINACION DE MATERIAL DEMOLIDO m3 30.50 30.50 100.00% 0.00 0.00% 30.50 100.00% 0.00 0.00%

16.04.00 DEMOLICION DE CERCO PERIMETRICO16.04.01 DEMOLICION DE COLUMNAS DE CONCRETO m3 1.88 1.88 100.00% 0.00 0.00% 1.88 100.00% 0.00 0.00%

16.04.02 DEMOLICION DE MUROS DE ALBAÑILERIA m3 11.47 11.47 100.00% 0.00 0.00% 11.47 100.00% 0.00 0.00%

16.04.03 DEMOLICION DE VIGAS DE CONCRETO ARMADO m3 1.02 1.02 100.00% 0.00 0.00% 1.02 100.00% 0.00 0.00%

16.04.04 DEMOLICION DE SOBRECIMIENTO m3 3.44 3.44 100.00% 0.00 0.00% 3.44 100.00% 0.00 0.00%

16.04.05 ACARREO DE MATERIAL DEMOLIDO m3 17.80 17.80 100.00% 0.00 0.00% 17.80 100.00% 0.00 0.00%

16.04.06 ELIMINACION DE MATERIAL DEMOLIDO m3 17.80 17.80 100.00% 0.00 0.00% 17.80 100.00% 0.00 0.00%

16.05.00 DEMOLICIONES DE CANALETAS DE EVACUACION DE AGUAS PRUVIALES16.05.01 DEMOLICION DE CONCRETO SIMPLE m3 3.36 3.36 100.00% 0.00 0.00% 3.36 100.00% 0.00 0.00%

16.05.02 ACARREO DE MATERIAL DEMOLIDO m3 3.36 3.36 100.00% 0.00 0.00% 3.36 100.00% 0.00 0.00%

16.05.03 ELIMINACION DE MATERIAL DEMOLIDO m3 3.36 3.36 100.00% 0.00 0.00% 3.36 100.00% 0.00 0.00%

16.06.00 DEMOLICION DE CANCHA DEPORTIVA16.06.01 DEMOLICION DE PISOS Y CONTRATIPSO DE CONCRETO m2 985.20 985.20 100.00% 0.00 0.00% 985.20 100.00% 0.00 0.00%

16.06.02 ACARREO DE MATERIAL DEMOLIDO m3 197.04 197.04 100.00% 0.00 0.00% 197.04 100.00% 0.00 0.00%

16.06.03 ELIMINACION DE MATERIAL DEMOLIDO m3 197.04 197.04 100.00% 0.00 0.00% 197.04 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 44 / 80

Page 45: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

16.07.00 DEMOLICIONES DE GRADERIAS16.07.01 DEMOLICION DE GRADERIAS m2 218.08 218.08 100.00% 0.00 0.00% 218.08 100.00% 0.00 0.00%

16.07.02 ACARREO DE MATERIAL DEMOLIDO m3 65.42 65.42 100.00% 0.00 0.00% 65.42 100.00% 0.00 0.00%

16.07.03 ELIMINACION DE MATERIAL DEMOLIDO m3 65.40 65.40 100.00% 0.00 0.00% 65.40 100.00% 0.00 0.00%

17.00 MEJORAMIENTO DE PABELLON D (02 NIVELES: 05 AULAS, 2 SS.HH.)17.01.00 TRABAJOS PRELIMINARES17.01.01 LIMPIEZA DE TERRENO m2 162.70 0.00 0.00% 162.70 100.00% 162.70 100.00% 0.00 0.00%

17.02.00 MEJORMAMIENTO DE SS.HH.17.02.01 PISOS17.02.01.01 PICADO DE PISO DE CEMENTO, CAPA SUPERIOR, E=0.03 MTS.m2 44.00 44.00 100.00% 0.00 0.00% 44.00 100.00% 0.00 0.00%

17.02.01.02 ACARREO DE MATERIAL DEMOLIDO m3 2.20 2.20 100.00% 0.00 0.00% 2.20 100.00% 0.00 0.00%

17.02.01.03 ELIMINACION DE MATERIAL DEMOLIDO m3 2.20 2.20 100.00% 0.00 0.00% 2.20 100.00% 0.00 0.00%

17.02.01.04 PISO DE CERAMICO DE 0.30 X 0.30 MTS. m2 44.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 44.00 100.00%

17.02.02 ZOCALOS Y CONTRAZOCALOS17.02.02.01 PICADO DE TARRAJEO PARA COLOCACION DE CERAMICOm2 90.16 0.00 0.00% 0.00 0.00% 0.00 0.00% 90.16 100.00%

17.02.02.02 ZOCALO DE CERAMICO DE 20 x 30 cm. m2 90.16 0.00 0.00% 0.00 0.00% 0.00 0.00% 90.16 100.00%

17.02.02.03 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 6.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.30 100.00%

17.02.03 PINTURA17.02.03.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 76.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 76.86 100.00%

17.02.03.02 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN VENTANASm2 5.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 5.56 100.00%

17.02.03.03 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 8.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 8.10 100.00%

17.02.03.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 6.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.30 100.00%

17.02.04 APARATOS Y ACCESORIOS SANITARIOS17.02.04.01 DESMONTAJE DE APARATOS SANITARIOS und 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

17.02.04.02 INODORO TANQUE BAJO C/BLANCO pza 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

17.02.04.03 SUMINISTRO Y COLOCACION DE ACCESORIOS SANITARIOS pza 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.00 100.00%

17.03.00 MEJORAMIENTO EN AULAS17.03.01 PISOS17.03.01.01 PICADO DE PISO DE CEMENTO, CAPA SUPERIOR, E=0.03 MTS.m2 286.24 286.24 100.00% 0.00 0.00% 286.24 100.00% 0.00 0.00%

17.03.01.02 PISO DE PARQUET DE 6x30 CM m2 239.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 239.30 100.00%

17.03.01.03 ACARREO DE MATERIAL DEMOLIDO m3 14.31 14.31 100.00% 0.00 0.00% 14.31 100.00% 0.00 0.00%

17.03.01.04 ELIMINACION DE MATERIAL DEMOLIDO m3 14.31 14.31 100.00% 0.00 0.00% 14.31 100.00% 0.00 0.00%

17.03.01.05 PISO DE CEMENTO PULIDO Y BRUÑADO E= 2" S/COLOREAR M2 46.94 46.94 100.00% 0.00 0.00% 46.94 100.00% 0.00 0.00%

17.03.02 ZOCALOS Y CONTRAZOCALOS17.03.02.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (INCLUYE RODON)ml 140.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 140.15 100.00%

17.03.02.02 CONTRAZOCALO DE CEMENTO PULIDO H = 0.30 MTS m 35.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 35.70 100.00%

17.03.03 PINTURA17.03.03.01 PINTURA LATEX EN INTERIORES Y EXTERIORES (INC. COLUMNAS Y DERRAMES)m2 320.06 0.00 0.00% 0.00 0.00% 0.00 0.00% 320.06 100.00%

17.03.03.02 PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN VENTANASm2 37.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 37.66 100.00%

17.03.03.03 PINTURA CON BARNIZ EN PUERTAS DE MADERA m2 24.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 24.20 100.00%

17.03.03.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.m 35.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 35.70 100.00%

17.03.04 COBERTURAS17.03.04.01 DESMONTAJE DE COBERTURA LIVIANA m2 241.78 241.78 100.00% 0.00 0.00% 241.78 100.00% 0.00 0.00%

17.03.04.02 COBERTURA C/PLANCHA CALAMINA 3.00 X 0.83 M m2 241.78 0.00 0.00% 241.78 100.00% 241.78 100.00% 0.00 0.00%

17.03.04.03 CIELO RASO CON PANELES DE TRIPLAY (INC. COLOCACION)m2 208.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 208.20 100.00%

17.04.00 VARIOS Y LIMPIEZA17.04.01 LIMPIEZA FINAL DE OBRA m2 162.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 162.70 100.00%

18.00 MEJORAMIENTO DE TANQUE ELEVADO18.01.00 TRABAJOS PRELIMINARES18.01.01 LIMPIEZA DE TERRENO m2 16.00 16.00 100.00% 0.00 0.00% 16.00 100.00% 0.00 0.00%

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 45 / 80

Page 46: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

18.02.00 REVOQUES ENLUCIDOS Y MOLDURAS18.02.01 TARRAJEO EN INTERIORES Y EXTERIORES (MEZCLA C:A 1:5, E=1.5CM.)m2 18.20 0.00 0.00% 0.00 0.00% 0.00 0.00% 18.20 100.00%

18.02.02 TARRAJEO IMPERMEABILIZADO INTERIOR TANQUE ELEVADO (Mezcla C:A 1:4, E=2 cm.)m2 51.01 0.00 0.00% 0.00 0.00% 0.00 0.00% 51.01 100.00%

18.02.03 VESTIDURA DE DERRAMES ANCHO = 15 CM. m 1.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.70 100.00%

18.03.00 PISOS Y PAVIMENTOS18.03.01 PISO DE CEMENTO PULIDO Y BRUÑADO E= 2" S/COLOREAR (VEREDA)m2 6.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 6.90 100.00%

18.04.00 CARPINTERIA METALICA18.04.01 PUERTA DE CASETA DE BOMBEO und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

18.04.02 ESCALERA DE GATO DE ALUMINIO EMPOTRADO P/CISTERNAund 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

18.04.03 ESCALERA DE GATO PARA TANQUE ELEVADO und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

18.05.00 CERRAJERIA18.05.01 CERRADURA PARA PUERTAS EXTERIORES DOS GOLPES und 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

18.05.02 BISAGRA ALUMINIZADA 4" pza 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

18.05.03 PICAPORTES DE 4" und 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

18.05.04 CANDADO TIPO FORTE 60 mm pza 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.00 100.00%

18.05.05 ABRAZADERA DE FIJACION DE TUBO pza 4.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4.00 100.00%

18.05.06 TAPA DE FIERRO EN TQE CISTERNA /TQE ELVADO und 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2.00 100.00%

18.06.00 SISTEMA DE AGUA FRIA18.06.01 REPOSICION Y REEMPLAZO DE INSTALACIONES RED DE AGUAGbl. 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

18.07.00 INSTALACIONES ELECTRICAS18.07.01 REPOSICION Y REEMPLAZO DE INSTALACIONES ELECTRICAGbl. 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

19.00 ACONDICIONAMIENTO DE 01 AULA (1ER NIVEL)-PABELLON B19.01.00 DESMONTAJES DE 04 AMBIENTES PREFABRICADOS19.01.01 DESMONTAJE DE PUERTAS m2 7.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 7.92 100.00%

19.01.02 DESMONTAJE DE DIVISIONES PREFABRICADAS m2 48.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 48.45 100.00%

19.01.03 ACARREO DE MATERIAL PROVENIENTE DE DESMONTAJES m3 3.39 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.39 100.00%

19.01.04 ELIMINACION DE MATERIAL PROVENIENTE DE DESMONTAJESm3 3.39 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.39 100.00%

19.02.00 PISOS19.02.01 PICADO DE PISO DE CEMENTO, CAPA SUPERIOR, E=0.03 MTS.m2 80.79 0.00 0.00% 0.00 0.00% 0.00 0.00% 80.79 100.00%

19.02.02 PISO DE PARQUET DE 6x30 CM m2 80.79 0.00 0.00% 0.00 0.00% 0.00 0.00% 80.79 100.00%

19.02.03 ACARREO DE MATERIAL DEMOLIDO m3 3.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.15 100.00%

19.02.04 ELIMINACION DE MATERIAL DEMOLIDO m3 3.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 3.15 100.00%

19.03.00 ZOCALOS Y CONTRAZOCALOS 0.00

19.03.01 CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (INCLUYE RODON)m 38.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 38.00 100.00%

19.04.00 PINTURA19.04.01 PINTURA LATEX EN INTERIORES Y EXTERIORES m2 102.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 102.30 100.00%

19.04.02 PINTURA CON BARNIZ EN PUERTAS Y VENTANAS DE MADERAm2 21.48 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.48 100.00%

19.04.03 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30 MTS.ml 14.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 14.35 100.00%

20.00 EQUIPAMIENTO BASICO Gbl. 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 100.00%

Del Cuadro Anterior podemos observar que las Metas Alcanzadas hasta el Mes Anterior, corresponden a la Columna “ANTERIOR ACUMULADO”, los Metrados Ejecutados del Mes corresponden a la columna “ACTUAL” y las Metas Alcanzadas hasta la fecha, corresponden a la Columna “ACUMULADO”.

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 46 / 80

Page 47: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

III. RESUMEN EJECUTIVO I I I . RESÚMEN EJECUTIVO ENERO 2013

10Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional TacnaFecha ENERO 2013Mod.Ejec. Administración Directa

AVANCE FÍSICO SEGÚN VALORIZACIONES A NIVEL DE COSTO DIRECTO: EXP.BASE

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %

2,495,518.39 100% 928,061.71 37.19% 109,004.36 4.37% 1,037,066.07 41.56% 1,458,452.21 58.44%

AVANCE FÍSICO ADICIONAL 01: MAYORES METRADOS

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %4,909.48 100% 4,909.48 100.00% - 0.00% 4,909.48 100.00% - 0.00%

AVANCE FÍSICO ADICIONAL 01: PARTIDAS NUEVAS

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %1,314,508.00 100% 729,755.67 55.52% 182,243.81 13.86% 911,999.49 69.38% 402,508.42 30.62%

VALORIZACIÓN: DEDUCTIVO 01

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %632,297.75 100% 632,297.75 100.00% - 0.00% 632,297.75 100.00% - 0.00%

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %3,182,638.12 100% 1,030,429.11 32.38% 291,248.17 9.15% 1,321,677.29 41.53% 1,860,960.83 58.47%

SALDO A EJECUTAR

AVANCE ANTERIOR AVANC. PRESENT. MES AVANCE ACUMULADO SALDO A EJECUTARRESÚMEN AVANCE FÍSICO (EXP.BASE + ADICIONAL 01 - DEDUCTIVO 01)

AVANCE ANTERIOR AVANC. PRESENT. MES AVANCE ACUMULADO SALDO A EJECUTAR

AVANC. PRESENT. MES AVANCE ACUMULADO SALDO A EJECUTAR

AVANCE ANTERIOR AVANC. PRESENT. MES

AVANCE ANTERIOR AVANC. PRESENT. MES AVANCE ACUMULADO SALDO A EJECUTAR

AVANCE ACUMULADO

INF. MENSUAL - VALORIZACION N°

PROGRAMADO TOT.

PROGRAMADO TOT.

PROGRAMADO TOT.

PROGRAMADO TOT.

PROGRAMADO TOT.

AVANCE ANTERIOR

Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM % Cantidad / UM %

2,430,375.34 63.81% 2,430,375.34 63.81% 295,015.62 7.75% 2,725,390.96 71.55% 1,083,675.21 28.45%

AVANCE FINANCIERO PRESUPUESTAL A NIVEL DE COSTO TOTAL ENERO 2013AVANCE ANTERIOR AVANC. PRESENT. MES AVANCE ACUMULADO SALDO A EJECUTARPROGRAMADO

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 47 / 80

Page 48: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

IV. EJECUCIÓN DEL PRESUPUESTO ANALÍTICO

IV. EJECUCIÓN DE P R ESUP UESTO ANALIT ICO ENER O 201310

Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional Tacna PLAZO EJECUCION 379 DÍAS DPTO

Fecha ENERO 2013 FECHA INICIO PROV

Mod.Ejec. Administración Directa FECHA TERMINO DIST

PPTO.BASE PPTO.ADIC.01 PPTO.DEDU.01 PARCIAL MONTO % MONTO % MONTO % SALDO S/. %

2.6.22.23 COSTOS DE CONST - PERSONAL 695,960.13 438,448.25 195,480.72 938,927.66 844,827.25 89.98% 141,893.20 15.11% 986,720.45 105.09% -47,792.79 -5.09%

2.6.22.24 COSTOS DE CONST - BIENES 1,357,362.54 785,015.34 407,644.77 1,734,733.12 1,178,256.09 67.92% 133,520.60 7.70% 1,311,776.69 75.62% 422,956.43 24.38%

2.6.22.25 COSTOS DE CONST - SERVICIOS 0.00 0.00 0.00 0.00 164,727.83 0.00 164,727.83 0.00% -164,727.83

2.6.32.22 EQUIPAMIENTO 231,143.87 0.00 0.00 231,143.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 231,143.87 100.00%

2.6.32.9 99 MAQUINARIAS, EQUIPOS, DURADEROS211,051.84 95,953.88 29,172.26 277,833.46 13,680.00 4.92% 0.00 0.00% 13,680.00 4.92% 264,153.46 95.08%

COSTO DIRECTO 2,495,518.39 1,319,417.48 632,297.75 3,182,638.12 2,201,491.17 69.17% 275,413.80 8.65% 2,476,904.97 77.83% 705,733.15 22.17%

2.6.81.41 GASTOS GENERALES 13% 324,417.39 171,524.27 82,198.71 413,742.96 228,884.17 55.32% 19,601.82 4.74% 248,485.99 60.06% 165,256.97 39.94%1°Comp. SUBTOTAL 2,819,935.78 1,490,941.75 714,496.45 3,596,381.08 2,430,375.34 67.58% 295,015.62 8.20% 2,725,390.96 75.78% 870,990.12 24.22%

2°Comp. CAPACITACION 37,640.00 - - 37,640.00 - - - - - - 37,640.00 100.00%

SUPERVISION 4% 99,820.74 52,776.70 25,291.91 127,305.52 - - - - - - 127,305.52 100.00%

LIQUIDACION 1.5% 37,432.78 19,791.26 9,484.47 47,739.57 - - - - - - 47,739.57 100.00%

2,994,829.29 1,563,509.71 749,272.83 3,809,066.17 2,430,375.34 63.81% 295,015.62 7.75% 2,725,390.96 71.55% 1,083,675.21 28.45%COSTO TOTAL PROYECTO

SEG. EXP. TEC. CONSOLIDADO

29/04/2013 CANDARAVE

ITEM DESCRIPCION ANTERIOR SALDO DE LA OBRA

INF. MENSUAL - VALORIZACION N°

EJECUCIÓN EN EL MES ENERO 2013

MES ACTUAL ENERO 2013 UBICACIÓNTACNA

16/04/2012 CANDARAVE

ACUMULADO

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 48 / 80

Page 49: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

V. VALORIZACIONES DE OBRA

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 49 / 80

Page 50: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

C ONTROL DE VALORIZAC ION FÍSIC A POR MES ENERO 2013INF. MENSUAL - VALORIZACION N° 1 0

ITEMCOSTOS

EXPED. ABRIL 2012 MAYO 2012 JUNIO 2012 JULIO 2012 AGOSTO 2012SETIEMBRE 2012 OCTUBRE 2012 NOVIEMBRE 2012DICIEMBRE 2012 ENERO 2013 FEBRERO 2013 MARZO 2013 ABRIL 2013

TOTAL

ACUMULADOSALDO

1 TRABAJOS PRELIMINARES 57115.21 4,361.70 27,277.51 3,468.00 - 2,268.00 - - 5,640.00 4,440.00 1,620.00 - - - 49,075.21 8,040.00 2 CONSTRUCCION DE 03 AMBIENTES PARA AULAS - PABELLON C149431.2328 - 7,268.98 6,266.93 12,713.72 - 15,521.47 16,525.74 1,290.34 366.69 10,159.11 - - - 70,112.99 79,318.25 3 CONSTRUCCION DE 01 AMBIENTE PARA S.U.M.140865.8024 - 5,300.89 6,547.54 2,252.37 - 4,106.95 7,451.11 14,193.70 948.87 11,823.95 - - - 52,625.37 88,240.44 4 CONSTRUCCION DE 01 AMBIENTE PARA COCINA-COMEDOR Y 01 AMBIENTE PARA ZONA ADMINISTRATIVA205609.5353 - 3,085.48 8,942.25 2,759.02 - 31,985.66 12,256.63 19,952.61 483.35 9,299.79 - - - 88,764.77 116,844.76 5 CONSTRUCCION DE 01 ESCALERA 56939.6157 - 22.47 - - - - 31.08 16,890.79 11,183.86 2,230.74 - - - 30,358.94 26,580.68 6 CONSTRUCCION DE 02 BATERIAS SS.HH. 118882.9487 - 86.55 2,283.10 - - - - 22,345.20 12,780.53 1,347.78 - - - 38,843.17 80,039.78 7 CONSTRUCCION DE 01 AMBIENTE PARA GUARDIANIA38444.9127 - 25.50 3,269.92 232.60 - 3,404.65 2,768.85 6,292.40 193.76 2,798.63 - - - 18,986.31 19,458.60 8 CONSTRUCCION DE 01 AMBIENTE PARA TALLER DE CARPINTERIA143931.9379 - 9,554.12 1,814.52 302.45 - 6,362.70 - 37,666.61 654.83 - - - - 56,355.21 87,576.72 9 CONSTRUCCION DE 02 AMBIENTES PARA SS.HH. EN ZONA DE LOSAS DEPORTIVAS Y 01 AMBIENTE DE EDUCACION FISICA177149.9114 - 108.05 - - - - - 25,658.72 66,648.56 7,705.10 - - - 100,120.44 77,029.47

10 CONSTRUCCION DE CERCO PERIMETRICO 19700.0787 - - - 26.03 - 1,948.65 - 6,244.05 1,870.15 - - - - 10,088.88 9,611.20 11 CONSTRUCCION DE 02 GRADERIAS EN ZONA DEPORTIVA171672.7516 - 193.89 - 413.92 - 334.66 - 2,660.84 2,295.24 11,498.94 - - - 17,397.48 154,275.27 12 CONSTRUCCION DE PATIO DE HONOR, 02 LOSAS DEPORTIVAS Y AREAS DE CIRCULACION591994.1753 4,982.79 55,686.82 23,496.89 45,176.64 9,444.83 941.12 21,120.98 15,899.10 58,613.21 28,415.73 - - - 263,778.11 328,216.06 13 AREAS VERDES 10303.6371 - - - - - - - - - - - - - - 10,303.64 14 COBERTURA CON MALLA RASHELL 80631.1745 - - - - - - 21,681.67 17,137.46 - - - - - 38,819.13 41,812.04 15 RED DE AGUA DESAGUE E ISTALACIONES ELECTRICAS106332.2469 - - - - - - 2,046.88 705.90 60,300.96 16,229.44 - - - 79,283.18 27,049.07 16 DESMONTAJES Y DEMOLICIONES 108881.15 59,129.35 41,843.18 6,929.65 978.98 - - - - - - - - - 108,881.15 - 17 MEJORAMIENTO DE PABELLON D (02 NIVELES: 05 AULAS, 2 SS.HH.)59001.5719 - 4,867.42 837.42 - - - - - 1,988.38 5,875.14 - - - 13,568.37 45,433.20 18 MEJORAMIENTO DE TANQUE ELEVADO 19052.6846 - - 7.36 - - - - - - - - - - 7.36 19,045.32 19 ACONDICIONAMIENTO DE 01 AULA (1ER NIVEL)-PABELLON B8433.7182 - - - - - - - - - - - - - - 8,433.72 20 EQUIPAMIENTO BASICO 231143.98 - - - - - - - - - - - - - - 231,143.98

COSTO DIRECTO 2,495,518.40 68,473.83 155,320.86 63,863.58 64,855.72 11,712.83 64,605.85 83,882.94 192,577.72 222,768.38 109,004.36 0.00 0.00 0.00 1,037,066.07 1,458,452.21GASTOS GENERALES (13% ) 324,417.39 8,901.60 20,191.71 8,302.27 8,431.24 1,522.67 8,398.76 10,904.78 25,035.10 28,959.89 14,170.57 0.00 0.00 0.00 134,818.59 189,598.79

INFRAESTRUCTURA (CD+GG) 2,819,935.79 77,375.43 175,512.58 72,165.85 73,286.96 13,235.50 73,004.61 94,787.72 217,612.82 251,728.27 123,174.93 0.00 0.00 0.00 1,171,884.66 1,648,050.99

CAPACITACIÓN 37,640.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00SUPERVISIÓN 4.00% 99,820.74

LIQUIDACIÓN 1.5% 37,432.78EXPEDIENTE TÉCNICO 0.00

PPTO TOTAL DEL PROYECTO 2,994,829.30 77,375.43 175,512.58 72,165.85 73,286.96 13,235.50 73,004.61 94,787.72 217,612.82 251,728.27 123,174.93 0.00 0.00 0.00 1,171,884.66 1,648,050.99

% AVANCE FISICO DEL MES 2.74% 6.22% 2.56% 2.60% 0.47% 2.59% 3.36% 7.72% 8.93% 4.37% 0.00% 0.00% 0.00% 41.56% 58.44%Fuente: % AVANCE FISICO ACUMULADO 8.97% 11.53% 14.13% 14.60% 17.18% 20.55% 28.26% 37.19% 41.56%

TRABAJOS EJECUTADOS

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 50 / 80

Page 51: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

INF. MENSUAL - VALORIZACION N° 10Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional Tacna PLAZO EJECUCIÓN 379 DÍAS DPTOMod.Ejec. Administración Directa FECHA INICIO PROV

FECHA TERMINO DIST

COSTO DIRECTO EXP. BASE

MESF. DE INIC IO : 16/04/2012 S/ . (%) S/ . (%) S/ . (%) S/ . (%) S/ . (%) S/ . (%)

ABRIL 2012 197,645.09 7.92% 197,645.09 7.92% 68,473.83 2.74% 68,473.83 2.74% 68,473.83 2.74% 68,473.83 2.74%

MAYO 2012 132,284.52 5.30% 329,929.61 13.22% 155,320.86 6.22% 223,794.70 8.97% 155,320.86 6.22% 223,794.70 8.97%

JUNIO 2012 321,411.79 12.88% 651,341.41 26.10% 63,863.58 2.56% 287,658.28 11.53% 63,863.58 2.56% 287,658.28 11.53%

JULIO 2012 399,316.56 16.00% 1,050,657.97 42.10% 64,855.72 2.60% 352,514.00 14.13% 64,855.72 2.60% 352,514.00 14.13%

AGOSTO 2012 395,319.84 15.84% 1,445,977.81 57.94% 11,712.83 0.47% 364,226.83 14.60% 11,712.83 0.47% 364,226.83 14.60%

SETIEMBRE 2012 285,958.83 11.46% 1,731,936.64 69.40% 64,605.85 2.59% 428,832.68 17.18% 64,605.85 2.59% 428,832.68 17.18%

OCTUBRE 2012 481,800.69 19.31% 2,213,737.33 88.71% 83,882.94 3.36% 512,715.62 20.55% 83,882.94 3.36% 512,715.62 20.55%

NOVIEMBRE 2012 281,781.05 11.29% 2,495,518.38 100.00% 192,577.72 7.72% 705,293.33 28.26% 192,577.72 7.72% 705,293.33 28.26%

DICIEMBRE 2012 222,768.38 8.93% 928,061.71 37.19% 222,768.38 8.93% 928,061.71 37.19%

ENERO 2013 109,004.36 4.37% 1,037,066.07 41.56% 109,004.36 4.37% 1,037,066.07 41.56%

FEBRERO 2013 784,558.88 31.44% 1,821,624.95 73.00%

MARZO 2013 673,893.43 27.00% 2,495,518.38 100.00%

C.D. PPTO.BASE 2,495,518.38 100% 2,495,518.38 100.00% 1,037,066.07 41.56%

CONTROL DEL AVANCE FISICO DE OBRA

PROGRAMADO BASE EJECUTADO

MES ACTUAL ENERO 2013

16/04/2012

RE-PROGRAMADO 02 A C.D.

2,495,518.38

UBICACIÓN

TACNA

CANDARAVE

MENSUAL ACUMULADO MENSUAL ACUMULADOMENSUAL ACUMULADO

29/04/2013 CANDARAVE

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 51 / 80

Page 52: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

0%

5%

10%

15%

20%

25%

30%

35%AB

RIL 2

012

MAY

O 2

012

JUN

IO 2

012

JULI

O 2

012

AGO

STO

201

2

SETI

EMBR

E 20

12

OCT

UBRE

201

2

NO

VIEM

BRE

2012

DICI

EMBR

E 20

12

ENER

O 2

013

FEBR

ERO

201

3

MAR

ZO 2

013

7.92

%

5.30

%

12.8

8%

16.0

0%

15.8

4%

11.4

6%

19.3

1%

11.2

9%

2.74

% 6.22

%

2.56

%

2.60

%

0.47

%

2.59

%

3.36

% 7.72

%

8.93

%

4.37

%

31.4

4%

27.0

0%

2.74

% 6.22

%

2.56

%

2.60

%

0.47

%

2.59

%

3.36

% 7.72

%

8.93

%

4.37

%

ABRIL 2012MAYO2012

JUNIO2012 JULIO 2012

AGOSTO2012

SETIEMBRE2012

OCTUBRE2012

NOVIEMBRE 2012

DICIEMBRE2012

ENERO2013

FEBRERO2013

MARZO2013

PROGRAMADO BASE 7.92% 5.30% 12.88% 16.00% 15.84% 11.46% 19.31% 11.29%

RE-PROGRAMADO 02 A C.D. 2.74% 6.22% 2.56% 2.60% 0.47% 2.59% 3.36% 7.72% 8.93% 4.37% 31.44% 27.00%

EJECUTADO 2.74% 6.22% 2.56% 2.60% 0.47% 2.59% 3.36% 7.72% 8.93% 4.37%

GRÁFICO Nº01AVANCE FÍSICO DE OBRA POR MES

PROGRAMADO Vrs. EJECUTADO

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 52 / 80

Page 53: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

ABRIL 2012 MAYO 2012 JUNIO 2012 JULIO 2012AGOSTO

2012SETIEMBRE

2012OCTUBRE

2012NOVIEMBRE

2012DICIEMBRE

2012 ENERO 2013FEBRERO

2013MARZO

2013

PROGRAMADO BASE 7.92% 13.22% 26.10% 42.10% 57.94% 69.40% 88.71% 100.00%

RE-PROGRAMADO 02 A C.D. 2.74% 8.97% 11.53% 14.13% 14.60% 17.18% 20.55% 28.26% 37.19% 41.56% 73.00% 100.00%

EJECUTADO 2.74% 8.97% 11.53% 14.13% 14.60% 17.18% 20.55% 28.26% 37.19% 41.56%

7.92%

13.22%

26.10%

42.10%

57.94%

69.40%

88.71%

100.00%

14.60%17.18%

20.55%

28.26%

37.19% 41.56%

73.00%

100.00%

14.60%17.18%

20.55%

28.26%

37.19%

41.56%

0%

20%

40%

60%

80%

100%

120%P

OR

CE

NTA

JE

A

CU

MU

LA

DO

GRÁFICO Nº02 "CURVA S"AVANCE FÍSICO ACUMULADO

PROGRAMADO Vrs. EJ ECUTADOPROGRAMADO BASE RE-PROGRAMADO 02 A C.D. EJECUTADO

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 53 / 80

Page 54: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

VI. REPORTE DE UTILIZACIÓN DE RECURSOS

6.1MATERIALES : INSUMOS Y SERVICIOS. 2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES MARZO 2012 483,251.74

ITEM PROVEEDOR ReferencNºOrd

CompraFECHA

Exp

SIAFDESCRIPCION UND CANT P.U. P.PARCIAL TOTAL

MATERIALES DE CONSTRUCCIÓN 466,274.74

1 FORESTAL MADERERA DEL SUR E.I.R.L. PEDIDO 01675 968 14/03/2012 2574 MADERA TRIPLAY LUPUNA 18 mm X 4" X 8" UNIDAD 100 98 9,800.00 2 COM.FERRETERIA ELECTRICA DEL SUR SCRL PEDIDO 01680 970 14/03/2012 2575 YESO X 18 KG UNIDAD 16 7.4 118.40 3 COM.FERRETERIA ELECTRICA DEL SUR SCRL PEDIDO 01680 970 14/03/2012 2575 COLA SINTETICA X 1 GAL UNIDAD 27 15.8 426.60 4 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01665 1000 14/03/2012 2578 TUBO DE PVC SEL DE 3/4" X 3 M UNIDAD 950 2.79 2,650.50 5 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 LIJA PARA PULIR FIERRO Nº 80 EMP X 25 100 30 3,000.00 6 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 LIJA PARA PULIR FIERRO Nº 100 UNIDAD 100 1.18 118.00 7 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 LIJA PARA PULIR FIERRO Nº 150 UNIDAD 50 1.15 57.50 8 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 LIJA PARA PULIR FIERRO Nº 40 UNIDAD 50 1.48 74.00 9 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 LIJA PARA PULIR FIERRO Nº 60 UNIDAD 50 1.45 72.50

10 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 CINTA TEFLON DE 1 1/2" X 10 M UNIDAD 10 2.6 26.00 11 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 CINTA AISLANTE DE 1/2" X 3 M UNIDAD 10 2.5 25.00 12 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 ESCOBA DE CERDA DE PLASTICO UNIDAD 12 4.9 58.80 13 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 CANDADO X 70 MM UNIDAD 3 53.9 161.70 14 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 OCRE COLOR ROJO KLG 7 7 49.00 15 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 CORDEL DE ALGODON GRUESO METRO 100 0.39 39.00 16 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01661 1002 14/03/2012 2579 CORDEL DE NAILON Nº 60 X 100 M UNIDAD 10 10 100.00 17 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 VARILLA DE FIERRO GALVANIZADO ROSCADA DE 1/2" X 1.80 M UNIDAD 15 17.5 262.50 18 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 SOLDADURA CELLOCORD 1/8" KLG 10 11.8 118.00 19 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 TUERCA DE ACERO DE 1/2'' UNIDAD 200 0.8 160.00 20 LADRILLERA J MARTORELL SA PEDIDO 01671 1087 16/03/2012 0 LADRILLO DE 15 CM X 30 CM X 30 CM DE 8 HUECOS UNIDAD 2120 2.69 5,702.80 21 LADRILLERA J MARTORELL SA PEDIDO 01671 1087 16/03/2012 0 LADRILLO DE ARCILLA DE 10 CM X 14 CM X 24 CM UNIDAD 36000 1.29 46,440.00 22 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 01666 1088 16/03/2012 2811 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 3/4" X 9 M UNIDAD 400 55.592 22,236.93 23 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 01666 1088 16/03/2012 2811 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 1/2" X 9 M UNIDAD 1100 24.333 26,766.77 24 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 01666 1088 16/03/2012 2811 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 3/8" X 9 M UNIDAD 2540 13.219 33,575.50 25 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 01666 1088 16/03/2012 2811 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 1/4" X 9 M UNIDAD 1380 5.3944 7,444.30 26 GRUPO SANTA FE SOCIEDAD ANONIMA CERRADA - GRUPO SANTA FE S.A.C. PEDIDO 01666 1089 16/03/2012 2872 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 5/8" X 9 M UNIDAD 680 38.534 26,202.81 27 HELIO INVERSIONES S.A.C PEDIDO 01670 1090 16/03/2012 2814 CEMENTO PORTLAND PUZOLANICO TIPO IP X 42.5 KG UNIDAD 8500 19.7 167,452.54 28 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01662 1113 16/03/2012 2650 WAIPE GRUESO KLG 10 5 50.00 29 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01662 1113 16/03/2012 2650 PARCHE PARA LLANTA Nº 5 UNIDAD 48 0.4 19.20 30 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01679 1114 16/03/2012 2651 ADITIVO IMPERMEABILIZANTE PARA CONCRETO. GALON 6 19.5 117.00 31 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01679 1114 16/03/2012 2651 ADITIVO INCORPORADOR DE AIRE PARA CONCRETO GALON 40 31 1,240.00 32 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01679 1114 16/03/2012 2651 ADITIVO CURADOR DE CONCRETO GALON 40 13.5 540.00 33 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01679 1114 16/03/2012 2651 ADITIVO ACELERANTE DE FRAGUA. GALON 53 26.3 1,393.90 34 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01676 1116 16/03/2012 2653 ESPONJA DE ESPUMA SINTETICA UNIDAD 12 10.9 130.80 35 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01676 1116 16/03/2012 2653 POLIESTIRENO EXPANDIDO DE 8 FT X 4 FT X 1" UNIDAD 24 10.2 244.80 36 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01674 1117 16/03/2012 2654 CLAVO DE FIERRO DE 1" (AL PESO) KLG 30 8.05 241.50 37 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01674 1117 16/03/2012 2654 CLAVO DE FIERRO DE 2 1/2" (AL PESO) KLG 120 4.1 492.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 54 / 80

Page 55: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

38 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01674 1117 16/03/2012 2654 CLAVO DE FIERRO DE 2" (AL PESO) KLG 180 4.1 738.00 39 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01674 1117 16/03/2012 2654 CLAVO DE FIERRO DE 3" (AL PESO) KLG 270 4.2 1,134.00 40 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01674 1117 16/03/2012 2654 CLAVO DE FIERRO DE 4" (AL PESO) KLG 270 4.2 1,134.00 41 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01673 1118 16/03/2012 2655 ALAMBRE DE FIERRO NEGRO Nº 16 (AL PESO) KLG 1500 3.85 5,775.00 42 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01673 1118 16/03/2012 2655 ALAMBRE DE FIERRO NEGRO Nº 8 (AL PESO) KLG 1200 3.9 4,680.00 43 FORESTAL MADERERA DEL SUR E.I.R.L. PEDIDO 01672 1317 23/03/2012 3163 MADERA TORNILLO (POR AREA) PIE CUAD 15000 5.17 77,549.99 44 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 02105 1465 28/03/2012 3498 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 3/8" X 9 M UNIDAD 521 14.9 7,762.90 45 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 02105 1465 28/03/2012 3498 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 1/2" X 9 M UNIDAD 34 26.9 914.60 46 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 02166 1515 29/03/2012 3655 LIJA PARA PULIR FIERRO Nº 120 UNIDAD 50 1.18 59.00 47 HANCCO LAJO RICHARD RODOLFO PEDIDO 01655 1051 15/03/2012 2632 ANDAMIO DE FIERRO GALVANIZADO DE 1 CUERPO UNIDAD 10 480 4,800.00 48 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 BROCHA DE 2" UNIDAD 8 8 64.00 49 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 BROCHA DE 4" UNIDAD 8 18 144.00 50 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 BARRETA DE ACERO FORJADO SAE 1045 HEXAGONAL DE 1 1/4" X 1.80 M UNIDAD 10 48 480.00 51 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 COMBA DE 10 LB UNIDAD 2 60 120.00 52 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 COMBA DE 20 LB UNIDAD 2 88 176.00 53 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 COMBA DE 6 LB UNIDAD 2 28 56.00 54 INVERSIONES RALSAK S.A.C. PEDIDO 01656 1053 16/03/2012 2631 COMBA DE 25 LB UNIDAD 2 98 196.00 55 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 DISCO DE CORTE DE 9 X 1/8" X 7/8" UNIDAD 48 8.2 393.60 56 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 DISCO DE CORTE PARA CONCRETO DE 7" UNIDAD 24 6 144.00 57 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 DISCO DE CORTE CIRCULAR DIAMANTADO PARA MADERA 12" DIAMETRO UNIDAD 4 77.5 310.00 58 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 DISCO DIAMANTADO DE 10" UNIDAD 4 63.5 254.00 59 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 HOJA DE SIERRA DE 18" UNIDAD 24 3.9 93.60 60 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 BROCA DE ACERO DE 5/8" UNIDAD 2 24.6 49.20 61 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01658 1054 16/03/2012 2630 BROCA DIAMANTADA 1/2" UNIDAD 2 18 36.00 62 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01663 1115 16/03/2012 2652 PALO EUCALIPTO 3" X 3 m UNIDAD 50 17.45 872.50 63 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01663 1115 16/03/2012 2652 MALLA DE PLASTICO DE 200 m X 2.5 m UNIDAD 1 730 730.00

COMBUSTIBLES Y CARBURANTES 1,328.00

64 ESTACION DE SERVICIOS ELISUR S.C.R.LTDA. PEDIDO 01683 999 14/03/2012 2576 PETROLEO DIESEL 2 GALON 100 13.28 1,328.00

MATERIALES DE ESCRITORIO 1,096.30

65 LIBRERIA E IMPRENTA CONTINENTAL E.I.R.L. PEDIDO 01632 1001 14/03/2012 2835 PAPEL AUTOCOPIATIVO 60 g TAMAÑO A4 (ORIGINAL + 4 COPIAS) MILLAR 1 170 170.00 66 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 BOLIGRAFO (LAPICERO) DE TINTA SECA PUNTA FINA COLOR AZUL UNIDAD 10 0.3 3.00 67 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 BOLIGRAFO (LAPICERO) DE TINTA SECA PUNTA FINA COLOR ROJO UNIDAD 10 0.3 3.00 68 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 CUADERNO DOBLE ESPIRAL CUADRICULADO TAMAÑO A4 X 200 HOJAS UNIDAD 1 5.9 5.90 69 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 CUADERNO DOBLE ESPIRAL CUADRICULADO TAMAÑO A4 X 100 HOJAS UNIDAD 2 4 8.00 70 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 ENGRAPADOR DE METAL TIPO ALICATE UNIDAD 1 14.8 14.80 71 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 FOLDER MANILA TAMAÑO A4 DE COLORES UNIDAD 200 0.3 60.00 72 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 SUJETADOR PARA PAPEL (TIPO FASTENER) DE METAL EMP X 50 4 3.5 14.00 73 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 BOLIGRAFO (LAPICERO) DE TINTA LIQUIDA PUNTA FINA COLOR AZUL UNIDAD 5 2.2 11.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 55 / 80

Page 56: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

74 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 TARJETA DE CONTROL VISIBLE DE ALMACEN CIENTO 6 10 60.00 75 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 ARCHIVADOR PLASTIFICADO DE PALANCA LOMO ANCHO TAMAÑO OFICIO DOC. 1 43.2 43.20 76 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 CUADERNO DE OBRA TAMAÑO A4 X 100 HOJAS UNIDAD 5 31.9 159.50 77 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 TABLERO ACRILICO TAMAÑO A4 CON SUJETADOR DE METAL UNIDAD 2 6.4 12.80 78 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 NOTA AUTOADHESIVA 1 1/2" X 2" (3.8 CM X 5 CM) APROX. X 100 HOJAS X 3 AMARILLOUNIDAD 5 4.5 22.50 79 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 TINTA PARA TAMPON X 28 ML APROX. UNIDAD 2 1.4 2.80 80 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 ESCALIMETRO DE ACRILICO X 30 CM UNIDAD 2 6.4 12.80 81 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 01633 1011 14/03/2012 2599 FORRO DE PLASTICO TAMAÑO OFICIO UNIDAD 2 4.9 9.80 82 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 CD GRABABLE DE 700 MB. EMP X 50 1 30 30.00 83 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 TINTA LIQUIDA PARA RECARGA DE CARTUCHO DE IMPRESORA NEGRO 1 L UNIDAD 2 43 86.00 84 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 CINTA PARA IMPRESORA EPSON 570 UNIDAD 3 19 57.00 85 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 CARTUCHO FOTORECEPTOR PARA IMPRESORA XEROX WORKCENTRE M15 UNIDAD 1 57 57.00 86 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 CARTUCHO FOTORECEPTOR PARA IMPRESORA MULTIFUNCIONAL XEROX WORKCENTRE 5230/5225/5222UNIDAD 3 46 138.00 87 ARDTEX E.I.R.L. PEDIDO 01647 1047 15/03/2012 2627 MEMORIA PORTATIL USB DE 8 GB UNIDAD 2 42 84.00 88 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01662 1113 16/03/2012 2650 CINTA DE EMBALAJE 2" X 55 YD UNIDAD 12 2.6 31.20

VESTUARIO

89 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 GUANTE DE JEBE DE USO DOMESTICO PUÑO LARGO PAR 60 9.5 570.00 90 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 MASCARILLA DESCARTABLE CON FILTRO UNIDAD 80 14 1,120.00 91 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 CINTA PLASTICA DE SEÑALIZACION DE SEGURIDAD DE 8" X 100 M UNIDAD 1 90 90.00 92 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 LENTES DE PROTECCION PARA CORTE DE METALES UNIDAD 100 9.5 950.00 93 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 CASCO DE SEGURIDAD DE PLASTICO (MENOR A 1/8 DE LA UIT) COLOR ROJOUNIDAD 80 11 880.00 94 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 BOTA DE JEBE CAÑA ALTA UNISEX TALLA 41 PAR 20 40 800.00 95 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 PROTECTOR AUDITIVO TIPO TAPONES DE MONOPRENO CON CORDON DE POLIESTERUNIDAD 80 4 320.00 96 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 TELA FRANELA 50 cm X 1.00 m UNIDAD 80 7 560.00 97 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 ARNES DE NYLON REFORZADO REGULABLE TALLA ESTANDAR UNIDAD 15 160 2,400.00 98 EXTINSERG'F PERU S.A.C. PEDIDO 01623 1012 14/03/2012 2580 GUANTE DE CUERO REFORZADO PARA SEGURIDAD PAR 150 11 1,650.00 99 COMERCIAL FERRETERIA FATIMA SOCIEDAD ANONIMA CERRADA - COMERCIAL FERRETERIA FATIMA S.A.C.PEDIDO 01699 1556 30/03/2012 3822 ZAPATO DE CUERO CON PUNTA DE ACERO PARA CABALLERO PAR 80 62.99 5,039.20

MEDICAMENTOS

BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 PEROXIDO DE HIDROGENO 100 V X 120 ML UNIDAD 5 2 10.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 ALCOHOL ETILICO (ETANOL) 90º LITRO 1 9.5 9.50 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 ALGODON HIDROFILO X 1 KG UNIDAD 1 31 31.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 ESPARADRAPO ANTIALERGICO DE PAPEL 5.00 CM X 4.50 M UNIDAD 2 14 28.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 GASA FRACCIONADA ESTERIL 10 CM X 10 CM DE 10 PLIEGUES X 5 UNI UNIDAD 20 2 40.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 VENDA DE ALGODON 4" X 5 YD UNIDAD 10 3.5 35.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 PARACETAMOL 500 MG TAB UNIDAD 40 0.2 8.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 01681 969 14/03/2012 2577 AMOXICILINA 500 MG TAB UNIDAD 40 0.3 12.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 56 / 80

Page 57: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES ABRIL 2012 24,288.00

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALCOMBUSTIBLES Y CARBURANTES 18,288.00

ESTACION DE SERVICIOS ELISUR S.C.R.LTDA. PEDIDO 02115 1835 12/04/2012 4488 GASOLINA DE 90 OCTANOS GALON 150 14.62 2,193.00 SERVICENTRO SUR ONDINA E.I.R.L. PEDIDO 01682 2094 23/04/2012 5205 GASOLINA DE 95 OCTANOS GALON 1050 15.329 16,095.00

VESTUARIO 6,000.00

EXTINSERG'F PERU S.A.C. PEDIDO 01700 1651 04/04/2012 3960 PANTALON DE DRIL UNISEX UNIDAD 80 35 2,800.00 EXTINSERG'F PERU S.A.C. PEDIDO 01700 1651 04/04/2012 3960 CAMISA DE DRIL MANGA LARGA UNIDAD 80 40 3,200.00

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - ABRIL 2012 1,050.00

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALHM.COM S.A.C. PEDIDO 00845 1605 10/04/2012 4571 SERVICIO DE GIGANTOGRAFIA EN BANNER POLYESTER SERVICIO 1050 1 1050

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES MAYO 2012 9,126.40

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 3,800.00

CALIZAYA TICAHUANCA FELIX SANTIAGO PEDIDO 03763 2771 18/05/2012 6823 ANDAMIO DE FIERRO GALVANIZADO DE 1 CUERPO UNIDAD 10 380 3,800.00

MATERIALES DE ESCRITORIO 1,168.40

LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 03793 2394 07/05/2012 5886 PAPEL BOND 80 G TAMAÑO A4 EMP X 500 10 12.9 129.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 ARCHIVADOR DE CARTON CON PALANCA LOMO ANCHO TAMAÑO A4 UNIDAD 10 3.6 36.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 ARCHIVADOR DE CARTON CON PALANCA LOMO ANGOSTO TAMAÑO A4 UNIDAD 5 3.6 18.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 PERFORADOR DE 2 ESPIGAS PARA 10 A 15 HOJAS UNIDAD 1 7 7.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 REGLA DE METAL 30 CM UNIDAD 1 2.5 2.50 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 REGLA DE METAL 60 CM UNIDAD 1 5.5 5.50 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 CUCHILLA CORTA PAPEL TAMAÑO MEDIANO UNIDAD 3 0.8 2.40 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 GRAPA 26/6 X 5000 UNIDAD 4 1.9 7.60 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 SOBRE MANILA TAMAÑO A4 EMP X 25 4 3.5 14.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 TIJERA RECTA 12 CM UNIDAD 1 4 4.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 GOMA LIQUIDA X 1 L UNIDAD 1 5 5.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BORRADOR MIXTO TAMAÑO GRANDE UNIDAD 10 0.35 3.50 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR AZUL UNIDAD 5 2.3 11.50

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 57 / 80

Page 58: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR NEGRO UNIDAD 5 2.3 11.50 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR ROJO UNIDAD 5 2.3 11.50 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BOLIGRAFO (LAPICERO) DE TINTA SECA PUNTA FINA COLOR AZUL. DOC. 5 9.8 49.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 PORTAMINA 0.5 MM UNIDAD 6 3.5 21.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 TIZA ANTIALERGICA PARA PIZARRA DECENA 2 3.5 7.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 LAPIZ DE COLOR UNIDAD 12 0.6 7.20 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 NOTA AUTOADHESIVA 3" X 2" APROX. X 100 HOJAS UNIDAD 4 1.6 6.40 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 CD REGRABABLE DE 700 MB CIENTO 2 65 130.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 PAPEL CARBON TAMAÑO A4 COLOR AZUL CIENTO 4 15 60.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 ENGRAPADOR DE METAL 26/8 UNIDAD 1 25 25.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 BINDER CLIP (CLIP BILLETERO) DE 1 1/8" (29 MM) UNIDAD 24 0.3 7.20 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 PAPEL CREPE DE 2.00 M X 50 CM COLOR ROJO UNIDAD 20 0.45 9.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 FOLDER MANILA TAMAÑO A4 EMP X 25 4 4 16.00 LOMBARDI CARBAJAL JOSE HUMBERTO PEDIDO 03785 2585 14/05/2012 6439 SUJETADOR PARA PAPEL (TIPO FASTENER) DE METAL EMP X 50 4 2.9 11.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 03789 2865 23/05/2012 7039 PAPEL AUTOCOPIATIVO 60 g TAMAÑO A4 (ORIGINAL + 4 COPIAS) MILLAR 2 275 550.00

VESTUARIO 4,158.00

ZURITA HUANACUNI ALICIA CARMELA PEDIDO 03158 2657 16/05/2012 6496 LENTE DE PROTECCION DE PVC OSCURO UNIDAD 6 30 180.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 03158 2657 16/05/2012 6496 CASCO DE SEGURIDAD DE PLASTICO COLOR BLANCO UNIDAD 6 28 168.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 03158 2657 16/05/2012 6496 ZAPATO DE CUERO CON PUNTA REFORZADA PARA CABALLERO PAR 6 290 1,740.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 03158 2657 16/05/2012 6496 CHALECO DE DRIL CON LOGOTIPO UNIDAD 6 45 270.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 03158 2657 16/05/2012 6496 CASACA TERMICA DE PLUMA DE GANSO UNISEX TALLA XL UNIDAD 6 300 1800

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES JUNIO 2012 7,785.00

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 7,785.00

REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 PICO CON MANGO UNIDAD 20 34.5 690.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 WINCHA METALICA 50 M UNIDAD 2 55 110.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 PLANCHA PARA EMPASTAR UNIDAD 6 8.5 51.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 PALA TIPO CUCHARA UNIDAD 20 24.5 490.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 LLANTA PARA CARRETILLA TIPO BUGUI DE 40 CM INCLUYE LLANTA DE JEBE Y CAMARAUNIDAD 20 36.5 730.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 INFLADOR PARA LLANTA DE CARRETILLA UNIDAD 2 16 32.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 CARRETILLA PARA CONSTRUCCION TIPO BUGUI (MENOR A 1/8 DE LA UIT) UNIDAD 20 116 2,320.00 REPRESENTACIONES FERRENATO SOCIEDAD ANONIMA CERRADA-REPRESENTACIONES FERRENATO S.A.C.PEDIDO 04844 3139 04/06/2012 7847 WINCHA METALICA 10 M UNIDAD 2 10 20.00 TABLEROS DEL SUR E.I.R.L. PEDIDO 05337 3543 25/06/2012 8945 PLASTICO TRANSPARENTE DOBLE ANCHO COLOR METRO 100 3 300.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 LINTERNA RECARGABLE UNIDAD 3 45 135.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 MANGUERA DE JEBE REFORZADA DE 3/4" METRO 150 1.9 285.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 ESPATULA DE 5" UNIDAD 20 5.5 110.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 ALICATE UNIVERSAL 7 3/8" UNIDAD 3 15 45.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 CIZALLA DE ACERO 24" UNIDAD 2 48 96.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 58 / 80

Page 59: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 CIZALLA PARA ACERO 1/2" UNIDAD 1 70 70.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 WINCHA METALICA 8 M UNIDAD 2 28 56.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 ALICATE PARA CONECTAR RJ-45 UNIDAD 2 35 70.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 JUEGO DE DESARMADORES ESTRELLA X 3 PIEZAS UNIDAD 1 35 35.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 JUEGO DE DESARMADORES PLANOS X 3 PIEZAS UNIDAD 1 35 35.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 SOGA DE NYLON. METRO 200 4 800.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 MANGUERA DE JEBE TRANSPARENTE DE 3/8" METRO 50 1.2 60.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 BALDE DE PLASTICO X 5 GAL UNIDAD 30 9 270.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 REGLA DE ALUMINIO DE USO EN LA CONSTRUCCION DE 3" X 2" X 6 M UNIDAD 5 85 425.00 INVERSIONES RALSAK S.A.C. PEDIDO 05323 3549 25/06/2012 8946 REGLA DE ALUMINIO 2" X 4" X 6 M UNIDAD 5 110 550

2.6. 3 2. 9 99 EQUIPAMIENTO Y BIENES DURADEROS 13,680.00

ITEM PROVEEDOR DOC N° ORDEN FECHAN°COMP PAGO DESCRIPCION UND CANT P.U. P.PARCIAL

EXIMPORT DISTRIBUIDORES DEL PERU S A PEDIDO 03828 3256 08/06/2012 8310 VIBRADOR DE CONCRETO UNIDAD 1 1730 1730IMPORTACIONES MAHEFA S.R.L. PEDIDO 03766 3307 12/06/2012 8311 COMPACTADOR VIBRATORIO TIPO PLANCHA UNIDAD 2 3300 6600QUISPE TICAHUANCA ELIAS PEDIDO 03827 3409 18/06/2012 8445 MEZCLADOR DE CONCRETO UNIDAD 1 5350 5350

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - 91,001.80

ITEM PROVEEDOR DOC N° ORDEN FECHAN°COMP PAGO DESCRIPCION UND CANT P.U. P.PARCIAL

GUTIERREZ SOSA MARGARITA PEDIDO 02778 2933 01/06/2012 8810 SERVICIO DE ALIMENTACION DE PERSONAS SERVICIO 9600 1 9600GOBIERNO REGIONAL DE TACNA PEDIDO 02556 3016 07/06/2012 8027 ALQUILER DE CAMION SERVICIO 31500 1 31500GOBIERNO REGIONAL DE TACNA PEDIDO 02556 3016 07/06/2012 8027 ALQUILER DE CAMION VOLQUETE SERVICIO 28000 1 28000GOBIERNO REGIONAL DE TACNA PEDIDO 02556 3016 07/06/2012 8027 ALQUILER DE CARGADOR FRONTAL SERVICIO 1500 1 1500GOBIERNO REGIONAL DE TACNA PEDIDO 02556 3016 07/06/2012 8027 ALQUILER DE COMPRESORA NEUMATICA SERVICIO 19360 1 19360COPICENTRO CAMANA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 01422 3156 13/06/2012 8285 SERVICIO DE FOTOCOPIADO SERVICIO 1041.8 1 1041.8

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES JULIO 2012 36,219.40

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 36,219.40

JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 3941 16/07/2012 10312 ARENA GRUESA M3 166 57.4 9,528.40 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 3941 16/07/2012 10312 HORMIGON M3 202 57.4 11,594.80 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 3941 16/07/2012 10312 PIEDRA GRANDE DE 8" M3 74 57.4 4,247.60 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 3941 16/07/2012 10312 PIEDRA MEDIANA DE 4" M3 8 57.4 459.20 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 3941 16/07/2012 10312 PIEDRA ZARANDEADA DE 1/2". M3 181 57.4 10,389.40

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - JULIO 2012 3,370.00

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALCOPICENTRO CAMANA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 04298 3697 09/07/2012 9598 SERVICIO DE FOTOCOPIADO SERVICIO 3000 1 3000VELASCO LAZO WILLIAMS ANDRES PEDIDO 03479 4059 25/07/2012 10836 MANTENIMIENTO PREVENTIVO DE IMPRESORA SERVICIO 370 1 370

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 59 / 80

Page 60: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES AGOSTO 2012 372.90

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE ESCRITORIO 372.90

DISTRIBUIDORA E IMPRENTA VIRGEN DEL ROSARIO E.I.R.L. PEDIDO 06744 4722 27/08/2012 12428 PAPEL BOND 80 G TAMAÑO A4 EMP X 500 30 12.43 372.90

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES SETIEMBRE 2012 27,032.30

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 20,509.30

JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 5146 17/09/2012 13461 ARENA GRUESA M3 166 57.4 9,528.40 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 5146 17/09/2012 13461 PIEDRA ZARANDEADA DE 1/2". M3 181 57.4 10,389.40 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 06998 5197 18/09/2012 13595 CURVA PARA SOLDAR O PEGAR DE PVC SEL DE 3/4" UNIDAD 199 0.5 99.50 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 06998 5197 18/09/2012 13595 CAJA OCTOGONAL GALVANIZADA 4" X 2 1/8" UNIDAD 90 2 180.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 06998 5197 18/09/2012 13595 CAJA DE PASE GALVANIZADA PESADA DE 15 CM X 15 CM X 7.5 CM UNIDAD 10 11 110.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 06998 5197 18/09/2012 13595 CAJA RECTANGULAR METALICA DE FIERRO GALVANIZADO 2" X 4" UNIDAD 101 2 202.00

COMBUSTIBLES Y CARBURANTES 5,200.00

PETROLERA DE TACNA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 08125 5439 28/09/2012 14413 PETROLEO DIESEL 2 GALON 400 13 5,200.00

MATERIALES DE ESCRITORIO 1,323.00

GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA LIQUIDA PARA RECARGA DE CARTUCHO DE IMPRESORA CIAN X 1 L UNIDAD 1 45 45.00 GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA LIQUIDA PARA RECARGA DE CARTUCHO DE IMPRESORA MAGENTA X 1 LUNIDAD 1 45 45.00 GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA LIQUIDA PARA RECARGA DE CARTUCHO DE IMPRESORA AMARILLO X 1 LUNIDAD 1 45 45.00 GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA DE IMPRESION PARA HP COD. REF. CC644WL COLOR UNIDAD 4 120 480.00 GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA LIQUIDA PARA RECARGA DE CARTUCHO PARA IMPRESORA HP INKJET 3820 NEGRO X 1 LUNIDAD 2 45 90.00 GIU INVERSIONES S.A.C. PEDIDO 07097 4954 10/09/2012 13027 TINTA DE IMPRESION PARA HP COD. REF. CC641WL NEGRO UNIDAD 6 103 618.00

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES OCTUBRE 2012 186,438.15

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 181,563.15

COMERCIALIZADORA GRUPO SANTA FE S.A.C. PEDIDO 07225 5544 04/10/2012 14745 CEMENTO PORTLAND PUZOLANICO TIPO IP X 42.5 KG UNIDAD 4100 25.52 104,632.00 LADRILLERA J MARTORELL SA PEDIDO 08375 5753 15/10/2012 15078 LADRILLO DE ARCILLA DE 10 CM X 14 CM X 24 CM UNIDAD 9000 1.29 11,610.00 LADRILLERA J MARTORELL SA PEDIDO 08375 5753 15/10/2012 15078 LADRILLO DE 15 CM X 30 CM X 30 CM DE 8 HUECOS UNIDAD 225 2.69 605.25 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 07052 5755 15/10/2012 15073 PEGAMENTO PARA PVC GALON 12 78 936.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 07052 5755 15/10/2012 15073 PEGAMENTO TIPO TEROKAL X 1 GAL UNIDAD 2 44 88.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 07052 5755 15/10/2012 15073 COLA SINTETICA GALON 67 18.5 1,239.50 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 07052 5755 15/10/2012 15073 TIZA EN POLVO KLG 350 1.2 420.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 07044 5781 16/10/2012 15164 POLIESTIRENO EXPANDIDO DE 8" X 4" X 1" UNIDAD 33 15 495.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 07044 5781 16/10/2012 15164 ESPONJA DE ESPUMA SINTETICA UNIDAD 33 14 462.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 60 / 80

Page 61: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

ZURITA HUANACUNI ALICIA CARMELA PEDIDO 07044 5781 16/10/2012 15164 PLANCHA PERFORADA MICROPOROSA UNIDAD 11 145 1,595.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 07054 5788 16/10/2012 15166 CLAVO DE ACERO DE 3" (AL PESO) KLG 90 4.5 405.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 07054 5788 16/10/2012 15166 CLAVO DE ACERO DE 4" (AL PESO) KLG 60 4.5 270.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 07054 5788 16/10/2012 15166 CLAVO DE ACERO DE 2" (AL PESO) KLG 30 4.5 135.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 07054 5788 16/10/2012 15166 CLAVO DE ACERO DE 1" (AL PESO) KLG 30 6.8 204.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 07054 5788 16/10/2012 15166 ALAMBRE DE FIERRO NEGRO Nº 16 (AL PESO) KLG 600 4.5 2,700.00 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 6015 24/10/2012 15796 ARENA FINA M3 54 57.4 3,099.60 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 6015 24/10/2012 15796 AFIRMADO GRUESO M3 201 57.4 11,537.40 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 6015 24/10/2012 15796 ARENA GRUESA M3 166 57.4 9,528.40 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 6015 24/10/2012 15796 PIEDRA ZARANDEADA DE 1/2". M3 181 57.4 10,389.40 FORESTAL MADERERA EL ROBLE E.I.R.L. PEDIDO 08722 6038 25/10/2012 15809 MADERA CEDRO 4" PIE CUAD 800 8.8 7,040.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 CODO PARA SOLDAR O PEGAR DE PVC DE 4" A 2" X 45º UNIDAD 12 4.5 54.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 CODO PARA PEGAR O SOLDAR DE PVC SAL DE 4" X 45º UNIDAD 10 4 40.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 YEE PARA SOLDAR O PEGAR DE PVC SAL DE 4" X 2" UNIDAD 35 4.3 150.50 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TRAMPA PARA SOLDAR O PEGAR DE PVC DE 1 1/2" EN FORMA DE P PARA DESAGUEUNIDAD 19 0.8 15.20 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 CODO PARA SOLDAR O PEGAR DE PVC SAL DE 2" X 90º UNIDAD 50 1 50.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 CODO PARA PEGAR O SOLDAR DE PVC SAL DE 2" X 45º UNIDAD 30 1 30.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TEE PARA PEGAR DE PVC SAL DE 4" X 4" UNIDAD 10 5.8 58.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 REDUCCION PARA SOLDAR O PEGAR DE PVC SAL DE 4" A 2" UNIDAD 7 2.5 17.50 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 YEE PARA SOLDAR O PEGAR DE PVC SAL DE 4" X 4" UNIDAD 7 7 49.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TEE PARA SOLDAR O PEGAR DE PVC SAL 2" UNIDAD 5 2.5 12.50 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 PEGAMENTO PARA PVC GALON 1 95 95.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TUBO DE PVC PARA DESAGUE SAL 6 in X 5 m UNIDAD 16 92 1,472.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 SOMBRERO DE VENTILACION DE PVC SAL DE 2" UNIDAD 12 3 36.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TUBO DE PVC PARA DESAGUE SAL 4 in X 3 m UNIDAD 40 18.5 740.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 TUBO DE PVC PARA DESAGUE SAL 2 in X 3 m UNIDAD 35 7.8 273.00 BRENIS DISTRIBUCIONES E.I.R.L. PEDIDO 08221 6073 26/10/2012 16030 CODO PARA SOLDAR O PEGAR DE PVC SAL DE 4" X 90º UNIDAD 4 4.5 18.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION PARA PEGAR DE PVC SAP DE 2" A 1" UNIDAD 3 6.5 19.50 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION PARA SOLDAR O PEGAR DE PVC SAP DE 2" A 1 1/2" UNIDAD 5 6.5 32.50 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION CON ROSCA DE PVC SAP DE 1 1/2" A 3/4" UNIDAD 4 4.5 18.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION PARA SOLDAR O PEGAR DE PVC SAP 3/4 in A 1/2 in UNIDAD 4 1 4.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION CON ROSCA DE PVC SAP DE 1" A 1/2" UNIDAD 3 2 6.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION CON ROSCA DE PVC SAP DE 1 1/2" A 1" UNIDAD 2 4.5 9.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC SIMPLE DE 3/4" SAP CLASE 10 UNIDAD 3 1.5 4.50 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC DE 2" CLASE 10 UNIDAD 2 7.5 15.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC DE 1 1/2" UNIDAD 4 6 24.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC DE 1/2" UNIDAD 18 1.2 21.60 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 REDUCCION CON ROSCA DE PVC SAP DE 1 1/2" A 1/2" UNIDAD 4 4.5 18.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC SIMPLE DE 1/2" SAP CLASE 10 UNIDAD 4 1.2 4.80 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION CON ROSCA DE PVC SIMPLE DE 1" SAP CLASE 10 UNIDAD 3 3.5 10.50 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION PARA SOLDAR O PEGAR DE PVC SAP DE 2" UNIDAD 14 7.5 105.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 UNION PARA SOLDAR O PEGAR DE PVC SAP DE 1 1/2" UNIDAD 28 6.5 182.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 61 / 80

Page 62: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 NIPLE DE PVC 1 1/2” X 2” UNIDAD 8 3 24.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 NIPLE DE PVC DE 1/2" X 1 1/2" UNIDAD 50 0.5 25.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 NIPLE DE PVC DE 2" X 2" UNIDAD 4 4.5 18.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 VALVULA DE PASO DE PVC DE 2" UNIDAD 1 23 23.00 HUALLPA VALDEZ WASHINGTON WALTER PEDIDO 08282 6075 26/10/2012 0 VALVULA DE PASO PVC 1/2" UNIDAD 9 5.5 49.50 JR ACEROS S.A.C. PEDIDO 08870 6076 26/10/2012 16044 PLANCHA DE ACERO DE 4 MM X 1.20 M X 2.40 M UNIDAD 28 235 6,580.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08905 6067 26/10/2012 16046 LLANTA PARA CARRETILLA TIPO BUGUI DE 40 CM INCLUYE CAMARA Y EJE DE 16 MMUNIDAD 25 39 975.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08905 6067 26/10/2012 16046 PERNO DE FIERRO GALVANIZADO DE 1/2" X 9" CON 2 TUERCAS UNIDAD 40 4.8 192.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08905 6067 26/10/2012 16046 CARRETILLA PARA CONSTRUCCION TIPO BUGUI (MENOR A 1/8 DE LA UIT) UNIDAD 15 180 2,700.00

VESTUARIO 4,875.00

ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 PANTALON DE DRIL UNISEX UNIDAD 35 30 1,050.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 CAMISA DE DRIL MANGA LARGA TALLA L UNIDAD 35 32 1,120.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 ZAPATO DE CUERO CON PUNTA DE ACERO PARA CABALLERO PAR 20 65 1,300.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 GUANTE DE CUERO Nº 9 PAR 80 7 560.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA UNIDAD 40 6 240.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 GUANTE DE JEBE CALIBRE 35 PAR 30 8.5 255.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08374 6074 26/10/2012 16043 BOTA DE JEBE DE CAÑA ALTA CON PUNTA DE ACERO REFORZADA UNISEX PAR 10 35 350

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - 18,000.00

ITEM PROVEEDOR DOC N° ORDEN FECHAN°COMP PAGO DESCRIPCION UND CANT P.U. P.PARCIAL

QUISPE CATUNTA JOSEFINA ANGELA PEDIDO 06329 5969 15/10/2012 15042 SERVICIO DE TRANSPORTE TERRESTRE SERVICIO 8000 1 8000GUTIERREZ SOSA MARGARITA PEDIDO 06439 6499 30/10/2012 16542 SERVICIO DE ALIMENTACION DE PERSONAS SERVICIO 10000 1 10000

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES NOVIEMBRE 2012 178,582.00

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 166,622.50

VIDRIERIA TEMPLEX E.I.R.L. PEDIDO 09007 6185 05/11/2012 16526 VIDRIO 4 mm PIE CUAD 2200 3.3 7,260.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 PLANCHA PARA EMPASTAR UNIDAD 24 14 336.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 CINTA PLASTICA DE SEÑALIZACION DE SEGURIDAD DE 8" X 100 M UNIDAD 3 20 60.00 COMERCIAL SANTA VERONICA E.I.R.L. PEDIDO 09021 6284 08/11/2012 16674 PERFIL DE POLICARBONATO TIPO H DE 8 MM X 2.10 M UNIDAD 50 40 2,000.00 COMERCIAL SANTA VERONICA E.I.R.L. PEDIDO 09021 6284 08/11/2012 16674 PERFIL DE POLICARBONATO TIPO U DE 8 MM X 2.10 M UNIDAD 55 16.5 907.50 COMERCIAL CASABLANCA E.I.R.L. PEDIDO 07039 6311 08/11/2012 16996 SOLVENTE PARA LACA PROTECTORA GALON 110 45 4,950.00 COMERCIAL CASABLANCA E.I.R.L. PEDIDO 07039 6311 08/11/2012 16996 LACA PROTECTORA PARA ENCOFRADO GALON 110 98 10,780.00 COMERCIAL CASABLANCA E.I.R.L. PEDIDO 09919 6760 22/11/2012 17662 ADITIVO IMPERMEABILIZANTE EN POLVO PARA CONCRETOS Y MORTEROS KLG 50 4.5 225.00 COMERCIAL CASABLANCA E.I.R.L. PEDIDO 10053 6846 23/11/2012 17776 POLIESTIRENO EXPANDIDO DE 1.20 M X 2.40 M X 1" UNIDAD 150 11 1,650.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TUBO DE PVC PARA DESAGUE SAL 3 in X 3 m UNIDAD 50 14 700.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CODO PARA SOLDAR O PEGAR DE PVC SAL DE 3" X 90º UNIDAD 18 3.5 63.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CODO PARA SOLDAR O PEGAR DE PVC DE 3" X 45º UNIDAD 6 3.5 21.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 REDUCCION PARA SOLDAR O PEGAR DE PVC DE 4" A 3" UNIDAD 5 4 20.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TEE CON ROSCA DE PVC DE 2" UNIDAD 7 12.5 87.50

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 62 / 80

Page 63: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 FORMADOR DE EMPAQUETADURA 130 G UNIDAD 30 6 180.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 LLAVE CROMADA PARA DUCHA DE 1/2'' UNIDAD 10 35 350.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 BRAZO DE DUCHA CROMADA UNIDAD 10 35 350.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TEE CON ROSCA DE FIERRO GALVANIZADO DE 1/2" UNIDAD 20 2.5 50.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CODO CON ROSCA DE FIERRO GALVANIZADO DE 1/2" X 90º UNIDAD 15 1.5 22.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 1/2 in X 5 mUNIDAD 10 9 90.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 REDUCCION CON ROSCA DE PVC DE 2" A 1 1/2" UNIDAD 2 6 12.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CODO CON ROSCA DE PVC SAP 1/2" X 90º CLASE 10 UNIDAD 30 1.5 45.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TEE CON ROSCA DE PVC DE 1/2" UNIDAD 15 1.5 22.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TAPON DE PVC DE 1/2" UNIDAD 20 0.8 16.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 VALVULA DE PASO DE PVC DE 2" UNIDAD 1 38 38.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 LLAVE DE PASO DE BRONCE DE 1 1/2" UNIDAD 2 55 110.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 VALVULA CHECK HORIZONTAL 1 1/2" UNIDAD 1 55 55.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 2 in X 5 mUNIDAD 16 36 576.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 NIPLE DE PVC 1 1/2” X 2” UNIDAD 8 5 40.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 NIPLE DE PVC DE 2" X 2" UNIDAD 6 6 36.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CINTA TEFLON DE 3/4" X 8 M UNIDAD 100 2 200.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 UNION UNIVERSAL CON ROSCA DE ACERO INOXIDABLE DE 1" UNIDAD 4 12 48.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TEE CON ROSCA DE FIERRO GALVANIZADO DE 1" UNIDAD 3 4 12.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 CODO CON ROSCA DE FIERRO GALVANIZADO DE 1" X 90º UNIDAD 3 3.5 10.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 NIPLE DE FIERRO GALVANIZADO DE 1" X 1 1/2" UNIDAD 8 3 24.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 VALVULA DE PIE DE 1" UNIDAD 1 35 35.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 UNION CON ROSCA UNIVERSAL DE PVC DE 1 1/2" UNIDAD 6 16 96.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 UNION CON ROSCA UNIVERSAL DE PVC DE 1" UNIDAD 6 6 36.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 REDUCCION CON ROSCA DE PVC DE 1 1/2" A 1" UNIDAD 5 5 25.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 UNION CON ROSCA UNIVERSAL DE PVC DE 2" UNIDAD 6 18.5 111.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 LLAVE DE PASO DE BRONCE DE 1" UNIDAD 2 38 76.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TAPON MACHO DE FIERRO GALVANIZADO DE 1" UNIDAD 2 3 6.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 09920 6847 23/11/2012 17778 TEE PARA SOLDAR O PEGAR DE PVC SAL DE 4" X 3" UNIDAD 6 10 60.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 RODILLO PARA PINTAR DE 9" UNIDAD 10 10 100.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 BROCHA DE 4" UNIDAD 25 18 450.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 RODILLO PARA PINTAR DE 12" UNIDAD 10 12 120.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 BROCHA DE 2" UNIDAD 12 8 96.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 LIJA PARA PULIR FIERRO Nº 80 EMP X 25 8 35 280.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 LIJA PARA PULIR FIERRO Nº 100 UNIDAD 200 1.4 280.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 LIJA PARA PULIR FIERRO Nº 120 CIENTO 1 140 140.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09914 6848 23/11/2012 17777 LIJA PARA PULIR FIERRO Nº 180 UNIDAD 100 1.4 140.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 INODORO DE TANQUE BAJO UNIDAD 32 158 5,056.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 URINARIO LOZA COLOR BLANCO UNIDAD 1 345 345.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LLAVE CROMADA DE 1/2"CON PERILLA PARA URINARIO UNIDAD 1 61 61.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 63 / 80

Page 64: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LAVADERO DE ACERO INOXIDABLE DE 1 POZA CON ESCURRIDERO UNIDAD 2 130 260.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LLAVE CUELLO DE GANSO PARA LAVADERO UNIDAD 2 84 168.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LAVATORIO DE LOZA PARA BAÑO UNIDAD 3 96 288.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LAVADERO TIPO OVALIN CON ACCESORIOS COMPLETOS UNIDAD 12 123 1,476.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LLAVE CROMADA PARA LAVATORIO UNIDAD 19 59 1,121.00 CORPORACION HELEO SOCIEDAD ANONIMA CERRADA PEDIDO 09773 6849 23/11/2012 17779 LAVATORIO SIMPLE UNIDAD 4 57 228.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09808 6850 23/11/2012 17781 PINTURA BASE X 5 KG UNIDAD 300 6.5 1,950.00 JR ACEROS S.A.C. PEDIDO 09810 6855 23/11/2012 17780 ANGULO DE FIERRO NEGRO DE 1" X 3/16" UNIDAD 44 33 1,452.00 JR ACEROS S.A.C. PEDIDO 09810 6855 23/11/2012 17780 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 1/2" X 9 M UNIDAD 42 24.5 1,029.00 JR ACEROS S.A.C. PEDIDO 09810 6855 23/11/2012 17780 PLANCHA DE ACERO 1/4" X 4" X 8" UNIDAD 1 350 350.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 10009 6905 26/11/2012 17821 MALLA RASCHEL AL 90% X 4 m DE ANCHO COLOR VERDE METRO 150 9.8 1,470.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 10009 6905 26/11/2012 17821 GUARDACABO DE ACERO GALVANIZADO PARA CABLE DE 3/8 in UNIDAD 40 1.7 68.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 10009 6905 26/11/2012 17821 CANDADO X 30 MM UNIDAD 70 2.5 175.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 10009 6905 26/11/2012 17821 CABLE DE ACERO GALVANIZADO DE 3/8" METRO 350 3.7 1,295.00 COMERCIALIZADORA GRUPO SANTA FE S.A.C. PEDIDO 07225 6914 27/11/2012 17978 CEMENTO PORTLAND PUZOLANICO TIPO IP X 42.5 KG UNIDAD 4100 25.52 104,632.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 CINTA MASKING TAPE 3/4" X 40 YD UNIDAD 300 2.9 870.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 PINTURA ANTICORROSIVA GALON 5 50 250.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 PINTURA BASE SINCROMATO X 1 GAL UNIDAD 10 34 340.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 PINTURA ESMALTE GALON 50 39 1,950.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 PINTURA LATEX GALON 170 28 4,760.00 REPRESENTACIONES Y SERVICIOS LA SOLUCION E.I.R.L PEDIDO 09917 6958 27/11/2012 18035 THINNER ACRILICO. GALON 30 16 480.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 PALETA DE PVC DE 30 CM X 20 CM PARA TARRAJEO UNIDAD 24 20 480.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 CORDEL DE NYLON PARA TRAZO METRO 360 0.1 36.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 DISCO DE CORTE CIRCULAR DIAMANTADO PARA MADERA 12" DIAMETRO UNIDAD 6 60 360.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 DISCO DE CORTE DIAMANTADO DE 10" UNIDAD 6 60 360.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BROCA DE ACERO 1/2" UNIDAD 6 14 84.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 HOJA DE SIERRA 18 in UNIDAD 56 5 280.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BRUÑA DE CANTO UNIDAD 18 5 90.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BRUÑA DE CENTRO UNIDAD 18 5 90.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 ESPATULA DE 4" UNIDAD 12 8 96.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 ESPATULA DE 5" UNIDAD 12 10 120.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BROCHA DE 2" UNIDAD 6 8 48.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BROCHA DE 4" UNIDAD 12 18 216.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 BROCA DE ACERO DE 5/8" UNIDAD 6 28 168.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 ESCOBA DE CERDA DE PLASTICO UNIDAD 12 12 144.00 CORPORACION EGAM SOCIEDAD ANONIMA CERRADA PEDIDO 09090 6252 07/11/2012 16624 ESPATULA DE 3" UNIDAD 12 7.5 90.00 COMERCIAL SANTA VERONICA E.I.R.L. PEDIDO 09021 6284 08/11/2012 16674 TORNILLO DE FIERRO AUTOPERFORANTE DE 6 MM X 25 MM MILLAR 1 105 105.00 COMERCIAL SANTA VERONICA E.I.R.L. PEDIDO 09021 6284 08/11/2012 16674 SILICONA COLOR BLANCO X 300 ML UNIDAD 15 11 165.00 COMERCIAL SANTA VERONICA E.I.R.L. PEDIDO 09021 6284 08/11/2012 16674 APLICADOR DE SILICONA UNIDAD 2 9 18.00 LAURA LUQUE MARISOL CARMELA PEDIDO 09926 6772 22/11/2012 17674 CORREA PARA MEZCLADORA DE CONCRETO UNIDAD 8 25 200.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 64 / 80

Page 65: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

COMBUSTIBLES Y CARBURANTES 5,770.00

PETROLERA DE TACNA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA PEDIDO 09299 6702 21/11/2012 17610 PETROLEO DIESEL 2 GALON 400 13 5,200.00 LAURA LUQUE MARISOL CARMELA PEDIDO 09926 6772 22/11/2012 17674 ACEITE MULTIGRADO 20W-50 PARA MOTOR PETROLERO GALON 4 85 340.00 LAURA LUQUE MARISOL CARMELA PEDIDO 09926 6772 22/11/2012 17674 GRASA PARA RODAMIENTO X 1 KG UNIDAD 10 23 230

MATERIALES DE ESCRITORIO 374.50

LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 ARCHIVADOR DE CARTON CON PALANCA LOMO ANCHO TAMAÑO A4 UNIDAD 30 3.5 105.00 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 ARCHIVADOR DE CARTON CON PALANCA LOMO ANGOSTO TAMAÑO A4 UNIDAD 5 3.5 17.50 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 PAPEL LUSTRE DE 60 CM X 50 CM COLOR VERDE CLARO UNIDAD 30 0.17 5.10 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 GRAPA 26/6 X 5000 UNIDAD 4 1.9 7.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR AZUL UNIDAD 3 2.2 6.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR NEGRO UNIDAD 3 2.2 6.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 BOLIGRAFO (LAPICERO) DE TINTA GEL PUNTA EXTRA FINA COLOR VERDE UNIDAD 3 3.2 9.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 GOMA EN BARRA X 200 G UNIDAD 4 2.8 11.20 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 BOLIGRAFO (LAPICERO) DE TINTA SECA PUNTA FINA COLOR AZUL. DOC. 1 21.6 21.60 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 CORRECTOR LIQUIDO TIPO LAPICERO CON PUNTA FINA DE METAL UNIDAD 5 1.8 9.00 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 FOLDER MANILA TAMAÑO A4 EMP X 25 4 4 16.00 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 TARJETA DE CONTROL VISIBLE DE ALMACEN CIENTO 10 6 60.00 LIBRERIA DORA SANTA MARIA S.R.L. PEDIDO 09909 6759 22/11/2012 17661 CUADERNO DE OBRA TAMAÑO A4 X 100 HOJAS UNIDAD 3 32.9 98.70

VESTUARIO 5,815.00

ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 ZAPATO DE CUERO CON PUNTA DE ACERO PARA CABALLERO PAR 30 62 1,860.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 PANTALON DE DRIL UNISEX UNIDAD 35 30 1,050.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 CAMISA DE DRIL MANGA LARGA UNIDAD 35 32 1,120.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 CASCO DE SEGURIDAD DE PLASTICO COLOR AMARILLO UNIDAD 35 7 245.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 GUANTE DE CUERO Nº 9 PAR 40 7 280.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 LENTES DE SEGURIDAD CON PROTECCION ULTRAVIOLETA UNIDAD 40 5 200.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 GUANTE DE JEBE CALIBRE 35 PAR 40 9 360.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 09908 6956 27/11/2012 18034 BOTA DE JEBE DE CAÑA ALTA CON PUNTA DE ACERO REFORZADA UNISEX PAR 20 35 700

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - 15,290.00

ITEM PROVEEDOR DOC N° ORDEN FECHAN°COMP PAGO DESCRIPCION UND CANT P.U. P.PARCIAL

GOBIERNO REGIONAL DE TACNA PEDIDO 07207 6587 06/11/2012 16922 ALQUILER DE CAMIONETA SERVICIO 7290 1 7290QUISPE CATUNTA JOSEFINA ANGELA PEDIDO 07943 7068 26/11/2012 0 ALQUILER DE CAMION SERVICIO 8000 1 8000

2.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES DICIEMBRE 2012 225,160.20

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 221,231.20

JM JIMENEZ EIRL PEDIDO 09715 7190 04/12/2012 18635 PLASTICO DE 1.50 M DE ANCHO COLOR NEGRO METRO 500 4 2,000.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 ADITIVO EPOXICO PARA CONCRETO KLG 1 100 100.00 EDIFICACIONES DRYWALL SAC PEDIDO 09019 7265 05/12/2012 19639 PLANCHA DE POLICARBONATO ALVEOLAR 8 mm X 2.10 m X 5.90 m COLOR TRANSPARENTEUNIDAD 21 507.14 10,650.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 65 / 80

Page 66: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 TUBO DE FIERRO GALVANIZADO DE 4" X 6 M UNIDAD 13 230 2,990.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 VARILLA DE COBRE 5/8" X 2.40 M UNIDAD 3 178 534.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CONECTOR DE COBRE TIPO ANDERSON DE 5/8" PARA PUESTA A TIERRA UNIDAD 6 8 48.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 THORGEL-DOSIS QUIMICA PARA POZO A TIERRA X 5 K UNIDAD 10 63 630.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CABLE CONDUCTOR DESNUDO DE 16 MM2 METRO 50 7.3 365.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CAJA REGISTRO DE CONCRETO PARA PUESTA TIERRA. UNIDAD 3 25 75.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CINTA AISLANTE DE 20 MM X 100 M UNIDAD 30 2.3 69.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CINTA AISLANTE VULCANIZANTE DE 19 MM X 20 M UNIDAD 20 29 580.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 PEGAMENTO PARA PVC GALON 1 100 100.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CINTA PLASTICA DE SEÑALIZACION DE SEGURIDAD DE 4" X 200 M UNIDAD 3 80 240.00 COMERCIAL PAMELA E.I.R.L. PEDIDO 09179 7390 07/12/2012 19640 CORTACIRCUITO BIPOLAR CON FUSIBLES UNIDAD 13 18 234.00 MANSILLA MALAGA FELIX JOSE PEDIDO 10960 7508 10/12/2012 19098 PERNO DE FIERRO DE 3/8" X 4" CON TUERCA Y DOBLE ARANDELA UNIDAD 1000 1.2 1,200.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10927 7592 11/12/2012 19300 TUBO DE PVC PARA INSTALACIONES ELECTRICAS SAP 3/4 in X 3 m UNIDAD 300 6 1,800.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10927 7592 11/12/2012 19300 TUBO DE PVC PARA INSTALACIONES ELECTRICAS SAP 4 in X 3 m UNIDAD 60 46 2,760.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10927 7592 11/12/2012 19300 TUBO DE PVC PARA INSTALACIONES ELECTRICAS SAP 2 in X 3 m UNIDAD 80 17 1,360.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10927 7592 11/12/2012 19300 TUBO DE PVC PARA INSTALACIONES ELECTRICAS SAP 3 in X 3 m UNIDAD 35 35 1,225.00 CAHUAYA TINTAYA DELIA JUANA PEDIDO 08637 7599 11/12/2012 19661 MADERA TRIPLAY LUPUNA 18 mm X 1.22 m X 2.44 m UNIDAD 30 93 2,790.00 CAHUAYA TINTAYA DELIA JUANA PEDIDO 08637 7599 11/12/2012 19661 MADERA TRIPLAY LUPUNA 4 mm X 1.22 m X 2.44 m UNIDAD 400 24 9,600.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 REDUCCION PARA SOLDAR O PEGAR DE PVC SAL DE 4" A 3" UNIDAD 8 3.5 28.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO PARA SOLDAR O PEGAR DE PVC SAL DE 3" X 90º UNIDAD 15 3.5 52.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TUBO DE PVC PARA DESAGUE SAL 2 in X 3 m UNIDAD 20 8 160.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TUBO DE PVC PARA DESAGUE SAL 4 in X 3 m UNIDAD 20 17.5 350.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO PARA SOLDAR O PEGAR DE PVC SAL DE 4" X 90º UNIDAD 15 5 75.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO PARA PEGAR O SOLDAR DE PVC SAL DE 2" X 45º UNIDAD 15 1.5 22.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CINTA TEFLON DE 3/4" X 100 M UNIDAD 30 2 60.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 LLAVE DE PASO DE BRONCE DE 1/2" UNIDAD 8 26 208.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TEE CON ROSCA DE PVC DE 1" UNIDAD 6 4 24.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO CON ROSCA DE PVC DE 1" X 90° UNIDAD 6 3.5 21.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 NIPLE DE PVC DE 3/4" X 2" UNIDAD 8 1.5 12.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 UNION CON ROSCA UNIVERSAL DE PVC DE 3/4" UNIDAD 8 4 32.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 LLAVE DE PASO DE BRONCE DE 3/4" UNIDAD 2 32 64.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO CON ROSCA DE FIERRO GALVANIZADO DE 1/2" X 90º UNIDAD 25 1.5 37.50 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TEE CON ROSCA DE FIERRO GALVANIZADO DE 1/2" UNIDAD 10 2 20.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 UNION SIMPLE DE PVC DE 1" CLASE 10 UNIDAD 6 2.5 15.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 UNION CON ROSCA UNIVERSAL DE PVC DE 1/2" UNIDAD 16 3 48.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 UNION CON ROSCA UNIVERSAL DE PVC DE 1 1/2" UNIDAD 5 16 80.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 REDUCCION CON ROSCA DE PVC DE 1" A 1/2" UNIDAD 10 2.5 25.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 REDUCCION CON ROSCA DE PVC DE 2" A 1" UNIDAD 6 6 36.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 1 in X 5 mUNIDAD 8 9.5 76.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 TUBO DE PVC PARA FLUIDOS A PRESION CON UNION DE PRESION CLASE 10 2 in X 5 mUNIDAD 15 42 630.00 WENDY DISTRIBUCIONES E.I.R.L. PEDIDO 10787 7623 12/12/2012 19385 CODO CON ROSCA DE PVC 3" X 90º UNIDAD 15 3.5 52.50

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 66 / 80

Page 67: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10928 7653 12/12/2012 19621 EQUIPO FLUORESCENTE LINEAL 2 X 36 W CON PANTALLA UNIDAD 56 85 4,760.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10928 7653 12/12/2012 19621 EQUIPO DE FLUORESCENTE CIRCULAR 1 X 32 W UNIDAD 41 126 5,166.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 TOMACORRIENTE BIPOLAR DOBLE DE 15A A 220V UNIDAD 63 26 1,638.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 INTERRUPTOR SIMPLE 15 A 250 V UNIDAD 43 15 645.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 INTERRUPTOR UNIPOLAR DOBLE 15A A 220V UNIDAD 2 24 48.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 BRAQUETA SIMPLE 20 W UNIDAD 3 60 180.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CAJA DE PASO DE FIERRO GALVANIZADO DE 6" X 6" X 2" CON TAPA UNIDAD 10 13 130.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CURVA PARA SOLDAR O PEGAR DE PVC SEL DE 20 MM UNIDAD 380 0.5 190.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CONDUCTOR DE COBRE TIPO TW DE 2.5 MM2 COLOR AMARILLO METRO 1500 1.05 1,575.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CONDUCTOR DE COBRE TIPO TW DE 4 MM2 COLOR AZUL METRO 1600 1.65 2,640.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 INTERRUPTOR DE CONMUTACION UNIDAD 2 18 36.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 FUSIBLE 15 A UNIDAD 26 1 26.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 TERMINAL DE COBRE PARA CABLE 25 MM UNIDAD 8 2.5 20.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 TERMINAL DE COBRE PARA CABLE 35 MM UNIDAD 7 3 21.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CURVA PARA SOLDAR O PEGAR DE PVC SEL DE 4" UNIDAD 3 30 90.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CURVA PARA SOLDAR O PEGAR DE PVC SEL 2" UNIDAD 16 15 240.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CAJA OCTOGONAL GALVANIZADA UNIDAD 100 3 300.00 CENTRO ELECTRICO ROJESAN E.I.R.L. PEDIDO 10925 7691 13/12/2012 19635 CAJA RECTANGULAR DE FIERRO GALVANIZADO UNIDAD 110 3 330.00 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 09816 7733 13/12/2012 19710 TUBO DE FIERRO NEGRO DE 2" X 3 MM X 6 M UNIDAD 29 106.5 3,088.50 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 09816 7733 13/12/2012 19710 TUBO DE FIERRO NEGRO 3 mm X 3 in X 6 m UNIDAD 2 165 330.00 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 09816 7733 13/12/2012 19710 TUBO DE FIERRO NEGRO DE 4" X 3 mm METRO 12 33 396.00 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 09816 7733 13/12/2012 19710 TUBO DE FIERRO NEGRO 3 mm X 1 1/2 in X 6 m UNIDAD 55 87 4,785.00 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 09924 7734 13/12/2012 19711 VARILLA DE ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 DE 5/8" X 9 M UNIDAD 210 43 9,030.00 INDUSTRIAS MALDONADO S.R.LTDA. PEDIDO 10427 7735 13/12/2012 19709 TABLERO ELECTRICO DE METAL TRIFASICO ESTABILIZADO PARA EMPOTRAR TIPO DIN DE 42 POLOSUNIDAD 1 1799.5 1,799.50 INDUSTRIAS MALDONADO S.R.LTDA. PEDIDO 10427 7735 13/12/2012 19709 TABLERO DE METAL TIPO RIEL PARA EMPOTRAR DE 12 POLOS UNIDAD 3 528.3 1,584.90 INDUSTRIAS MALDONADO S.R.LTDA. PEDIDO 10427 7735 13/12/2012 19709 TABLERO DE METAL TIPO RIEL PARA EMPOTRAR DE 18 POLOS UNIDAD 3 750.3 2,250.90 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09927 7736 13/12/2012 19708 DISCO DE CORTE DIAMANTADO PARA PIEDRA Y CONCRETO DE 7" UNIDAD 20 75 1,500.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09927 7736 13/12/2012 19708 SOLDADURA CELLOCORD 1/8" X 20 KG UNIDAD 35 230 8,050.00 SANICENTER S.A.C. PEDIDO 09709 7737 13/12/2012 20436 PEGAMENTO PARA CERAMICO X 25 KG UNIDAD 200 15 3,000.00 SANICENTER S.A.C. PEDIDO 09709 7737 13/12/2012 20436 FRAGUA COLOR BLANCO PARA MAYOLICA KLG 287 3 861.00 SANICENTER S.A.C. PEDIDO 09709 7737 13/12/2012 20436 PERFIL DE PVC DE 9 MM X 1.8 M UNIDAD 30 4.6 138.00 SANICENTER S.A.C. PEDIDO 09709 7737 13/12/2012 20436 PEGAMENTO EN POLVO X 25 KG UNIDAD 20 35 700.00 PROMOTORA DEL ACERO SOCIEDAD DE RESP LTD PEDIDO 10789 7738 13/12/2012 19705 ANGULO DE FIERRO NEGRO 2" X 2" X 3/16" X 6 m UNIDAD 140 62 8,680.00 AUTOSERVICIOS MARIBEO E.I.R.L. PEDIDO 03285 7815 17/12/2012 19856 AGUA DE MESA SIN GAS X 20 L UNIDAD 30 35 1,050.00 AUTOSERVICIOS MARIBEO E.I.R.L. PEDIDO 03285 7815 17/12/2012 19856 SURTIDOR DE PLASTICO DE AGUA MINERAL UNIDAD 3 28 84.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 07043 7915 19/12/2012 20306 ADITIVO ACELERANTE DE FRAGUA. GALON 250 39 9,750.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 07043 7915 19/12/2012 20306 ADITIVO INCORPORADOR DE AIRE PARA CONCRETO GALON 150 52 7,800.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 07043 7915 19/12/2012 20306 ADITIVO IMPERMEABILIZANTE PARA CONCRETO. GALON 200 19.65 3,930.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 07043 7915 19/12/2012 20306 ADITIVO CURADOR DE CONCRETO GALON 300 19 5,700.00 COMERCIAL CYJSA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 07043 7915 19/12/2012 20306 ADITIVO PLASTIFICANTE PARA CONCRETO GALON 300 28 8,400.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 11143 7955 20/12/2012 20501 ALAMBRE DE FIERRO NEGRO Nº 8 (AL PESO) KLG 1000 4.3 4,300.00 COMERCIAL SANTA FE S.A.C. PEDIDO 09866 7979 20/12/2012 20595 CALAMINA DE ACERO GALVANIZADO DE 22 MM X 3.60 M X 83 CM UNIDAD 560 29 16,240.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 67 / 80

Page 68: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 ARENA FINA M3 54 57.4 3,099.60 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 AFIRMADO GRUESO M3 402 57.4 23,074.80 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 ARENA GRUESA M3 167 57.4 9,585.80 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 PIEDRA CONFITILLADA DIAMETRO MAXIMO 1/4" M3 92 57.4 5,280.80 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 MATERIAL DE BASE GRANULAR M3 5 57.4 287.00 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 PIEDRA ZARANDEADA DE 1/2". M3 182 57.4 10,446.80 JUAN CARLOS MAMANI INVERSIONES S.C.R.L. PEDIDO 01667 7992 20/12/2012 0 TIERRA DE CHACRA M3 44 57.4 2,525.60 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 DISCO DE CORTE DE 7" UNIDAD 4 50 200.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 DISCO DE CORTE DE 9" UNIDAD 12 75 900.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 REGLA DE ALUMINIO 2" X 4" X 6 M UNIDAD 4 90 360.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 MANGUERA DE JEBE DE 3/4" METRO 100 1.5 150.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 TELA ARPILLERA X 2.20 M DE ANCHO METRO 300 5 1,500.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09927 7736 13/12/2012 19708 DISCO DE CORTE PARA CONCRETO DE 4" UNIDAD 20 29 580.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09927 7736 13/12/2012 19708 DISCO DE DESBASTE DE 7" UNIDAD 10 8.9 89.00 REPRESENTACIONES INCOFER EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADAPEDIDO 09927 7736 13/12/2012 19708 DISCO DE CORTE PARA FIERRO 14 in UNIDAD 10 19 190.00

VESTUARIO 3,540.00

ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08785 7191 04/12/2012 18634 CASACA TERMICA DE PLUMA DE GANSO UNISEX TALLA XL UNIDAD 4 320 1,280.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08785 7191 04/12/2012 18634 ZAPATO DE CUERO CON PUNTA DE ACERO PARA CABALLERO PAR 4 320 1,280.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 08785 7191 04/12/2012 18634 CHALECO DE DRIL UNISEX COLOR ROJO UNIDAD 4 45 180.00 ZURITA HUANACUNI ALICIA CARMELA PEDIDO 01648 7193 04/12/2012 19638 TELA YUTE X 3 M DE ANCHO METRO 200 4 800

MEDICAMENTOS 389.00

BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 PEROXIDO DE HIDROGENO 100 V X 120 ML UNIDAD 5 2.5 12.50 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 ALCOHOL ETILICO (ETANOL) 90º LITRO 1 9.5 9.50 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 ALGODON HIDROFILO X 1 KG UNIDAD 1 34 34.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 ESPARADRAPO ANTIALERGICO DE PAPEL 5.00 CM X 4.50 M UNIDAD 5 22 110.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 GASA FRACCIONADA ESTERIL 10 CM X 10 CM DE 10 PLIEGUES X 5 UNI UNIDAD 50 2.5 125.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 VENDA DE ALGODON 4" X 5 YD UNIDAD 20 3.5 70.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 PARACETAMOL 500 MG TAB UNIDAD 40 0.2 8.00 BOTICA SANTA MARIA E.I.R.L. PEDIDO 09913 7316 06/12/2012 18930 AMOXICILINA 500 MG TAB UNIDAD 40 0.5 20

2.6. 2 2. 2 5 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - SERVICIOS - 36016.03

ITEM PROVEEDOR DOC N° ORDEN FECHAN°COMP PAGO DESCRIPCION UND CANT P.U. P.PARCIAL

ANQUISE LLANOS EDWIN GABRIEL PEDIDO 07756 7275 04/12/2012 18661 ALQUILER DE CAMIONETA SERVICIO 8100 1 8100GUTIERREZ SOSA MARGARITA PEDIDO 07696 8161 28/12/2012 20887 ALQUILER DE LOCAL SERVICIO 5200 1 5200GOBIERNO REGIONAL DE TACNA PEDIDO 08209 8164 28/12/2012 20898 ALQUILER DE CARGADOR FRONTAL SERVICIO 1735.4 1 1735.44GOBIERNO REGIONAL DE TACNA PEDIDO 08209 8164 28/12/2012 20898 ALQUILER DE CAMION VOLQUETE SERVICIO 11793 1 11793.11GOBIERNO REGIONAL DE TACNA PEDIDO 08209 8164 28/12/2012 20898 ALQUILER DE CAMION SERVICIO 9187.5 1 9187.48

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 68 / 80

Page 69: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

Año 20132.6. 2 2. 2 4 COSTOS DE CONSTRUCCIÓN POR ADMINISTRACIÓN DIRECTA - BIENES ENERO 2013 133,520.60

ITEM PROVEEDOR Referenc NºOrdCompra FECHA ExpSIAF DESCRIPCION UND CANT P.U. P.PARCIAL TOTALMATERIALES DE CONSTRUCCIÓN 133,520.60

JUL MADERERAS COMERCIAL E.I.R.L. PEDIDO 00361 101 30/01/2013 648 MADERA TORNILLO 4" PIE CUAD 6135 5 30,675.00 COMERCIALIZADORA GRUPO SANTA FE S.A.C. PEDIDO 00369 102 31/01/2013 650 CEMENTO PORTLAND PUZOLANICO TIPO IP X 42.5 KG UNIDAD 4030 25.52 102845.6

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 69 / 80

Page 70: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

6.2.a M ANO DE OB R A: P ER SONAL OB R ER O ENER O 201310

Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional Tacna PLAZO EJECUCION 379 DÍAS DPTO

Fecha ENERO 2013 FECHA INICIO PROV

Mod.Ejec. Administración Directa FECHA TERMINO DIST

METR. COSTO % METR.10 COSTO % METR. MONTO AC. % METR. MONTO %

TOPOGRAFO H.H. 69.83 0.00 0.00 69.83 15.37 1,073.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 69.83 1,073.34 100.00%CAPATAZ H.H. 2,725.55 1,182.53 334.47 3,573.61 15.37 54,928.86 1,744.00 21,515.69 39.17% 240.00 3,007.72 5.48% 1,984.00 24,523.41 44.65% 1,589.61 30,405.45 55.35%OPERARIO H.H. 18,072.60 9,910.08 4,383.43 23,599.25 13.97 329,696.35 27,984.00 364,857.30 110.66% 5,520.00 69,392.83 21.05% 33,504.00 434,250.13 131.71% -9,904.75 -104,553.78 -31.71%OFICIAL H.H. 7,770.26 6,986.47 3,076.63 11,680.10 12.29 143,554.89 9,888.00 106,729.02 74.35% 960.00 10,393.71 7.24% 10,848.00 117,122.73 81.59% 832.10 26,432.16 18.41%PEON H.H. 26,848.83 17,247.50 8,035.08 36,061.25 11.36 409,674.23 35,472.00 351,725.24 85.85% 6,120.00 59,098.94 14.43% 41,592.00 410,824.18 100.28% -5,530.75 -1,149.95 -0.28%

TOTAL S/. 938,927.66 844,827.25 89.98% 141,893.20 15.11% 986,720.45 105.09% -47,792.79 -5.09%

ACUMULADOE.G U.M CANT.

EXP.BASE

CANT.

ADIC.01

CANTIDAD

REQUERIDA

COSTOH.H.

COSTOTOTAL

CANDARAVE

CANT. PROGRAMADA SEG. PPTO

2.6.22.23

EJECUTADOSALDO

ANTERIOR MES EVALUADOCATEGORIA

INF. MENSUAL - VALORIZACION N°

MES ACTUAL ENERO 2013 UBICACIÓNTACNA

16/04/2012 CANDARAVE

CANT.

DEDUC. 01

29/04/2013

6.2.b MANO DE OBRA: PERSONAL OBRERO (DISGREGADO) ENER O 2013ABRIL 2012 MAYO 2012 JUNIO 2012 JULIO 2012 AGOSTO 2012 SETIEMBRE 2012 OCTUBRE 2012 NOVIEMBRE 2012 DICIEMBRE 2012 ENERO 2013

METR.1 COSTO METR.2 COSTO METR.3 COSTO METR.4 COSTOMETR.

5COSTO METR.6 COSTO METR.7 COSTO METR.8 COSTO METR.9 COSTO METR.10 COSTO METR.

MONTO

AC.% METR. MONTO %

TOPOGRAFOH.H. 69.83 15.37 1,073.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 69.83 1,073.34 100.00%CAPATAZ H.H. 3,573.61 15.37 54,928.86 120.00 1,370.58 240.00 2,787.40 232.00 2,798.45 240.00 2,735.95 48.00 595.39 168.00 1,977.31 232.00 3,032.88 232.00 3,099.64 232.00 3,118.09 240.00 3,007.72 1,984.00 24,523.41 44.65% 1,589.61 30,405.45 55.35%

OPERARIOH.H. 23,599.25 13.97 329,696.35 0.00 0.00 2,328.00 28,508.19 1,160.00 13,841.64 2,968.00 35,169.59 240.00 3,083.35 3,056.00 37,644.13 4,880.00 66,563.93 5,760.00 77,552.12 7,592.00 102,494.35 5,520.00 69,392.83 33,504.00 434,250.13 131.71% -9,904.75 -104,553.78 -31.71%

OFICIAL H.H. 11,680.10 12.29 143,554.89 480.00 4,855.60 1,184.00 12,462.26 1,640.00 16,774.23 1,904.00 19,468.15 96.00 1,090.80 824.00 8,988.63 1,248.00 14,888.80 2,048.00 22,864.63 464.00 5,335.92 960.00 10,393.71 10,848.00 117,122.73 81.59% 832.10 26,432.16 18.41%

PEON H.H. 36,061.25 11.36 409,674.23 1,080.00 9,666.87 3,072.00 28,726.94 3,376.00 30,920.41 3,048.00 27,812.85 0.00 0.00 2,688.00 25,318.83 5,712.00 59,436.29 8,256.00 85,198.71 8,240.00 84,644.34 6,120.00 59,098.94 41,592.00 410,824.18 100.28% -5,530.75 -1,149.95 -0.28%

TOTAL S/. 938,927.66 15,893.05 72,484.79 64,334.73 85,186.54 4,769.54 73,928.90 143,921.90 188,715.10 195,592.70 141,893.20 986,720.45 -47,792.79 -5.09%

DEL MES % 100.00% 1.69% 7.72% 6.85% 9.07% 0.51% 7.87% 15.33% 20.10% 20.83% 15.11% 105.09%ACUMULADO % 100.00% 1.69% 9.41% 16.26% 25.34% 25.85% 33.72% 49.05% 69.15% 89.98% 105.09%

CATEGORIAU.M.CANT.

REQUER.

COST

O

H.H.

COSTO

TOTAL

TOTAL ACUMULADO SALDO

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 70 / 80

Page 71: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

6.2.C - RECURSOS DE MANO DE OBRA - GASTOS GENERALES (RESUMEN)

Anterior Acumulado Actual Mes ENERO2013Cant. Parcial Cant. Parcial Cant. Parcial

Mes Mes S/. Mes S/. Mes S/.

01 RESIDENTE DE OBRA MES 5,450.00 10.10 55,367.50S/. 1.07 5,813.33S/. 11.17 61,180.83S/.

02 ASISTENTE TECNICO MES 3,270.00 11.00 30,057.00S/. 0.97 3,161.00S/. 11.97 33,218.00S/.

03 TECNICO DE CAMPO MES 2,725.00 3.00 7,630.00S/. 0.97 2,634.17S/. 3.97 10,264.17S/.

04 ASISTENTE ADMINISTRATIVO MES 2,180.00 15.63 39,585.67S/. 0.97 2,107.33S/. 16.60 41,693.00S/.

05 AUXILIAR ADMINISTRATIVO MES 2.00 3,579.00S/. 0.00 -S/. 2.00 3,579.00S/.

06 INSPECTOR DE SEGURIDAD MES 3.00 6,540.00S/. 0.00 -S/. 3.00 6,540.00S/.

07 CADISTA PROYECTO MES 1.00 2,943.00S/. 0.00 -S/. 1.00 2,943.00S/.

08 SECRETARIA DE APOYO MES 2,180.00 4.00 8,720.00S/. 0.97 2,107.33S/. 4.97 10,827.33S/.

09 GUARDIAN MES 2,180.00 9.00 19,920.00S/. 0.97 2,107.33S/. 9.97 22,027.33S/.

10 ALMACENERO MES 2,180.00 9.00 19,920.00S/. 0.77 1,671.33S/. 9.77 21,591.33S/.

11 CHOFER MES 2.00 5,995.00S/. 0.00 -S/. 2.00 5,995.00S/.

12 COORDINADOR DE SEGURIDAD MES 1.00 1,853.00S/. 0.00 -S/. 1.00 1,853.00S/.

13 SEGURIDAD Y VIGILANCIA MES 6.00 10,110.00S/. 0.00 -S/. 6.00 10,110.00S/.

14 PROFESIONAL ADMINISTRATIVO MES 3.00 7,703.00S/. 0.00 -S/. 3.00 7,703.00S/.

15 TECNICO ADMINISTRATIVO MES 3.00 5,414.00S/. 0.00 -S/. 3.00 5,414.00S/.

16 TECNICO II MES 1.00 1,962.00S/. 0.00 -S/. 1.00 1,962.00S/.

17 PERSONAL DE APOYO MES 0.97 1,585.00S/. 0.00 -S/. 0.97 1,585.00S/.

COSTO INDIRECTO 228,884.17S/. 19,601.82S/. 248,485.99S/.

Item Categoria Unid Actual AcumuladoPrecioUnitario

Costo en Obra

Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.Programa Infraestructura EducativaU.Ejecutora Gobierno Regional TacnaMod.Ejec. Administración Directa

INGRESOSAPORTES

ESSALUDPARCIAL

FEBRERO 2012 PLANILLA Nº032-2012 GOB. REG. TACNA - EMPLEADO TOTAL A COMPROMETER = 10,137.0007 ASISTENTE ADMINISTRATIVO ASISTENTE IV 30 2,000.00 180.00 2,180.00

08 ASISTENTE TECNICO ASISTENTE IV+ 30 2,300.00 207.00 2,507.00

09 RESIDENTE DE OBRA INGENIERO V 30 5,000.00 450.00 5,450.00

MARZO 2012 PLANILLA Nº062-2012 GOB. REG. TACNA - EMPLEADO TOTAL A COMPROMETER = 10,355.0017 ASISTENTE ADMINISTRATIVO ASISTENTE IV 30 2,000.00 180.00 2,180.00

18 ASISTENTE TECNICO ASISTENTE V 30 2,500.00 225.00 2,725.00

19 RESIDENTE DE OBRA INGENIERO V 30 5,000.00 450.00 5,450.00

ABRIL 2012 PLANILLA Nº083-2012 GOB. REG. TACNA - EMPLEADO TOTAL A COMPROMETER = 5,450.0002 RESIDENTE DE OBRA INGENIERO V 30 5,000.00 450.00 5,450.00

ABRIL 2012 PLANILLA Nº097-2012 GOB. REG. TACNA - EMPLEADO TOTAL A COMPROMETER = 7,085.0020 GUARDIAN ASISTENTE IV 30 2,000.00 180.00 2,180.00

21 ASISTENTE TECNICO ASISTENTE V 30 2,500.00 225.00 2,725.00

22 ALMACENERO ASISTENTE IV 30 2,000.00 180.00 2,180.00

6.2.d REPORTE DISGREGADO DE RECURSOS EMPLEADOS - PLANILLAS GASTOS GENERALES

TOTALES

DIASCATEGORIAN° DESCRIPCIÓN

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 71 / 80

Page 72: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

MAYO 2012 PLANILLA Nº122-2012 GOB. REG. TACNA - GRI (00-0) TOTAL A COMPROMETER = 15,260.0012 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.00

13 GUARDIAN 30 2,000.00 180.00 2,180.00

14 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.00

15 ALMACENERO 30 2,000.00 180.00 2,180.00

16 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.00

MAYO 2012 PLANILLA Nº130-2012 GOB. REG. TACNA - (18-H) TOTAL A COMPROMETER = 7,957.0020 TECNICO II 30 1,800.00 162.00 1,962.00

21 TECNICO ADMINISTRATIVO 30 1,500.00 135.00 1,635.00

22 PROFESIONAL ADMINISTRATIVO 30 2,500.00 225.00 2,725.00

23 AUXILIAR ADMINISTRATIVO 30 1,500.00 135.00 1,635.00

MAYO 2012 PLANILLA Nº132-2012 GOB. REG. TACNA - GRI (00-0) TOTAL A COMPROMETER = 2,180.00

01 ASISTENTE ADMINISTRATIVO 30 2,000.00 180.00 2,180.00

MAYO 2012 PLANILLA Nº137-2012 GOB. REG. TACNA (18-H) TOTAL A COMPROMETER = 10,028.0027 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

28 COORDINADOR DE SEGURIDAD TECNICO III 30 1,700.00 153.00 1,853.00

29 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

30 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

31 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

32 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

JUNIO 2012 PLANILLA Nº154-2012 GOB. REG. TACNA -GRI-OEM (00-0) TOTAL A COMPROMETER = 17,440.0013 ASISTENTE ADMINISTRATIVO 30 2,000.00 180.00 2,180.0014 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0015 GUARDIAN 30 2,000.00 180.00 2,180.0016 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.0017 ALMACENERO 30 2,000.00 180.00 2,180.0018 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.00

JUNIO 2012 PLANILLA Nº162-2012 GOB. REG. TACNA - (18-H) TOTAL A COMPROMETER = 9,701.0001 PROFESIONAL ADMINISTRATIVO 30 2,000.00 180.00 2,180.0002 PROFESIONAL ADMINISTRATIVO 30 2,200.00 198.00 2,398.0003 TECNICO ADMINISTRATIVO 30 1,600.00 144.00 1,744.0004 AUXILIAR ADMINISTRATIVO 30 1,600.00 144.00 1,744.0005 TECNICO ADMINISTRATIVO 30 1,500.00 135.00 1,635.00

JUNIO 2012 PLANILLA Nº164-2012 GOB. REG. TACNA (18-H) TOTAL A COMPROMETER = 1,635.0012 SEGURIDAD Y VIGILANCIA TECNICO II 30 1,500.00 135.00 1,635.00

JULIO 2012 PLANILLA Nº179-2012 GOB. REG. TACNA - (18-H) TOTAL A COMPROMETER = 1,000.0021 PROFESIONAL ADMINISTRATIVO 0 200.00 0.00 200.0022 PROFESIONAL ADMINISTRATIVO 0 200.00 0.00 200.0023 TECNICO ADMINISTRATIVO 0 200.00 0.00 200.0024 AUXILIAR ADMINISTRATIVO 0 200.00 0.00 200.0025 TECNICO ADMINISTRATIVO 0 200.00 0.00 200.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 72 / 80

Page 73: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

JULIO 2012 PLANILLA Nº181-2012 GOB. REG. TACNA (18-H) TOTAL A COMPROMETER = 300.0011 SEGURIDAD Y VIGILANCIA 0 300.00 0.00 300.00

JULIO 2012 PLANILLA Nº188-2012 GOB. REG. TACNA (00-0) TOTAL A COMPROMETER = 1,800.008 ASISTENTE ADMINISTRATIVO 0 300.00 0.00 300.009 ASISTENTE ADMINISTRATIVO 0 300.00 0.00 300.00

10 GUARDIAN 0 300.00 0.00 300.0011 ASISTENTE TECNICO 0 300.00 0.00 300.0012 ALMACENERO 0 300.00 0.00 300.0013 RESIDENTE DE OBRA 0 300.00 0.00 300.00

JULIO 2012 PLANILLA Nº194-2012 GOB. REG. TACNA (00-0) TOTAL A COMPROMETER = 17,985.008 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.009 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.00

10 GUARDIAN 30 2,000.00 180.00 2,180.0011 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.0012 ALMACENERO 30 2,000.00 180.00 2,180.0013 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.00

AGOSTO 2012 PLANILLA Nº218-2012 GOB. REG. TACNA TOTAL A COMPROMETER = 20,383.0001 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0002 CADISTA PROYECTO 30 2,700.00 243.00 2,943.0003 ASISTENTE ADMINISTRATIVO 30 2,000.00 180.00 2,180.0004 GUARDIAN 30 2,000.00 180.00 2,180.0005 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.0006 ALMACENERO 30 2,000.00 180.00 2,180.0007 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.00

SETIEMBRE 2012 PLANILLA Nº250-2012 GOB. REG. TACNA TOTAL A COMPROMETER = 13,938.1701 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0002 SECRETARIA DE APOYO 30 2,000.00 180.00 2,180.0003 GUARDIAN 30 2,000.00 180.00 2,180.0004 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.0005 ALMACENERO 30 2,000.00 180.00 2,180.0006 RESIDENTE DE OBRA 3 500.00 67.50 567.5007 ASISTENTE ADMINISTRATIVO 19 1,266.67 114.00 1,380.67

OCTUBRE 2012 PLANILLA Nº301-2012 GOB. REG. TACNA TOTAL A COMPROMETER = 27,250.0001 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0002 CHOFER 30 3,000.00 270.00 3,270.0003 SECRETARIA DE APOYO 30 2,000.00 180.00 2,180.0004 GUARDIAN 30 2,000.00 180.00 2,180.0005 INSPECTOR DE SEGURIDAD 30 2,000.00 180.00 2,180.0006 ALMACENERO 30 2,000.00 180.00 2,180.0007 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.0008 TECNICO DE CAMPO 30 2,000.00 180.00 2,180.0009 ASISTENTE ADMINISTRATIVO 30 2,000.00 180.00 2,180.0010 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.00

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 73 / 80

Page 74: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

NOVIEMBRE 2012 PLANILLA Nº327-2012 GOB. REG. TACNA TOTAL A COMPROMETER = 23,162.5001 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0002 PERSONAL DE APOYO 15 750.00 67.50 817.5003 SECRETARIA DE APOYO 30 2,000.00 180.00 2,180.0004 GUARDIAN 30 2,000.00 180.00 2,180.0005 INSPECTOR DE SEGURIDAD 30 2,000.00 180.00 2,180.0006 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.0007 ALMACENERO 30 2,000.00 180.00 2,180.0008 TECNICO DE CAMPO 30 2,500.00 225.00 2,725.0009 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.00

DICIEMBRE 2012 PLANILLA Nº370-2012 GOB. REG. TACNA TOTAL A COMPROMETER = 25,837.5015 ASISTENTE ADMINISTRATIVO 30 2,500.00 225.00 2,725.0016 PERSONAL DE APOYO 14 700.00 67.50 767.5017 CHOFER 30 2,500.00 225.00 2,725.0018 SECRETARIA DE APOYO 30 2,000.00 180.00 2,180.0019 GUARDIAN 30 2,000.00 180.00 2,180.0020 INSPECTOR DE SEGURIDAD 30 2,000.00 180.00 2,180.0021 RESIDENTE DE OBRA 30 5,000.00 450.00 5,450.0022 ALMACENERO 30 2,000.00 180.00 2,180.0023 TECNICO DE CAMPO 30 2,500.00 225.00 2,725.0024 ASISTENTE TECNICO 30 2,500.00 225.00 2,725.00

ENERO 2013 PLANILLA Nº015-2013 GOB. REG. TACNA TOTAL A COMPROMETER = 19,601.8235 RESIDENTE DE OBRA 21 3,500.00 315.00 3,815.0036 SECRETARIA DE APOYO 29 1,933.33 174.00 2,107.3337 ASISTENTE ADMINISTRATIVO 29 1,933.33 174.00 2,107.3338 GUARDIAN 29 1,933.33 174.00 2,107.3339 RESIDENTE DE OBRA 11 1,833.33 165.00 1,998.3340 ALMACENERO 23 1,533.33 138.00 1,671.3341 TECNICO DE CAMPO 29 2,416.67 217.50 2,634.1742 ASISTENTE TECNICO 29 2,900.00 261.00 3,161.00

TOTAL ACUMULADO 248,485.99

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 74 / 80

Page 75: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

VII. CRONOGRAMA VALORIZADO DE EJECUCIÓN POR PARTIDAS

10Obra: RECONSTRUCCION E IMPLEMENTACION DE LA I.E. FORTUNATO ZORA CARBAJAL, PROVINCIA DE CANDARAVE - TACNA.

ProgramaInfraestructura Educativa

U.EjecutoraGobierno Regional Tacna PLAZO EJECUC. DPTO

Fecha ENERO 2013 FECHA INICIO PROV

Mod.Ejec. Administración Directa FECHA TERMINO DIST

VALORIZ % VALORIZ % VALORIZ % VALORIZ %01 TRABAJOS PRELIMINARES 57,115.21 47,455.21 83.09% 1,620.00 2.84% 49,075.21 85.92% 8,040.00 14.08%

2.00 CONSTRUCCION DE 03 AMBIENTES PARA AULAS - PABELLON C 149,431.23 59,953.87 40.12% 10,159.11 6.80% 70,112.99 46.92% 79,318.25 53.08%

3.00 CONSTRUCCION DE 01 AMBIENTE PARA S.U.M. 140,865.80 40,801.41 28.96% 11,823.95 8.39% 52,625.37 37.36% 88,240.44 62.64%

4.00 CONSTRUCCION DE 01 AMBIENTE PARA COCINA-COMEDOR Y 01 AMBIENTE PARA ZONA ADMINISTRATIVA205,609.54 79,464.99 38.65% 9,299.79 4.52% 88,764.77 43.17% 116,844.76 56.83%

5.00 CONSTRUCCION DE 01 ESCALERA 56,939.62 28,128.20 49.40% 2,230.74 3.92% 30,358.94 53.32% 26,580.68 46.68%

6.00 CONSTRUCCION DE 02 BATERIAS SS.HH. 118,882.95 37,495.39 31.54% 1,347.78 1.13% 38,843.17 32.67% 80,039.78 67.33%

7.00 CONSTRUCCION DE 01 AMBIENTE PARA GUARDIANIA 38,444.91 16,187.68 42.11% 2,798.63 7.28% 18,986.31 49.39% 19,458.60 50.61%

8.00 CONSTRUCCION DE 01 AMBIENTE PARA TALLER DE CARPINTERIA 143,931.94 56,355.21 39.15% - 0.00% 56,355.21 39.15% 87,576.72 60.85%

9.00 CONSTRUCCION DE 02 AMBIENTES PARA SS.HH. EN ZONA DE LOSAS DEPORTIVAS Y 01 AMBIENTE DE EDUCACION FISICA177,149.91 92,415.34 52.17% 7,705.10 4.35% 100,120.44 56.52% 77,029.47 43.48%

10.00 CONSTRUCCION DE CERCO PERIMETRICO 19,700.08 10,088.88 51.21% - 0.00% 10,088.88 51.21% 9,611.20 48.79%

11.00 CONSTRUCCION DE 02 GRADERIAS EN ZONA DEPORTIVA 171,672.75 5,898.54 3.44% 11,498.94 6.70% 17,397.48 10.13% 154,275.27 89.87%

12.00 CONSTRUCCION DE PATIO DE HONOR, 02 LOSAS DEPORTIVAS Y AREAS DE CIRCULACION591,994.18 235,362.38 39.76% 28,415.73 4.80% 263,778.11 44.56% 328,216.06 55.44%

13.00 AREAS VERDES 10,303.64 - 0.00% - 0.00% - 0.00% 10,303.64 100.00%

14.00 COBERTURA CON MALLA RASHELL 80,631.17 38,819.13 48.14% - 0.00% 38,819.13 48.14% 41,812.04 51.86%

15.00 RED DE AGUA DESAGUE E ISTALACIONES ELECTRICAS 106,332.25 63,053.73 59.30% 16,229.44 15.26% 79,283.18 74.56% 27,049.07 25.44%

16.00 DESMONTAJES Y DEMOLICIONES 108,881.15 108,881.15 100.00% - 0.00% 108,881.15 100.00% - 0.00%

17.00 MEJORAMIENTO DE PABELLON D (02 NIVELES: 05 AULAS, 2 SS.HH.) 59,001.57 7,693.22 13.04% 5,875.14 9.96% 13,568.37 23.00% 45,433.20 77.00%

18.00 MEJORAMIENTO DE TANQUE ELEVADO 19,052.68 7.36 0.04% - 0.00% 7.36 0.04% 19,045.32 99.96%

19.00 ACONDICIONAMIENTO DE 01 AULA (1ER NIVEL)-PABELLON B 8,433.72 - 0.00% - 0.00% - 0.00% 8,433.72 100.00%

20.00 EQUIPAMIENTO BASICO 231,143.98 - 0.00% - 0.00% - 0.00% 231,143.98 100.00%

COSTO DIRECTO 2,495,518.40 928,061.71 37.19% 109,004.36 4.37% 1,037,066.07 41.56% 1,458,452.21 58.44%

GASTOS GENERALES (13% ) 324,417.39 120,648.02 37.19% 14,170.57 4.37% 134,818.59 41.56% 189,598.79 58.44%

INFRAESTRUCTURA (CD+GG) 2,819,935.79 1,048,709.73 37.19% 123,174.93 4.37% 1,171,884.66 41.56% 1,648,050.99 58.44%

CAPACITACIÓN 37,640.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

SUPERVISIÓN 4.00% 99,820.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

LIQUIDACIÓN 1.5% 37,432.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%

EXPEDIENTE TÉCNICO 0.00PPTO TOTAL DEL PROYECTO 2,994,829.30 1,048,709.73 35.02% 123,174.93 4.11% 1,171,884.66 39.13% 1,648,050.99 55.03%

ENERO 2013

379

16/04/2012

INF. MENSUAL - VALORIZACION N°

MES ACTUAL UBICACIÓNTACNA

CANDARAVE

ITEM TRABAJOS EJECUTADOSCOSTO AL

100%

ANT.ACUMULADO ACTUAL

CANDARAVE

ACUMULADO EJECUT. SALDO A EJEC.

29/04/2013

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 75 / 80

Page 76: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CAPÍTULO I I :PARTE ANEXOS

1. PANEL FOTOGRÁFICO

2. COPIAS DEL CUADERNO DE OBRA

3. COPIAS DE PLANILLA DE PAGOS

4. OTROS

OFICINA EJECUTIVA DE SUPERVISIÓN (OES) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 76 / 80

Page 77: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

ANEXOPANEL FOTOGRÁFICO

2.00 CONSTRUCCIÓN DE 03 AMBIENTES PARA AULAS – PABELLÓN C 02.11.04 COBERTURA CON PLANCHA CALAMINA

COBERTURA CON PLANCHA CALAMINA

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 77 / 80

Page 78: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CORTE PARA INSTALACIONES SANITARIAS SS.HH. PABELLON D

CORTE EN PISO PARA INSTALACIONES SANITARIAS SS.HH. PABELLON D

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 78 / 80

Page 79: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CONCRETO EN VÍAS DE CIRCULACIÓN

CONCRETO EN VIAS DE CIRCULACIÓN

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 79 / 80

Page 80: INF.MENS.Nº10.ENERO2013_IE.ZORA.CANDARAVE-RCH_RES-IMPRIMIR

INFORME MENSUAL Nº10-R.Ch.H-RO OBRA:“ RECONSTR. E IMPLEMENTAC. DE LA I.E. FORTUNATO ZORA CARBAJAL, PROV. CANDARAVE - TACNA” ENERO- 2013

CONCRETO EN RAMPA PARA INGRESO VEHICULAR

CONCRETO EN RAMPA PARA INGRESO VEHICULAR

SUB-GERENCIA DE OBRAS (SGO) - Dirección: Av. Hipólito Unánue Nº 1269 Teléfono 58-3051 Fax 58-3050 Tacna – Perú Pág. 80 / 80