The Cryonorm consortium Industry case of the implementation of small scale LNG pioneering in a very promising industry
The Cryonorm consortium
Industry case of the implementation of small scale
LNG
pioneering in a very promising industry
The Cryonorm consortium
Cryonorm consortium – an overview
Experience in Maritime LNG systems The first inland ship on LNG in the world
- What made it a reality? - 12 months of experience
Agenda
The Cryonorm consortium
The consortium
four major companies.
Vaporization systems for cryogenic liquids with www.cryonorm.nl to be contacted via [email protected]. Engineering and building of skids for oil and gas industry to be contacted via [email protected] Small scale LNG liquefaction and industrial gas production units with www.cryonormprojects.com to be contacted via [email protected] Energy from small and mid scale LNG systems with www.cryonormsystems.com
The Cryonorm consortium
The consortium
Privately owned company European based Turn over 2011: 25 mio Euro Employees: 120 Founded: 1962
The Cryonorm consortium
• Cryogenic Engineering
• Natural Gas Liquefaction Plants (LNG)
focusing on
Small scale LNG liquefaction units (Gas to Liquid)
The Cryonorm consortium, serving the LNG market.
The Cryonorm consortium
focusing on three major product lines in a first phase.
2. Small scale LNG liquefaction
The Cryonorm consortium, serving the LNG market.
The Cryonorm consortium
• Ambient type vaporizers
• Forced Draft Vaporizers
• Hot Water Vaporizers
• Steam Driven Vaporizers
• Gas fired / Diesel fired Vaporizers
The Cryonorm consortium, serving the LNG market.
focusing on
Vaporization systems
The Cryonorm consortium
focusing on
Turn-key small and mid scale LNG systems – engineering and installation
The Cryonorm consortium, serving the LNG market.
• Maritime LNG fuel systems – Inland ships – Seagoing ships
• LNG and LCNG fill stations • LNG bunkering systems
– Land based – Installed on ship
• LNG regasification systems
The Cryonorm consortium
LNG stations for truck filling
LNG system for truck filling Simon Loos - Zaandam
The Cryonorm consortium
Land based regasification systems for industry or municipalities.
Cryonorm Systems, part of the Cryonorm consortium
The Cryonorm consortium
Cryonorm Systems, part of the Cryonorm consortium
About Anthony Veder Group: Anthony Veder was established in 1937 as a ship-owner and port agent.
Ever since acquiring its first gas tanker in 1969, the company has been
involved in gas shipping. As an integrated shipping company, it aims to
develop long-term customer relationships by offering a safe, reliable
and flexible service through a wide range of high quality gas carriers.
The group is involved in all segments of the gas market, from CO2 to
ethylene and LPG to LNG. Furthermore, it provides comprehensive and
efficient technical and commercial ship management services to third
parties. www.anthonyveder.com
About Cryonorm Systems: Cryonorm Systems is part of the Cryonorm consortium and is a leading
designer and installer of turn-key small and medium LNG Systems. The
LNG systems are developed to meet the international standards as well
as the applicable regulations. Our scope ranges from project design,
manufacturing and detailed engineering to installation and
commissioning of complete LNG systems for the increasing market of
small and mid scale LNG . www.cryonormsystems.com
Cryonorm Systems receives order to install the LNG fuel system on two gas
carriers of Anthony Veder.
The order consists of a turn key LNG fuel system for two gas tankers. Cryonorm Systems will engineer, produce and
supervise the installation of the LNG system. Anthony Veder and Cryonorm Systems reached an agreement to partner in
this important project. “This is a milestone for both companies” says Jos Glorie, business development director at
Cryonorm Systems.
The Cryonorm consortium
Experiences in LNG systems for maritime applications
The first inland ship in the world in
operation
What made it a reality?
The Cryonorm consortium
The hurdles/challenges with regards to
small scale LNG systems for inland ships
The Cryonorm consortium
Initially, the saving on fuel costs were estimated at 20 to 25%. The reality after 9 months is between 25 and 30% The pay back time for the installation was estimated on 3 to 6 years (depending on the running time of the ship) The reality after 9 months is between 2 and 4 years
The economic feasability
The Cryonorm consortium
The only solution for this issue was and still is trucking of LNG. LNG can be trucked in from UK, Scandinavia, Belgium or Spain. Currently, the LNG is trucked in from Zeebrugge, Belgium. Still, this remains an issue since the flexibility of supply is not optimum.
Availability of LNG
The Cryonorm consortium
Rotterdam Harbor did not give permission initially. First bunkering was done with a lot of safety precautions and in the presence of more then 20 people. Bunkering today is very simple and a straight forward operation. Cryonorm systems made the HAZOP study for bunkering + procedure.
Bunkering of LNG
The Cryonorm consortium
Currently it is forbidden to use LNG for inland ships. The correct permits (derogations) can be obtained. Needed documents are: Certificate of investigation following rules of investigation for inland ships on the Rheine (directive 2006/87/EC) Certificate of approval (ADN) These certificates can be obtained under the following rules • Central commission for the Rheine to give recommendation per ship. • The ship needs to have a new technical feature. • The needed safety precautions need to be taken. • Only for test purposes and with limitation in time. Argonon is build under Lloyd classification. Cryonorm systems provided the needed assistance to get the classification.
Permission to build the ship
The Cryonorm consortium
Pre - engineering done by Cryonorm Systems starts with the information on flow of natural gas to the engine Pressure of the natural gas to the engine Autonomy of the ship (time between bunkering) After this, in close cooperation with owner and shipyard, Cryonorm systems performs a pre – engineering Mainly looking for space on the ship.
Pre engineering of the LNG system
The Cryonorm consortium
Detailed engineering was performed on storage, vaporization control system. safety system Project execution plan is made. Process Flow diagram made P&ID made – list of components Close relation was kept with classification is kept. Kick off meeting with stakeholders included.
Engineering of the LNG system
The Cryonorm consortium
Manufacturing drawings made. Pre manufacturing of the LNG system. Installation on board. Connection to the steering house Connection to the engine room
Installation of the LNG system
The Cryonorm consortium
All challenges/hurdles have been overcome in order to put LNG systems in the market. Economical and environmental drivers of the industry are making the choice for small and mid scale LNG Classification agencies are taking their responsibility to make sure that maritime and land based LNG systems can be put in operation. In order to create a legal framework, the correct standards and rules need to be further developed by official instances. Preferable on a global basis. Cryonorm Systems has experience with maritime and land based LNG systems for the supply of natural gas to various applications
Conclusion
The Cryonorm consortium
Thank you for your attention
Cryonorm Systems: Turn-key small and mid