Top Banner
Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer
10

Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Dec 13, 2015

Download

Documents

Stephen Nash
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Industry briefing

Weddell Power Station unit three

Johannes Rickermann

Senior Development Engineer

Page 2: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Weddell Power Station Overview

Page 3: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Current view

Page 4: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Proposed expansion

Page 5: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Water treatment plant (RO-EDI)

Page 6: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Planned works packages• Main engineer, procure and construct (EPC)

contract for supply installation and commissioning of heat recovery system including steam turbine

• Contract to integrate control system into Channel Island Power Station Yokogawa CS3000 system

• Contract to supply, install and commissioning 66 kV interface, station black start system and auxiliary electrical system

• Contract to augment the water demineralisation plant to add capacity and / or polish demineralised water

Page 7: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Local opportunities

Electrical contractControl system integrationSubcontracting to main contractor for:

– Civil, earthworks, roads and foundations– Piping / mechanical– Electrical – Steel works and structures– others

Page 8: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Envisaged timeline

• Heat recovery and steam system advertised early July 2009

• Control system integration contract advertised end of July 2009

• Electrical contract planned to be advertised October 2009

• Water demineralisation plant augmentation planned to be advertised October 2009

• Plant completion planned for September 2011

Page 9: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Contract conditions• Design and construct packages according

to new NT-works contract • EPC contract specifically tailored for this

job– Fixed lump sum turn key contract– Milestone payments– No Superintendent, Principal’s Representative– Hard obligation to achieve time line and

performance– Risk of site condition on contractor except for

latent conditions– 2 years defects liability period– Working under PWC permit system

Page 10: Industry briefing Weddell Power Station unit three Johannes Rickermann Senior Development Engineer.

Useful hints

• Register your capabilities with NTICN, www.nticn.com.au

• Checkout tenders online on http://www.nt.gov.au/dcis/tendering/tol_homepage.html– to become aware of future tender

opportunities– to know who downloaded the tender

information