Feasibility Studies with the Aim of Developing a Bilateral Offset Credit Mechanism FY2011 Studies for Project Development and Organization Indonesia Sumatera SNG Project Feasibility Study of Low rank coal to SNG New Energy and Industrial Technology Development Organization (NEDO) Mitsubishi Heavy Industries, Ltd.
12
Embed
Indonesia Sumatera SNG Project Feasibility Study of … Sumatera SNG Project Feasibility Study of Low rank coal to SNG New Energy and Industrial Technology Development Organization
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Feasibility Studies with the Aim of Developing a Bilateral Offset Credit
Mechanism FY2011
Studies for Project Development and Organization
Indonesia Sumatera SNG Project
Feasibility Study of Low rank coal to SNG
New Energy and Industrial Technology Development Organization (NEDO)
Mitsubishi Heavy Industries, Ltd.
Indonesia Sumatera SNG Project
Feasibility Study of Low rank coal to SNG
2012/5
Low rank coal
SNG
CO2
SNG Plant
EOR/CCS
To existing pipeline
4.55 Mton/yr
11.4M ton/yr
150MMSCFD
石炭
石炭
コンバスタ
リダクタ
SGCSGCガス化炉ガス化炉
Coal Gasifier (Oxygen blown)
Gas purification
Pre- Drying
SNG Compression
CO2
Synthesis gas
CO2 Compression
Project Outline (1/1)
SNG Synthesis
Coal Supplier
1. Outline of Sumatera SNG Project
SNG Plant
JAKARTA
CO2 Oil CO2
EOR
Concept
SNG Plant
Low Rank Coal Mine
Oil Plant
CO2 Injection
Singapore
JAKARTA
NG
Pipeline
South Sumatera is promising plant location.
● SNG plant is constructed beside Low Rank Coal mine. SNG product is transported to West Java with exiting pipeline.
● Byproduct CO2 is injected existing oil fields for EOR and CCS.
Project Outline (2/2) 1. Outline of Sumatera SNG Project
● Design of coal gasification and SNG synthesis process with Low Rank Coal
● Estimation of Plant Capital and Operating Cost
● Oxygen-blown gasification test with “Indonesian Low Rank Coal” at Gasification Pilot Plant in Nagasaki Japan
● Study of EOR and CCS opportunity of CO2, byproduct SNG Plant
● Study of application for “Bilateral Offset Credit Mechanism (BOCM)”
2. Outline of Feasibility Study
Gasifier
Control Room
Coal Feeder
● Oxygen-blown Gasification test using “Indonesian Low Rank Coal” was conducted at 50ton per day class Pilot Plant in MHI’s Nagasaki R&D center.
● Test results such as main syngas components and gasification efficiency, will be reflected to the design of Commercial class gasifier.
Appearance of 50 t/d class Coal Gasification Pilot Plant
Coal Gasification Pilot Plant Test(1/2)
3. Feasibility Study Result
Slag
Slag
Water
Bathe
Slag hole camera
Gasifier
Vessel
Combustor
Water bathe
camera
Slag is discharged very stably. No unburned carbon falls down from slag hole. Discharged Slag is grassy. (Good appearance)
Discharged slag
slag hole camera
water bathe camera
Coal gasification test was completed successfully.
Coal Gasification Pilot Plant Test(2/2)
3. Feasibility Study Result
Initial Screening Study of CO2/EOR
- Initial CO2 EOR/CCS Screening Study was completed. The study was
screening of oil fields in South Sumatera Basin of 100km radius of SNG
plant.
- The study collected data of half of oil fields in the radius. 2/3 of
reservoirs show CO2/EOR miscible flooding.
- Detail study for CO2/EOR for one representative reservoir was
conducted. The study of core sampling, slim tube test and geological
simulation was carried out. Increment oil recovery is estimated to be
28.8%.
3. Feasibility Study Result
BOCM / CO2 Emission Reduction Calculation (1/1)
<Coal Gasification>
<CCS-EOR>
ERy: 3,316,404 tCO2/yr GHG emissions reductions in year y by CCS-EOR
BEy: 4,560,270 tCO2/yr Baseline emissions reductions in year y
PEy: 1,243,866 tCO2/yr Project emissions reductions in year y
LEy: 0 tCO2/yr Leakage in year y
ERy: 2,975,874 tCO2/yr GHG emissions reductions at the Coal Gasification Plant in year y
BEy: 10,582,242 tCO2/yr Baseline emissions reductions in year y
PEy: 7,606,368 tCO2/yr Project emissions reductions in year y
LEy: 0 tCO2/yr Leakage in year y
<Combined Result>
ERy: 6,292,278 tCO2/yr GHG emissions reductions by coal gasification and CCS-EOR in year y
BEy: 10,582,242 tCO2/yr Baseline emissions reductions in year y
PEy: 4,289,964 tCO2/yr Project emissions reductions in year y
LEy: 0 tCO2/yr Leakage in year y
3. Feasibility Study Result
Base Condition for Sensitive Analysis of SNG Price
Item Unit Price
① EPC Plant Cost MM USD 2,920 ~ 3,650 (100% ~125%)
② Coal Price $/ton 13 ~ 16
③ Target SNG Price $/MMBtu < 10
④ CO2 Off Take Price $/ton 30 ~ 50
(25 years)
⑤ BOCM Credit Price $/ton 0 – 10
(10 years)
⑥ Finance Repayment %p.a./ Year 5% / 18
⑦ Return on Equity (ROE) % 12.5
⑧ Project Period Year 30
⑨ Availability % 90
Sensitive Analysis (1/2)
3. Feasibility Study Result
Coal Price CAPEX CO2 Price ( US$/ ton) SNG Price
(US$ / MMBtu) Off-Take BOCM Credit
Project Target @ 13 US$ / ton 3,302 MM US$
(EPC 2,920 + O/C 208 +
IDC 174)
30 10 10.0
EPC Cost High @ 13 US$ / ton 4,073 MM US$
(EPC 3,650 + O/C 208 +
IDC 215)
30 10 12.1
Coal Price High @ 16 US$ / ton 3,302 MM US$
(EPC 2,920 + O/C 208 +
IDC 174)
30 10 10.8
CO2 Credit Price
Zero
@ 13 US$ / ton 3,302 MM US$
(EPC 2,920 + O/C 208 +
IDC 174)
30 0 10.8
CO2 Off Take
Price High ①
@ 13 US$ / ton 3,302 MM US$
(EPC 2,920 + O/C 208 +
IDC 174)
50 10 7.9
CO2 Off Take
Price High ②
@ 13 US$ / ton 4,073 MM US$
(EPC 3,650 + O/C 208 +
IDC 215)
50 10 10.0
Sensitive Analysis (2/2)
O/C : Owner’s Cost, IDC : Interest during Construction
3. Feasibility Study Result
4. Feasibility Study Summary
The product price of SNG is 10 $/MMBtu calculated by sensitive analysis. This price is equivalent to import LNG CIF price.
Coal gasification test was completed successfully. Slag was discharged very stable. No unburned carbon fell down from slag hole.
Initial CO2 EOR/CCS Screening Study around the potential low rank coal mine was completed. The study was screening of oil fields in South Sumatra Basin of 100km radius of SNG Plant. The study collected data of half of oil fields in the radius. 2/3 of reservoirs show CO2 /EOR miscible flooding.
The reduction potential volume of CO2 was calculated and the methodology of CO2 reduction for Indonesia SNG/EOR plant was summarized. Possible CO2 Reduction volume in this plant will be about 6.29 M t/y.