Top Banner
BBBEE ONE Level PROJECT EXPERIENCE Shaping the future of Africa’s Infrastructure Development ARCHITECTS ENGINEERS PROPERTIES QUANTITY SURVEYORS FOUNDATION PROJECT MANAGEMENT MANAGEMENT CONSULTING PROJECT FINANCE ASSET MANAGEMENT FACILITIES MANAGEMENT MINING ENERGY AFRICA
28

Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

Sep 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

BBBEE

ONELevel

PROJECT EXPERIENCE

Shaping the future of Africa’s Infrastructure Development

ARCHITECTS • ENGINEERS • PROPERTIES • QUANTITY SURVEYORS • FOUNDATION

PROJECT MANAGEMENT • MANAGEMENT CONSULTING • PROJECT FINANCE

ASSET MANAGEMENT • FACIL IT IES MANAGEMENT • MINING • ENERGY • AFRICA

Page 2: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

IKG PROJECT EXPERIENCE1

OUR HISTORYIndigo Kulani Group is an integrated multi-disciplinary infrastructure and property development holding company. The company was established in 2006 and initially specialised in the provision of planning and design services within the construction industry. Over the past few years we have rapidly grown from strength to strength into the formidable multi-disciplinary infrastructure and property development company that it is today. We pride ourselves through all our award winning achievements. We have an operational presence in all nine of South Africa’s provinces and have expanded our operations to other African countries. These include projects in Tanzania, Angola, Nigeria, Ghana and Lesotho.

IKG SERVICING MODEL

ARCHITECTS • ENGINEERS • PROPERTIES • QUANTITY SURVEYORS • FOUNDATION • PROJECT MANAGEMENT • MANAGEMENT CONSULTING • PROJECT FINANCE • ASSET MANAGEMENT • FACILITIES MANAGEMENT • MINING • ENERGY • AFRICA

Top 100 Empowerment Companies for

2013

Best Empowerment

Award in 2012

Best Women-Owned

Business Award 2013

Best Established

SMME Award in 2012

O U R A C H I E V E M E N T S

Planning and Design

Management Advisory Services

EngineeringServices

Property Development

Infrastructure Management

Architecture Project Management Bulk Water System

Housing Development Asset Management

Town Planning

Programme Management

Roads & Transport

Retail Development

Facilities Management

Urban Design Transaction Advisory Structural Engineering Land Development

Operation & Maintenance

Quantity Surveying

Revenue Management

Mining, Energy and Marine

Property Valuation

Asset Lease Management

Page 3: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

2

MEGA HEALTH PROJECTS

MEGA EDUCATION PROJECTS

MEGA SOCIAL INFRASTRUCTURE PROJECTS

MEGA AIRPORT DEVELOPMENT

INTERNATIONAL MEGA DEVELOPMENT PROJECT

ASSET MANAGEMENT

SOCIO-ECONOMIC IMPACT OF IKG:

• EDUCATION PROJECTS

• HEALTH PROJECTS

• HOUSING PROJECTS

3

7

11

15

17

19

21

23

25

CONTENTS

ARCHITECTS • ENGINEERS • PROPERTIES • QUANTITY SURVEYORS • FOUNDATION • PROJECT MANAGEMENT • MANAGEMENT CONSULTING • PROJECT FINANCE • ASSET MANAGEMENT • FACILITIES MANAGEMENT • MINING • ENERGY • AFRICA

Page 4: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

PROJECT NAME: Programme Monitoring Support Unit (PMSU)CLIENT NAME National Department of Health LOCATION Free State, Eastern Cape and LimpopoPROJECT VALUE R500 million / $35 million

IKG responsibilitiesPMSU Monitoring and oversight of all provincial health projects, advice and manage budget expenditure including quality control for the National Department of Health. Implemented by DBSA.

PROJECT NAME: Trompsburg HospitalCLIENT NAME Department of Health Free StateLOCATION Free StatePROJECT VALUE R468 million / $33 million

IKG responsibilitiesPMSU Monitoring and oversight of project, advice and manage budget expenditure including quality control for the Free State Department of Health.

3 IKG PROJECT EXPERIENCE

MEGA HEALTH PROJECTS

Page 5: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

4

PROJECT NAME: Zola Community Health CentreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION Soweto, GautengPROJECT VALUE R350 million / $24 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Ladybrand HospitalCLIENT NAME Department of Health Free StateLOCATION Free StatePROJECT VALUE R350 million / $24 million

IKG responsibilitiesMonitoring and oversight of project, advice and manage budget expenditure including quality control for the Free State Department of Health.

PROJECT NAME: Refentse Community Health CentreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION HammaskraalPROJECT VALUE R375 million / $26 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

PROJECT NAME: Atteridgeville Community Health CentreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION Pretoria, GautengPROJECT VALUE R320 million / $23 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

Page 6: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

5 IKG PROJECT EXPERIENCE

PROJECT NAME: Siloem HospitalCLIENT NAME Limpopo Department of Health LOCATION LimpopoPROJECT VALUE R1.2 billion / $84 million

IKG responsibilitiesPMSU Monitoring and oversight of all provincial health projects, advice and manage budget expenditure including quality control for the National Department of Health. Implemented by DBSA.

PROJECT NAME: Thabazimbi HospitalCLIENT NAME Limpopo Department of Health LOCATION LimpopoPROJECT VALUE R700 million / $49 million

IKG responsibilitiesPMSU Monitoring and oversight of all provincial health projects, advice and manage budget expenditure including quality control for the National Department of Health. Implemented by DBSA.

PROJECT NAME: Warmbad HospitalCLIENT NAME Limpopo Department of Health LOCATION LimpopoPROJECT VALUE R200 million / $14 million

IKG responsibilitiesPMSU Monitoring and oversight of all provincial health projects, advice and manage budget expenditure including quality control for the National Department of Health. Implemented by DBSA.

Page 7: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

6

PROJECT NAME: Kwa-Thema Community Health CentreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION Benoni, GautengPROJECT VALUE R300 million / $21 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

PROJECT NAME: Mandisa Shiceka ClinicCLIENT NAME Department of Infrastructure and DevelopmentLOCATION HammaskraalPROJECT VALUE R118 million / $8 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

PROJECT NAME: Messina HospitalCLIENT NAME Limpopo Department of Health LOCATION LimpopoPROJECT VALUE R150 million / $10 million

IKG responsibilitiesPMSU Monitoring and oversight of all provincial health projects, advice and manage budget expenditure including quality control for the National Department of Health. Implemented by DBSA.

Page 8: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

MEGA EDUCATION PROJECTS

IKG PROJECT EXPERIENCE7

PROJECT NAME: ASIDI (Accelerated School Infrastructure Delivery Initiative) 2011/12 FYCLIENT NAME National Department of Basic EducationLOCATION National, PROJECT VALUE R700 million / $48 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: ASIDI (Accelerated School Infrastructure Delivery Initiative) 2012/13 FYCLIENT NAME National Department of Basic EducationLOCATION National, PROJECT VALUE R2.3 billion / $159 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

Page 9: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

8

PROJECT NAME: ASIDI (Accelerated School Infrastructure Delivery Initiative) 2013/14 FYCLIENT NAME National Department of Basic EducationLOCATION NationalPROJECT VALUE R2.5 billion / $174 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: ASIDI (Accelerated School Infrastructure Delivery Initiative) 2014/15 FYCLIENT NAME National Department of Basic EducationLOCATION NationalPROJECT VALUE R2.5 billion / $174 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: ASIDI (Accelerated School Infrastructure Delivery Initiative) 2015/16 FYCLIENT NAME National Department of Basic EducationLOCATION National, PROJECT VALUE R2 billion / $139 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: Phephetsu Primary SchoolCLIENT NAME National Department of Basic EducationLOCATION Free StatePROJECT VALUE R53 million / $4 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

Page 10: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

IKG PROJECT EXPERIENCE9

PROJECT NAME: DBSA Gauteng school programmeCLIENT NAME National Department of EducationLOCATION GautengPROJECT VALUE R300 million / $21 million

IKG responsibilitiesConcept Design, Design development of General prototypes for the Gauteng Department of Education for Large, Medium and large primary and Secondary school to be rolled out and implemented for all Gauteng Province schools.

PROJECT NAME: Bekizulu Secondary SchoolCLIENT NAME National Department of Basic EducationLOCATION Eastern CapePROJECT VALUE R82 million / $6 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: Du Noon Primary SchoolCLIENT NAME National Department of Basic EducationLOCATION Western CapePROJECT VALUE R54 million / $4 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

Page 11: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

10

PROJECT NAME: Wesselton Primary School CLIENT NAME National Department of Basic EducationLOCATION MpumalangaPROJECT VALUE R31 million / $2 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: Chief Henry Boklein Secondary School CLIENT NAME National Department of Basic EducationLOCATION Eastern CapePROJECT VALUE R75 million / $5 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

PROJECT NAME: Phephetsu Primary SchoolCLIENT NAME National Department of Basic EducationLOCATION Free StatePROJECT VALUE R53 million / $4 million

IKG responsibilitiesASIDI-Monitoring and oversight of project, advice and manage Design processes, advice and manage budget expenditure including quality control for the National Department of Basic Education.

Page 12: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

MEGA SOCIAL INFRASTRUCTURE PROJECTS

IKG PROJECT EXPERIENCE11

PROJECT NAME: Alexandra Mixed Income developmentCLIENT NAME City of JohannesburgLOCATION Gauteng, AlexandraPROJECT VALUE R3 billion / $208 million Estimated Value

IKG responsibilitiesPart of consortium, Full Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Mixed Income Housing Development (Makgathoville)CLIENT NAME Limpopo Department of Co-operative Governance an Human SettlementLOCATION LimpopoPROJECT VALUE R1.2 billion / $83 million

IKG responsibilitiesDeveloper, Capital Investor, Project management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

Page 13: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

12

PROJECT NAME: New Canada StationCLIENT NAME PRASALOCATION Gauteng, JHB SouthPROJECT VALUE R400 million / $28 million

IKG responsibilitiesPart of consortium, Full Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Terenure Urban Design ProjectCLIENT NAME Ekurhuleni Metro MunicipalityLOCATION Soweto, GautengPROJECT VALUE R250 million /$17 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Rethabiseng Low Cost Housing Development CLIENT NAME Department of Infrastructure and DevelopmentLOCATION NationalPROJECT VALUE R150 million / $10 million Estimated Value

IKG responsibilitiesPart of consortium, Full Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: June 16 Memorial AcreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION Soweto, GautengPROJECT VALUE R30 million / $2milliion

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

Page 14: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

13 IKG PROJECT EXPERIENCE

PROJECT NAME: Operation Mabaleng Sports ComplexCLIENT NAME Department of Infrastructure and DevelopmentLOCATION GautengPROJECT VALUE R300 million / $21 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

PROJECT NAME: Naledi Precinct StationCLIENT NAME PRASALOCATION Gauteng, JHB SouthPROJECT VALUE R600 million / $28 million Estimated

IKG responsibilitiesPart of consortium, Full Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Extension to Park StationCLIENT NAME PRASALOCATION Gauteng, JHB CBDPROJECT VALUE R1,5 billion / $105 million

IKG responsibilitiesPart of consortium, Full Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

Page 15: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

14

PROJECT NAME: Westbury Operation Mabaleng Sports ComplexCLIENT NAME Department of Infrastructure and DevelopmentLOCATION GautengPROJECT VALUE R200 million / $14 million

IKG responsibilitiesProject management of project team, Design development, preparing tender documentation, cost estimation scheme, documentation, construction supervision and monitoring, operation model.

PROJECT NAME: Boipatong Memorial AcreCLIENT NAME Department of Infrastructure and DevelopmentLOCATION NationalPROJECT VALUE R30 million / $2 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Ekurhuleni Metro Municipality Urban FrameworkCLIENT NAME EMMLOCATION GautengPROJECT VALUE R1,5 billion / $105 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

Page 16: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

MEGA AIRPORT DEVELOPMENT

15 IKG PROJECT EXPERIENCE

Page 17: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

16

PROJECT NAME: ACSA – Mid field Terminal CLIENT NAME ACSALOCATION OR Tambo AirportPROJECT VALUE R1.5billion / $104 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Polokwane International AirportCLIENT NAME ACSALOCATION LimpopoPROJECT VALUE R150 million / $10 million

IKG responsibilitiesInception, Concept Design, Concept Development.

Page 18: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

IKG PROJECT EXPERIENCE17

INTERNATIONAL MEGA DEVELOPMENT PROJECT

Page 19: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

18

PROJECT NAME: Abuja Golf & Polo Integrated DevelopmentCLIENT NAME AMG Petroenergy LimitedLOCATION NigeriaPROJECT VALUE R2.5 billion / $173 million

IKG responsibilitiesInception, Concept Design, Concept Development.

PROJECT NAME: Proposed Mixed use Development and Retail AngolaCLIENT NAME Escoffiera GroupLOCATION Luanda, AngolaPROJECT VALUE R1.5 billion / $104 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Hotel in AngolaCLIENT NAME Escoffiera GroupLOCATION Luanda, AngolaPROJECT VALUE R450 million / $31 million

IKG responsibilitiesFull Architectural Services, Inception, Concept Design, Concept Development, Documentation & Procurement, Contract Administration and inspection, close out.

PROJECT NAME: Taringeri 5 star game lodgeCLIENT NAME Private client, Libyan investorLOCATION TanzaniaPROJECT VALUE R600 million / $41 million

IKG responsibilitiesInception, Concept Design, Concept Development.

Page 20: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

IKG PROJECT EXPERIENCE19

PROJECT NAME: Limpopo Public Works and InfrastructureCLIENT NAME Limpopo Public Works and InfrastructureLOCATION LimpopoPROJECT VALUE R300 million / $21 million

IKG responsibilitiesReview the Asset Management Plans for all 12 Provincial Departments, Update of Asset Management Plans for all 12 Provincial Departments, Verify assets occupied and utilised by Provincial Departments, Conduct Accredited Asset Management Training to 30 Limpopo Officials.

PROJECT NAME: Department of Justice and Constitutional DevelopmentCLIENT NAME Department of Justice LOCATION GautengPROJECT VALUE R300 million / $21 million

IKG responsibilitiesImmovable Asset Space Audit, Immovable Asset Physical Verification, Immovable Asset Condition Assessment, Accredited Asset Management Training.

ASSET MANAGEMENT

Page 21: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

20

PROJECT NAME: Ekurhuleni Metropolitan MunicipalityCLIENT NAME Ekurhuleni Metropolitan MunicipalityLOCATION GautengPROJECT VALUE R10 billion / $692 million

IKG responsibilitiesPreparation of Property General Valuation Roll, Development of Property Master File, Physical Property Inspection, Property Condition Assessment.

PROJECT NAME: SAFCOL KomatilandCLIENT NAME SAFCOL KomatilandLOCATION GautengPROJECT VALUE R1.3 billion / $90 million

IKG responsibilitiesPhysical Inspection and Verification of all SAFCOL Fixed Assets, Update of SAFCOL Fixed Asset Register, Condition Assessment and Valuation of all SAFCOL Fixed Assets.

PROJECT NAME: Eastern Cape Department of Roads and Public WorksCLIENT NAME Eastern Cape Department of Roads and Public WorksLOCATION Eastern CapePROJECT VALUE R600 million / $42 million

IKG responsibilitiesImmovable Asset Physical Verification, Immovable Asset Condition Assessment, Preparation of User Asset Management Plans, Preparation of Custodian Asset Management Plans, GIAMA Implementation Review, Accredited Asset Management Training.

PROJECT NAME: Eastern Cape Department of Human SettlementCLIENT NAME Eastern Cape Department of Human SettlementLOCATION Eastern CapePROJECT VALUE R300 million / $21 million

IKG responsibilitiesDevelopment of Low-cost Housing Policy, Title Deeds Allocation, IDMS Policy Framework, IDMS Toolkit, User Asset Management Plan, Immovable Asset Condition Assessment, Immovable Asset Verification and Identification.

Page 22: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

SOCIO-ECONOMIC IMPACT OF IKG

EDUCATION PROJECTS

IKG PROJECT EXPERIENCE21

LIVES IMPACTED BY OUR PROJECTSThe scope of the ASIDI Programme comprises the following sub-programmes:

Sub-programme 1: Inappropriate Structures: 483 Schools that were built from inappropriate material in their entirety are replaced with new schools that meet the department’s standards of basic functionality.Sub-programme 2: Providing Sanitation: Facilities 939 Schools that previously did not have access to sanitation are supplied with at least a basic level of sanitation. Sub-programme 3: Providing Electricity: 932 Identified schools that are not serviced have access to electrical energy supply. Sub-programme 4: Providing Water: 1145 Schools that do not have access to water are provided with basic water supply.

The ASIDI programme managed to provide:• 179/483 inappropriate schools have been replaced • 615/1145 schools provided with basic water supply • 425/939 schools supplied with at least a basic level of sanitation• 307/932 schools have access to electrical energy supply

Page 23: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

22

JOB CREATIONIn 2013 the programme created at least 959 job opportunities by the end of the third quarter. To date the ASIDI programme has created just over 27 739 job opportunities.

DEMOGRAPHICSEquity employment is reported for three categories of workers: Those who declare themselves to be woman, people with disabilities, and youth. Opportunities created thus far consist of:• 7% woman above 35• 69% youth • 1% people with disabilities

INTERNSHIPWork place experience for interns was provided by the Implementing agents, professional consultants and contractors to enable the young professionals to gain suitable experience. A total of 162 interns were offered in-service training during the implementation of this programme. This enabled the interns to benefit in terms of completing their practical training obligation towards their Built Environment Qualification.

ACHIEVEMENTS OF ASIDIThrough ASIDI alone, we have built and delivered 163 state of the art schools since the programmes inception in 2011. IKG, as part of a full team of experts, who gather to work together to design and deliver these schools that give our children science labs, computer labs, nutrition centers, rain water harvesting tanks, decent sanitation, administration blocks with staff rooms and offices for educators and dedicated Grade R centers. Thereby allowing us to lay the right foundation for our children, to have the best possible chances to success. Over and above this, the initiative has provided water to 596 schools, sanitation to 414 schools and electricity to 307 schools that previously had none. This is an investment in the future of South Africa.

According to the Basic Education Norms and Standard edition 21 August 2009 • A large primary school must have a capacity of 930 leaners• A large secondary school must have a capacity of 1000 learners

Indigo Kulani Group on average have contributed to education infrastructure to developing about 483 schools since the inception of the ASIDI programme. This has resulted in creating access to schooling for more than 9600 children per year since 2010.

Page 24: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

SOCIO-ECONOMIC IMPACT OF IKG

IKG PROJECT EXPERIENCE23

LIVES IMPACTED BY OUR PROJECTSThe scope of the PMSU Programme was to provide services to enhance the health infrastructure projects delivery, leading to enhanced health service delivery.

1. Limpopo Province: IKG was involved in 14 Hospitals, 58 Clinics, assisting the Provincial department and National department of Health to develop norms and standards, project managing all facilities, monitoring and oversight support and developing of cost modelling tools.

2. Free State Province: IKG was involved in 20 Hospitals, 9 Clinics and 2 Community Health Centers. Assisting the Provincial department and National department of Health to develop norms and standards, project managing all facilities, monitoring and oversight support and developing of cost modelling tools.

3. Gauteng Province: IKG was involved in 17 Hospitals, 10 Clinics and 7 Community Health Centers. Assisting the Provincial department and National department of Health to develop norms and standards, project managing all facilities, monitoring and oversight support and developing of cost modelling tools.

HEALTH PROJECTS

Page 25: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

24

The PMSU programme managed to provide:• 51 Hospitals upgraded to state of the art facilities• 77 Clinics upgraded to state of the art facilities• 9 CHC upgraded to state of the art facilities• 21.7 million people now have access to health facilities in Limpopo, Free State

and Gauteng.

JOB CREATIONTo date the PMSU programme has created just over 50 000 job opportunities with contractors, appointing a percentage of woman, youth and people with disabilities.

DEMOGRAPHICSEquity employment is reported for three categories of workers: Those who declare themselves to be woman, people with disabilities, and youth. Opportunities created thus far consist of:• 16% woman above 35• 75% youth • 1,5% people with disabilities

INTERNSHIPWork place experience for interns was provided by the Implementing agents, professional consultants and contractors to enable the young professionals to gain suitable experience. A total of 200 interns were offered in-service training during the implementation of this programme. This enabled the interns to benefit in terms of completing their practical training obligation towards their Built Environment Qualification.

ACHIEVEMENTS OF PMSUThrough the PMSU alone, we have built/upgraded and delivered 163 state of the art health facilities since the programme inception in 2010. IKG as part of a full team of experts worked to manage and deliver primary health services to be working in the very best way they can, with communities receiving required health care as close to home as possible.

There are 4 200 public health facilities in South Africa. People per clinic is 13 718, exceeding WHO guidelines of 10 000 per clinic. However, figures from March 2009 show that people averaged 2.5 visits a year to public health facilities and the usable bed occupancy rates were between 65% and 77% at hospitals.

IKG contributed to about 163 health facilities which gives an average of 1 630 000 people access to health facilities.

Page 26: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

SOCIO-ECONOMIC IMPACT OF IKG

IKG PROJECT EXPERIENCE25

LIVES IMPACTED BY OUR PROJECTSThe scope of the Housing Projects comprises the following :

1. Limpopo Province: IKG was involved in a mixed development project that included 430 RDP, 260 GAP, 200 OPEN MARKET, 500 WALK UP UNITS, RETAIL CENTRE, TAXI RANK, SCHOOL, CLINIC AND BULK INFRASTRUCTURE.

2. Gauteng Province: IKG was involved with designing about 4500 houses for Alexandra Mixed Income development, Terenure urban design, Rethabiseng Low cost housing Development.

3. Eastern Cape Province: IKG was involved in a low cost housing project called Parsonsvlei low cost housing development. This development accommodated about 400 RDP housing including bulk infrastructure.

HOUSING PROJECTS

Page 27: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

26

JOB CREATIONTo date these projects had created just over 20 000 job opportunities with contractors, appointing a percentage of woman, youth and people with disabilities.

DEMOGRAPHICSEquity employment is reported for three categories of workers: Those who declare themselves to be woman, people with disabilities, and youth. Opportunities created thus far consist of:• 12% woman above 35• 40% youth • 2,5% people with disabilities

INTERNSHIPWork place experience for interns was provided by the Implementing agents, professional consultants and contractors to enable the young professionals to gain suitable experience. A total of 150 interns were offered in-service training during the implementation of these projects. This enabled the interns to benefit in terms of completing their practical training obligation towards their Built Environment Qualification.

ACHIEVEMENTS OF HOUSING PROJECTSThe right to adequate housing is one of the most important basic human rights. It speaks to the restoration of dignity to the millions of South Africans who have been marginalised for centuries and who still suffer from the legacy of apartheid’s selective development.

IKG has aligned itself to the South African Governments Housing goal, to deliver over 1,5 million housing opportunities by 2019, as set out in the 2014-2019 Medium Term Strategic Framework. It also seeks to ensure, among other things, that poor households have access to adequate housing in better living environments.

IKG has contributed towards more than 6200 houses, which gives an average of 1550 families the opportunity of access to housing.

Page 28: Indigo Kulani Group - PROJECT EXPERIENCE · 2018. 7. 6. · 1 IKG PROJECT EPERIENCE OUR HISTORY Indigo Kulani Group is an integrated multi-disciplinary infrastructure and property

OU

R O

FFIC

ES

We a lso have o ff ices inZambia Lesotho Ghana Tanzan ia N ige r ia

CONTACT US Tel: 086 111 2221Fax: 086 690 6963Email: [email protected]

JOHANNESBURG HEAD OFFICEWaverley Office ParkBuilding 1Ground Floor15 Forest RoadBramleySandton2090

PO Box 502Melrose Arch2076

LIMPOPOConsillium BuildingGround Floor118 General Beyers StreetWelgelegenPolokwane0700

DURBANRoyal Palm Hotel3rd Floor Suite 3C6 Palm BoulevardNewton CentreUmhlanga4320

EASTERN CAPE22 Alexander RoadKing William’s TownEastern Cape5600

CAPE TOWNMetropolitan Life Centre14th floorWalter Sisulu StreetCape Town City CentreCape Town8001

BLOEMFONTEINReitz Park Complex74-80 PresidentReitz AvenueWestdeneBloemfontein9301

NORTH WEST186 Klopper StreetRustenburgNorth West0299