State Preservation and Local Initiated Projects FY 2016 - 2019 Indiana Department of Transportation (INDOT) SPONSOR CONTR ACT # / LEAD DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL CATEGORY PROGRAM PHASE FEDERAL MATCH Estimated Cost left to Complete Project* 2016 2017 2018 2019 STIP NAME Adams County Indiana Department of Transportation US 224 Bridge Deck Overlay Bridge over Koos Ditch, 1.55 Miles East of US 27 Fort Wayne 0 NHPP Bridge Consulting PE $80,000.00 $20,000.00 $100,000.00 A 36 $338,000.00 38562 / 1700223 Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP. Adams County Total Federal: $80,000.00 Match :$20,000.00 2016: 2017: $100,000.00 2018: 2019: *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Page 1 of 59 Report Created:2/16/2017 1:20:18PM
59
Embed
Indiana Department of Transportation (INDOT) - IN.gov · Indiana Department of Transportation (INDOT) SPONSOR CONTR ... Indiana Department of Transportation ... SR 60 Box Culvert
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Adams County
Indiana Department
of Transportation
US 224 Bridge Deck Overlay Bridge over Koos Ditch, 1.55
Miles East of US 27
Fort Wayne 0 NHPP Bridge Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $338,000.0038562 /
1700223
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Adams County Total
Federal: $80,000.00 Match :$20,000.00 2016: 2017: $100,000.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 1 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Allen County
Indiana Department
of Transportation
SR 14 HMA Overlay,
Preventive
Maintenance
2.44 miles W of I-69 to 0.28
miles E of I-69
Fort Wayne 2.447 STP Road Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $1,550,000.0038562 /
1600115
Comments: NIRCC Resolution 17-295. Adding PE in 2017 for new FY 2020 Project into STIP.
Indiana Department
of Transportation
SR 3 HMA Overlay,
Preventive
Maintenance
From I-69 to 3.63 miles N of
I-69.
Fort Wayne 3.562 NHPP Road Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $2,500,000.0038564 /
1592638
Comments: NIRCC Resolution 17-294. Increasing PE in 2017 for new FY 2020 Project into STIP.
Indiana Department
of Transportation
US 33 Bridge Deck Overlay Bridge over Johnson Ditch,
5.33 Miles North of US 30
Fort Wayne 0 NHPP Bridge Consulting PE $60,000.00 $15,000.00 $75,000.00A 36 $320,000.0038564 /
1700224
Comments: NIRCC Resolution 17-297. Adding PE in 2017 for new FY 2020 Project into STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over US 24 NB, 3.21
miles S of SR 14
Fort Wayne 0 NHPP Bridge Consulting PE $27,000.00 $3,000.00 $30,000.00A 36 $26,800.0039355 /
1592926
Comments: NIRCC Resolution 17-290. Adding PE to FY 2017 into STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over US 24, SB, 3.21
miles S of SR 14
Fort Wayne 0 NHPP Bridge Consulting PE $27,000.00 $3,000.00 $30,000.00A 36 $26,800.0039355 /
1592927
Comments: NIRCC Resolution 17-291. Adding PE to FY 2017 into STIP.
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Lower Huntington Road over I
69, 2.97 miles S of US 24
Fort Wayne 0 NHPP Bridge Consulting PE $27,000.00 $3,000.00 $30,000.00A 36 $26,800.0039355 /
1592980
Comments: NIRCC Resolution 17-292. Adding PE to FY 2017 into STIP.
Indiana Department
of Transportation
SR 930 Bridge Deck
Replacement
Bridge over Trier Ditch, 2.05
miles W of I-469
Fort Wayne 0 NHPP Bridge Consulting PE $75,200.00 $18,800.00 $0.00 $94,000.00A 36 $717,350.0039430 /
1600227
Comments: NIRCC Resolution 17-299. Increasing PE in FY 2017.
Indiana Department
of Transportation
I 69 Small Structure Pipe
Lining
S. Jct of I69/I469 Interchange -
Loop Ramp from WB Laf. Ctr to
SB I69
Fort Wayne 0 NHPP Bridge Consulting PE $45,000.00 $5,000.00 $50,000.00A 36 $191,450.0039433 /
1700221
Comments: NIRCC Resolution 17-296. Adding PE in 2017 for new FY 2020 Project into STIP.
Allen County Total
Federal: $421,200.00 Match :$87,800.00 2016: $0.00 2017: $509,000.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 2 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Comments: Amend PE phase in FY 2017 to current STIP. Amended to CAMPO's TIP per Resolution 2017-01 dated 2/13/17.
Bartholomew County Total
Federal: $292,841.60 Match :$73,210.40 2016: 2017: $331,052.00 2018: $35,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 3 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Clark County
Indiana Department
of Transportation
I 65 Environmental
Mitigation
Mitigation site off of I-65 at the
Weber Property for Stream and
Wetland
Seymour 8.064 NHPP Major New - ROW RW $135,000.00 $15,000.00 $150,000.00 A 36 $1,133,504.0039568 /
1600757
Major New -
Consulting
PE $180,000.00 $20,000.00 $200,000.00
Comments: Amend PE phase in FY 2017 and RW phase in FY 2018 to the current STIP. Amended per KIPDA Resolution 29 dated 1/23/17
Indiana Department
of Transportation
ST 1001 Environmental
Mitigation
Environmental mitigation for Old
Salem Road from Utica (4th St)
to SR 265
Seymour 0 STP Major New -
Construction
CN $80,000.00 $20,000.00 $100,000.00 A 36 $150,000.0039852 /
1601801
Major New - ROW RW $40,000.00 $10,000.00 $50,000.00
Comments: Amend RW phase in FY 2017 and CN phase in FY 2018 to the current STIP. Amended to KIPDA's TIP per Administrative Modification #29 dated 1/23/17.
Indiana Department
of Transportation
SR 60 Box Culvert
Replacement
0.87 mile E of SR 111 Seymour 0 STP Bridge Consulting PE $108,000.00 $27,000.00 $135,000.00A 36 $766,405.0039888 /
1600679
Comments: Amend PE phase in FY 2017. Amended to KIPDA's TIP per Administrative Modification #29 dated 1/23/17.
Clark County Total
Federal: $543,000.00 Match :$92,000.00 2016: 2017: $385,000.00 2018: $250,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 4 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Clinton County
Indiana Department
of Transportation
I 65 Bridge Deck Overlay CR 900W over I-65, 1.41 mi N
Comments: Delaware-Muncie Metropolitan Plan Commison ; Transportation Policy Committee of the Delaware-Muncie Metropolitan Plan Commison Resolution 17-4 was approved on February 9, 2017
Comments: Delaware-Munchies Metropolitan Plan Commission, Transportation Policy Committee of the Delaware-Muncie Metropolitan Plan Commission Resolution 17-4 was approved on February 9,
Comments: Indianapolis Metropolitan Planning Organization, Approval of Administrative Amendment to the 2016-2019 Indianapolis TIP, approved February 13, 2017.
Comments: Indianapolis Metropolitan Planning Organization, Approval of an Administrative Modification to the 2016-2019 IRTIP approved February 1, 2017.
Comments: Indianapolis Metropolitan Planning Organization, Approval of an Administrative Modification to the 2016 IRTIP was approved on January 18, 217.
Hendricks County Total
Federal: -$51,430.50 Match :-$5,714.50 2016: 2017: -$57,145.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 20 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Henry County
Indiana Department
of Transportation
SR 38 Small Structure
Replacement
7.572 mi E of E jct SR 103 Greenfield 0 STP Bridge Consulting PE $24,000.00 $6,000.00 $30,000.00A 36 $241,397.0038527 /
1400016
Comments: No MPO, amendment to add $30,000.00 in FY 17 PE via 16-36.
Henry County Total
Federal: $24,000.00 Match :$6,000.00 2016: 2017: $30,000.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 21 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Howard County
Indiana Department
of Transportation
SR 931 Guardrail,
Maintenance Or
Repair
From SR 26 to US 35 N. Jct. Greenfield 9.016 NHS District Other
Construction
CN $325,520.80 $81,380.20 $406,901.00 A 36 $400,000.0040030 /
1700268
Comments: KHCGCC Resolution 2017-2, amendment to add $400,000 in FY 17 CN via 16-36.
Indiana Department
of Transportation
SR 931 Guard Rail
Attenuators, New Or
Modernize
From SR 26 to US 35 Greenfield 9.016 NHS District Other
Consulting
PE $80,000.00 $20,000.00 $100,000.00A 36 $1,124,051.0040031 /
1700270
District Other
Construction
CN $819,240.80 $204,810.20 $1,024,051.00
Comments: KHCGCC Resolution 2017-2, amendment to add $100,000 in FY 17 PE, and $1,024,051 in FY 18 CN via 16-36.
Howard County Total
Federal: $1,224,761.60 Match :$306,190.40 2016: 2017: $100,000.00 2018: $1,430,952.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 22 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Huntington County
Indiana Department
of Transportation
SR 9 Small Structure Pipe
Lining
SR 9 Carries Little Majenica
Creek, 3.15 Miles North of SR
124
Fort Wayne 0 STP Bridge Consulting PE $80,000.00 $20,000.00 $10,000.00 $90,000.00A 36 $280,000.0038561 /
1383585
Bridge ROW RW $60,000.00 $15,000.00 $75,000.00
Comments: No MPO. Adding PE to FY 2017 and 2018 and RW to 2019 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
SR 9 Small Structure Pipe
Lining
Rusher Drain (UNT of Little
Majenica Creek), 1.93 Miles
north of SR 124
Fort Wayne 0 STP Bridge Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $520,000.0038561 /
1700225
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
SR 9 Small Structure Pipe
Lining
Branch #2 of Wabash River
(UNT of Wabash River), 8.40
Miles North of SR 124
Fort Wayne 0 NHPP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00A 36 $200,000.0038561 /
1700226
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
SR 9 Bridge Deck
Replacement
Bridge over Wabash River,
0.13 Miles South of US 24
Fort Wayne 0 NHPP Bridge Consulting PE $240,000.00 $60,000.00 $300,000.00A 36 $4,100,000.0038561 /
1700227
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 24 Bridge Deck Overlay Bridge over Clear Creek,
Eastbound, 1.23 Miles West of
SR 9
Fort Wayne 0 NHPP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00A 36 $425,000.0038561 /
1700228
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 24 Bridge Deck Overlay Bridge over Clear Creek,
Westbound, 1.23 Miles West of
SR 9
Fort Wayne 0 NHPP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00A 36 $425,000.0038561 /
1700229
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
I 69 Small Structure Pipe
Lining
Rest Area Ditch/UNT of Flat
Creek, 3.00 miles North of US
224
Fort Wayne 0 NHPP Bridge Consulting PE $90,000.00 $10,000.00 $100,000.00A 36 $745,000.0039433 /
1700218
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
SR 16 Small Structure Pipe
Lining
0.53 miles E of SR 105,
(Branch of Silver Creek)
Fort Wayne 0 STP Bridge Consulting PE $35,440.00 $8,860.00 $44,300.00A 36 $59,000.0039891 /
1383461
Comments: No MPO. Increasing PE funds in FY 2017.
Indiana Department
of Transportation
SR 16 Small Structure Pipe
Lining
2.10 miles E of SR 105, (Over
Branch of Clear Creek)
Fort Wayne 0 STP Bridge Consulting PE $36,940.00 $9,235.00 $46,175.00A 36 $126,000.0039891 /
1383465
Comments: No MPO. Increasing PE funds in FY 2017.
Indiana Department
of Transportation
SR 16 Small Structure Pipe
Lining
3.35 miles E of SR 105, (Over
Branch of Clear Creek)
Fort Wayne 0 STP Bridge Consulting PE $39,340.00 $9,835.00 $49,175.00A 36 $120,000.0039891 /
1383468
Comments: No MPO. Increasing PE funds in FY 2017.
Indiana Department
of Transportation
SR 105 HMA Overlay Minor
Structural
From SR 16 to SR 114 Fort Wayne 6.059 STP Road Consulting PE $69,890.40 $17,472.60 $87,363.00A 36 $1,700,000.0039891 /
1601015
Comments: No MPO. Increasing PE funds in FY 2017.
Indiana Department
of Transportation
SR 9 QC/QA PCC Thin
Overlay
From 2.64 miles S of US 24
(Old SR 37) to US 24 RP
125+14 to 127+48
Fort Wayne 2.622 NHPP Road Consulting PE $67,200.00 $16,800.00 $84,000.00A 36 $5,340,000.0040016 /
1401854
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 23 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Indiana Department
of Transportation
SR 9 QC/QA PCC Thin
Overlay
From 2.64 miles S of US 24
(Old SR 37) to US 24 RP
125+14 to 127+48
Fort Wayne 2.622 NHPP Road
Construction
CN $2,063,059.20 $515,764.80 $5,078,824.00 ($2,500,000.00) A 36 $5,340,000.0040016 /
1401854
Comments: NO MPO. Increasing PE in FY 2017 and Moving CN from 2019 to 2018 and increasing by $2,578,824.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 28 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
LaGrange County
Indiana Department
of Transportation
US 20 HMA Overlay,
Preventive
Maintenance
From 0.18 Miles East of SR 9 to
1.05 Miles West of SR 327
Fort Wayne 11.358 STP Road Consulting PE $288,000.00 $72,000.00 $360,000.00A 36 $3,600,000.0038558 /
1700250
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
LaGrange County Total
Federal: $288,000.00 Match :$72,000.00 2016: 2017: $360,000.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 29 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Lake County
Indiana Department
of Transportation
VA
VARI
Railroad Protection Sohl Street at IHB DOT
#326991C in Hammond
LaPorte 0 Safety Local Safety
Program - 130
CN $400,000.00 $0.00 $400,000.00 A 36 $400,000.0039449 /
1600450
Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $400,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Lake County Total
Federal: $420,000.00 Match :$0.00 2016: 2017: 2018: $20,000.00 2019: $400,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 30 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
LaPorte County
Indiana Department
of Transportation
VA
VARI
Railroad Protection Tryon Road at CSX DOT
#232070F in Michigan City
LaPorte 0 Safety Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00 A 36 $320,000.0039447 /
1600448
Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Indiana Department
of Transportation
VA
VARI
Railroad Protection Tilden Street at CSX RR DOT
#232080L in Michigan City
LaPorte 0 Safety Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00 A 36 $320,000.0039448 /
1600449
Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Indiana Department
of Transportation
VA
VARI
Railroad Protection Roeske Ave at CSX DOT
#232074H in Michigan City
LaPorte 0 Safety Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00 A 36 $320,000.0039450 /
1600451
Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Indiana Department
of Transportation
VA
VARI
Railroad Protection Greenwood Ave at CSX DOT
#232075P in Michigan City
LaPorte 0 Safety Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00 A 36 $320,000.0039451 /
1600452
Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Indiana Department
of Transportation
VA
VARI
Railroad Protection Carroll Ave at CSX DOT
#232077D in Michigan City
LaPorte 0 Safety Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00 A 36 $320,000.0039453 /
1600454
Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
LaPorte County Total
Federal: $1,700,000.00 Match :$0.00 2016: 2017: 2018: $100,000.00 2019: $1,600,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 31 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Lawrence County
Indiana Department
of Transportation
SR 37 PCCP Cleaning and
Sealing Joints
From 0.62 mile S of S Jct SR-60
to the S Jct of US-50
Vincennes 7.214 NHPP Road
Construction
CN $488,652.80 $122,163.20 $610,816.00 A 36 $1,534,300.0039210 /
1592587
Comments: Amend FY 2016-2019 STIP to reflect to reflect FY 2018 CN phase increase from $715,184 to $1,326,000.00. No MPO.
Indiana Department
of Transportation
SR 58 Bridge Thin Deck
Overlay
Over Spring Creek, 1.48 miles
West SR-54
Vincennes 0 STP Bridge Consulting PE $27,200.00 $6,800.00 $34,000.00 A 36 $137,000.0040052 /
1700014
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $34,000. New Project. No MPO.
Indiana Department
of Transportation
SR 58 HMA Overlay,
Preventive
Maintenance
From 5.1 mile East of SR-37 to
SR-446
Vincennes 6.289 STP Road Consulting PE $125,600.00 $31,400.00 $157,000.00 A 36 $1,854,000.0040078 /
1700043
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $157,000. New Project. No MPO.
Lawrence County Total
Federal: $641,452.80 Match :$160,363.20 2016: 2017: 2018: $801,816.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 32 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Madison County
Indiana Department
of Transportation
SR 9 Replace
Superstructure
2.01 mile S US 36 over Lick
Creek
Greenfield 0 STP Bridge
Construction
CN $656,995.20 $164,248.80 $821,244.00A 3635651 /
1006489
Comments: MCCOG MPO. Amendment to add $3,900 of PE to FY17 via Resolution 1-2017.
Indiana Department
of Transportation
SR 13 Intersect. Improv. W/
New Signals
at I-69 NB and SB ramps Greenfield .111 STP Safety Consulting PE $248,000.00 $62,000.00 $310,000.00A 36 $5,644,437.0038541 /
1400064
Comments: MCCOG amendment approved by Resolution 12-19-16. New PE Funding to secure consultant to perform design work.
Comments: Indianapolis Metropolitan Planning Organization, Approval of Administrative Amendment to the 2016-2019 Indianapolis TIP, approved February 13, 2017.
Indiana Department
of Transportation
I 70 Noise Abatement from 3.17 mi. E of I-465 E. Jct.
to 3.40 mi. E of I-465 E. Jct.
Greenfield .23 STP District Other
Consulting
PE $48,330.00 $5,370.00 $53,700.00A 36 $685,812.0039865 /
1601820
Comments: IMPO Resolution Number 16-IMPO-015, amendment to add $53,700 in FY 17 PE via 16-36.
Marion County Total
Federal: -$182,019.20 Match :-$89,668.80 2016: 2017: -$29,084.00 2018: -$242,604.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 34 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Martin County
Indiana Department
of Transportation
US 50 Bridge Thin Deck
Overlay
Over Beech Creek, 1.10 miles
West SR-450
Vincennes 0 NHPP Bridge Consulting PE $48,800.00 $12,200.00 $61,000.00 A 36 $261,000.0040076 /
1602251
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $61,000. New Project. No MPO.
Martin County Total
Federal: $48,800.00 Match :$12,200.00 2016: 2017: 2018: $61,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 35 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Miami County
Indiana Department
of Transportation
SR 124 Bridge Thin Deck
Overlay
Bridge over Treaty Creek, 1.56
Miles East of SR 19
Fort Wayne 0 STP Bridge Consulting PE $40,000.00 $10,000.00 $50,000.00A 36 $39,000.0039808 /
1700230
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 Small Structure Pipe
Lining
Whitmore Ditch, 6.03 Miles
North of SR 16
Fort Wayne 0 NHPP Bridge Consulting PE $60,000.00 $15,000.00 $75,000.00A 36 $295,000.0039808 /
1700231
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 Bridge Maintenance
And Repair
Bridge over Wabash River,
Northbound, 0.15 Miles South
of US 24
Fort Wayne 0 NHPP Bridge Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $600,000.0039808 /
1700232
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 Bridge Maintenance
And Repair
Bridge over Wabash River,
Southbound, 0.15 Miles South
of US 24
Fort Wayne 0 NHPP Bridge Consulting PE $40,000.00 $10,000.00 $50,000.00A 36 $125,000.0039808 /
1700233
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 Small Structure Pipe
Lining
UNT of Pipe Creek, 1.54 Miles
North of Westbound SR 218
Fort Wayne 0 NHPP Bridge Consulting PE $66,000.00 $16,500.00 $82,500.00A 36 $550,000.0039808 /
1700244
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 Concrete Pavement
Restoration (CPR)
From 0.50 Miles South of US 24
to 0.60 Miles North of US 24
Fort Wayne 1.13 NHPP Bridge Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $750,000.0039808 /
1700254
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Miami County Total
Federal: $366,000.00 Match :$91,500.00 2016: 2017: $457,500.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 36 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Comments: No MPO, remove PE phase from the current STIP; project is approved to eliminate
Montgomery County Total
Federal: -$13,465.60 Match :-$3,366.40 2016: 2017: -$16,832.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 37 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Noble County
Indiana Department
of Transportation
SR 3 Bridge Painting Bridge over NS RxR, NB Lanes,
0.53 miles S of US 6
Fort Wayne 0 STP Bridge
Construction
CN $126,400.00 $31,600.00 $158,000.00 A 36 $158,000.0038564 /
1600425
Comments: No MPO. Adding CN to FY 2019 into STIP.
Noble County Total
Federal: $126,400.00 Match :$31,600.00 2016: 2017: 2018: 2019: $158,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 38 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Orange County
Indiana Department
of Transportation
SR 145 Replace
Superstructure
Over South Branch French Lick
Creek, 2.93 miles South SR-56
Vincennes 0 NHPP Bridge Consulting PE $114,400.00 $28,600.00 $143,000.00 A 36 $914,000.0038719 /
1700016
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $143,000. New Project. No MPO.
Orange County Total
Federal: $114,400.00 Match :$28,600.00 2016: 2017: 2018: $143,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 39 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Pike County
Indiana Department
of Transportation
SR 257 Bridge Thin Deck
Overlay
Over Patoka River, 2.03 miles
North SR-64
Vincennes 0 STP Bridge Consulting PE $126,400.00 $31,600.00 $158,000.00 A 36 $641,000.0038638 /
1602252
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $158,000. New Project. No MPO.
Indiana Department
of Transportation
SR 257 Bridge Thin Deck
Overlay
Over Flat Creek, 01.92 miles
South SR-56
Vincennes 0 STP Bridge Consulting PE $39,200.00 $9,800.00 $49,000.00 A 36 $199,000.0038638 /
1700063
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $49,000. New Project. No MPO.
Pike County Total
Federal: $165,600.00 Match :$41,400.00 2016: 2017: 2018: $207,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 40 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Porter County
Indiana Department
of Transportation
VA
VARI
Railroad Protection Calumet St at NS RR DOT
#522625P in Chesterton
LaPorte 0 Safety Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00 A 36 $320,000.0039454 /
1600455
Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $320,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Indiana Department
of Transportation
ST 1001 Railroad Protection 15th Street at CSX Railroad
DOT # 232115K in Chesterton
LaPorte 0 Safety Local Safety
Program
CN $400,000.00 $0.00 $400,000.00 A 36 $400,000.0039600 /
1601122
Local Safety
Program - 130
PE $20,000.00 $0.00 $20,000.00
Comments: PE Phase in FY 2018 for $20,000 and CN phase in FY 2019 for $400,000 amended into the 16-36 STIP. NRPC Resolution 16-30; Amendment No. 30; dated 10-20-2016.
Portage IR 1027 Bridge Rehabilitation
Or Repair
Rehab Willowcreek Road
Bridge over I-80/90
LaPorte 0 STP Northwest Indiana
MPO
CN $640,000.00 $0.00 $640,000.00 A 36 $800,000.0040096 /
1601923
100% Local
Funds
CN $0.00 $160,000.00 $160,000.00
Comments: NIRPC Amendment #33 add CN phase FY18
Porter County Total
Federal: $1,400,000.00 Match :$160,000.00 2016: 2017: 2018: $840,000.00 2019: $720,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 41 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Putnam County
Indiana Department
of Transportation
SR 42 Bridge Painting 3.47 mi E of US 231 over MILL
CREEK
Crawfordsville 0 NHPP Bridge
Construction
CN -$383,200.00 -$95,800.00 ($479,000.00) A 36 $0.001500642
Comments: No MPO, remove CN phase from the current STIP; project is approved to eliminate
Putnam County Total
Federal: -$383,200.00 Match :-$95,800.00 2016: 2017: 2018: -$479,000.00 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 42 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Randolph County
Indiana Department
of Transportation
US 36 Replace
Superstructure
OVER GREENS FORK, 00.99 E
US 27
Greenfield 0 STP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00 A 36 $80,000.0039819 /
1600846
Comments: No MPO
Randolph County Total
Federal: $64,000.00 Match :$16,000.00 2016: 2017: 2018: 2019: $80,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 43 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
RW $0.00 $158,000.00 $158,000.00 A 36 $1,988,000.0038065 /
1401811
South Bend MPO PE $112,000.00 $0.00 $112,000.00
100% Local
Funds
PE $0.00 $28,000.00 $28,000.00
South Bend MPO RW $632,000.00 $0.00 $632,000.00
Comments: MACOG Resolution 05-17 Increase PE phase in FY17 by $112,000 federal, from $160,000 to $272,000. Add RW Phase in FY19
St. Joseph County Total
Federal: $1,044,000.00 Match :$261,000.00 2016: 2017: $515,000.00 2018: 2019: $790,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 48 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Vanderburgh County
Evansville ST 1001 Other Type Project
(Miscellaneous)
City of Evansville
Bike/Pedestrian Plan
Implementation and Technical
Vincennes 0 On Federal Aid 100% Local
Funds
PE $0.00 -$7,135.60 ($7,135.60)A 3639581 /
1601026
Evansville MPO PE -$28,542.40 $0.00 ($28,542.40)
Comments: Amend 2016-2019 STIP Des# 1601026 is being eliminated as part of correcting with the new Des#1600643 and the EMPO did not process them as two separate steps.
Vanderburgh County Total
Federal: -$28,542.40 Match :-$7,135.60 2016: 2017: -$35,678.00 2018: 2019:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 49 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Various County
Indiana Department
of Transportation
SR 7 HMA Overlay,
Preventive
Maintenance
From N Junction of SR 3 to US
31
Seymour 4.436 NHPP Road Consulting PE $32,000.00 $8,000.00 $40,000.00 A 36 $3,405,400.001602165
Comments: Amend PE phase to the current STIP in FY 2018. Amended to CAMPO's TIP per Resolution 2017-01 dated 2/13/17.
Comments: Amend FY 2017-2019 STIP to reflect move in funding fiscal year - from FY 2018 to FY 2017 and increase funding from $1,061,000 to $3,600,000. No MPO.
Indiana Department
of Transportation
I 64 HMA Overlay,
Preventive
Maintenance
From SR 66 to SR 135 Seymour 12.495 NHPP Road
Construction
CN -$6,275,700.00 -$697,300.00 ($6,973,000.00) A 36 $0.0039413 /
1593019
Comments: Remove CN phase from FY 2019. It will be increased and added to FY 2021 in the new STIP. No MPO.
Indiana Department
of Transportation
VA
VARI
Traffic Signal Visibility
Improvements
Various Locations, From US 30
to US 20 and on US 6, Various
Locations.
Fort Wayne 46.832 Safety Safety
Construction
CN $611,200.00 $152,800.00 $764,000.00 A 36 $779,000.0039946 /
1601788
Safety Consulting PE $12,000.00 $3,000.00 $15,000.00
Comments: NIRCC Resolution 17-287. Adding PE to FY 2017 and CN to FY 2018 into STIP.
Indiana Department
of Transportation
US 50 HMA Overlay,
Preventive
Maintenance
From SR 101 to Sharon Road Seymour 7.29 NHPP Road Consulting PE $199,280.00 $49,820.00 $249,100.00A 36 $5,949,100.0039950 /
1500611
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 50 of 59 Report Created:2/16/2017 1:20:18PM
State Preservation and Local Initiated Projects FY 2016 - 2019
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2016 2017 2018 2019STIP
NAME
Indiana Department
of Transportation
US 50 HMA Overlay,
Preventive
Maintenance
From SR 101 to Sharon Road Seymour 7.29 NHPP Road
Construction
CN $4,560,000.00 $1,140,000.00 $5,700,000.00 A 36 $5,949,100.0039950 /
1500611
Comments: Increase PE phase in 2017 and CN phase in FY 2018 to current STIP. Amended to OKI's TIP per Amendment #14 dated 2/9/17
Indiana Department
of Transportation
I 65 HMA Overlay,
Preventive
Maintenance
SR 160 to SR 56 Shoulder
work only
Seymour 9.91 NHPP Road
Construction
CN $900,000.00 $100,000.00 $1,000,000.00 A 36 $1,000,000.0039951 /
1601225
Comments: Amend CN phase in FY 2018 to the current STIP. Amended to KIPDA's TIP per Administrative Modification #29 dated 1/23/17.
Indiana Department
of Transportation
VA
VARI
Raised Pavement
Markings,
Refurbished
FY 2020, Various Locations
within the Fort Wayne District.
Fort Wayne 0 Safety Safety Consulting PE $40,000.00 $10,000.00 $50,000.00A 36 $330,000.0040048 /
1700319
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
VA
VARI
Traffic Signals
Modernization
FY 2020, Various Locations
within the Fort Wayne District.
Fort Wayne 0 Safety Safety Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $1,150,000.0040049 /
1700320
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
VA
VARI
Traffic Signal Visibility
Improvements
FY2020, Various Locations
within the Fort Wayne District
Fort Wayne 0 Safety Safety Consulting PE $80,000.00 $20,000.00 $100,000.00A 36 $1,600,000.0040050 /
1700321
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.
Indiana Department
of Transportation
US 31 HMA Overlay,
Preventive
Maintenance
0.33 mile S of I-65 to N Jct SR
252
Seymour 8.065 NHPP Road Consulting PE $36,000.00 $9,000.00 $45,000.00 A 36 $5,931,100.0040061 /
1602167
Comments: Amend PE in FY 2018 to the current STIP. Amended to CAMPO's TIP per Resolution 2017-01 dated 2/13/17. (submitted to IMPO for location in their TIP area also).
Indiana Department
of Transportation
SR 450 HMA Overlay,
Preventive
Maintenance
From South Jct US-50 to North
Jct US-50/SR-37
Vincennes 24.982 STP Road
Construction
CN $340,800.00 $85,200.00 $426,000.00 A 36 $6,512,000.0040078 /
1700019
Comments: Amend FY 2016-2019 STIP to reflect FY 2018 PE phase - $426,000. New Project. No MPO.
Indiana Department
of Transportation
SR 114 HMA Overlay,
Preventive
Maintenance
From SR 13 to SR 105 Fort Wayne 8.924 STP Road Consulting PE $200,000.00 $50,000.00 $250,000.00A 36 $2,200,000.0040081 /
1700130
Comments: No MPO. Adding PE to FY 2017 for New FY 2020 Project into STIP.