Top Banner
Indian Reservation Roads Construction Costs Update June 24, 2008 June 24, 2008 Rapid City, South Dakota Rapid City, South Dakota
43

Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Mar 28, 2015

Download

Documents

Corinne Gorbet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Indian Reservation RoadsConstruction Costs Update

June 24, 2008June 24, 2008

Rapid City, South DakotaRapid City, South Dakota

Page 2: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Outline

• Introduction

• Cost Data Transformation

• Cost Update Process

• Data Management Issues

• Review of Cost Updates

Page 3: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Relative Need Distribution Formula

• 50% Cost-to-Construct

• 30% Vehicles Miles Traveled

• 20% Population

Page 4: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Importance of Costs

• Cost to Construct (CTC) factor contributes to fifty percent

• CTC is driven significantly by what it costs to construct one mile of road

• Costs X Miles on a reservation = CTC

• Tribes benefit from timely and accurate updates while outdated and inaccurate cost data have the opposite impact.

Page 5: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Current Cost Data System

• The Final Rule does not adequately address the existing Construction Cost Data system, now we need to:– Understand the system – Identify the deficiencies– Improve the current system

Page 6: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

What are What are Construction Costs? Costs?

• Cost Accounting SystemJob Cost Accounting

- Accumulated by part number or contract- Dependent on historical and recorded data

• Construction CostsUnit Costs – The cost to build one-mile of roadway.

Unit Cost = $ / mile

Page 7: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

What are What are Construction Costs? Costs?

Costs vary due to• Geo-Political Region (GPR)

– Geographical location– Total (61)

• Functional classification of the road – Classification

– Terrain (Flat, Rolling, Mountainous)

– Roadway Width

Page 8: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

How are the construction costs developed?

• Cost data is developed by the Regional Offices from

– Bid tabulations and/or Engineer Estimates of projects constructed

– P.L. 93-638 contracts

– Competitive contracts

– BIA force account

Page 9: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

How are the construction costs developed?

• The unit bid costs used are the initial costs as submitted by the successful low bidder.

• The unit bid list is broken down into four categories and :

• Incidental construction F3113• Grade & Drain construction F3109 • Gravel construction F3110 • Pavement construction F3111

Page 10: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

How are the construction costs developed?

• Each unit bid item is placed in its appropriate category.

• Each categories sum is computed and divided by the length of roadway being constructed and this equals the cost to construct a mile of roadway.

Unit Cost = $ / mile

Page 11: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Construction Costs

• Total Number of IRR Costs

19 - Adequate Design Standards

61 – Geo-Political Regions (GPR)

4 – Construction Categories

4636 Individual Costs in the IRR Program

Page 12: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Costs related to the RNDF

• Inventory Data needed to locate costs– Inventory location identifier (Region,Agency,Res.)– State Code– Class Code– Terrain

Page 13: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Costs in RIFDSCosts in RIFDS

• RIFDS Navigation Screen

• Cost Module Screen (In use only)

• Costs Tables

• Controls Tab (Route Summary)

• QA Detail Report for Roads

• Geo Political Region Report

Page 14: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Data TransformationCost Data Transformation

Page 15: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Data TransformationCost Data Transformation

• Final Rule established a new funding formula– Road Classifications were changed. – Existing Cost Data became incompatible and

conversion of cost data was necessary.

Page 16: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

2004 Cost Conversion2004 Cost Conversion

• In June 2005, discrepancies were identified with the cost tables due to the initial cost conversion.

• Where a number of cost cells had values much lower than were previously listed severely impacting a tribe’s annual allocation amount.

• Proposed to redo the conversion and only populate the zeroes.

Page 17: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

2005 Cost Conversion2005 Cost Conversion

• Existing Cost Data (2003 cost data file)– Estimated costs– Actual costs– No costs (zero values) – Blanks (no cost & embedded cost)– The zero values were

• Cost cells that were never populated or may have been ignored.

• Because many zero values were not considered in the formula calculations because many road classifications do not exist in those states/GPRs

Page 18: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Steps in Cost ConversionSteps in Cost Conversion1. Accounted for the existing costs by utilizing

those costs– Used historical data files to identify existing costs

2. Consolidated costs in correlation with Cost Tables Conversion.– Used the upper limit (existing) to satisfy conversion

3. Identified the zero values in the cost values4. Verified the zeroes by a search for

hidden/embedded values5. In accordance with 25CFR Part 170, first used

the state values to fill empty cells6. Completed filling empty cells with national

average values.

Page 19: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Update ProcessCost Update Process

Page 20: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Update ProcessCost Update Process

• RIFDS allows the BIADOT to input the cost data in the new format.

• However the data entry and validation process of the cost updates still exist in paper form, external to the computer program.

• BIADOT manually reviews the submittals for completeness and acceptability

Page 21: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Update ProcessCost Update Process

• Regional office submits the cost data to BIADOT in accordance with the Chief of Transportation’s memo issued March, 2001, Process to Standardize the Cost to Construct Factors Within the Indian Reservation Roads (IRR) Program.

Page 22: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Update Process• The memo provides:

• Standardized list of categorized items– Based on FP-96

• Defines Scope and Source of data– 5 years of previous construction cost data

• Consistency by an input format– Methods – Calculations

• Quality assurance – Organize existing Data & Data Collection Procedures

Page 23: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

COST TO CONSTRUCT CATEGORY FP-96 BID ITEM Incidental Construction Costs

MobilizationConstruction stakingErosion control measuresRip-rapRemovalsConstruction surveyingConstruction inspectionMaterials testingGuardrailPermanent traffic control devicesStripingSignageConcrete barriersObstruction removalPavement removalTemporary construction traffic controlSidewalksCurb & gutterFencingLandscapingStructural concreteTraffic signalsUtilities

  Manhole Adjustments  Topsoil

Page 24: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Grade & Drain Construction

Clearing and GrubbingRoadway excavationAll drainage structures and appurtenances

Gravel Construction

Aggregate bases

Aggregate surfacing

 

Pavement Construction

Hot Mix Asphalt pavements

Surface Treatments - Prime coats, tack coats

Aggregates and Asphalt Materials - Chip Seals

Concrete pavements

Page 25: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Example of Report FormPay Incidental Construction Grade & Drain Construction Gravel ConstructionItem ITEM NAME Unit Cost Quantity Unit Amount Quantity Unit Amount Quantity

15101 Mobilization $37,500.00 1.00 L.S. $37,500.00 15201 Construction Staking $16,000.00 1.00 L.S. $16,000.00 15301 Contractor Quality Control and Inspection $31,500.00 1.00 L.S. $31,500.0015401 Contractor Sampling and Testing $3,000.00 1.00 L.S. $3,000.0015501 Construction Schedule $1,000.00 1.00 L.S. $1,000.00

15801 Watering for Dust Control $5.00 100.00 Mgal $500.0020401 Roadway Excavation $5.00 4408.00 cy $22,040.0030101 Aggregate Base Grading $8.00 11960.0040101 Hot Asphalt Concrete Pavement

class grading, pavement smoothness $33.0040103 Asphalt Cement Grade 13A $225.0041202 Tack Coat $2.0060216 Concrete Pipe, Class 4, 30" x 19" $35.00 222.00 lf $7,770.0060216 Concrete Pipe, Class 4, 38" x 24" $45.00 110.00 lf $4,950.0060222 Concrete Culvert End Section, 30" x 19" $400.00 6.00 each $2,400.0060222 Concrete Culvert End Section, 38" x 24" $550.00 4.00 each $2,200.0060902 Portland Cement Concrete Curb and Gutter,

mm Depth Det B2 $20.00 157.00 lf $3,140.0062102 Marker, Culvet $40.00 10.00 each $400.0062404 Placing Conserved Topsoil, 4" depth $1.00 8060.00 sy $8,060.0062502 Seeding, Dry Method $12.00 150.00 lb $1,800.0062505 Mulching, Dry Method $0.25 8060.00 sy $2,015.0062507 Fertilizer, Dry Method $25.00 5.00 cwt $125.0063302 Sign Installation $15.00 55.90 sf $838.50 63305 Wood Posts $40.00 11.00 each $440.0063501 Temporary Traffic Control $2,500.00 1.00 L.S. $2,500.00 63401 Pavement Markings, 4 " Epoxy $0.10 13388.00 lf $1,338.8063401 Pavement Markings, Channelizing, 8 " Epoxy $1.00 200.00 lf $200.0071316 Silt Fence $2.25 2750.00 lf $6,187.50

Cost $116,144.80 Cost $39,760.00

Average Cost to construct one mile of road $184,356.83 $63,111.11

Page 26: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

The review criteria identified at BIADOT are:

• The project from which the costs are derived is relative to the cost of a road construction project.

• The classification of the road, based on information provided from the Plan title and typical sheet, must correspond to the appropriate Adequate Design Standard being proposed which is in accordance to Table 1 Appendix C.

• The bid items from a given initial bid schedule or negotiated bid schedule are appropriately separated into the four construction types and formatted for review.

• On the formatted breakout sheet, the sums of each four construction types are divided by the total project length.

Page 27: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost Update ProcessCost Update Process

• An annual deadline date for submission of cost data has not been established under the New Rule.

• The former deadline coincided with the annual IRR inventory update deadline (June 1st of each year).

• Presently BIADOT is considering June 15th as the deadline for cost update submissions.

Page 28: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data Management IssuesData Management Issues

Cost InputCost Input

Data SourceData Source

Data ElementsData Elements

Page 29: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost InputCost Input

• So costs may remain as high as possible • Requests to update a specific cost cell when

replacement across the four construction types would result in lower costs of other costs cells are permissible.

• Undesired costs are blocked out in the submittal package to signify its hold back.

• Has been implemented when existing/actual costs are considered.

Page 30: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost InputCost Input

• Populating multiple cost cells with one set of data, which covers more than one Adequate Design Standard.

• Where the ADSs are within the same functional classification. – Mountainous used for Rolling costs.– Rolling used for Flat costs.

• Historically there is no evidence of this practice and has not been implemented.

Page 31: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Cost InputCost Input• Three sources of data are required to justify

costs exceeding the $1,000,000 per mile level of any of the four construction types.

• Previously, projects had been accepted that were unreasonably high, so in order to contain these anomalies this method was implemented.

Page 32: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data SourceData Source

• The PS&E requirement as supporting documentation needs endorsement.

– Its primary purpose is to support the Bid Tab amounts

– and correlate the cost data with the physical geometry of the roadway.

– The verification of the functional classification and confirmation of the standard unit of measure (English/Metric) are derived from the title and typical section sheets.

Page 33: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data SourceData Source

• Obtaining construction cost data from state transportation departments has been the concern of IRR Regional offices.

• The obstacle relates to the difficulties in obtaining the PS&E as supporting documents to the cost data.

• Although this is an identified problem it is important to the approval process.

Page 34: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data SourceData Source

• In addition previously mentioned data source (State DOTs) past practice has required the Regional office to convert the state bid item descriptions to the FP-96 bid item descriptions.

• Regional offices have requested this task be performed at the BEO headquarters.

Page 35: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data SourceData Source• State DOT data is commonly used for estimating

construction costs for upcoming projects.• The data is typically compiled from numerous

road projects that are not separated by road classifications.

• Additionally the units provided by the states are average bid item costs as opposed to the units (cost per mile) used in the TAP calculations.

• Consider applying one standard project type in order to utilize these data such as; 12 ft. wide lanes, 2 miles in length, with specific depth of base materials and standard number of Incidental items, etc.

Page 36: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data Elements

Project TypesThe following types of projects do not adequately reflect the costs relative to road construction, therefore are not acceptable as data.• Bridge Projects• Traffic Signal Installations• Landscaping/Enhancements• Safety Improvements

Page 37: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data ElementsModifications

– The original contract bid amount is required for the breakdown of the bid items.

– The total of the bid items must equal the original bid amount.

– Contract modification amounts are not considered part of the road construction costs and are not part of the cost calculations.

Page 38: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data ElementsProject Length

– The length of a project has significant impacts on the cost data.

– The unit of construction cost is dollars per mile ($/mi.),

– So the shorter the project length (< one mile), the cost increases inversely.

– Road construction projects with project lengths less than one mile have generated over-inflated costs.

Page 39: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data ElementsData Elements

Lump Sum Bid Items– There are Regions that prefer to divide these

costs among the four construction categories.– This is not customary and does not benefit the

cost amounts.– Because incidental costs are primarily the first

costs to be generated in the formula, sometimes never generating gravel and pavement costs.

Page 40: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Data ElementsData Elements

Phased Construction– Two or three phases are compiled into one

cost data package. Is there one project or a series of projects? 1. This method increases the costs of lump sum

items significantly. (Mobilization: 2X, 3X)

2. Example: – Excavation & Rock, Phase I; – Grade and Drain, Phase II; – Paving, Phase III. (includes chip seal)

– Acceptable if all work is within one contract.

Page 41: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Review of Cost UpdatesReview of Cost Updates

FY SummariesFY Summaries

Page 42: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

Review of Cost UpdatesReview of Cost Updates

• FY 2000 – FY2008 Updates

• FY Summaries

Page 43: Indian Reservation Roads Construction Costs Update June 24, 2008 Rapid City, South Dakota.

ContactContact

Robert Frazier

Highway Engineer

BIADOT, Branch of Engineering & Operations

1001 Indian School Rd., Suite 249A

Albuquerque, NM 87104

(505) 563-3319