Top Banner
Dheer Patel Fellow The Regulatory Assistance Project (RAP) ® +91 98700 19280 Mumbai, India [email protected] raponline.org 9 th January 2020 Presentation at IIT-K for Officers of Electricity Regulatory Commissions (ERCs) The India Electricity Simulation Tool (IES)
19

Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Jan 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Dheer Patel

Fellow

The Regulatory Assistance Project (RAP)®

+91 98700 19280

Mumbai, India

[email protected]

raponline.org

9th January 2020

Presentation at IIT-K for Officers of Electricity Regulatory Commissions (ERCs)

The India Electricity Simulation Tool (IES)

Page 2: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Where electricity is bought and sold, primarily by distribution and generation

companies for delivering it to end consumers.

• How is India’s wholesale electricity market structured?

• Decentralized, bilateral scheduling model

• Long-term PPAs which are physical contracts.

• A few market based products available in the PXs.

Wholesale Electricity Markets?

PXM

Discoms

Page 3: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Where electricity is

bought and sold,

primarily by distribution

and generation

companies for delivering

it to end consumers.

Wholesale Electricity Markets?

Page 4: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Decentralized, bilateral scheduling model

• Long-term PPAs which are physical contracts.

• A few market-based products available in the

PXs.

India’s current wholesale electricity market structure

PXM

Discoms

Page 5: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)® 5

What is happening today?

87%

7%

4% 2%

Type of transactions

Long-term

Short-term bilateral

PXs

DSM

PXM

Discoms

Page 6: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Lack of imbalance management in real-time

• Small balancing areas incompatible with increasing variable RE

• Sub-optimal use of generation resources due to scheduling in

individual silos

• Cost of generation in any given time-block is undiscovered i.e. system

marginal cost

6

Challenges with Current Structure

PXM

Discoms

Page 7: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Centralized platform for scheduling and dispatch

of resources in day-ahead and real-time.

• Market based bidding mechanism to ensure the

cheapest resources are being utilized.

• PPAs are proposed to be made into financial

contracts or hedges against market prices.

• Co-optimization of ancillary services with day-

ahead and real-time market.

7

What is CERC Proposing?

Page 8: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

Day-Ahead Market

Real-Time Market

• Explanatory Memorandum

Ancillary Services Market

8

Check out CERC’s proposals

Page 9: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)® 9

Have you ever wondered

what if there was a centralized balancing

market?

what if there were no legacy

contracts?

what if there is market power

present?

how decentralized bilateral wholesale

market decisions are made?

how to make long-term investments in

capacity?

how to operate merchant vs contracted

plant?

Page 10: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)® 10

India Electricity Simulation (IES)

Programmed by Bostian Consulting LLC

Page 11: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Player-driven simulation

• Experiment with various market designs and structures

• Switch between the roles of Discoms and Gencos

• Go through multiple rounds of gameplay to assess various

decision making behavior and its outcomes

11

What is IES all about?

Page 12: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Distribution and Generation companies interact with each other under

different market designs, rules and time horizons.

• Players

• 3 Distribution Companies

• 6 Generation Companies

• 3 Automated Generation Companies*

• Three Stages

• Long-Term – contracting and investment decisions

• Day-Ahead – scheduling and procurement decisions

• Real-Time – imbalance management

12

Simulation Gameplay! (1/3)Things to know

Page 13: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

Market Design – Decentralized Bilateral Long-Term Procurement

• Players start with some existing capacity.

• Gencos present long-term offers to each Discoms for new capacity

• Discoms can accept or reject offers

• Gencos can choose to build capacity as Merchants or leave it unbuilt

Simulation Gameplay! (2/3)Long-Term Stage

MM

Discom

BuiltNewUnbuiltM - Merchant

Contracting

Page 14: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Two Market Designs – Decentralized Bilateral Scheduling and Centralized

Market-based Scheduling

• Deviation Settlement Mechanism

Simulation Gameplay! (3/3)Day-Ahead Stage and Real-Time Stage

MM

Discom

100% 90%90% 100% 50%

Scheduling

0%

Centralized Market

SchedulingBidding

Bidding Dispatch

Discom Discom Discom

100%

M

0%

M

100% 100% 50%0%

Page 15: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)® 15

Simulation Features

Scenario Long-term stage Day-ahead stage Real-time stage

1 Bilateral Bilateral DSM

3

Bilateral + Initial Resale Bilateral DSM

Note - Discoms have an additional opportunity to resell their legacy contracts to one another in the long-term stage.

4

BilateralBilateral + Centralized

AuctionDSM

Note - Most interactions occur bilaterally however Discoms are mandated to schedule at least 10% of their day-ahead forecast load from the centralized auction

5 Bilateral Centralized Auction Centralized Auction

6 Bilateral Bilateral Centralized Auction

Policy Scenarios and Market Designs

Page 16: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Pair different scenarios with different market structures

such as:

• Less flexible capacity in the system

• No legacy contracts

• Level playing field

• Market power in generation

• Modular simulations

• Simulate specific stages in select scenarios as well

• Faster gameplay and focus on specific topics

16

Simulation FeaturesMarket Structures and Parameters

Page 17: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)® 17

So lets get started!

Page 18: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Regulatory Assistance Project (RAP)®

• Check out RAP’s Markets Learning Hub for other

resource material.

18

Additional Resources

Page 19: Indian Electricity Simulation Tool€¦ · The Regulatory Assistance Project (RAP) ... Scenario Long-term stage Day-ahead stage Real-time stage 1 Bilateral Bilateral DSM 3 Bilateral

Dheer Patel

Fellow

The Regulatory Assistance Project (RAP)®

[email protected]

raponline.org

+91 98700 19280

Mumbai, India

About RAPThe Regulatory Assistance Project (RAP)® is an

independent, non-partisan, non-governmental

organization dedicated to accelerating the transition

to a clean, reliable, and efficient energy future.

Learn more about our work at raponline.org