    SOLARPowerPlant

    pVModule

    (Renewablesourceof Energy)

  • 7/29/2019 India Solar Power Plant VPC

    2/35

    With itsabundanceofsunlight,Indiahastremendouspotentialtoemergeasoneoftheleadersinsolarpowergeneration. According to the Government of Indiaspolicyforthesolarsector JawaharlalNehruNationalSolarMission(JNNSM) atargetof20GWofsolarinstallationsby2022hasbeenset.

  • 7/29/2019 India Solar Power Plant VPC

    3/35

    GlobalScenarioSolar Energy demand globally has been growing at

    about30%perannumoverthepast15years.

    In comparison, the hydrocarbon demand growth rate is

    02%

    per

    annum.

    This

    high

    growth

    rate

    in

    solar

    energy

    is

    due to many reasons increasing cost of petroleumproducts and the parallel decreasing cost of producingpower

    from

    solar,

    and

    a

    concern

    world

    over

    on

    the

    harmfuleffectsofusingfossilfuels

  • 7/29/2019 India Solar Power Plant VPC

    4/35

    Indiaisoneofthefewcountriesintheworldthat

    has

    a

    dedicated

    ministry

    for

    New

    and

    Renewable

    energy

    InIndia,

    the

    high

    GDP

    growth

    rate

    has

    created

    ahuge

    demand forenergy,but thesupply isunable tomatchthedemand.Thetotalinstalledcapacityofpowerasof

    January

    2012

    is

    187

    GW.

    The

    per

    capita

    totalconsumption is 778 kWh. The estimated shortage of

    powerinIndiaisabout20GW.

    SolarEnergy

    in

    India

  • 7/29/2019 India Solar Power Plant VPC

    5/35

    PlantCommissionedinIndiaNameofPlant DCPeakPower(MW) Notes

    MithapurSolarPowerPlant

    Mithapur,Gujarat(TataPower) 25 CommissionedFebruary2012

    WAASOLARPOWERPLANT

    Surendranagar,Gujarat 10.22 CommissionedJanuary2012

    ReliancePowerPokaranSolarPVPlant,Rajasthan 40 CommissioninginMarch2012

    AdaniBittaSolarPlant,Gujarat 40 CompletedinJanuary2012

    MahindraSolar

    Plant,

    Jodhpur,

    Rajasthan

    5 Completed

    in

    January

    2012

    SivagangaPhotovoltaicPlant 5 CompletedDecember2010KolarPhotovoltaicPlant 3 CompletedMay2010ItnalPhotovoltaicPlant,Belgaum 3 CompletedApril2010

    AzurePower

    PhotovoltaicPlant 2 Completed2009

    ChesdinPower

    BiomassandSolarPhotovoltaicPlants 4.1 CompletesDecember2011

    Citraand

    Sepset

    Power

    Plants

    Solar

    Photovoltaic

    Plants

    4 Commissioned

    October

    2011

    JamuriaPhotovoltaicPlant 2 Completed2009NDPCPhotovoltaicPlant 1 Completed2010ThyagarajStadiumPlantDelhi 1 CompletedApril,2010GandhinagarSolarPlant 1 CompletedJanuary2011Tata

    Mulshi,Maharashtra 3 CommissionedApril2011

    AzurePower

    Sabarkantha,Gujarat(Khadodavillage) 10 CommissionedJune2011.

    MoserBaer

    Patan,

    Gujarat

    30 Commissioned

    July

    2011

    B&GSolarPvtLtd

    Mayiladuthurai,TamilNadu 1 CommissionedJune2011

    REHPL

    Sadeipali,(Bolangir)Orissa 1 CommissionedJuly2011

    Tata

    Patapur,Orissa 1 CommissionedAugust2011

    Tata

    Osmanabad,Maharastra 1 Commissioned1stAug2011

    AmruthSolarPowerPlant

    Kadiri,AndhraPradesh 1 CommissionedMarch2012

    Abengoa

    Gwal

    Pahari,

    Haryana

    3 Commissioned

    September

    2011ChandraleelaPowerEnergy

    Narnaul,Haryana 0.8 CommissionedDecember2011

    GreenInfraSolarEnergyLimited

    Rajkot,Gujarat 10 CommissionedNovember2011

    Total 182.1

  • 7/29/2019 India Solar Power Plant VPC

    6/35

    WhyInIndia India is in thesunnyregionsof theworldwithmostpartsofthecountryreceiving47kwh(kilowatthour)

    ofsolar

    radiation

    per

    square

    meter

    per

    day,

    250

    300

    sunny days in a year. Even though Solar energyconstitutesaminisculepartinIndiasinstalledpower

    generation

    capacity

    (with

    grid

    connected

    solar

    PV

    generationatamere6MWasofMarch2010),inthemediumandlongrun,itisexpectedthatsolarenergy,

    especiallysolar

    PV

    will

    form

    avital

    component

    of

    the

    country'senergymix.

  • 7/29/2019 India Solar Power Plant VPC

    7/35

  • 7/29/2019 India Solar Power Plant VPC

    8/35

    SolarResourceMapofIndia

  • 7/29/2019 India Solar Power Plant VPC

    9/35

    Differentsuppliers

    of

    ModuleManufacturer Country Model Number Watts (p) Life in years/Guarantee

    given

    Bosch Germany M 240 3 BB 240 10 years-90%,

    25 years-80%Canadian solar Canada CS5A-170 170 25 years

    Co energy US Power Plus 215 P 215 12 years-92%,

    25years-80%

    Del Solar Taiwan D6P_E 120 10 years-90%,

    25 years-80%Evergreen solar US ES-A series 200 25 years

    First solar US FS Series 70 10 years-90%,

    Mitsubishi J apan TD/TE series 190

    J A solar holdings China J AS 165 10 years-90%,

    25 years-80%

    Q cells Germany SL 1 70 25 years

    PLG Solar India 10 years-90%,

    25 years-80%

    Moser Baer India 10 years-90%,

    25 years-80%Tata BP Solar India 10 years-90%,

    25 years-80%

  • 7/29/2019 India Solar Power Plant VPC

    10/35

    IncentivesfromGovernment

  • 7/29/2019 India Solar Power Plant VPC

    11/35

    JawaharlalNehruNationalSolar

    Mission

    The

    JawaharlalNehruNationalSolarMission

    (alsoknownastheNational

    Solar Mission) is a major initiative of the

    Government of India

    and State

    Governments to promote ecologically sustainable growthwhile addressing

    Indias

    energysecurity

    challenges.Itwillalsoconstituteamajorcontribution

    byIndiatotheglobalefforttomeetthechallengesof

    climatechange.Named

    forJawaharlalNehru,theMissionisoneoftheseveralinitiativesthatarepart

    of National Action Plan on Climate Change.

    The program was officially

    inaugurated

    byPrimeMinisterofIndia,ManmohanSingh.

  • 7/29/2019 India Solar Power Plant VPC

    12/35

    SchemeonfinancingofOffGridand

    DecentralisedSolar

    Applications

    Government

    of

    India,

    Ministry

    of

    New

    and

    Renewable

    Energy

    (MNRE)has formulatedaschemeonfinancingofOffGridand

    DecentralisedSolar (Photovoltaic andThermal)applicationsas

    partof theJawaharlalNehruNational Solar Mission (JNNSM).

    Underthescheme,banksmayextendsubsidised loansto

    entrepreneursat

    interest

    rates

    not

    exceeding

    five

    per

    cent

    whererefinanceoftwopercentfromGovernmentofIndia

    isavailable.

  • 7/29/2019 India Solar Power Plant VPC

    13/35

    ExciseDuty

    Exemption

    on

    Transmission

    Equipments

    Exemption

    of

    Excise

    Duty

    on

    procurement

    of

    Transmission Equipments for initial setup of Solar

    Power

    Plant.

    The

    exemptionwould

    be

    available

    on

    transmission equipments wherever the contractual

    obligation

    for

    installing

    transmission

    lines/equipmentsuptothepointofdeliveryisc0ston

    thesolarpowerdeveloper.

  • 7/29/2019 India Solar Power Plant VPC

    14/35

    Subsidyin

    installation

    of

    Solar

    Powerplant

    TheMinistryofNewandRenewableEnergy(MNRE)provides70percentsubsidyontheinstallationcostof

    asolar

    photovoltaic

    power

    plant

    in

    North

    East

    states

    and 30 percentage subsidy on other regions. Thedetailed outlay of the National Solar Mission

    highlightsvarious

    targets

    set

    by

    the

    government

    to

    increasesolarenergyinthecountry'senergyportfolio.

  • 7/29/2019 India Solar Power Plant VPC

    15/35

    MajorotherincentivesIn the budget for 2010/11, the government has announced an

    allocation of US $ 220 million towards the Jawaharlal NehruNational

    Solar

    Mission.

    They encouraged private solar companies by reducing customs

    duty onsolarpanelsby5%andexempting excise duty

    on solar

    photovoltaicpanels.

    The budget also proposed a coal tax of

    US$1 per metric ton

    on

    domesticand

    imported

    coal

    used

    for

    power

    generation.

    The government has initiated a Renewable Energy Certificate

    (REC) scheme, which is designed to drive investment in lowcarbonenergyprojects.

  • 7/29/2019 India Solar Power Plant VPC

    16/35

    OpportunitiesandChallengesLandisascarceresourceinIndiaandpercapitalandavailabilityislow.Dedication

    of landarea forexclusive installationofsolararraysmighthave tocompetewith

    othernecessities that require land. The amount of land required

    for utilityscale

    solar power plantscurrently approximately 1 km2

    for every 2060

    megawatts

    (MW)

    generated

    could pose a strain on India's available land resource. The

    architecturemore

    suitable

    for

    most

    of

    India

    would

    be

    ahighly

    distributed

    set

    of

    individual rooftop power generation systems, all connected via a local

    grid.

    However, erecting such an infrastructure, which does not enjoy the

    economiesof

    scale

    possible

    in

    mass,

    utility

    scale,

    solar

    panel

    deployment,

    needs

    themarketpriceofsolartechnologydeploymenttosubstantially

    decline,sothatit

    attractstheindividualandaveragefamilysizehouseholdconsumer.Thatmightbe

    possible in the future, because PV is projected to continue its current cost

    reductionsforthenextdecadesandbeabletocompetewithfossilfuel.

  • 7/29/2019 India Solar Power Plant VPC

    17/35

    SolarPowerPlantinGujarat

  • 7/29/2019 India Solar Power Plant VPC

    18/35

    IncentivesfromStateGovernment GovernmentofGujaratdeclaredcomprehensiveSolarPolicy2009,whereinGovtwillpurchasethepoweratthe

    following

    minimum

    rates.

    fromdateofcommissioning

    Solar PV Rs.12/

    kWh Rs.3/

    kWh

    SolarThermal Rs.9/

    kWh Rs.3/

    kWh

    for next12yearsfor first12years

  • 7/29/2019 India Solar Power Plant VPC

    19/35

    Transmissioncharges&transmissionlosses

    At 66kV : Transmission charges and transmissionlosses

    applicable

    to

    normal

    Open

    Access

    Consumer.

    Below 66 kV : Transmission charges, applicable tonormal

    open

    access

    consumer

    and

    transmission

    and

    wheeling losses @ 10%of the energy fed to the grid,forSolarpowerPlantofcapacitymorethan5MW.

    For Solar power Plants of capacity less than 5 MW,Transmission charges, applicable to normal openaccess consumer and transmission and wheeling

    losses

    @

    7%

    of

    the

    energy

    fed

    to

    the

    grid.

  • 7/29/2019 India Solar Power Plant VPC

    20/35

  • 7/29/2019 India Solar Power Plant VPC

    21/35

    PolicyrelatedtoLandAcquisitionforSolarPlant

    At 66kV : Transmission charges and transmissionlosses

    applicable

    to

    normal

    Open

    Access

    Consumer.

    Below 66 kV : Transmission charges, applicable tonormal open access consumer and transmission andwheeling losses @ 10%of the energy fed to the grid,forSolarpowerPlantofcapacitymorethan5MW.

    For Solar power Plants of capacity less than 5 MW,Transmission charges, applicable to normal openaccess consumer and transmission and wheeling

    losses

    @

    7%

    of

    the

    energy

    fed

    to

    the

    grid.

  • 7/29/2019 India Solar Power Plant VPC

    22/35

    Govt.sInitiativeTheGovernmentof Gujarat ispromotingSolarPowerParksintheSate.RolledOut SpecialPolicyin2009.

    AlreadyfewPlantsareoperationalintheState.The development of solar parks will streamline the project developmenttimeline by letting government agencies undertake land acquisition and

    necessary

    permits,

    and

    provide

    dedicated

    common

    infrastructure

    for

    setting

    upsolarpowergenerationplantslargelyintheprivatesector.

    The State Government is taking initiative in providing the commoninfrastructure/facilitieslikesitepreparationandleveling,powerevacuation,

    availability

    of

    water,

    access

    roads,

    security

    and

    services.

    In

    parallel

    with

    the

    centralgovernment'sinitiative..

  • 7/29/2019 India Solar Power Plant VPC

    23/35

    Contd.The Gujarat Electricity Regulatory Commission has announced

    feedin

    tariff

    to

    mainstream

    solar

    power

    generation

    which

    will

    beappliedforsolarpowergenerationplantsinthesolarpark.

    Gujarat Power Corporation Limited is the responsible agency

    fordeveloping

    the

    solar

    park

    of

    500

    megawatts

    and

    will

    lease

    thelandstotheprojectdeveloperstogeneratesolarpower.

    GujaratEnergyTransmissionCorporationLimitedwilldevelop

    thetransmission

    evacuation

    from

    the

    identified

    interconnection

    pointswiththesolardeveloper.Thisprojectisbeingsupported,inpart,bytheAsianDevelopmentBank

    E l i d t f L d i

  • 7/29/2019 India Solar Power Plant VPC

    24/35

    ExclusivemandateforLandinGujarat

    Landarea : About1200 acre(485 hec.)Location

    : 60kmfromAhmedabad(CapitalofGujarat)20kmfromSanand(PlantofTataNanoCar).

    ExpectedPrice

    : $12,000/ peracre

    PrimaryUse :SolarPowerPlant

    SecondaryUse : Storage/Warehousing

  • 7/29/2019 India Solar Power Plant VPC

    25/35

    Location:INDIA

  • 7/29/2019 India Solar Power Plant VPC

    26/35

    Location:Gujarat

  • 7/29/2019 India Solar Power Plant VPC

    27/35

    Location:Bagodra

  • 7/29/2019 India Solar Power Plant VPC

    28/35

    Location: Bagodratoproposedsite

  • 7/29/2019 India Solar Power Plant VPC

    29/35

    Location :Proposedsite

  • 7/29/2019 India Solar Power Plant VPC

    30/35

    ExpectedProduction1200 acre @ 10 MW /100 acre X 0.80

    = 96

    MW

    Assumingefficiency80%

  • 7/29/2019 India Solar Power Plant VPC

    31/35

    CostoftheProject($m)

    Land Cost :

    1.4 Cost of Approvals/Coversion/Devlopment 0.28(20% of land cost) PV Power Panels @ 4m 480.00 Thus total initial investment for 120 Mw : 48168

    Say 500.00

    Less Subsidy 30% 150.00

    Net Investment 350.00

  • 7/29/2019 India Solar Power Plant VPC

    32/35

    Expectedrevenue ExpectedRevenuefromtheSellingofElectricity @Rs.12/ perkWhforfirst12years:

    =2,102,400,000/

    orUSD$42mn/year

    Assumingtheplantwillfor5hoursadaywithefficiencyof80%

  • 7/29/2019 India Solar Power Plant VPC

    33/35

    ReturnofInvestment Paybackperiodof8yearsincludeslandalso

    WiththatotherbenefitslikeCarbonCreditsand

    othersubsidies,moreoverappreciationintheland

    value.

  • 7/29/2019 India Solar Power Plant VPC

    34/35

    Secondarybenefits

    CanbeusedasStoragepurposeifconstructedasRoof

    topSolar

    power

    plant,

    to

    store

    the

    items

    which

    is

    not

    effectedbyUVraysandotherharmfulrays.