Page 1
2/27/2017 2:49:09 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 100-RR 11x17_pdf.pltcfg
STANDARD DESCRIPTION
INDEX OF REPAIR STANDARDS
INDEX OF REPAIR RETROFIT BRIDGE STANDARDS
INDEX OF REPAIR RETROFIT BRIDGE STANDARDS
1031 RETROFIT BARRIER RAIL DETAILS
RETROFIT BARRIER RAIL DETAILS
1031D RETROFIT BARRIER RAIL DETAILS
1031E RETROFIT BARRIER RAIL DETAILS
1031F RETROFIT BARRIER RAIL DETAILS
1031T RETROFIT BARRIER RAIL DETAILS
1038 DECK REPAIR - QUANTITIES
1040
DECK RE-OVERLAY REPAIR DETAILS
1042 DECK REPAIR - APPROACH PAVEMENT
1045 CONCRETE REPAIRS
1039s1
1039s2
STANDARD SHEET 100-RR
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN - 100-
RR -
THIS
SH
EE
T IS
SU
ED 02-10.
1031C
1038R DECK RE-OVERLAY REPAIR - QUANTITIES
1040R
DECK REPAIR DETAILS AND RAISED EXPANSION PLATES
1055
1057s1
1057s2
CONCRETE BEAM REPAIR DETAILS
CONCRETE BEAM FIBER REINFORCED POLYMER (FRP) REPAIR DETAILS
CONCRETE BEAM FIBER REINFORCED POLYMER (FRP) REPAIR DETAILS
RE
VIS
ED 03-2017 - IS
SU
ED
ST
AN
DA
RD
SH
EE
TS 1055, 1057s1
AN
D 1057s2. S
TA
ND
AR
D
SH
EE
TS 1039s1
&
1039s2
NO
W
VOI
D.
DECK REPAIR - NOTES ( VOID 03-2017 )
DECK REPAIR - NOTES ( VOID 03-2017 )
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 2
2/27/2017 2:49:10 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031 11x17_pdf.pltcfg
STANDARD SHEET 1031
RETROFIT BARRIER RAIL DETAILS
THIS PLAN
SEE DETAILS IN
THIS PLAN
SEE DETAILS IN
RE
VIS
ED: 05-15 -
RE
FE
RE
NC
E
TO "1"½
PV
C
PIP
E"
WA
S
CH
AN
GE
D
FR
OM "1"½
PL
AS
TIC
CO
ND
UIT".
ELEVATION OF RETROFIT BARRIER RAIL
EPOXY REINFORCING STEEL-? RAIL
SECTION A-A SECTION B-B
BAR LOCATION SHAPE LENGTH WEIGHT
6c1
5d1
1'-0ƒ
6c1
MIN. LAP
6c1 5d1
3•
"X" SEE
6c1
5d1
6c1 3ƒ
5d1
CONSTR. JOINT
PERMISSIBLE
2 MIN.
NOTE A
AT GUTTER LINE
FINAL RIDING SURFACE
JOINT
CONSTRUCTION
PERMISSIBLE
NO.
TOTAL (LBS.)
2 MIN.
8
STANDARD SECTION
10
6 MAX.
2'-
10
IN PLACE RAIL
TOP OF CAST
2'-
10
6
7•
5 MIN.
3 MAX.
10
EM
BE
D.
SPACES AT 0'-7• = ; - 6c1 BARS STAGGERED
AT GUTTER LINE
FINAL RIDING SURFACE
2'-
10
5
(SEE NOTE B)
EXISTING RAIL
STANDARD RAIL, VERT.
STANDARD RAIL, LONGIT.
3Ž
3Ž
7‚ 2'-0
1'-
10
7†
7†
? END SECTION? END SECTION
(END OF 5d1)
3'-0}
TO CLEAR HOLES.
SHIFT 5d1 BARS AS NECESSARY
EXISTING END
POST - REMOVE
EXISTING END
POST - REMOVE2'-2
END TO END OF RETROFIT BARRIER RAIL (BID LENGTH)
CONCRETE BARRIER RAILING. (TYP. EACH END SECTION)
COST TO BE INCLUDED IN PRICE BID FOR RETROFIT
PROVIDE SEVEN HOLES FORMED WITH 1"½ PVC PIPE.
7•
(SHOWING 6c1 PLACEMENT)
7•
EXISTING CURB
10
AT GUTTER LINE
FINAL RIDING SURFACE
NOTE B:
EXISTING RAIL IS TO BE REMOVED. ANCHOR BOLTS WHICH ARE
NOT STAINLESS STEEL SHALL BE CUT OFF FLUSH WITH
OR SLIGHTLY BELOW CURB SURFACE AND THE REMAINING
EXPOSED ENDS PAINTED WITH 2 COATS OF ZINC RICH PAINT.
IF THE EXISTING ANCHOR BOLTS ARE STAINLESS STEEL THEY MAY
BE LEFT IN POSITION AT THE CONTRACTOR'S OPTION SUBJECT
TO THE APPROVAL OF THE ENGINEER.
¡ ESTIMATED QUANTITIES BOX
¡ CONCRETE PLACEMENT SUMMARY
¡ RETROFIT BARRIER RAIL NOTES
¡ DOWEL SETTING NOTE
¡ RAIL JOINT DETAILS
SEE STANDARD SHEET 1031T IN THESE PLANS FOR:
NOTE A: ( SEE STANDARD SHEET 1031T IN THESE PLANS ).
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1031 -
THIS
SH
EE
T
RE
DR
AW
N 2-26-90.
A
A
B B
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 3
2/27/2017 2:49:11 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031C 11x17_pdf.pltcfg
RETROFIT BARRIER RAIL DETAILS
STANDARD SHEET 1031`C
RE
VIS
ED: 05-15 -
RE
FE
RE
NC
E
TO "1"½
PV
C
PIP
E"
WA
S
CH
AN
GE
D
FR
OM "1"½
PL
AS
TIC
CO
ND
UIT".
EPOXY REINFORCING STEEL-? RAIL
ELEVATION OF RETROFIT BARRIER RAIL
SECTION D-D SECTION A-A
SECTION B-B SECTION C-C
6c1
MIN. LAP
6c1 5d1
3•
"X" SEE
6c1
5d1
7•
6c1 3ƒ
5d1
CONSTR. JOINT
PERMISSIBLE
(SHOWING 6c1 PLACEMENT)
2 MIN.
NOTE A
AT GUTTER LINE
FINAL RIDING SURFACE
JOINT
CONSTRUCTION
PERMISSIBLE
END SECTION, VERTICAL
END SECTION, LONGIT.
2 MIN.
7•
7'-0 EXISTING END POST BASE
7'-5 END SECTION
5
69ƒ
1'-
3ƒ
2'-0 6c1
6c2 5d2
5d1
BY THE CONTRACTOR
POSTS TO BE REMOVED
EXISTING RAIL AND
1'-3ƒ1" ½ HOLES
6c2
5d2
10
BASE (U. A. C.)
EXIST. END POST
5d2
REMOVE EXISTING END POST
3'-0}
1'-2• 9•
6c2
2
SEE NOTE A
1"
7'-5 END SECTION STANDARD SECTION
10
6 MAX.
6ƒ
5ƒ
(SHOWING 6c2 PLACEMENT)
"X"
EXISTING CURB
1'-
8
STANDARD SECTION
10
FIELD BEND
EXISTING END POST BASE
VA
RIE
S
2'-
10
IN PLACE RAIL
TOP OF CAST
2}
INTO NEW WORK.
AS REQUIRED & INCORPORATED
BARS TO BE EXPOSED, FIELD CUT
EXISTING †"½ END POST VERTICAL
SHOWN.
HOLES AS
BETWEEN 1"½
CENTERED
5d2 BARS
AT GUTTER LINE
FINAL RIDING SURFACE
2'-
10
67•
5 MIN.
3 MAX.
10
EM
BE
D.
EM
BE
D.
( )
( )
SPACES AT 0'-7• = ; - 6c1 BARS STAGGERED
5
(END OF 5d1)
EXISTING †" ½ BARS , INCORPORATE INTO NEW WORK.
EXIST. ANCHOR BOLTS
MAY BE LEFT IN PLACE
(SEE NOTE B)
(SEE NOTE B)
EXIST. ANCHOR BOLTS
2'-2
END TO END OF RETROFIT BARRIER RAIL (BID LENGTH)
NON STAINLESS STEEL BOLTS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW THE TOP OF CURB AND ENDS OF
OF THE ENGINEER. ANY ANCHOR BOLTS NOT HAVING THE 2" MIN. COVER SHALL
MAY BE LEFT IN PLACE AT THE CONTRACTORS OPTION SUBJECT TO THE APPROVAL
LEAST 2" OF CONCRETE COVER WHEN ENCOMPASSED BY THE NEW BARRIER RAIL
EXISTING RAIL IS TO BE REMOVED. ANY ANCHOR BOLTS THAT WILL HAVE AT
NOTE B:
STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER RAIL
MAY BE LEFT IN PLACE AT CONTRACTORS OPTION SUBJECT TO APPROVAL OF
THE ENGINEER. STAINLESS STEEL BOLTS NEED NOT BE PAINTED.
RAIL SHALL BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW TOP OF CURB SURFACE
AND THE REMAINING EXPOSED ENDS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
NON STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER
BAR
6c1
5d1
STANDARD RAIL, VERT.
STANDARD RAIL, LONGIT.
6c2
5d2
NOTE A: ( SEE STANDARD SHEET 1031T IN THESE PLANS ).
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1031C -
THIS
SH
EE
T
RE
DR
AW
N 11-3-88.
1'-0ƒ
SHOWN
7'-1
8 7‚ 2'-0
3Ž
3Ž
7†
7†
9• 1'-2•
7'-5 END SECTION
END POST
REMOVE EXISTING
AT GUTTER LINE
FINAL RIDING SURFACE
1'-
10
LOCATION SHAPE LENGTH WEIGHT NO.
TOTAL (LBS.)
¡ ESTIMATED QUANTITIES BOX
¡ CONCRETE PLACEMENT SUMMARY
¡ RETROFIT BARRIER RAIL NOTES
¡ DOWEL SETTING NOTE
¡ RAIL JOINT DETAILS
SEE STANDARD SHEET 1031T IN THESE PLANS FOR:
CONCRETE BARRIER RAILING. (TYP. EACH END SECTION)
COST TO BE INCLUDED IN PRICE BID FOR RETROFIT
PROVIDE SEVEN HOLES FORMED WITH 1"½ PVC PIPE.
2'-
10
5 SPA. AT 1'-1 ; 12 - 6c2 5 SPA. AT 1'-1 ; 12 - 6c2
A
A
B B
D
D
C C
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 4
2/27/2017 2:49:12 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031D 11x17_pdf.pltcfg
RETROFIT BARRIER RAIL DETAILS
STANDARD SHEET 1031 D
RE
VIS
ED: 05-15 -
RE
FE
RE
NC
E
TO "1"½
PV
C
PIP
E"
WA
S
CH
AN
GE
D
FR
OM "1"½
PL
AS
TIC
CO
ND
UIT".
PART ELEVATION VIEW
PART PLAN VIEW
ELEVATION OF RETROFIT BARRIER RAIL
EPOXY REINFORCING STEEL-? RAIL
SECTION D-D SECTION E-E SECTION A-A
SECTION C-C SECTION B-B
1'-0ƒ
6c1
MIN. LAP
6c1 5d1
AT GUTTER LINE
FINAL RIDING SURFACE
JOINT
CONSTRUCTION
PERMISSIBLE
5d2
REMOVE EXISTING END POST
3'-0}
1'-2• 9•
6c2
8 7‚ 2'-0
3Ž
3Ž
7†
7†
9• 1'-2•
7'-5 END SECTION 7'-5 END SECTIONSTANDARD SECTION
END POST
REMOVE EXISTING
2'-
10
IN PLACE RAIL
TOP OF CAST
( )
( )
SPACES AT 0'-7• = ; - 6c1 BARS STAGGERED
AT GUTTER LINE
FINAL RIDING SURFACE
1'-
10
(END OF 5d1) 2'-2
END SECTION, VERTICAL
END SECTION, LONGIT.
SHOWN
7'-1
BAR LOCATION SHAPE LENGTH WEIGHT
6c1
5d1
NO.
TOTAL (LBS.)
STANDARD RAIL, VERT.
STANDARD RAIL, LONGIT.
6c2
5d2
3 6
| ANCHORAGE SYSTEM
RAIL.
OF CONCRETE
WITH SURFACE
TO BE FLUSH
COVER PLATE
FACE OF …"
JUNCTION BOX
EXISTING
| EXIST. JUNCTION BOX EXIST. JUNCTION BOX
1'-0 1'-0
1'-9 1'-9 COVER PLATE
OPENING
TYP.
CONDUIT
RIGID STEEL
EXIST. 2"½3ƒ
CONSTR. JOINT
PERMISSIBLE 7'-0 EXISTING END POST BASE
7'-5 END SECTION
5
1"
STANDARD SECTION
EXISTING †" ½ BARS , INCORPORATE INTO NEW WORK.
3•
"X" SEE
6c1
5d1
NOTE A
1'-2
CURB
EXISTING
1'-2
37
7
66
BOLT AND CONCRETE ANCHOR
…" ½ x 0'-3 COUNTER SUNK
BY THE CONTRACTOR
POSTS TO BE REMOVED
EXISTING RAIL AND
BENT PLATE
…" x 3'-6
(U. A. C.) SEE NOTE C
STEEL CONDUIT
EXIST. 2" ½ RIGID
1'-3ƒ1" ½ HOLES
6c2
5d2
10
BASE (U. A. C.)
EXIST. END POST
VA
RIE
S
2}
INTO NEW WORK.
AS REQUIRED & INCORPORATED
BARS TO BE EXPOSED, FIELD CUT
EXISTING †"½ END POST VERTICAL
SHOWN.
HOLES AS
BETWEEN 1"½
CENTERED
5d2 BARS
AT GUTTER LINE
FINAL RIDING SURFACE
EM
BE
D.
2'-
10
5
6
7•
10
EM
BE
D.
AT GUTTER LINE
FINAL RIDING SURFACE
EXIST. ANCHOR BOLTS
MAY BE LEFT IN PLACE
(SEE NOTE B)
NOTE C:
NON STAINLESS STEEL BOLTS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW THE TOP OF CURB AND ENDS OF
OF THE ENGINEER. ANY ANCHOR BOLTS NOT HAVING THE 2" MIN. COVER SHALL
MAY BE LEFT IN PLACE AT THE CONTRACTORS OPTION SUBJECT TO THE APPROVAL
LEAST 2" OF CONCRETE COVER WHEN ENCOMPASSED BY THE NEW BARRIER RAIL
EXISTING RAIL IS TO BE REMOVED. ANY ANCHOR BOLTS THAT WILL HAVE AT
NOTE B:
STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER RAIL
MAY BE LEFT IN PLACE AT CONTRACTORS OPTION SUBJECT TO APPROVAL OF
THE ENGINEER. STAINLESS STEEL BOLTS NEED NOT BE PAINTED.
RAIL SHALL BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW TOP OF CURB SURFACE
AND THE REMAINING EXPOSED ENDS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
NON STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER
1. PHYSICALLY LOCATE THE CONDUIT AT APPROXIMATELY 50 FOOT
DOWEL BARS.
TO PLACEMENT OF THE DOWELS, PROVE TO THE INSPECTOR BY A
REASONABLE METHOD THE USABILITY OF THE CONDUIT HAS NOT BEEN
COMPROMISED.
COST OF THESE OPERATIONS WILL BE CONSIDERED INCIDENTAL TO THE COST
WIRING BY THE CONTRACTOR WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND REPAIRED AT NO EXTRA COST TO THE STATE.
INTERVALS PRIOR TO DRILLING ANY HOLES FOR ƒ" DIAMETER
2. AFTER COMPLETION OF DRILLING FOR THE ƒ" DOWEL BARS AND PRIOR
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE EXISTING CONDUIT IN THE
BRIDGE CURBS. IN ORDER TO ENSURE THE EXISTING CONDUITS AND/OR ELECTRICAL
SERVICE ( IF PRESENT`) ARE NOT DAMAGED DURING PLACEMENT OF THE RETROFIT
FOLLOWING:
CONCRETE BARRIER RAILING, THE CONTRACTOR SHALL BE REQUIRED TO DO THE
OF THE RETROFIT CONCRETE BARRIER RAILING. ANY DAMAGE TO THE CONDUIT OR
¡ ESTIMATED QUANTITIES BOX
¡ CONCRETE PLACEMENT SUMMARY
¡ RETROFIT BARRIER RAIL NOTES
¡ DOWEL SETTING NOTE
¡ RAIL JOINT DETAILS
SEE STANDARD SHEET 1031T IN THESE PLANS FOR:
NOTE A:
SEE STANDARD SHEET 1031T IN THESE PLANS.
BARRIER RAILING. (TYP. EACH END SECTION)
COST TO BE INCLUDED IN PRICE BID FOR RETROFIT CONCRETE
PROVIDE SEVEN HOLES FORMED WITH 1"½ PVC PIPE.
BOXES AS DETAILED. THE VERTICAL BARS SHALL BE SHIFTED AS REQUIRED
ENDS OF LONGITUDINAL BARS SHALL BE PATCHED WITH EPOXY. A …"
GALVANIZED PLATE SHALL FIT OVER THE GAPPED AREA IN THE RAIL AND
SHALL BE HELD IN PLACE WITH COUNTERSUNK BOLTS AND CONCRETE
ANCHORS. THE COST OF THE GALVANIZED PLATES AND ANCHORAGE SYSTEM
AND THE LONGITUDINAL BARS SHALL BE FIELD CUT AS REQUIRED. CUT
THE RETROFIT RAIL SHALL BE GAPPED AT EXISTING JUNCTION
SHALL BE INCIDENTAL TO THE COST OF THE RETROFIT RAIL.
7•
6c1 5d1
(SHOWING 6c1 PLACEMENT)
7•
69ƒ
1'-
3ƒ
2'-0 6c1
6c2 5d2
5d1
2
SEE NOTE A
2ƒ
1ƒ
(SHOWING 6c2 PLACEMENT)
"X"
1'-
2
1'-
8
FIELD BEND
EXISTING END POST BASE
REQUIRED AT ??? EXISTING JUNCTION BOXES.
END TO END OF RETROFIT BARRIER RAIL (BID LENGTH)
2'-
10
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1031
D -
THIS
SH
EE
T
RE
DR
AW
N 11-3-88.
{ …" x 3'-6
5 SPA. AT 1'-1 ; 12 - 6c2 5 SPA. AT 1'-1 ; 12 - 6c2
3 MAX.
2 MIN.
3 MAX.
2 MIN.
A
A
B B
D
C
D
C
E
E
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 5
2/27/2017 2:49:13 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031E 11x17_pdf.pltcfg
RETROFIT BARRIER RAIL DETAILS
STANDARD SHEET 1031`E
RE
VIS
ED: 05-15 -
RE
FE
RE
NC
E
TO "1"½
PV
C
PIP
E"
WA
S
CH
AN
GE
D
FR
OM "1"½
PL
AS
TIC
CO
ND
UIT".
ELEVATION OF RETROFIT BARRIER RAIL
EPOXY REINFORCING STEEL-? RAIL
SECTION D-D SECTION A-A
SECTION B-B SECTION C-C
1'-0ƒ
6c1
MIN. LAP
6c1 5d1
3•
"X" SEE
6c1
5d1
2 MIN.
NOTE A
AT GUTTER LINE
FINAL RIDING SURFACE
JOINT
CONSTRUCTION
PERMISSIBLE
2 MIN.
7'-0 END SECTION
BY THE CONTRACTOR
POSTS TO BE REMOVED
EXISTING RAIL AND
1'-3ƒ1" ½ HOLES
6c2
5d2
5d2
REMOVE EXISTING END POST
3'-0}
9•
6c2
8 7‚ 2'-0
3Ž
3Ž
7†
7†
9•
7'-0 END SECTION 7'-0 END SECTIONSTANDARD SECTION
10
6 MAX.
EXISTING CURB
STANDARD SECTION
END POST
REMOVE EXISTING
2'-
10
IN PLACE RAIL
TOP OF CAST
2}
INTO NEW WORK.
AS REQUIRED & INCORPORATED
BARS TO BE EXPOSED, FIELD CUT
EXISTING †"½ END POST VERTICAL
SHOWN.
HOLES AS
BETWEEN 1"½
CENTERED
5d2 BARS
AT GUTTER LINE
FINAL RIDING SURFACE
2'-
10
67•
5 MIN.
3 MAX.
10
EM
BE
D.
SPACES AT 0'-7• = ; - 6c1 BARS STAGGERED
5
1'-
10
(END OF 5d1)
EXIST. ANCHOR BOLTS
MAY BE LEFT IN PLACE
(SEE NOTE B)
(SEE NOTE B)
EXIST. ANCHOR BOLTS
2'-2
END TO END OF RETROFIT BARRIER RAIL (BID LENGTH)
9• 9•
SIDE OF WING TO MATCH BARRIER RAIL SURFACE.
INCORPORATE INTO NEW WORK. REBUILD ROADWAY
SURFACE. FIELD BEND EXISTING REINFORCING AND
REMOVE WING TO THIS LINE AND DOWN TO RIDING
POST BASE
EXIST. END
1"
2'-
10
SURFACE
FINAL RIDING
NON STAINLESS STEEL BOLTS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW THE TOP OF CURB AND ENDS OF
OF THE ENGINEER. ANY ANCHOR BOLTS NOT HAVING THE 2" MIN. COVER SHALL
MAY BE LEFT IN PLACE AT THE CONTRACTORS OPTION SUBJECT TO THE APPROVAL
LEAST 2" OF CONCRETE COVER WHEN ENCOMPASSED BY THE NEW BARRIER RAIL
NOTE B:
STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER RAIL
MAY BE LEFT IN PLACE AT CONTRACTORS OPTION SUBJECT TO APPROVAL OF
THE ENGINEER. STAINLESS STEEL BOLTS NEED NOT BE PAINTED.
RAIL SHALL BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW TOP OF CURB SURFACE
AND THE REMAINING EXPOSED ENDS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
NON STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER
END SECTION, VERTICAL
END SECTION, LONGIT.
SHOWN
6'-8
BAR LOCATION SHAPE LENGTH WEIGHT
6c1
5d1
NO.
TOTAL (LBS.)
STANDARD RAIL, VERT.
STANDARD RAIL, LONGIT.
6c2
5d2
¡ ESTIMATED QUANTITIES BOX
¡ CONCRETE PLACEMENT SUMMARY
¡ RETROFIT BARRIER RAIL NOTES
¡ DOWEL SETTING NOTE
¡ RAIL JOINT DETAILS
SEE STANDARD SHEET 1031T IN THESE PLANS FOR:
NOTE A:
SEE STANDARD SHEET 1031T IN THESE PLANS.
(TYP. EACH END SECTION)
RETROFIT CONCRETE BARRIER RAILING.
COST TO BE INCLUDED IN PRICE BID FOR
PROVIDE SEVEN HOLES FORMED WITH 1"½ PVC PIPE.
2'-
10
7•
6c1 3ƒ
5d1
CONSTR. JOINT
PERMISSIBLE
(SHOWING 6c1 PLACEMENT)
7•
7'-0 EXISTING END POST BASE
69ƒ
1'-
3ƒ
2'-0 6c1
6c2 5d2
5d1
2
SEE NOTE A
1"
6ƒ
5ƒ
(SHOWING 6c2 PLACEMENT)
"X"
1'-
8
10
FIELD BENDBASE ( REMOVE )
EXISTING END POST
END POST BASE
REMOVAL LINE FOREXISTING †"½ BARS, INCORPORATE INTO NEW WORK.
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1031E -
THIS
SH
EE
T IS
SU
ED 5-25-99.
5 SPA. AT 1'-1 ; 12 - 6c2 5 SPA. AT 1'-1 ; 12 - 6c2
EXISTING RAIL IS TO BE REMOVED. ANY ANCHOR BOLTS THAT WILL HAVE AT
A
A
B B
D
C
D
C
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 6
2/27/2017 2:49:14 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031F 11x17_pdf.pltcfg
STANDARD SHEET 1031`F
RE
VIS
ED: 05-15 -
RE
FE
RE
NC
E
TO "1"½
PV
C
PIP
E"
WA
S
CH
AN
GE
D
FR
OM "1"½
PL
AS
TIC
CO
ND
UIT".
PART ELEVATION VIEW
PART PLAN VIEW
ELEVATION OF RETROFIT BARRIER RAIL
EPOXY REINFORCING STEEL-? RAIL
RETROFIT BARRIER RAIL DETAILS
SECTION D-D SECTION E-E SECTION A-A
SECTION C-C SECTION B-B
1'-0ƒ
6c1
MIN. LAP
6c1 5d1
AT GUTTER LINE
FINAL RIDING SURFACE
JOINT
CONSTRUCTION
PERMISSIBLE
5d2
REMOVE EXISTING END POST
3'-0}
9•
6c2
8
3Ž
3Ž
7†
7†
9• 5 SPA. AT 1'-1 ; 12 - 6c2
7'-0 END SECTION 7'-0 END SECTIONSTANDARD SECTION
END POST
REMOVE EXISTING
2'-
10
IN PLACE RAIL
TOP OF CAST
SPACES AT 0'-7• = ; - 6c1 BARS STAGGERED
1'-
10
(END OF 5d1) 2'-2
END TO END OF RETROFIT BARRIER RAIL (BID LENGTH)
9•
SIDE OF WING TO MATCH BARRIER RAIL SURFACE.
INCORPORATE INTO NEW WORK. REBUILD ROADWAY
SURFACE. FIELD BEND EXISTING REINFORCING AND
REMOVE WING TO THIS LINE AND DOWN TO RIDING
END SECTION, VERTICAL
END SECTION, LONGIT.
BAR LOCATION SHAPE
6c1
5d1
NO.
TOTAL (LBS.)
STANDARD RAIL, VERT.
STANDARD RAIL, LONGIT.
6c2
5d2
7'-0 END SECTIONSTANDARD SECTION
3 6
| ANCHORAGE SYSTEM
RAIL.
OF CONCRETE
WITH SURFACE
TO BE FLUSH
COVER PLATE
FACE OF …"
JUNCTION BOX
EXISTING
| EXIST. JUNCTION BOX EXIST. JUNCTION BOX
1'-0 1'-0
1'-9 1'-9 COVER PLATE
OPENING
TYP.
3•
"X" SEE
6c1
5d1
2 MIN.
NOTE A
1'-2
2 MIN.
CURB
EXISTING
1'-2
37
7
66
BOLT AND CONCRETE ANCHOR
…" ½ x 0'-3 COUNTER SUNK
BY THE CONTRACTOR
POSTS TO BE REMOVED
EXISTING RAIL AND
BENT PLATE
…" x 3'-6
(U. A. C.) SEE NOTE C
STEEL CONDUIT
EXIST. 2" ½ RIGID
AT GUTTER LINE
FINAL RIDING SURFACE
2'-
10
5
6
7•
10
EM
BE
D.
AT GUTTER LINE
FINAL RIDING SURFACE
EXIST. ANCHOR BOLTS
MAY BE LEFT IN PLACE
(SEE NOTE B)
1'-3ƒ1" ½ HOLES
6c2
5d2
2}
INTO NEW WORK.
AS REQUIRED & INCORPORATED
BARS TO BE EXPOSED, FIELD CUT
EXISTING †"½ END POST VERTICAL
SHOWN.
HOLES AS
BETWEEN 1"½
CENTERED
5d2 BARS
POST BASE
EXIST. END
1"
2'-
10
SURFACE
FINAL RIDING
NOTE C:
NON STAINLESS STEEL BOLTS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW THE TOP OF CURB AND ENDS OF
OF THE ENGINEER. ANY ANCHOR BOLTS NOT HAVING THE 2" MIN. COVER SHALL
MAY BE LEFT IN PLACE AT THE CONTRACTORS OPTION SUBJECT TO THE APPROVAL
LEAST 2" OF CONCRETE COVER WHEN ENCOMPASSED BY THE NEW BARRIER RAIL
EXISTING RAIL IS TO BE REMOVED. ANY ANCHOR BOLTS THAT WILL HAVE AT
NOTE B:
STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER RAIL
MAY BE LEFT IN PLACE AT CONTRACTORS OPTION SUBJECT TO APPROVAL OF
THE ENGINEER. STAINLESS STEEL BOLTS NEED NOT BE PAINTED.
RAIL SHALL BE CUT OFF FLUSH WITH OR SLIGHTLY BELOW TOP OF CURB SURFACE
AND THE REMAINING EXPOSED ENDS PAINTED WITH TWO COATS OF ZINC RICH PAINT.
NON STAINLESS STEEL ANCHOR BOLTS OUTSIDE THE AREA OF NEW BARRIER
1. PHYSICALLY LOCATE THE CONDUIT AT APPROXIMATELY 50 FOOT
DOWEL BARS.
TO PLACEMENT OF THE DOWELS, PROVE TO THE INSPECTOR BY A
REASONABLE METHOD THE USABILITY OF THE CONDUIT HAS NOT BEEN
COMPROMISED.
COST OF THESE OPERATIONS WILL BE CONSIDERED INCIDENTAL TO THE COST
INTERVALS PRIOR TO DRILLING ANY HOLES FOR ƒ" DIAMETER
2. AFTER COMPLETION OF DRILLING FOR THE ƒ" DOWEL BARS AND PRIOR
OF THE RETROFIT CONCRETE BARRIER RAILING. ANY DAMAGE TO THE CONDUIT OR
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE EXISTING CONDUIT IN THE
BRIDGE CURBS. IN ORDER TO ENSURE THE EXISTING CONDUITS AND/OR ELECTRICAL
SERVICE ( IF PRESENT`) ARE NOT DAMAGED DURING PLACEMENT OF THE RETROFIT
FOLLOWING:
CONCRETE BARRIER RAILING, THE CONTRACTOR SHALL BE REQUIRED TO DO THE
¡ ESTIMATED QUANTITIES BOX
¡ CONCRETE PLACEMENT SUMMARY
¡ RETROFIT BARRIER RAIL NOTES
¡ DOWEL SETTING NOTE
¡ RAIL JOINT DETAILS
SEE STANDARD SHEET 1031T IN THESE PLANS FOR:
NOTE A:
SEE STANDARD SHEET 1031T IN THESE PLANS.
(TYP. EACH END SECTION)
RETROFIT CONCRETE BARRIER RAILING.
COST TO BE INCLUDED IN PRICE BID FOR
PROVIDE SEVEN HOLES FORMED WITH 1"½ PVC PIPE.
5 SPA. AT 1'-1 ; 12 - 6c2
{ …" x 3'-6
7‚ 2'-0
2'-
10
9•
SHOWN
LENGTH WEIGHT
6'-8
7•
6c1
3ƒ
5d1
CONSTR. JOINT
PERMISSIBLE
7•
7'-0 EXISTING END POST BASE
SEE NOTE A
2ƒ
1ƒ
"X"
1'-
2
1'-
8
69ƒ
1'-
3ƒ
2'-0 6c1
6c2 5d2
5d1
2
1"
FIELD BEND
EXISTING †"½ BARS, INCORPORATE INTO NEW WORK.
BOXES AS DETAILED. THE VERTICAL BARS SHALL BE SHIFTED AS REQUIRED
ENDS OF LONGITUDINAL BARS SHALL BE PATCHED WITH EPOXY. A …"
GALVANIZED PLATE SHALL FIT OVER THE GAPPED AREA IN THE RAIL AND
SHALL BE HELD IN PLACE WITH COUNTERSUNK BOLTS AND CONCRETE
ANCHORS. THE COST OF THE GALVANIZED PLATES AND ANCHORAGE SYSTEM
AND THE LONGITUDINAL BARS SHALL BE FIELD CUT AS REQUIRED. CUT
CONDUIT
RIGID STEEL
EXIST. 2"½
THE RETROFIT RAIL SHALL BE GAPPED AT EXISTING JUNCTION
POST BASE
FOR END
REMOVAL LINE
( REMOVE )
POST BASE
EXISTING END
(SHOWING 6c1 PLACEMENT) (SHOWING 6c2 PLACEMENT)
WIRING BY THE CONTRACTOR WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND REPAIRED AT NO EXTRA COST TO THE STATE.
SHALL BE INCIDENTAL TO THE COST OF THE RETROFIT RAIL.
REQUIRED AT ?? EXISTING JUNCTION BOXES.
HE1031̀
F.S
01 -
THIS
SH
EE
T IS
SU
ED 5-25-99
3 MAX. 3 MAX.
A
A
B B
D
C
D
C
E
E
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 7
REMOVAL OF E
XISTIN
G HANDRAIL
AND END P
OSTS
RETROFIT CONCRETE B
ARRIER R
AILING
QUANTITIES NEEDED
2/27/2017 2:49:15 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1031T 11x17_pdf.pltcfg
INCIDENTAL TO OTHER CONSTRUCTION.
‚" MIN.
(TYPICAL)
ƒ TOTAL
BOND BREAKER.
MINIMUM CLEAR DISTANCE FROM FACE OF CONCRETE TO NEAR
REINFORCING BAR IS TO BE 2" UNLESS OTHERWISE NOTED OR SHOWN.
THE PERMISSIBLE CONSTRUCTION JOINTS ARE TO BE PLACED BETWEEN
JOINT CONTACT SURFACES ARE TO BE COATED WITH AN APPROVED
COST OF JOINT SEALER AND BOND BREAKER SHALL BE CONSIDERED
BASIS MEASURED FROM END TO END OF RAIL. THE NUMBER OF LINEAL
THE CONTRACT PRICE PER LINEAL FOOT BASED ON PLAN QUANTITIES.
ALL REINFORCING STEEL IS TO BE GRADE 60 AND EPOXY COATED.
COATING
BREAKING
BOND
TOP AND SIDES
JOINT SEALER ON
SECTION
TOTAL (CU. YDS.)
STANDARD SECTION
BREAKING COATING
OF BOND
INDICATES AREA
HATCHED AREA
EXISTING BRIDGE RAIL IS NOT TO BE REMOVED UNTIL AUTHORIZED BY
THE ENGINEER.
STANDARD SHEET 1031T
END SECTIONS
OF 1" AND A MAXIMUM OF 3", BUT MUST BE CONSTANT FOR FULL
LENGTH OF BRIDGE, HOWEVER APPROXIMATELY 10 LINEAR FEET AT
MARKETED FOR OUTDOOR USE. NO TESTING OR CERTIFICATION IS REQUIRED.
THE JOINT SEALER SHALL BE LIGHT GRAY NONSAG LATEX CAULKING SEALER
THE RETROFIT BARRIER RAIL IS TO BE BID ON A LINEAL FOOT
FEET OF RETROFIT BARRIER RAIL INSTALLED WILL BE PAID FOR AT
PRICE BID FOR RETROFIT CONCRETE BARRIER RAILING SHALL BE FULL
COMPENSATION FOR FURNISHING ALL MATERIAL (INCLUDING REINF. STEEL
REQUIRED TO ERECT THE RAIL IN ACCORDANCE WITH THESE PLANS AND
CURRENT SPECIFICATIONS.
RETROFIT BARRIER RAIL DETAILS
THE EXISTING STRUCTURE NOT NOTED FOR REMOVAL SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED BY THE
CONTRACTOR AT NO COST TO THE STATE.
THE PRICE BID FOR "REMOVAL OF EXISTING HANDRAIL AND END POSTS"
SHALL INCLUDE ALL COSTS ASSOCIATED WITH DISMANTLING THE EXISTING
THE EXISTING RAIL POST ANCHOR BOLTS IF REQUIRED.
EXISTING CONCRETE END POSTS AND THE CUTTING OFF AND PAINTING OF
ALSO INCLUDE ALL COSTS ASSOCIATED WITH THE REMOVAL OF THE
AND REMOVED FROM THE SITE BY THE CONTRACTOR. THE BID ITEM SHALL
RAILS AND POSTS ARE TO BECOME THE PROPERTY OF THE CONTRACTOR
EITHER END OF STANDARD RAIL SECTION SHALL BE TRANSITIONED
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1031T -
THIS
SH
EE
T IS
SU
ED 01-01.
BE 10" DEEP. THE DOWELS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS. EITHER OF THE FOLLOWING SYSTEMS MAY
BE USED AS A BONDING AGENT FOR VERTICAL DOWELS, BUT ONLY SYSTEM "A"
MAY BE USED FOR HORIZONTAL DOWELS:
B. HYDRAULIC CEMENT GROUT SYSTEMS. DRILLED HOLES ARE TO BE 2• TIMES
THE DOWEL DIAMETER AND ARE TO BE BLOWN CLEAN WITH COMPRESSED AIR
SHALL BE ONE OF THOSE APPROVED IN MATERIALS I.M. 491.13 AND SHALL
BE USED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
ALL DIMENSIONS AND DETAILS SHOWN IN THESE PLANS PERTINENT TO NEW
CONSTRUCTION IN RELATION TO EXISTING PORTIONS OF THE STRUCTURE SHALL
BE VERIFIED IN THE FIELD BY THE BRIDGE CONTRACTOR BEFORE STARTING
CONSTRUCTION.
FAINT LINES ON PLANS INDICATE THE EXISTING STRUCTURE.
DESIGN STRESSES FOR THE FOLLOWING MATERIALS ARE IN ACCORDANCE WITH
REINFORCING STEEL IN ACCORDANCE WITH SECTION 8, GRADE 60.
DESIGN: AASHTO SERIES OF 2002.
?
?
APPLICABLE GENERAL SUPPLEMENTAL SPECIFICATIONS,
DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS
AND SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK
ON THIS PROJECT.
CONSTRUCTION: IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, SERIES OF 2002.
ESTIMATED BRIDGE RAIL RETROFIT QUANTITIES
RETROFIT BARRIER RAIL DETAILS
A. POLYMER GROUT SYSTEM SHALL BE IN ACCORDANCE WITH ARTICLE
2301.03, E, OF THE STANDARD SPECIFICATIONS.
THESE BRIDGE PLANS LABEL ALL REINFORCING STEEL WITH ENGLISH NOTATION
(`5a1 IS † INCH DIAMETER BAR`). ENGLISH REINFORCING STEEL RECEIVED IN
DESIGNATION" IS THE STAMPED IMPRESSION ON THE REINFORCING BARS, AND
IS EQUIVALENT TO THE BAR DIAMETER IN MILLIMETERS.
ENGLISH SIZE 3 4 5 6 `7 8 9 `10 11
BAR DESIGNATION 10 13 16 19 22 25 29 32 36
____ HANDRAIL (APPROX. ____ L.F. AND ____ POSTS). THE
DOWEL SETTING NOTE :
RETROFIT BARRIER RAILING NOTES:
NOTE A:( SEE SECTION A-A ON BARRIER RAIL LAYOUT SHEET`).
ON EACH RAIL OF BRIDGE, DIMENSION "X" SHALL BE A MINIMUM
TO 2" AT END SECTION AS SHOWN.
ANY REMOVALS REQUIRED SHALL BE IN ACCORDANCE WITH SECTION 2401,
ALL RETROFIT BARRIER RAIL CONCRETE IS TO BE EITHER CLASS BR MIX
OR CLASS C MIX.
CLASS BR CONCRETE SHALL BE USED FOR THE SLIP FORMING METHOD.
CLASS C CONCRETE SHALL BE USED FOR THE CAST-IN-PLACE METHOD.
CONCRETE IN ACCORDANCE WITH SECTION 8, f'c = 4.0 KSI.
___ AT ___ CU. YDS. PER LIN. FT
___ AT ___ CU. YDS. PER SECTION
THE _____ BARS SHALL BE SET AS DOWELS IN DRILLED HOLES. HOLES ARE TO
IMMEDIATELY PRIOR TO PLACING GROUT. THE HYDRAULIC CEMENT GROUT OF THE STANDARD SPECIFICATIONS. ANY DAMAGE TO OTHER PORTIONS OF
THE FIELD MAY DISPLAY THE FOLLOWING "BAR DESIGNATION". THE "BAR
VERTICAL BARS AT A MINIMUM SPACING OF 20 FEET. CONSTRUCTION
FORMWORK.
THE PRICE BID FOR THE CAST-IN-PLACE METHOD SHALL INCLUDE THE
AND 1"½ PVC PIPE) PLUS ALL OF THE EQUIPMENT AND LABOR
TYPE OF WORK DES. NO.
X
X
X
X
X
X
X
X
X
X
AT THIS SITE
DESIGN HISTORY
(INCLUDES THIS DESIGN)
RAIL JOINT DETAILS
RETROFIT BARRIER
DESIGN STRESSES:
SPECIFICATIONS:
CONCRETE PLACEMENT SUMMARY
PART PLAN VIEW
PART ELEVATION VIEW
RE
VIS
ED 11-15 -
MO
DIFIE
D "D
ESI
GN
HIS
TO
RY" T
AB
LE
TO
ST
AT
E "(I
NC
LU
DE
S
THIS
DE
SI
GN)".
FOR HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS
RE
VIS
ED 03-2017 -
MO
DIFIE
D
CO
NS
TR
UC
TI
ON:
ST
AN
DA
RD
SP
ECIFIC
ATI
ON
S
BRI
DG
E
CO
NS
TR
UC
TI
ON,
SE
RIE
S
TO 2015, (W
AS 2012).
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 8
2/27/2017 2:49:16 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1038 11x17_pdf.pltcfg
CLASSIFICATION LINE
TOP BAR
(TOP OF OVERLAY)
RAISED FINAL SURFACEBETWEEN REPAIR AND OVERLAY)
CLASSIFICATION LINE (BOUNDARY
ORIGINAL P.C. SURFACE
CLASSIFICATION LINE
OF DRAIN
ROUND TO TOP
REPAIR AND OVERLAY DEFINITION
MI
N.
CL.
A
DECK REPAIR DETAIL AT DRAIN
DECK REPAIR DETAIL AT DRAIN
(REQUIRED AT ___ LOCATIONS)
(REQUIRED AT ___ LOCATIONS) (REQUIRED AT ___ LOCATIONS) (REQUIRED AT ___ LOCATIONS)
DECK REPAIR - QUANTITIES
DECK REPAIR DETAIL AT DRAIN
NEW DECK OVERLAY
SURFACE
NEW DECK OVERLAY
SURFACE NEW DECK OVERLAY
SURFACE
NEW DECK OVERLAY
SURFACE
OF DRAIN
ROUND TO TOP
OF DRAIN
ROUND TO TOP
OF DRAIN
ROUND TO TOP
CLASSIFICATION LINE
EXISTING SURFACEEXISTING SURFACE
CLASSIFICATION LINECLASSIFICATION LINE CLASSIFICATION LINE
TYPE OF WORK
AT THIS SITE
DESIGN HISTORY
(INCLUDES THIS DESIGN)
A
A
A
A
A
A
A
A
LOCATION:
DESIGN STRESSES:
SPECIFICATIONS:
SITUATION PLAN
SECTION A-A
DECK REPAIR DETAIL AT DRAIN
SECTION A-A
SECTION A-A SECTION A-A
SU
RF
AC
E
RAIS
E
= 1•"
‚"
OV
ER
LA
Y
= 1ƒ"
D
=
DE
PT
H
ORI
GI
NA
L P.C.
MA
X.
CL.
A
NOTE:
ELSEWHERE IN THESE PLANS.
ROADWAY QUANTITIES SHOWN
DESIGN STRESSES FOR THE FOLLOWING MATERIALS ARE IN ACCORDANCE WITH
CONCRETE IN ACCORDANCE WITH SECTION 8, f'c = 3,500 PSI.
REINFORCING STEEL IN ACCORDANCE WITH SECTION 8, GRADE 60.
DESIGN: AASHTO SERIES OF 2002.
?
?
CONSTRUCTION: IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, SERIES OF 2002.
DES. NO.
X
X
X
X
X
X
X
X
X
X
ON THIS PROJECT.
APPLICABLE GENERAL SUPPLEMENTAL SPECIFICATIONS,
DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS
AND SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK
D/2 RE
PAIR
CLASS A REPAIR CLASS B
REPAIR
OVERLAY
1'-0 1'-0 1'-0 DEPRESSION
| DRAIN
TO BE U.A.C.
EXISTING DRAIN
EXISTING SURFACE
GUTTER LINE
TO BE U.A.C.
EXISTING DRAIN
MAINTENANCE NO.
1'-0 1'-0 1'-0
ƒ"
MI
N.
DEPRESSION
| DRAIN
EXISTING SURFACE
GUTTER LINE
LINE
CLASSIFICATIONDRAIN (U.A.C.)
EXISTING
DRAIN (U.A.C.)
EXISTING
LINE
CLASSIFICATION
1'-0 1'-0 1'-0
ƒ"
MI
N.
DEPRESSION
| DRAIN GUTTER LINE
1'-0 1'-0 1'-0
ƒ"
MI
N.
DEPRESSION
| DRAIN GUTTER LINE
DRAIN (U.A.C.)
EXISTING
DRAIN (U.A.C.)
EXISTING DRAIN (U.A.C.)
EXISTING
DRAIN (U.A.C.)
EXISTING
STANDARD SHEET 1038
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1038 -
THIS
SH
EE
T
RE
DR
AW
N 9-8-88.
ƒ"
MI
N.
RE
VIS
ED 11-15 -
MO
DIFIE
D "D
ESI
GN
HIS
TO
RY" T
AB
LE
TO
ST
AT
E "(I
NC
LU
DE
S
THIS
DE
SI
GN)".
RE
VIS
ED 03-2017 -
MO
DIFIE
D
CO
NS
TR
UC
TI
ON:
ST
AN
DA
RD
SP
ECIFIC
ATI
ON
S
BRI
DG
E
CO
NS
TR
UC
TI
ON,
SE
RIE
S
TO 2015, (W
AS 2012).
FOR HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 9
2/27/2017 2:49:17 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1038R 11x17_pdf.pltcfg
CLASSIFICATION LINECLASSIFICATION LINE
OF DRAIN
ROUND TO TOP
TOP BAR
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
RE-
OV
ER
LA
Y=̀̀
2"
MI
N.
CL.
A
REPAIR AND RE-OVERLAY DEFINITION
ORI
GI
NA
L P.C.
•"
`OVERLAY SURFACE)
(SAME AS EXISTING
FINAL RIDING SURFACE
ORIGINAL P.C. SURFACE)
FIRST OVERLAY (‚" BELOW
CLASSIFICATION LINE FOR
ORIGINAL P.C. SURFACE
D=̀̀
DE
PT
H
RE-OVERLAY
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1038
R -
THIS
SH
EE
T IS
SU
ED 10-12.
ORIGINAL P.C. SURFACE
ORIGINAL P.C. SURFACE
OF DRAIN
ROUND TO TOP
OF DRAIN
ROUND TO TOP
ORIGINAL P.C. SURFACE
ORIGINAL P.C. SURFACE
(REQUIRED AT ___ LOCATIONS)(REQUIRED AT ___ LOCATIONS) (REQUIRED AT ___ LOCATIONS)
(REQUIRED AT ___ LOCATIONS)
STANDARD SHEET 1038RRE-OVERLAY DECK REPAIR - QUANTITIES
DECK REPAIR DETAIL AT DRAIN
DECK REPAIR DETAIL AT DRAIN DECK REPAIR DETAIL AT DRAIN DECK REPAIR DETAIL AT DRAIN
TO BE U.A.C.
EXISTING DRAINTO BE U.A.C.
EXISTING DRAIN
TO BE U.A.C.
EXISTING DRAINCLASSIFICATION LINE
CLASSIFICATION LINE
CLASSIFICATION LINE
CLASSIFICATION LINE
EXISTING OVERLAY SURFACE
NEW DECK OVERLAY AND
EXISTING OVERLAY SURFACE
NEW DECK OVERLAY AND
EXISTING OVERLAY SURFACE
NEW DECK OVERLAY AND
EXISTING OVERLAY SURFACE
NEW DECK OVERLAY AND
TYPE OF WORK
X X
AT THIS SITE
DESIGN HISTORY
(INCLUDES THIS DESIGN)
A
A
A
A
A
A
A
A
SITUATION PLAN
SPECIFICATIONS:
DESIGN STRESSES:
LOCATION:
SECTION A-A
SECTION A-A SECTION A-A SECTION A-A
CONSTRUCTION: IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
APPLICABLE GENERAL SUPPLEMENTAL SPECIFICATIONS,
DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS
AND SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK
DESIGN: AASHTO SERIES OF 2002.
?
?
ON THIS PROJECT.
DESIGN STRESSES FOR THE FOLLOWING MATERIALS ARE IN ACCORDANCE WITH
CONCRETE IN ACCORDANCE WITH SECTION 8, f'c = 3,500 PSI.
REINFORCING STEEL IN ACCORDANCE WITH SECTION 8, GRADE 60.
THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, SERIES OF 2002.
1'-0 1'-0 1'-0 DEPRESSION
| DRAIN GUTTER LINE
LINE
CLASSIFICATIONLINE
CLASSIFICATION
1'-0 1'-0 1'-0
ƒ"
MI
N.
DEPRESSION
| DRAIN GUTTER LINE
1'-0 1'-0 1'-0
ƒ"
MI
N.
DEPRESSION
| DRAIN
TO BE U.A.C.
EXISTING DRAIN
GUTTER LINE
TO BE U.A.C.
EXISTING DRAIN
ROUND TO TOP
OF DRAIN.
TO BE (U.A.C.)
EXISTING DRAIN
1'-0 1'-0 1'-0 DEPRESSION
| DRAIN
TO BE U.A.C.
EXISTING DRAIN
GUTTER LINE
TO BE U.A.C.
EXISTING DRAIN
MAINTENANCE NO.
NOTE:
ELSEWHERE IN THESE PLANS.
ROADWAY QUANTITIES SHOWN
D/2 R
EP
AIR
MA
X.
CL.
A
CLASS A REPAIR CLASS B
REPAIR
DES. NO.
X
X
X
X
X
X
X X
ƒ"
MI
N.
ƒ"
MI
N.
FOR HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS
RE
VIS
ED 11-15 -
MO
DIFIE
D "D
ESI
GN
HIS
TO
RY" T
AB
LE
TO
ST
AT
E "(I
NC
LU
DE
S
THIS
DE
SI
GN)".
RE
VIS
ED 03-2017 -
MO
DIFIE
D
CO
NS
TR
UC
TI
ON:
ST
AN
DA
RD
SP
ECIFIC
ATI
ON
S
BRI
DG
E
CO
NS
TR
UC
TI
ON,
SE
RIE
S
TO 2015, (W
AS 2012).
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 10
E411
E420
E421
E422
E430
E431
E432
E433
E435
E436
E437
E438
E450
E451
E400A
E400B
E400C
E400D
E410A
E410B
E410C
E441A
E441B
E440
E442
E434
E410D
E410E
E412
2/27/2017 2:49:18 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1039s1_VOID 11x17_pdf.pltcfg
IN THESE PLANS. HATCHED PORTIONS REPRESENT CLASS A BRIDGE FLOOR
REPAIR. CROSS HATCHED PORTIONS, IF SHOWN, REPRESENT CLASS B BRIDGE
FLOOR REPAIR. ACTUAL SPALLED AND HOLLOW AREAS, AS DETERMINED BY THE
ENGINEER AT THE TIME OF CONSTRUCTION, SHALL BE REPAIRED.
PLAN QUANTITY OF FLOOR REPAIR IS BASED ON THE "SURVEY PLOT" AS SHOWN
PRESENT FLOOR THICKNESS IS ABOUT _____ INCHES. THE CONTRACTOR SHALL
EXERCISE CARE IN REMOVING CONCRETE IN ORDER TO PREVENT UNNECESSARY
UNBONDING OF REINFORCING STEEL.
PRESENT FLOOR THICKNESS IS ABOUT _____ INCHES. THE CONTRACTOR SHALL
EXERCISE CARE IN ORDER TO PREVENT UNNECESSARY REMOVAL OF CONCRETE
BELOW THE TOP OF THE TOP REINFORCING. THE ENERGY OF HAND TOOLS SHALL
BE RESTRICTED NEAR THE BOTTOM OF THE DESIGNATED CLASS A REPAIR AREAS
IN ORDER TO PREVENT UNBONDING OF REINFORCING. NO CONCRETE SHALL BE
REMOVED BELOW THE TOP OF THE TOP LONGITUDINAL REINFORCING WITHOUT
PRIOR PERMISSION FROM THE BRIDGE ENGINEER.
PRESENT FLOOR THICKNESS IS ABOUT _____ INCHES. THE FLOOR REINFORCING
IS QUITE SHALLOW FOR A PORTION OF THE FLOOR AREA. IN THOSE AREAS
SURFACE, THE BOTTOM LIMIT OF BRIDGE FLOOR OVERLAY WILL BE CONSIDERED
AS THE TOP OF THE TOP REINFORCING. UNSOUND CONCRETE BELOW THE TOP OF
THE TOP REINFORCING SHALL BE REPAIRED AS CLASS A BRIDGE FLOOR REPAIR.
THE CONTRACTOR WILL BE REQUIRED TO CAREFULLY REGULATE SCARIFYING DEPTH
AND EMPLOY HAND METHODS AS NECESSARY IN ORDER TO PREVENT DAMAGE OR
UNBONDING OF REINFORCING.
WHERE REINFORCING IS LESS THEN ‚" CLEAR BELOW THE ORIGINAL FINISHED
WHERE TOP REINFORCING IS NOT PRESENT.
THE MINIMUM DEPTH FOR CLASS A REPAIR IS TO BE 1• INCHES IN AREAS
CONSTRUCTION SHALL BE DONE IN STAGES WITH AT LEAST ONE LANE TRAFFIC
MAINTAINED AT ALL TIMES IN ACCORDANCE WITH "TRAFFIC CONTROL PLAN" NOTE.
SURFACE RAISE, AS SHOWN ON THE PLANS, SHALL BE CONSIDERED A MINIMUM.
IN ORDER TO LIMIT THE ADDITIONAL DEAD LOAD SURFACE RAISE SHALL BE
MAY BE ADJUSTED TO THE EXTENT POSSIBLE WITHIN THESE LIMITS.
RESTRICTED TO A MAXIMUM OF •" MORE THAN SHOWN ON THE PLANS. PROFILE
ALL DIMENSIONS AND DETAILS SHOWN ON THESE PLANS PERTINENT TO NEW
CONSTRUCTION SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR BEFORE
STARTING CONSTRUCTION.
ALL DIMENSIONS REQUIRED TO FABRICATE NEW STRUCTURAL STEEL SHALL BE
FIELD VERIFIED BY THE CONTRACTOR.
FAINT LINES ON PLANS INDICATE EXISTING PORTIONS OF THE BRIDGE.
MINIMUM CLEAR DISTANCE FROM FACE OF CONCRETE TO NEAR REINFORCING BAR
IS TO BE 2" UNLESS OTHERWISE NOTED OR SHOWN.
THE BID ITEM "HAULING AND STORING EXISTING HANDRAIL" SHALL INCLUDE ALL
COSTS ASSOCIATED WITH THE DISMANTLING, HAULING AND STORING OF BOTH OF
THE HANDRAILS (APPROXIMATELY _____ L.F. OF RAIL AND _____ POSTS). THE
RAILS, POSTS AND HARDWARE ARE TO BE HAULED TO THE IOWA D.O.T. MAINTENANCE
YARD AT ___________________. ANCHOR BOLTS NEED NOT BE SALVAGED.
THE CONTRACTOR SHALL PLACE PORTLAND CEMENT CONCRETE OVERLAY ON THE
BRIDGE APPROACH PAVEMENT AS NOTED AND SHOWN ON STANDARD ROAD PLAN
RK-17. PAYMENT FOR THIS WORK SHALL BE NOTED ON STANDARD ROAD PLAN
RK-17.
AREAS OF CURB INDICATED ON THE "SURVEY PLOT" OR DESIGNATED BY THE
ENGINEER ARE TO BE REPAIRED USING CONCRETE REPAIR NOTES AND DETAILS
INCLUDED IN THESE PLANS.
DECK REPAIR - NOTES (1 OF 2)
DECK REPAIR NOTES
PRESENT FLOOR THICKNESS IS ABOUT _____ INCHES, INCLUDING EXISTING
OVERLAY. THE CONTRACTOR SHALL EXERCISE CARE IN REMOVING CONCRETE
IN ORDER TO PREVENT UNNECESSARY UNBONDING OF REINFORCING STEEL.
PRESENT FLOOR THICKNESS IS ABOUT _____ INCHES, INCLUDING EXISTING
OVERLAY. THE CONTRACTOR SHALL EXERCISE CARE IN ORDER TO PREVENT
UNNECESSARY REMOVAL OF CONCRETE BELOW THE TOP OF THE TOP REINFORCING.
THE ENERGY OF HAND TOOLS SHALL BE RESTRICTED NEAR THE BOTTOM OF THE
DESIGNATED CLASS A REPAIR AREAS IN ORDER TO PREVENT UNBONDING OF
REINFORCING. NO CONCRETE SHALL BE REMOVED BELOW THE TOP OF THE TOP
LONGITUDINAL REINFORCING WITHOUT PRIOR PERMISSION FROM THE BRIDGE
ENGINEER.
THE BRIDGE FLOOR IS COVERED WITH A _____ INCH THICK PORTLAND CEMENT
CONCRETE OVERLAY. THE CONTRACTOR SHALL NOTE THE REDEFINING OF THE
CLASSIFICATION LINE (BOUNDARY BETWEEN REPAIR AND OVERLAY) FOR THIS
PROJECT DUE TO THE EXISTING _____ INCH OVERLAY. THE CLASSIFICATION
LINE WILL BE DEFINED AS _____ INCHES BELOW THE TOP OF EXISTING OVERLAY.
THIS WILL NECESSITATE THE REMOVAL OF THE EXISTING BRIDGE FLOOR OVERLAY
BEFORE PLACING THE PROPOSED NEW BRIDGE FLOOR OVERLAY.
ALL COSTS ASSOCIATED WITH THE REMOVAL OF THE EXISTING OVERLAY SHALL BE
INCLUDED IN THE BID ITEM "REMOVAL OF EXISTING P.C. OVERLAY". REMOVAL
OF EXISTING OVERLAY SHALL BE COMPUTED IN SQUARE YARDS FROM THE
MEASUREMENT OF AREAS REMOVED. THE CONTRACTOR WILL BE PAID THE CONTRACT
PRICE PER SQUARE YARD FOR FURNISHING ALL EQUIPMENT AND LABOR NECESSARY
LINE. ALL COSTS, INCLUDING FURNISHING EQUIPMENT AND LABOR, ASSOCIATED
LINE) SHALL BE INCLUDED IN THE BID ITEM "BRIDGE FLOOR OVERLAY".
UPON COMPLETION OF THE REMOVAL OF CONCRETE DOWN TO THE CLASSIFICATION
LINE, THE ENGINEER SHALL DETERMINE THE AREAS OF BRIDGE DECK TO BE
REPAIRED AS "CLASS A BRIDGE FLOOR REPAIR". ACTUAL HOLLOW AREAS, AS
DETERMINED BY THE ENGINEER, SHALL BE REPAIRED.
TO REMOVE THE CONCRETE TO WITHIN ‚ INCH ABOVE THE CLASSIFICATION
WITH REMOVAL OF THE NEXT ‚ INCH OF CONCRETE (TO THE CLASSIFICATION
AT THE CONTRACTOR'S OPTION SUBJECT TO THE ENGINEER'S APPROVAL.
CONSTRUCTION STAGES I & II AS DETAILED ON THESE PLANS MAY BE REVERSED
THIS DESIGN IS FOR REPAIRS TO THE EXISTING ___.
COPIES OF ORIGINAL DESIGN PLANS WILL BE MADE AVAILABLE TO THE
DIVISION - IOWA D.O.T. - AMES.
REPAIR SHALL CONSIST OF:
1. __________________
2. __________________
CONTRACTOR. CONTACT THE OFFICE OF CONTRACTS - HIGHWAY
STANDARD 1039s1
RE
VISI
ON 03-2017 -
THIS
SH
EE
T
VOI
D,
SE
E
BRI
DG
E
DE
SI
GN
MA
NU
AL F
OR
CU
RR
EN
T
NO
TE
S.
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1039s1 -
THIS
SH
EE
T
REIS
SU
ED 8-23-96.
NO PRELIMINARY FLOOR SURVEY IS SHOWN. THE PLAN QUANTITY FOR "CLASS
AREAS AS DETERMINED BY THE ENGINEER SHALL BE REPAIRED.
THE H.M.A. SURFACING HAS BEEN REMOVED. ACTUAL SPALLED AND HOLLOW
FLOOR AREA. THE ACTUAL QUANTITY IS DETERMINED BY THE ENGINEER AFTER
A BRIDGE FLOOR REPAIR" IS ESTIMATED AS ___________ OF THE TOTAL
PLAN QUANTITY OF FLOOR REPAIR IS BASED ON TWO TIMES THE SHADED AREAS
PLUS THE BOUNDED AREAS SHOWN ON THE "SURVEY PLOT" IN THESE PLANS.
SHADED AREAS REPRESENT CLASS A BRIDGE FLOOR REPAIR FOUND BY DELAMTECT
PLOT. BOUNDED AREAS INCLUDE H.M.A. PATCH OR SPALLED AREAS NOT RECORDED
BY THE DELAMTECT AND/OR THE SQUARING UP OF THE REPAIR AREAS. ACTUAL
SPALLED AND HOLLOW AREAS AS DETERMINED BY THE ENGINEER AT THE TIME OF
CONSTRUCTION SHALL BE REPAIRED.
PLAN QUANTITY OF FLOOR REPAIR IS BASED ON TWO TIMES THE SHADED AREAS
SHOWN ON THE "SURVEY PLOT" IN THESE PLANS. SHADED AREAS REPRESENT CLASS
A BRIDGE FLOOR REPAIR FOUND BY SOUNDING THE BRIDGE DECK. ACTUAL SPALLED
AND HOLLOW AREAS AS DETERMINED BY THE ENGINEER AT THE TIME OF
CONSTRUCTION, SHALL BE REPAIRED.
BEFORE PROCEEDING WITH BRIDGE FLOOR OVERLAY AND BRIDGE FLOOR REPAIR
THE CONTRACTOR MAY COMPLETE ALL STAGES OF OTHER CONSTRUCTION. ANY
APPROVED METHOD. ALL COSTS FOR ADDITIONAL TRAFFIC CONTROL,
CONTRACTOR.
CONSTRUCTION SHALL HAVE STAGE LIMITS, TEMPORARY BARRIER RAIL AND
TRAFFIC CONTROL AS DETAILED ON THESE PLANS. TEMPORARY BARRIER RAIL
AND TRAFFIC CONTROL MAY BE ADJUSTED TO FIT THE ACTUAL WORK AND STORAGE
AREA. WHEN BACKWALLS AND/OR APPROACH SECTIONS ARE TO BE REBUILT
TO A RAISED SURFACE, AND WHEN FLOOR OVERLAY IS NOT A PART OF THE SAME
STAGE, THE CONTRACTOR SHALL PROVIDE FOR PROFILE TRANSITION WITH H.M.A.
SURFACING. PROFILE TRANSITION SHALL BE TAPERED AT A RATE OF 25' FOR
1• INCHES OF RAISE. THE H.M.A. TRANSITION MATERIAL SHALL BE A
COMMERCIAL GRADE HOT SURFACING MIX OR A MIX APPROVED BY THE ENGINEER.
H.M.A. MAY BE PLACED BY HAND METHODS AND MAY BE COMPACTED BY ANY
REPOSITI0NING OF BARRIER AND H.M.A. SURFACING SHALL BE BORNE BY THE
SCREED EXTENSION OR OVERLAY BEYOND THE LONGITUDINAL CONSTRUCTION JOINT
MAY BE LESS THAN THE 6 INCHES REQUIRED BY ARTICLE 2413.03, A, 4, OF THE
STANDARD SPECIFICATIONS. THE ENGINEER MAY REQUIRE ADDITIONAL VIBRATION
OR SPECIAL FINISHING PROCEDURES ADJACENT TO THE LONGITUDINAL
CONSTRUCTION JOINT.
STANDARD SPECIFICATIONS.
OF CONCRETE SEALER IN ACCORDANCE WITH ARTICLE 2403.03, P, 3, OF THE
SPECIFICATIONS, BOTH ABUTMENT BRIDGE SEATS SHALL HAVE AN APPLICATION
IN ADDITION TO THE REQUIREMENTS OF ARTICLE 2413.03, G, OF THE STANDARD
ASSOCIATED WITH REMOVING THE _______.
THE LUMP SUM BID FOR "REMOVALS, AS PER PLAN" SHALL INCLUDE ALL COSTS
OF THE STANDARD SPECIFICATIONS. ANY DAMAGE TO ANY STEEL OR CONCRETE
NOT TO BE REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND
REPAIRED AT NO EXTRA COST TO THE STATE.
REMOVAL OF SCHEDULED ITEMS SHALL BE IN ACCORDANCE WITH SECTION 2401,
THE BID ITEM "REMOVAL OF EXISTING HANDRAIL + END POST" SHALL
INCLUDE ALL COSTS ASSOCIATED WITH DISMANTLING THE EXISTING
THE HANDRAILS ARE TO BECOME THE PROPERTY OF THE CONTRACTOR.
_____ HANDRAIL (APPROXIMATELY _____ L.F. AND _____ POSTS).
THE CONTRACTOR SHALL CONSTRUCT NEW BRIDGE APPROACH PAVEMENT AS NOTED AND
SHOWN. THE PRICE BID FOR "BRIDGE APPROACH SECTION, REINFORCED AS PER
PLAN" SHALL BE FULL COMPENSATION FOR FURNISHING AND INSTALLING P.C.
CONCRETE APPROACH PAVEMENT, INCLUDING EXCAVATION, REINFORCING STEEL, AND
JOINT MATERIAL REQUIRED.
THE PRICE BID FOR "REMOVAL OF ASPHALT CEMENT CONCRETE SURFACING" SHALL
BE CONSIDERED FULL COMPENSATION FOR REMOVAL OF THE EXISTING H.M.A. OVERLAY
TO THE LIMITS SHOWN. THE REMOVED MATERIAL SHALL BECOME THE PROPERTY OF
THE CONTRACTOR.
RE
VISI
ON 11-10 - S
EV
ER
AL
OF
TH
E
NO
TE
S
WE
RE
UP
DA
TE
D
TO
AG
RE
E
WIT
H
CU
RR
EN
T
SP
ECIFIC
ATI
ON
S.
FOR CURRENT
REPAI
R NOTES
.
SEE BRI
DGE DES
IGN
MANUAL
THIS
SHEET VOI
D 03-0
1-20
17
VOID
VOIDCOUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 11
E461
E462
E470
E471
E480
E490
E481
E463
2/27/2017 2:49:19 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1039s2_VOID 11x17_pdf.pltcfg
1. PHYSICALLY LOCATE THE CONDUIT AT APPROXIMATELY 50 FOOT
DOWEL BARS.
TO PLACEMENT OF THE DOWELS, PROVE TO THE INSPECTOR BY A
REASONABLE METHOD THE USABILITY OF THE CONDUIT HAS NOT BEEN
COMPROMISED.
COST OF THESE OPERATIONS WILL BE CONSIDERED INCIDENTAL TO THE COST
OF THE CAST-IN-PLACE BARRIER RAIL. ANY DAMAGE TO THE CONDUIT OR
WIRING BY THE CONTRACTOR WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND REPAIRED AT NO EXTRA COST TO THE STATE.
INTERVALS PRIOR TO DRILLING ANY HOLES FOR ƒ" DIAMETER
2. AFTER COMPLETION OF DRILLING FOR THE ƒ" DOWEL BARS AND PRIOR
DECK REPAIR - NOTES (2 OF 2)
DECK REPAIR NOTES
THE TOP OF THE ABUTMENT BACKWALLS AS SHOWN SHALL BE CONSTRUCTED USING
STRUCTURAL CONCRETE CLASS C. PROMPTLY AFTER THE CONCRETE HAS BEEN
PLACED AND VIBRATED AS PROVIDED IN ARTICLES 2403.03, C, AND 2403.03, D, OF
THE STANDARD SPECIFICATIONS, IT SHALL BE HAND FINISHED TO PROVIDE A
SMOOTH SURFACE WITH THE PROPER CROWN. THE CONTRACTOR MAY ELECT TO
USE FORMWORK WHICH IS MARKED OR TRIMMED TO THE CORRECT ELEVATION AND
CROWN TO PROVIDE THE LIMITS FOR THE HAND FINISHING.
THE UNIT PRICE BID ITEM "______".
CLEANING AND SEALING OF THE CONCRETE RAILS SHALL BE INCLUDED IN
THE NEW SECTIONS SHALL NOT BE SEALED. ALL COSTS ASSOCIATED WITH
STANDARD SPECIFICATIONS. IF NEW SECTIONS OF RAIL ARE CONSTRUCTED,
BE CLEANED AND SEALED IN ACCORDANCE WITH ARTICLE 2403.03, P, OF THE
THE TOP AND INTERIOR FACES OF THE EXISTING CONCRETE RAILING ARE TO
TO THE ENGINEER BEFORE ANY SCRAP STEEL IS REMOVED FROM THE PROJECT.
A COPY OF THIS NOTICE, SIGNED BY THE RECEIVING FACILITY, SHALL BE RETURNED
OF THIS INFORMATION.
3. A SIGNATURE BLOCK FOR THE RECEIVING FACILITY TO CONFIRM THEIR RECEIPT
2. A COPY OF THE SCRAPE SAMPLE PROVIDED IN THE CONTRACT DOCUMENTS.
ENVIRONMENT.
MATERIALS AT LEVELS WHICH COULD BE HAZARDOUS TO EMPLOYEES OR THE
1. A NOTICE THAT THE SCRAP STEEL IS COATED WITH PAINT THAT HAS REGULATED
THIS NOTICE SHALL AT A MINIMUM INCLUDE:
CONTRACTOR SHALL PROVIDE A WRITTEN NOTICE TO THE RECEIVING FACILITY.
FEDERAL AND STATE REGULATIONS. BEFORE DELIVERY OF ANY SCRAP STEEL THE
IN ACCORDANCE WITH SECTION 2508, OF THE STANDARD SPECIFICATIONS, AND ALL
PAINT REMOVED DURING DEMOLITION IS CONTAINED, COLLECTED, AND DISPOSED OF
THE CONTRACTOR SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER THAT ANY
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE EXISTING CONDUIT IN
THE BRIDGE CURBS. IN ORDER TO ENSURE THE EXISTING CONDUITS ARE NOT
DAMAGED DURING PLACEMENT OF THE CAST-IN-PLACE BARRIER RAIL, THE
CONTRACTOR SHALL BE REQUIRED TO DO THE FOLLOWING:
IT WILL BE NECESSARY TO SUPPORT THE EARTH AND/OR GRANULAR MATERIAL BEHIND
THE ABUTMENT DURING RECONSTRUCTION OF THE ABUTMENT BACKWALLS BY SOME
METHOD APPROVED BY THE ENGINEER. ALL COSTS FOR SUPPORTING THE EARTH
AND/OR GRANULAR MATERIAL SHALL BE INCLUDED IN THE PRICE BID FOR "CLASS
20 EXCAVATION".
ITEM "CONTAINMENT".
ITEMS INCLUDED IN THE BID ITEM "PAINTING STRUCTURAL STEEL" AND THE BID
FURNISHING AND INSTALLING RAISE PLATE ON EXPANSION DEVICE AS SHOWN EXCEPT
THE BID ITEM "STRUCTURAL STEEL" SHALL INCLUDE ALL COSTS ASSOCIATED WITH
ITEM "PAINTING STRUCTURAL STEEL".
PAINTING OF THE EXPANSION DEVICE AS NOTED IS TO BE INCLUDED IN THE BID
BECAUSE OF THE SMALL QUANTITY, ALL COST ASSOCIATED WITH CLEANING AND
AND RAISE PLATES ARE TO BE PAINTED. NO PAINTING OF OTHER STEEL IS REQUIRED.
THE COLOR OF CONCRETE. ONLY THE EXPOSED SURFACES OF THE EXPANSION DEVICE
EQUAL PRIMER AND FINAL COAT. THE COLOR OF THE DRY PAINT SHOULD APPROXIMATE
RUST-OLEUM PRIMER AND ONE COAT OF RUST-OLEUM FINAL COAT OR AN APPROVED
SURFACES OF THE COMPLETED EXPANSION DEVICE ARE TO BE GIVEN ONE COAT OF
STRUCTURES PAINTING COUNCIL SPECIFICATIONS SSPC-SP3. THE EXPOSED TOP
BLAST OR BY A NON-BLASTING METHOD AND IS TO COMPLY WITH THE STEEL
WELDING TO THE EXISTING EXPANSION DEVICE. THE CLEANING IS TO BE BY VACUUM
PLATES FOR THE EXPANSION DEVICE ARE TO BE CLEANED AND PAINTED AFTER FIELD
CORROSION AND PAINT IN PREPARATION FOR FIELD WELDING. THE 1•" THICK RAISE
SURFACES OF EXISTING EXPANSION DEVICE ARE TO BE CLEANED OF EXISTING
AND THE BID ITEM "CONTAINMENT".
SHOWN, EXCEPT ITEMS INCLUDED IN THE BID ITEM "PAINTING STRUCTURAL STEEL"
COSTS ASSOCIATED WITH FURNISHING AND INSTALLING THE EXPANSION DEVICE AS
THE BID ITEM "STEEL EXTRUSION JOINT WITH NEOPRENE" SHALL INCLUDE ALL
IS TO BE INCLUDED IN THE BID ITEM "PAINTING STRUCTURAL STEEL".
ASSOCIATED WITH CLEANING AND PAINTING OF THE EXPANSION DEVICE AS NOTED
STRUCTURAL STEEL IS REQUIRED. BECAUSE OF THE SMALL QUANTITY, ALL COST
DEVICE NOTED TO BE PAINTED ARE TO BE PAINTED. NO PAINTING OF OTHER
APPROXIMATE THE COLOR OF CONCRETE. ONLY THOSE SURFACES OF THE EXPANSION
APPROVED EQUAL PRIMER AND FINAL COAT. THE COLOR OF THE DRY PAINT SHOULD
COAT OF RUST-OLEUM PRIMER AND ONE COAT OF RUST-OLEUM FINAL COAT OR
EXPOSED SURFACES OF THE COMPLETED EXPANSION DEVICE ARE TO BE GIVEN ONE
WITH THE STEEL STRUCTURES PAINTING COUNCIL SPECIFICATIONS SSPC-SP3. THE
IS TO BE BY VACUUM BLAST OR BY A NON-BLASTING METHOD AND IS TO COMPLY
PAINTED AFTER FIELD WELDING TO THE EXISTING EXPANSION DEVICE. THE CLEANING
WELDING. THE NEW STEEL EXTRUSION TO BE PAINTED SHALL BE CLEANED AND
BE CLEANED OF EXISTING CORROSION AND PAINT IN PREPARATION FOR FIELD
SURFACES OF EXISTING EXPANSION DEVICE AS DETAILED IN THESE PLANS ARE TO
A SCRAPE SAMPLE WAS TAKEN FROM AN AREA OF THIS BRIDGE TO GET AN
INDICATION OF THE EXISTENCE OF AND LEVEL OF TOTAL CHROMIUM AND TOTAL
PPM. THESE ANALYSES SHOW THE EXISTENCE OF THESE TWO TOXIC
CONSTITUENTS. LEVELS INDICATED BY THESE TESTS COULD CREATE
CONDITIONS ABOVE REGULATORY LIMITS FOR HEALTH AND SAFETY
REQUIREMENTS. NO OTHER CONSTITUENTS WERE ANALYZED. THE BIDDER
SHOULD NOT RELY ON THE DEPARTMENT'S TESTING AND ANALYSIS FOR ANY
PURPOSE OTHER THAN AS AN INDICATION OF THE EXISTENCE OF THESE TWO
TOXIC CONSTITUENTS.
LEAD. ANALYSIS OF TOTAL LEAD ON THIS SAMPLE WAS ______ PARTS PER
MILLION (PPM). ANALYSIS OF TOTAL CHROMIUM ON THIS SAMPLE WAS ______
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1039s2 -
THIS
SH
EE
T
REIS
SU
ED 8-23-96.
STANDARD 1039s2
RE
VISI
ON 01-12 -
E461
NO
TE
WA
S
CH
AN
GE
D
TO
US
E
CL
AS
S
C
CO
NC
RE
TE I
NS
TE
AD
OF
CL
AS
S
D.
RE
VISI
ON 03-2017 -
THIS
SH
EE
T
VOI
D,
SE
E
BRI
DG
E
DE
SI
GN
MA
NU
AL F
OR
CU
RR
EN
T
NO
TE
S.
FOR CURRENT
REPAI
R NOTES
.
SEE BRI
DGE DES
IGN
MANUAL
THIS
SHEET VOI
D 03-0
1-20
17
VOID
VOID
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 12
REC
OM
MEN
DED
NO
T
PAVIN
G
NO
TC
H
BA
CK
WA
LL BEC
AUSE
OF
CO
NSID
ER
RE-
BUIL
DIN
G
2/27/2017 2:49:20 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1040 11x17_pdf.pltcfg
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
75'-0 RUNOUT SURFACE RAISE
______ OUT TO OUT OF DECK OVERLAY‚"
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
2
MI
N.
1ƒ
OVERLAY
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
"E" JOINT
ƒ"
MI
N.
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE NEW "CF" JOINT
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
"E" JOINT
NEW STEEL EXTRUSION JOINT
STANDARD SHEET 1040
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1040 -
THIS
SH
EE
T
RE
DR
AW
N 9-8-88.
AND PAINTED.
EXPANSION DEVICE IS TO BE CLEANED
THE VERTICAL FACE OF THE EXISTING
PART LONGITUDINAL SECTION ALONG ROADWAY PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
PAVEMENT
EXISTING APPROACH
OVERLAY
P.C.C. APPROACH
PAVEMENT
NEW APPROACH
TO TOP OF EXISTING BACKWALL
CLASS A BRIDGE DECK REPAIR
PAVEMENT
EXISTING APPROACH
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
PAVEMENT
EXISTING APPROACH
PAVEMENT
EXISTING APPROACH
EXTRUSIONS
NEW STEEL
MATERIAL TO BE U.A.C.
EXISTING EXPANSION JOINT
MATERIAL TO BE U.A.C.
EXISTING EXPANSION JOINT
PAVEMENT
NEW APPROACH
PAVEMENT
NEW APPROACH
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF BACKWALL
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF BACKWALL
AND NO SEPARATE PAYMENT WILL BE MADE
INCIDENTAL TO THE COST OF OTHER CONSTRUCTION
CLEANING AND SEALING THE JOINT IS CONSIDERED
THE STANDARD SPECIFICATIONS. THE COST OF
IN ACCORDANCE WITH ARTICLE 4136.02, A, 1, OF
AND SEALED WITH HOT POURED JOINT SEALER
HAS BEEN PLACED, THE JOINT IS TO BE CLEANED
IS TO BE REMOVED. AFTER THE NEW SURFACE
TOP PORTION OF EXISTING JOINT FILLER (2"})
DECK REPAIR DETAILS
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF DECK
1ƒ
OV
ER
LA
Y
1•
SU
RF
AC
E
RAIS
E
‚"
TOP OF OVERLAY
EXISTING SURFACE
REMOVE EXISTING
JOINT MATERIALS.
EXISTING APPROACH
PAVEMENT
_____ ABUTMENT
‚" BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY
CLASSIFICATION LINE (BOUNDARY
(SEE ROAD SHEETS)
H.M.A. RUNOUT TAPER
(SEE ROAD SHEETS)
H.M.A. RUNOUT TAPER
NEW CONSTRUCTION WORK.
BARS SHALL BE CAREFULLY EXPOSED AND INCORPORATED INTO THE
TOP MAT OF REINFORCING. THE EXISTING BRIDGE DECK REINFORCING
BE REMOVED TO A MINIMUM DEPTH 1 INCH BELOW THE EXISTING
THE 2'-0 CLASS "A" REPAIR AREA SHOWN AT THE JOINT SHALL
NOTE:
NEW "CF" JOINT
CLASS "A"
2'-0
2'-0
CLASS "A"
______ ABUTMENT ______ ABUTMENT
______ ABUTMENT
______ ABUTMENT
______ ABUTMENT
______ ABUTMENT
2'-0
CLASS "A"
PART LONGITUDINAL SECTION ALONG ROADWAY
"E" JOINT
CLASSIFICATION LINE (BOUNDARY
BELOW TOP OF EXIST. SURFACE)
BETWEEN REPAIR AND OVERLAY, ‚"
CLASSIFICATION LINE (BOUNDARY BETWEEN
CLASSIFICATION LINE CLASSIFICATION LINE
WITHIN RUNOUT SURFACE RAISE)
TO 1ƒ" BELOW TOP OF EXISTING SURFACE
REPAIR AND OVERLAY, VARIES FROM ‚"
SURFACE
EXISTING
1ƒ
PAVEMENT
NEW APPROACH
JOINT (U.A.C.)
EXISTING FINGER
DEVICE TO BE REUSED.
EXISTING EXPANSION
PORTION OF
______ OUT TO OUT OF DECK OVERLAY ______ OUT TO OUT OF DECK OVERLAY
______ OUT TO OUT OF DECK OVERLAY
______ OUT TO OUT OF DECK OVERLAY ______ OUT TO OUT OF DECK OVERLAY
______ OUT TO OUT OF DECK OVERLAY
______ OUT TO OUT OF DECK OVERLAY
______ ABUTMENT
TOP OF FINAL RIDING SURFACE
PART LONGITUDINAL SECTION ALONG ROADWAY
RE
VIS
ED 10-12 -
AD
DE
D 2'-
0
CL
AS
S
A
RE
PAIR
AT J
OI
NT
S
SH
OW
N
&
BO
RD
ER
ED
NO
TE. A
DD
ED
RE
PAIR
DE
TAIL
AN
D
RE
PAIR
DE
TAILS
FR
OM
VOI
DE
D 1041 S
TA
ND
AR
D.
ROAD STANDARD
SEALER - SEE BR-111
NEW BACKER ROPE AND
(SEE BR-111 ROAD STANDARD)
P.C.C. RUNOUT TAPER
(SEE BR-111 ROAD STANDARD)
P.C.C. RUNOUT TAPER
‚"
TO BE U.A.C.
EXISTING ‚" RESILIENT JOINT FILLER
RE
VIS
ED 03-2017 -
CH
AN
GE
D
RE
FE
RE
NC
E
TO
RO
AD
ST
AN
DA
RD
BR-111. (
WA
S
RK-17).
CH
AN
GE
D
NO
TE
ST
ATI
NG "E
XIS
TI
NG ‚" R
ESILIE
NT J
OI
NT
FIL
LE
R
TO
BE
U.A.C." (W
AS
PR
EF
OR
ME
D J
OI
NT
FIL
LE
R).
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 13
REC
OM
MEN
DED
NO
T
PAVIN
G
NO
TC
H
BA
CK
WA
LL BEC
AUSE
OF
CO
NSID
ER
RE-
BUIL
DIN
G
2/27/2017 2:49:22 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1040R 11x17_pdf.pltcfg
NO
SU
RF
AC
E
RAIS
E
75'-0 RUNOUT SURFACE RAISE
2" O
VE
RL
AY
______ OUT TO OUT OF DECK RE-OVERLAY
‚"‚"
MI
N.
"E" JOINT
NEW "CF" JOINT "E" JOINT
AND PAINTED.
EXPANSION DEVICE IS TO BE CLEANED
THE VERTICAL FACE OF THE EXISTING
PART LONGITUDINAL SECTION ALONG ROADWAY PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY PART LONGITUDINAL SECTION ALONG ROADWAY PART LONGITUDINAL SECTION ALONG ROADWAY
PART LONGITUDINAL SECTION ALONG ROADWAY
PAVEMENT
EXISTING APPROACH
OVERLAY
P.C.C. APPROACH
PAVEMENT
NEW APPROACH
TO TOP OF EXISTING BACKWALL
CLASS A BRIDGE DECK REPAIR
PAVEMENT
EXISTING APPROACH
PAVEMENT
EXISTING APPROACH
PAVEMENT
EXISTING APPROACH
MATERIAL TO BE U.A.C.
EXISTING EXPANSION JOINT
MATERIAL TO BE U.A.C.
EXISTING EXPANSION JOINT
PAVEMENT
NEW APPROACH
PAVEMENT
NEW APPROACH
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF BACKWALL
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF BACKWALL
TOP OF RE-OVERLAY
SURFACE
EXISTING
LINE
CLASSIFICATION
ORIGINAL
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
STANDARD SHEET 1040R
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1040
R -
THIS
SH
EE
T IS
SU
ED 10-12.
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
NO
SU
RF
AC
E
RAIS
E
2" O
VE
RL
AY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
CLASSIFICATION LINE (BOUNDARY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
LINE
CLASSIFICATION
ORIGINAL
SURFACE
EXISTING
TOP OF RE-OVERLAY
2"
STEEL EXTRUSION JOINT
_____ ABUTMENT _____ ABUTMENT _____ ABUTMENT
_____ ABUTMENT_____ ABUTMENT
_____ ABUTMENT
_____ ABUTMENT
2'-0
CLASS "A"
2'-0
CLASS "A"
2'-0
CLASS "A"
2'-0
CLASS "A"
4"
WILL BE MADE.
CONSTRUCTION AND NO SEPARATE PAYMENT
CONSIDERED INCIDENTAL TO THE COST OF OTHER
SPECIFICATIONS. THE COST OF THE JOINT IS
WITH SECTION 4136, OF THE STANDARD
THE JOINT IS TO BE REPLACED IN ACCORDANCE
THE EXISTING JOINT FILLER IS TO BE REMOVED.
FILLER
NEW JOINT
JOINT
EXTRUSION
NEW STEEL
RE-OVERLAY DECK REPAIR DETAILS
JOINT MATERIALS
REMOVE EXISTING
PAVEMENT
EXISTING APPROACH
TOP OF RE-OVERLAY
(STRUCTURAL CONCRETE CLASS C)
NEW PORTION OF DECK
(SEE ROAD SHEETS)
H.M.A. RUNOUT TAPER
(SEE ROAD SHEETS)
H.M.A. RUNOUT TAPER
NEW "CF" JOINT
NEW CONSTRUCTION WORK.
BARS SHALL BE CAREFULLY EXPOSED AND INCORPORATED INTO THE
TOP MAT OF REINFORCING. THE EXISTING BRIDGE DECK REINFORCING
BE REMOVED TO A MINIMUM DEPTH 1 INCH BELOW THE EXISTING
THE 2'-0 CLASS "A" REPAIR AREA SHOWN AT THE JOINT SHALL
NOTE:
ƒ"
MI
N.
PART LONGITUDINAL SECTION ALONG ROADWAY
"E" JOINT
CLASSIFICATION LINE (BOUNDARY CLASSIFICATION LINE (BOUNDARY BETWEEN
CLASSIFICATION LINE CLASSIFICATION LINE
2"
TYPICAL BOTH ABUTMENTS
PAVEMENT
NEW APPROACH
JOINT (U.A.C.)
EXISTING FINGER
FOR FIRST OVERLAY)
‚" BELOW CLASSIFICATION LINE
BETWEEN REPAIR AND RE-OVERLAY,
EXISTING SURFACE
LINE
CLASSIFICATION
ORIGINAL
WITHIN RUNOUT SURFACE RAISE)
CLASSIFICATION LINE FOR FIRST OVERLAY
REPAIR AND RE-OVERLAY, ‚" BELOW
TOP OF FINAL RIDING SURFACE
______ OUT TO OUT OF DECK RE-OVERLAY ______ OUT TO OUT OF DECK RE-OVERLAY ______ OUT TO OUT OF DECK RE-OVERLAY
______ OUT TO OUT OF DECK RE-OVERLAY ______ OUT TO OUT OF DECK RE-OVERLAY______ OUT TO OUT OF DECK RE-OVERLAY
______ OUT TO OUT OF DECK RE-OVERLAY
PART LONGITUDINAL SECTION ALONG ROADWAY
‚"
‚"
‚"
‚"
‚"
‚"
‚"
(SEE BR-111 ROAD STANDARD)
P.C.C. RUNOUT TAPER
ROAD STANDARD
SEALER - SEE BR-111
NEW BACKER ROPE AND
(SEE BR-111 ROAD STANDARD)
P.C.C. RUNOUT TAPER
RE
VIS
ED 03-2017 -
CH
AN
GE
D
RE
FE
RE
NC
E
TO
RO
AD
ST
AN
DA
RD
BR-111. (
WA
S
RK-17).
CH
AN
GE
D
NO
TE
ST
ATI
NG "E
XIS
TI
NG ‚" R
ESILIE
NT J
OI
NT
FIL
LE
R
TO
BE
U.A.C." (W
AS
PR
EF
OR
ME
D J
OI
NT
FIL
LE
R).
TO BE U.A.C.
EXISTING ‚" RESILIENT JOINT FILLER
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 14
2/27/2017 2:49:23 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1042 11x17_pdf.pltcfg
DECK REPAIR - APPROACH PAVEMENT STANDARD SHEET 1042
= 2•
PIN DIAMETER
APPROACH PAVEMENT DETAILS
APPROACH PAVEMENT QUANTITIES
THRU APPROACH PAVEMENT
PART LONGITUDINAL SECTION
GRANULAR BACKFILL DETAILS
SECTION A-A
SECTION B-B
SECTION A-A
†"½ BARS
1" "E"
JOINT
15'-0 3ƒ}• 3ƒ}•
1'-0 2•
CL.
1'-0
VA
RIE
S
4 SPA. @ 0'-6
= 2'-0
6 6
3ƒ}•3'-0
10
NO
MI
NA
L
P.C.C. APPROACH OVERLAY.
1•
SUBGRADE ELEVATION
2'-0
1
1
6}
PAVEMENT
EXISTING
PAVEMENT
OF EXISTING
MATCH ELEVATION
EXCAVATION.
PAY LIMITS FOR CLASS 20
BACKFILL.
COMPACTED GRANULAR
‚" RADIUS
EDGE TO
PAVEMENT.
EXISTING APPROACH
SURFACE.
EXISTING ROADWAY
‚" RADIUS
EDGE TOTOP OF OVERLAY
EXPOSE AND INCORPORATE INTO NEW WORK.
EXISTING †"½ LONGITUDINAL BARS; CAREFULLY
BACKFILL BETWEEN WINGS.
PAY LIMITS FOR GRANULAR
TARPAPER.
TWO LAYERS OF
10
1'-3
MIN. LAP
KEYWAY †"½ BARS
10
KEYWAY †"½ BARS
1'-3
MIN. LAP
2ƒ
1ƒ
2ƒ
1ƒ
STAGE º CONSTRUCTION
STAGE º CONSTRUCTION
STAGE » CONSTRUCTION
STAGE » CONSTRUCTION
1„}
1„}
†"½ x 3'-0 DOWEL
TOTAL (SQ. YD.)
REQUIRED AT
NOTE:
ALL APPROACH PAVEMENT REINFORCING IS TO BE #5 BARS.
APPROACH PAVEMENT REINFORCING AND JOINT MATERIAL TO
BE INCLUDED IN PRICE BID FOR "BRIDGE APPROACH SECTION
REINFORCED AS PER PLAN".
THE "E" JOINTS SHALL BE SEALED AS DIRECTED BY THE
STANDARD SPECIFICATIONS.
THE CONCRETE USED FOR THE APPROACH PAVEMENT SHALL
SPECIFICATIONS FOR CONCRETE PAVING, INCLUDING VIBRATION.
BE PAVEMENT MIX AND PLACED IN ACCORDANCE WITH THE CURRENT
1'-
6
SEE THE FOLLOWING IOWA D.O.T. ROAD STANDARDS
FOR DETAILS OF JOINT MATERIALS:
BARS.
SHALL BE STRAIGHTENED TO LAP WITH THE †"½ TRANSVERSE
BAR. AFTER STAGE » PAVEMENT REMOVAL THE †"½ DOWEL
THE †"½ x 3'-0 DOWEL SHALL BE FABRICATED AS A BENT
NOTE:
QUANTITYLOCATION
ABUTMENT - STAGE º
ABUTMENT - STAGE »
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1042 -
THIS
SH
EE
T
RE
DR
AW
N 9-8-88.
NEW †"½ BARS
1'-6
ENGINEER. THE SEALER SHALL BE AS SPECIFIED IN THE
BRIDGE CONTRACTOR.
"CF" JOINT BY THE
BY THE BRIDGE CONTRACTOR
FURNISHED AND PLACED
"CF" JOINTS TO BE
BRIDGE CONTRACTOR
JOINT MATERIAL BY THE
1" RESILIENT EXPANSION
RE
VIS
ED 03-2017 -
CH
AN
GE
D
NO
TE
ST
ATI
NG "1" R
ESILIE
NT
EX
PA
NSI
ON J
OI
NT
MA
TE
RI
AL
BY
TH
E
BRI
DG
E
CO
NT
RA
CT
OR" (W
AS
PR
EF
OR
ME
D
EX
PA
NSI
ON J
OI
NT
FIL
LE
R).
RE
VIS
ED:
RO
AD
ST
AN
DA
RD
DE
SI
GN
ATI
ON
DE
LE
TE
D
FR
OM
NO
TE
S.
AR
CH.
TA
PE
NO. 9
DA
TE
D 7-12-89.
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 15
2/27/2017 2:49:24 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1045 11x17_pdf.pltcfg
INCLUSIVE, EXAMPLE "WWF 3`x`3 - W1.4`x`W2.9".
PER ASTM A-641. THE WWF WIRES SHALL BE SPACED 3`x`3 OR 4`x`4 AND
THE WIRES SHALL HAVE A NOMINAL AREA OF 0.014 TO 0.029 SQUARE INCHES
(BRIDGE SEAT)
HORIZONTAL SURFACE
(IF REQ'D.)
ANCHORS
CONCRETE
SURFACE
CONCRETE
FORMED
ƒ" MIN.
(TYP.)
SAW CUT
•"½ CONCRETE ANCHOR
1•
MA
X.
*`ƒ" MIN. CLEAR
*`INDICATES CLEARANCE FOR AN UN-BONDED REBAR.
•"½ CONCRETE ANCHOR
`SHALL BE TREATED AS AN UN-BONDED REBAR.
~`IF MORE THAN • OF THE REBAR IS EXPOSED IT
(TYP.)
SAW CUT
(NO
FO
RM
S)
RE
PAIR
(FO
RM
ED)
RE
PAIR
REPAIRING THE STRUCTURAL CONCRETE SHALL BE IN ACCORDANCE WITH
SECTION 2426, OF THE STANDARD SPECIFICATIONS.
RE
VIS
ED 10-14 -
DE
LE
TE
D
AL
L
RE
FE
RE
NC
ES
TO
GR
OU
T. S
EC
TI
ON 2426
CO
VE
RS
THIS
RE
QUIR
EM
EN
T
AN
D
DO
ES
N'T
NE
ED
TO
ST
AT
ED
ON
TH
E
PL
AN
S.
ESTIMATED CONCRETE REPAIR QUANTITIES
REPAIR NOTES:
ALL THE COSTS OF EQUIPMENT AND MATERIALS REQUIRED TO REPAIR THE
CONCRETE ANCHORS AND WELDED WIRE FABRIC REQUIRED BY THE PLANS.
AND WWF SEE THE REPAIR NOTES.
FOR SPACING AND USE OF CONCRETE ANCHORS
CONCRETE PLACEMENT QUANTITIES
VERTICAL FACE
REGULAR REPAIR
VERTICAL FACE
SHALLOW REPAIR
CORNER REPAIR
ANCHOR DETAIL
REPAIR DEFINITION
ADJACENT TO REINFORCING
CONCRETE REMOVAL
BOTTOM SURFACE
SHALLOW REPAIR
THESE PLANS SHALL BE REPAIRED AS FOLLOWS:
THE ENGINEER SHALL DETERMINE AND OUTLINE BY VISUAL AND AUDIBLE
FOOT BASIS BASED ON THE PRICE BID PER SQUARE FOOT.
ALL EXISTING REINFORCING BARS THAT ARE EXPOSED BY CONCRETE REMOVAL
REQUIREMENTS OF IOWA D.O.T. MATERIALS I.M. 453.09 AND THE PULL OUT LOAD
INSTALLED ACCORDING TO RECOMMENDATIONS OF THE MANUFACTURER. THE
COST OF FURNISHING AND INSTALLING THE CONCRETE ANCHORS SHALL BE
INCLUDED IN THE PRICE BID FOR "CONCRETE REPAIR".
THE WELDED WIRE FABRIC SHALL BE ASTM A185 AND GALVANIZED AS
WHERE REINFORCEMENT HAS BEEN EXPOSED AND CLEARANCE AROUND THE
PERIPHERY OF THE EXISTING BAR IS PROVIDED NO SUPPLEMENTAL REIN-
FORCING IS REQUIRED, EXCEPT WHERE EXISTING REINFORCEMENT DENSITY
AND PATTERN ARE SUCH THAT INDIVIDUAL OPEN SPACES BETWEEN BARS ARE
AND WELDED WIRE FABRIC SHALL BE INSTALLED AT THE RATE OF ONE
CONCRETE ANCHOR WITH WWF PER EACH 1.5 SQUARE FEET OF AREA WITHIN EACH
SHALL BE CLEANED AND CAREFULLY INCORPORATED INTO THE NEW WORK, EXCEPT
BADLY DETERIORATED EXISTING REINFORCING WHICH SHALL BE REPLACED
SHALL BE PAID FOR THE ACTUAL AMOUNT OF REPAIRS MADE ON A SQUARE
THE PRICE BID FOR "CONCRETE REPAIR" SHALL INCLUDE THE COST OF ALL
OPEN SPACE.
AS DIRECTED BY THE ENGINEER.
MARK
1
2
TYPE UNITS
UNITS
QUANTITY
AMOUNT
REGULAR REPAIR
SHALLOW REPAIR SQ. FT.
SQ. FT.
SQ. FT.
TOTAL (SQ. FT.)
REPAIR
SHALLOW
REPAIR
REGULAR
ALL SIDES
ƒ" SAW CUT
CONCRETE
SOUND
REPAIR
SHALLOW
CURING COMPOUND
ƒ" SAW CUT
VERTICAL FACE
UNDERCUT
ƒ" SAW CUT
FO
RM
ED
RE
GU
LA
R
REGULAR REPAIR
CONCRETE
SOUND
EXISTING
REQUIRED
FORMS NOT
ƒ" MIN.
BEVEL TOP CUT
UNDERCUT
(U.A.C.)
REINFORCING
EXISTING
1• MAX.
CONCRETE
SOUND
EXISTING
2
MIN.
1" MIN. CL.
REPAIR
CONCRETE
SURFACE
CONCRETE
FORMED
WELDED WIRE FABRIC
CONCRETE
SOUND
SURFACE
ORIGINAL
FORMS
BEVEL TOP CUT
UNDERCUT
(U.A.C.)
REINFORCING
EXISTING
SOUND CONCRETE
ƒ" MIN. CL. OR TO
1• MIN.
CONCRETE
SOUND
EXISTING
REPAIR AREA
BAR
REINFORCING
EXPOSED BAR
ACCEPTABLE
BONDED AREA
DESCRIPTION
SH
AL
LO
W
EXISTING
SOUND
CONCRETE
CONCRETE REPAIR
CONCRETE
SOUND
EXISTING
(IF REQ'D.)
WIRE FABRIC
WELDED
(LENGTH VAR.)
MACHINE BOLT
•"½ GALVANIZED
COATED WIRE
WITH 14 GA. VINYL
TO BOLTS
FASTEN FABRIC
`EXPOSED
`CIRCUMFERENCE
~`UP TO • OF BAR
TO BE REMOVED
ALL UN-BONDED AREAS
BAR
REINFORCING
MIN.
ƒ"
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1045 -
THIS
SH
EE
T
RE
DR
AW
N 9-27-90.
STANDARD SHEET 1045
THE CONCRETE ANCHORS REQUIRED SHALL HAVE A MINIMUM PULL OUT OF
INSPECTION THE ACTUAL AREAS OF THE CONCRETE REPAIRS. THE CONTRACTOR
THE SPALLED AND HOLLOW AREAS OF THIS BRIDGE AS NOTED AND SHOWN IN
PRICE BID FOR "CONCRETE REPAIR".
OF 1.5 SQUARE FOOT OR LARGER. FOR THIS CONDITION •"½ CONCRETE ANCHORS
ABOVE IS REQUIRED. THE ANCHORS SHALL BE GALVANIZED AND SHALL BE
5000 LBS. BASED ON 4000 PSI CONCRETE. AN ANCHOR MEETING THE
CONCRETE
SOUND
EXISTING
CONCRETE REPAIRS
ƒ" MIN. CLEAR
1•
MA
X.
ƒ"
MI
N.
SPALLED AND HOLLOW AREAS OF THIS BRIDGE SHALL BE INCLUDED IN THE
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 16
2/27/2017 2:49:25 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1055 11x17_pdf.pltcfg
S
67•
6• 7
67•
82'-
7•
1'-10
1'-8
4'-
6
7•
5 MAX. 5 MAX.
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
BEAM END REPAIR DTLS. & NOTES
AREAS
REGULAR REPAIR
BEAM SECTION
AREAS
SHALLOW REPAIR
BEAM LINE NO. 1
BEAM LINE NO. 2
BEAM LINE NO. 3
BEAM LINE NO. 4
BEAM LINE NO. 5
BEAM LINE NO. 6
| S. ABUT. BRG. | PIER 1 | PIER 2 | PIER 3
MATERIAL
PATCHING
MATERIAL
PATCHING
BEAM END REPAIR NOTES:
BASF
EUCLID
SIKA
BONDING AGENT SHALLOW REPAIRMANUFACTURER
VERTICOAT SUPREME
SIKATOP 123 PLUS SIKATOP 111 PLUS
REGULAR REPAIR
EUCOREPAIR SCC
TABLE OF MANUFACTURERS
1"
P 124
MASTEREMACO
DURALPREP A.C.
110 EPOCEM
SIKA ARMATEC
LIMITS OF SANDBLASTING
*
| PIER 4 | PIER 5 | N. ABUT. BRG.
*
*
OF BEAM ENDS TO BE REPAIRED SEE BEAM LAYOUT BELOW.
TO BE REPAIRED WILL BE DETERMINED BY THE ENGINEER. FOR LOCATION
NOTE: THE REPAIR AREAS SHOWN ARE SCHEMATIC ONLY. THE ACTUAL AREA
TO 6 FEET OF THE BEAM ENDS.
FLANGE AND WEB WITHIN THE LIMITS SHOWN
* SANDBLAST THE SURFACES OF THE BOTTOM
- REGULAR BEAM END REPAIR LOCATIONS
- SHALLOW BEAM END REPAIR LOCATIONS
PRESTRESSED CONCRETE BEAM END REPAIR DETAILS
S 477Cº
MASTEREMACO
N 350 Cº
MASTEREMACO
BEAM LINE NO. 1
BEAM LINE NO. 2
BEAM LINE NO. 3
BEAM LINE NO. 4
BEAM LINE NO. 5
BEAM LINE NO. 6
| S. ABUT. BRG. | PIER 1 | PIER 2 | PIER 3 | PIER 4 | PIER 5 | N. ABUT. BRG.
BEAM LINE NO. 1
BEAM LINE NO. 2
BEAM LINE NO. 3
BEAM LINE NO. 4
BEAM LINE NO. 5
BEAM LINE NO. 6
| S. ABUT. BRG.| PIER 1| PIER 2| PIER 3| PIER 4| PIER 5| N. ABUT. BRG.
BEAM LAYOUT
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1055 -
THIS
SH
EE
T IS
SU
ED 03-01-2017.
MANUFACTURERS AS N
EEDED.
PROVIDE PRODUCT AND
YOUR STRUCTURE A
S NEEDED.
PROVIDE SITUATION P
LAN FOR
YOUR STRUCTURE A
S NEEDED.
PROVIDE SITUATION P
LAN FOR
YOUR STRUCTURE A
S NEEDED.
PROVIDE SITUATION P
LAN FOR
YOUR STRUCTURE
AS NEEDED.
PROVIDE
BEAM SECTI
ONS FOR
MATERIAL.
8. APPLY CONCRETE SEALER TO SANDBLASTED PORTIONS OF BEAMS ENDS. DO NOT SEAL PATCHING
BE INCLUDED IN THE PRICE BID FOR "REPAIR BEAM ENDS".
DO NOT SANDBLAST PATCHING MATERIAL. ALL COSTS ASSOCIATED WITH SANDBLASTING ARE TO
SANDBLASTING SHALL BE A LIGHT BLAST JUST ENOUGH TO EXPOSE THE FINE AGGREGATES.
7. SANDBLAST 6 FEET OF THE ENDS OF THE REPAIRED BEAMS AS SHOWN ON THIS SHEET. THE
PROCEDURES AND/OR AS DIRECTED BY THE ENGINEER:
THE CONTRACTOR SHALL PERFORM THE CONCRETE REPAIR WORK IN ACCORDANCE WITH THE FOLLOWING
REMOVAL TOOLS SHALL BE LIMITED TO 15 LB. CHIPPING HAMMERS AND TO HAND TOOLS WITHOUT POWER.
PROJECT IN ORDER TO NOT DELAY THE PROJECT.
SHALL INCORPORATE THIS TIME INTO THE CONSTRUCTION SCHEDULE WITH WORK IN OTHER AREAS OF THE
ADEQUATE TIME (7 DAYS MAX.) TO DETERMINE WHETHER BEAM REINFORCING IS REQUIRED. THE CONTRACTOR
WORK, TO THE ENGINEER PRIOR TO PERFORMING ANY REPAIR WORK. THE ENGINEER SHALL BE GIVEN
THE CONTRACTOR SHALL REPORT TENDON OR REINFORCING BAR SECTION LOSS, EXPOSED DURING REMOVAL
MORTAR.
LOCATION TO ALLOW INSPECTION BY THE ENGINEER PRIOR TO PLACEMENT OF CONCRETE OR REPAIR
THE CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN CONCRETE REMOVALS ARE COMPLETE BY EACH
END AREAS SHALL BE DETERMINED BY THE ENGINEER.
IT IS ESTIMATED THAT ????? BEAM END WILL BE REPAIRED. THE FINAL QUANTITY AND LIMITS OF BEAM
MIXING, PLACING AND CURING.
PATCH NEED NOT BE FORMED. FOLLOW MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR
CONTAIN CORROSION INHIBITORS. APPLY PATCHING MATERIAL TO MATCH ORIGINAL BEAM SURFACE.
PATCHING MATERIAL SHALL BE AS LISTED IN THE TABLE ON THIS SHEET. PATCHING MATERIALS
BARS OR PRESTRESSING STRANDS BEING EXPOSED FOR MORE THAN HALF THEIR DIAMETERS.
SHALLOW REPAIR AREAS ARE THOSE WHERE CONCRETE REMOVAL DID NOT RESULT IN REINFORCING
A. SHALLOW REPAIR:
FORMS ARE TO REMAIN IN PLACE FOR SEVEN DAYS.
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR MIXING, PLACING AND CURING.
THE TABLE ON THIS SHEET. PATCHING MATERIALS CONTAIN CORROSION INHIBITORS. FOLLOW
THE ORIGINAL BEAM SURFACE. PATCHING MATERIAL SHALL BE ONE OF THE GROUTS AS LISTED IN
BARS AND/OR PRESTRESSING STRANDS. THESE AREAS ARE TO BE PLACED USING FORMS TO MATCH
REGULAR REPAIR AREAS ARE THOSE WHERE CONCRETE REMOVAL EXTENDED BEHIND THE REINFORCING
B. REGULAR REPAIR:
WILL BE PAID THE CONTRACT UNIT PRICE PER EACH REPAIR.
ENDS". THE ENGINEER WILL COUNT EACH END OF EACH BEAM PROPERLY REPAIRED, AND THE CONTRACTOR
DETAILED IN THESE PLANS. THESE DETAILS SHALL BE INCLUDED IN THE PRICE BID FOR "REPAIR BEAM
ALL COSTS INCLUDE EQUIPMENT AND MATERIALS REQUIRED TO REPAIR DETERIORATED BEAM ENDS AS
THE EXTENT OF CONCRETE REMOVAL AND THE TWO TYPES OF REPAIR ARE TO BE AS FOLLOWS:
6. APPLY PATCHING MATERIAL. TYPE OF MATERIAL AND APPLICATION OF MATERIAL DEPENDS UPON
MANUFACTURER'S RECOMMENDATIONS.
ON THIS SHEET) TO EXPOSED PRESTRESSING STRANDS AND REINFORCING BARS ACCORDING TO
5. APPLY TWO COATS OF PROTECTIVE COATING/BONDING AGENT (PRODUCTS ARE LISTED IN THE TABLE
EXPOSED DURING REMOVALS.
4. REPORT TO THE ENGINEER, PRIOR TO REPAIR, SECTION LOSS OF TENDONS OR REINFORCING STEEL
CONTACT THE ENGINEER PRIOR TO REMOVAL.
THE FIRST INTERIOR STRAND. IF REMOVALS COULD EXCEED THE 5" MAXIMUM HORIZONTAL DEPTH,
PRESTRESSING STRAND BEING EXPOSED, THEN REMOVAL SHALL CONTINUE TO A MINIMUM OF ƒ" BEHIND
3. IF CONCRETE REMOVAL RESULTS IN MORE THAN HALF THE DIAMETER OF ANY REINFORCING BAR OR
USING CLEAN COMPRESSED AIR.
STEEL TO BARE METAL. REMOVE ALL DUST AND DEBRIS RESULTING FROM CHIPPING AND BLASTING BY
WITH NO FEATHERED EDGES. SANDBLAST CONCRETE SURFACES IN THE REPAIR AREA AND THE EXPOSED
2. REMOVE DETERIORATED AREAS TO SOUND CONCRETE AND CHIP SQUARE. BOUNDARIES TO BE SQUARE
BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.
BARS ARE NOT DAMAGED. ANY DAMAGE DONE TO THE STRANDS OR BARS BY THE CONTRACTOR SHALL
CARE SHALL BE EXERCISED DURING CONCRETE REMOVAL SO THAT EXPOSED STRANDS AND REINFORCING
SAW CUT AS REQUIRED TO PREVENT CUTTING OF EXISTING REINFORCING STEEL OR STRANDS. EXTREME
AT CORNERS. STOP SAW CUTS SHORT OF CORNERS AND REMOVE CONCRETE BY HAND. ADJUST DEPTH OF
1. INITIATE REMOVAL OF UNSOUND CONCRETE WITH •" SAW CUTS AT PERIMETER. DO NOT CROSS CUT
REMOVAL
LIMITS OF
STANDARD SHEET 1055
Page 17
2/27/2017 2:49:26 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1057s1 11x17_pdf.pltcfg
1'-0 VARIES
VARIES
1'-0
8„
1'-
62
6‚
1̂
1'-3•
8„
1'-
6
2
1̂
1'-3•
6‚
3†
MATERIAL
PATCH
IMPACT AREA REPAIR DETAIL
MIN.MIN.
( TYPICAL )
1‚ MIN. ( TYP.)
ROUND CORNER
1‚ MIN. ( TYP.)
ROUND CORNER
NOTE BELOW
SEE REPAIR
ALL CONCRETE SHALL BE CLASS "O" STRUCTURAL CONCRETE.
SPECIFICATIONS (•" MAXIMUM SIZE).
THE COARSE AGGREGATE SHALL BE AS DESCRIBED IN ARTICLE 4115.05 OF THE STANDARD
TO ORIGINAL DIMENSIONS.
INSTALLED. FORMS SHALL BE POSITIVELY HELD IN THE PROPER POSITION TO RESTORE BEAM
WHEN SURFACE PREPARATION AND CLEANING IS COMPLETE THE NECESSARY FORMS ARE TO BE
SPALLING OR REMOVAL OF LOOSE AND UNSOUND CONCRETE.
REQUIREMENTS WHEN THE REINFORCING STEEL HAS BEEN EXPOSED AS A RESULT OF CONCRETE
REFER TO ARTICLE 2426.03, B OF THE STANDARD SPECIFICATION FOR SURFACE PREPARATION
CONCRETE COVERED WITH WET BURLAP FOR AT LEAST 7 DAYS.
THE REPAIRED SURFACES SHALL BE CURED BY LEAVING THE FORMS IN PLACE AND ANY EXPOSED
APPLICATION OF FRP LAMINATES.
THE EPOXY INJECTION OF CRACKS AFTER THE CONCRETE PATCH HAS CURED AND BEFORE
PERSONNEL. COORDINATION WILL BE REQUIRED WITH IOWA D.O.T. PERSONNEL TO ALLOW FOR
EPOXY INJECTION OF CRACKS DUE TO BEAM COLLISION DAMAGE WILL BE DONE BY IOWA D.O.T.
ADHESION BETWEEN THE FRP LAMINATE AND CONCRETE SURFACE.
ALL INTERIOR CORNERS SHALL BE GROUND SMOOTH TO ENSURE PROPER
REPAIR NOTE:
FRP
BEAM REPAIR NOTES:
FRP LAMINATE REPLACEMENT
LAMINATES.
VERTICALLY FOR
SHALL BE ORIENTED
REQUIRED ). FIBERS
OF LAST WRAP ( NO LAP
AT THE ENDING POINT
BE STARTED ( BUTTED )
FRP LAMINATES SHALL
CONTRACTOR ON APPLICATION AND PLACEMENT OF FRP LAMINATES.
BEAMS". THE MANUFACTURER OF FRP LAMINATES SHOULD BE PRESENT TO ADVISE THE BRIDGE
CONCRETE CONTAINMENT OF COLLISION DAMAGED PRETENSIONED PRESTRESSED CONCRETE
THE DEVELOPMENTAL SPECIFICATIONS FOR "FIBER REINFORCED POLYMER REPAIR FOR
SPECIFICATIONS FOR FIBER REINFORCED POLYMER (FRP) REPAIR OF BEAMS ARE INCLUDED IN
"BEAM REPAIR, AS PER PLAN".
WITH THE FRP LAMINATE REPLACEMENT SHALL BE INCLUDED IN THE LUMP SUM PRICE FOR
COLLISION DAMAGED PRETENSIONED PRESTRESSED CONCRETE BEAMS". ALL COSTS ASSOCIATED
SPECIFICATIONS FOR "FIBER REINFORCED POLYMER REPAIR FOR CONCRETE CONTAINMENT OF
LAMINATE APPLICATION SHALL CONFORM TO THE REQUIREMENTS OF THE DEVELOPMENTAL
LAMINATE ROUGHENED WITHIN THE LIMITS OF THE LAP. THE SURFACE PREPARATION AND FRP
THE EXISTING FRP LAMINATE TO RECEIVE THE LAP SHALL HAVE ALL PAINT REMOVED AND FRP
BEYOND WHERE DAMAGE IS DETECTED. WHERE OVERLAP OF THE FRP LAMINATES ARE NECESSARY,
TRANSVERSE AXIS OF THE BEAM. LIMITS OF REMOVAL SHALL BE A MINIMUM OF 6 INCHES
NOT DAMAGED. REMOVAL SHALL BE TO STRAIGHT LINES PARALLEL TO THE LONGITUDINAL OR
BY GRINDING. CARE SHALL BE TAKEN DURING GRINDING SO CONCRETE SURFACE OF BEAMS IS
THE PORTIONS OF DAMAGED FRP LAMINATE ON BEAM #?? ?? BOUND ???? SHALL BE REMOVED
AND NO. ?? ON ?? BOUND ????
REPAIR DETAILS FOR BEAM NO. ??, ??, ?? AND ?? ON ?? BOUND ????
BEAM FRP REPAIR DETAILS
1‚ MIN. ( TYP.)
ROUND CORNER
1‚ MIN. ( TYP.)
ROUND CORNER
NOTE BELOW
SEE REPAIR
FRP
FRP = FIBER REINFORCED POLYMER
PRESTRESSED CONCRETE BEAM FRP REPAIR DETAILS
BEAM(S) UNDER REPAIR FOR THE 24 HOURS OF CONCRETE CURING.
IN TWO STAGES ON THE ?? BOUND ???? BRIDGE TO SHIFT LIVE LOAD AWAY FROM THE
HOUR CONCRETE CURING PERIOD. RESTORATION OF THE BEAM CROSS-SECTION SHALL BE DONE
FROM THE BEAM(S) UNDER REPAIR. TRAFFIC SHALL BE MAINTAINED IN ONE LANE FOR A 24
PRIOR TO CONCRETE PLACEMENT TRAFFIC ON ???? SHALL BE SHIFTED TO ONE LANE AWAY
DAMAGED BEAMS. BONDING GROUT WILL NOT BE REQUIRED.
CONSTRUCTION METHODS THAT ARE ADEQUATE FOR STRUCTURAL CONCRETE REPAIR OF THE
REFER TO ARTICLE 2426 OF THE STANDARD SPECIFICATIONS FOR MATERIALS AND
NEW CONCRETE. EDGE OF REPAIR AREA SHALL BE SAWCUT ƒ" DEEP.
ENGINEER. ALL CONCRETE REMOVALS SHALL BE COMPLETE BEFORE COMMENCING PLACEMENT OF
UNSOUND CONCRETE FROM THE BEAM AS SHOWN ON THESE PLANS AND AS DESIGNATED BY THE
PREPARE THE SURFACE OF THE OLD CONCRETE BY REMOVING ALL LOOSE, DISINTEGRATED OR
PRESTRESSED CONCRETE BEAMS."
REPAIR FOR CONCRETE CONTAINMENT OF COLLISION DAMAGED PRETENSIONED
THE PLANS AND DEVELOPMENTAL SPECIFICATIONS FOR "FIBER REINFORCED POLYMER
D. APPLICATION OF FIBER REINFORCED POLYMER LAMINATES TO THE BEAM AS SHOWN IN
NOTED AND SHOWN IN THE PLANS.
C. RESTORING BEAM TO ITS ORIGINAL CROSS SECTIONAL DIMENSIONS WITH CONCRETE AS
B. REMOVAL OF EXISTING DAMAGED FRP LAMINATES.
A. REMOVAL OF UNSOUND OR LOOSE CONCRETE, PREPARING, AND CLEANING REPAIR AREAS.
PRICE BID FOR "BEAM REPAIR, AS PER PLAN":
ALL COSTS ASSOCIATED WITH THE FOLLOWING SHALL BE INCLUDED IN THE
THRU WRAPPED BEAM
TYPICAL SECTION
THRU WRAPPED BEAM
TYPICAL SECTION
STANDARD SHEET 1057s1
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1057s1 -
THIS
SH
EE
T IS
SU
ED 03-01-2017.
OUTSIDE OF S
HEET BORDER.
SEE ADDITI
ONAL DETAIL
MANUFACTURER.
THE CURE TIME FOR THE REPAIRS SHALL FOLLOW WHAT IS RECOMMENDED BY THE FRP
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM
Page 18
2/27/2017 2:49:27 PM bkloss W:\Highway\Bridge\Standards\Bridges\EnglishRepairRetrofitBridges.dgn 1057s2 11x17_pdf.pltcfg
??? }
??? } ??? }
HOLLOW CONCRETE
SPALLED CONCRETE
| BEAM
| BEAM
| BEAM
3'-0 EXPOSED STRAND MAX.
3 STRANDS EXPOSED
FRP DAMAGE
SHALLOW SPALL AND
BEAM FRP REPAIR DETAILS
FRP = FIBER REINFORCED POLYMER
?? BOUND ???? BEAM #?? BOTTOM VIEW
?? BOUND ???? BEAM #?? LOOKING NORTH
?? BOUND ???? BEAM #?? LOOKING NORTH
EXAMPLE
EXAMPLE
EXAMPLEPIER #??
OR
?? ABUT.
PIER #??
OR
?? ABUT.
PIER #??
OR
?? ABUT.
PIER #??
OR
?? ABUT.
PIER #??
OR
?? ABUT.
PIER #??
OR
?? ABUT.
PRESTRESSED CONCRETE BEAM FRP REPAIR DETAILS STANDARD SHEET 1057s2
EN
GLIS
HR
EP
AIR
RE
TR
OFIT
BRI
DG
ES.D
GN 1057s2 -
THIS
SH
EE
T IS
SU
ED 03-01-2017.
COUNTY
DESIGN SHEET NO. OF DESIGN NO.FILE NO.
IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION
PROJECT NUMBER SHEET NUMBERDESIGN TEAM