INDEX [media.wiley.com] · Allowing shortages in EOQ, 327 All unit discount in EOQ, 345 American Productivity Center (APC), 551 Analytical Hierarchy Process (AHP), 85, 87 Consistency
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
INDEX
ABC classification based on cost, 358ABC classification based on critical index, 358Acceptable Quality Level (AQL), 950Acceptance sampling plan, 944
Average Outgoing Quality (AOQ), 954Average Outgoing Quality Limit (AOQL), 955bicriteria acceptance sampling, 956bicriteria procedure for AOQ, 957Operating Characteristic (OC) curve, 948producer’s and consumer’s risks, 949
Acceptable Quality Level (AQL), 950effect of increasing n and decreasing c on OCC,
952Lot Tolerance Percent Defective (LTPD), 950optimal n and c for given AQL, LTPD, � and �,
953Type I error (producer’s risk), 949Type II error (consumer’s risk), 949
Attaching sequence, layout, 820Attributes of an object, clustering, 644Average Actual Cycle Time (AACT), 978Average linkage, GT, 675
Backlogging in lot sizing, 285Backward–forward lot sizing, 280Bellman–Ford algorithm, energy systems, 593Between Sum of Squares (BSS), K-means, 690Betz limit the power coefficient, wind energy,
624Bicriteria
acceptance sampling, 956ALB problem, 789composite approach in sequencing, 389DEA linear programming, 561economic production quantity, 336energy selection, energy systems, 588EOQ versus JIT, 333EPQ versus JIT, 337location – ordinal/cardinal approach, 869
criteria assessment, 877weight assessment, 878
LP aggregate planning, 245PERT, 475p-median, clustering, 684procedure for AOQ, 957rank order clustering, GT, 659sampling for X̄-chart, 929sampling for c-charts, 943sampling for p-chart, 941similarity coefficient, GT, 672single-factor efficiency, 554stochastic sequencing, 424, 426time-cost trade-off, 458weight space, 60
CPM time-cost trade-off method, 452Criteria assessment, 84, 87Critical index multi-item classification, 358Critical index optimization problem, 352Critical path, 446Critical path method (CPM), 441Critical Ratio (CR) rule, 387Customer interface, 501Cutting speed, wind energy, 625Cycle Time (CT), ALB, 778
Data Envelopment Analysis (DEA), 555, 556, 560,562
Data reduction, clustering, 644DEA (Data Envelopment Analysis), 555, 556, 560,
562Charnes, Cooper, and Rhodes, 568DMU (Decision Making Units), 553
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
1066 INDEX
DEA (Data Envelopment Analysis) (Continued )linear programming, 556, 560measurement of input and output factors, 560multicriteria efficiency, 560multiobjective linear programming, 560
Linear programming for transportation problems, 528minimizing total cost of transportation, 528multiobjective optimization of transportation, 529transshipment problem, 524
failure rate signature, 1020Mean Time To Repair (MTTR), 1016MTBF for single units, 1016MTBF for multiple units, 1019
Mean time between failure rate, 16, 1016, 1019Mean Time To Repair (MTTR), 1016Measurement of input and output factors in DEA, 560Measures of supply-chain performance, 503Measuring efficiency of energy systems, 621Micromotion study, 977Minimizing cycle time, ALB, 786Mirroring, layout, 817Mixed-hybrid utility, 62, 64Mixed product line balancing, 14Mixed-product, ALB, 791Modal (one and two) clustering, 644Monocode (hierarchical structure), GT, 652Mortality curve, 72Most likely duration of an activity, 471Moving averages, 9MRP II (manufacturing resource planning), 295Mulicriteria energy selection, 589Multicriteria, 510, 560
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
1070 INDEX
Multicriteria (Continued )producer’s view, 908productivity of a network, 568project management, 484pyramid of operations systems, 21, 22ranking of units, 563reliability of multiple units, 1024, 1026
reliability-cost trade-off algorithm, 1026improved units to increase reliability, 1026
reliability of single unit, 1014replacement model, 1040sequencing of 2 × m, 410sequencing of n × m, 406, 420single location-Euclidean method, 873stochastic ALB, 794transportation problem, 526work measurement, 988, 997
Between Sum of Squares (BSS), 690Euclidean distances, 699exclusive clustering, 644feasible goal approach, 703incremental explained variance, 647, 696k-means method, 689multicriteria clustering, 697multicriteria k-means, 699overlapping (fuzzy) clustering, 644probabilistic clustering, 644Total Sum of Squares (TSS), 690Within Sum of Squares (WSS), 690
Part Period Balancing (PPB), MRP, 275p-chart, control charts for attributes, 936Peak speed, wind energy, 623Perishable inventory, 364, 368Perishable inventory, multi-criteria of, 368PERT method, the probabilistic CPM, 440, 471
bicriteria PERT, 475most likely duration of an activity, 471optimistic duration of an activity, 471pessimistic duration of an activity, 471tricriteria PERT, 476
Pessimistic duration of an activity, 471Planned order release, MRP, 270, 271P-median for continuous data, clustering, 687P-median, clustering, 679P-median method, clustering, 679P-median optimization clustering, 679, 684, 686, 687
Process capability, 932Cp, for symmetric tolerances, 932Cpk, for Non-Symmetric Tolerances, 933
Process design and logistics, 3, 4, 13Process layout, layout, 805Procurement in energy systems, 588, 591
Bellman–Ford algorithm, 593Dijkstra’s algorithm, 593energy procurement in distributed systems, 597multicriteria energy routing, 590shortest route algorithm, 591
Production planning, 1, 10, 24, 25, 27Product layout, layout, 805Product and process life cycle, 26Productivity and efficiency, 4, 12Productivity index, 548
base year price index, 551bottleneck Identification, 565factor productivity index, 549multifactor productivity index, 549partial productivity index, 549total productivity index, 550
Productivity growth, 549Productivity of a network of processors, 564Project Evaluation and Review Technique (PERT),
470Project management, 4, 11, 24, 25
life-cycle phases, 440software, 441
Project management with resource constraints, 479ACTIM (ACTivity TIMe) heuristic, 479CPM with multiple resource constraints, 482
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
1072 INDEX
Project management with resource constraints(Continued )
CPM with one resource constraint, 479multicriteria project management with resources,
484Project management with resources, multicriteria,
484Project monitoring-Gantt chart, 450Pseudo activity in project management, 442Pull systems, Just-In-Time (JIT), 9, 10Push-and-pull hybrid systems, 302Push-and-pull lot sizing MCDM, 286Push-and-pull lot sizing optimization, 283, 290Push system, 268, 297
Bill Of Materials (BOM), 268improving productivity in JIT, 298kanban system, 300principles of JIT, 297setup time reduction in JIT, 298time-phased product structure, 268waste elimination in JIT, 298
Push and pull systems: MRP and JIT, 9, 10
QFD (Quality Function Deployment), 903Quadratic Assignment Problem (QAP), 845Quadratic linear regression, 189Quadratic optimization for linear regression, 183,
184Quadratic optimization for nonlinear regression, 189,
hybrid systems, 1023parallel systems, 1022series systems, 1021use of duplicated units, 1024, 1025use of emergency spares, 1024, 1025use of improved units, 1024, 1026
Reliability of single units, 1010exponential reliability function, 1011multicriteria reliability of single unit, 1014
Renewability of energy source, energy systems, 587,590
Reorder point, 318Replacement policies, 16
cost of maintenance per visit, 1034cost of replacing per visit, 1034general replacement model, 1037multi-criteria replacement modelmultiobjective replacement policy, 1035optimal replacement time, 1034single-objective replacement policy, 1034
Robustness– sensitivity of EOQ, 322ROC (Rank Order Clustering), GT, 655Rotation, layout, 820Routing and procurement in energy systems, 591Rule-based layout
planning, 814software, layout, 848
Safety stock, 315, 318, 367, 369Sample average quality, statistical background,
916
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
Sample standard deviation, statistical background,917
Sampling accuracy for X̄-chart, 927Scheduling and sequencing, 4, 10, 11, 24, 25Sequencing algorithm for n × 3, 402Sequencing algorithms for n jobs by 1 processor, 384Sequencing n jobs by 1 processor, 383, 392Sequencing n jobs by 2 processors, 395Sequencing n jobs by 3 processors, 402Sequencing performance measurements, 383Sequencing problems, types, 382, 421Sequencing, bicriteria stochastic, 424, 426Sequencing, risk averse rule, 425Sequencing, stochastic, 421, 422, 424, 425Sequential sampling plans, 15Series systems, reliability, 1021Setting process UCL and LCL, practical guidance,
934Setup time, reduction in JIT, 298Shortest expected processing time, 422Shortest Processing Time (SPT) rule, 386Shortest route algorithm, energy systems, 591Silver-meal heuristic, MRP, 276Similarity coefficient (continuous) method,
bicriteria single-factor efficiency, 554Decision Making Units (DMU), 553
Single linkage, GT, 675Single objective stochastic ALB, 793Single period model in inventory, 364Single row loop,
linear, 718circular, 718optimization, 754
Single row network, cell, 718, 719Smoothness index (SI), ALB, 778Spares use in reliability, 1024, 1025Standard normal distribution, statistical background,
918Standard table for X and R charts, control charts for
variables, 924
Standard time, 978Average Actual Cycle Time (AACT), 978Normal Time (NT), 978standard time procedure, 979stopwatch studies, 977
Station time, ALB, 778Stationary assumption, 157, 158
in time series, 157, 158, 161Stationary time series,
exponential smoothingmoving averages, 158, 159multi-criteria for exponential smoothingmulti-criteria for moving averagesnaive method, 158The lagging effect of moving averages, 161weighted moving averages, 160, 161
Stations, cell, 718, 718, 719Statistical process control, 913
bicriteria sampling for c-charts, 943bicriteria sampling for X̄-chart, 929bicriteria sampling for p-chart, 941control charts for attributes, 935
p and c-charts, Overview, 936p-Chart, 936c-Chart, 939
control charts for variables, 920X̄- chart with known population standard
deviation, 922X̄-chart with unknown population standard
deviation, 923X̄-chart, 921R chart, 926standard table for X and R charts, 924
go/no-go gauge, 913interpreting Control Charts, 914quality control, statistical background, 915
bin width selection, importance, 915central limit theorem, 919histograms, 915normal distribution, 918population mean (average), 916population standard deviation, 917range of each sample, 917sample average, 916sample standard deviation, 917standard normal distribution, 918Type I error, 919Type II error, 920upper and Lower Control Limits (LCL & UCL),
919process capability vs. design tolerances, 932
defects per million opportunities (DPMO),932
out of control process, practical guidelines, 935process capability, 932process capability, Cp, for symmetric
tolerances, 932
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in
1074 INDEX
Statistical process control (Continued )process capability, Cpk, for non-symmetric
tolerances, 933setting process UCL and LCL, practical
guidance, 934sampling accuracy for X̄-chart, 927types of control charts, 914
attribute control charts, 914variable control charts, 914
Traveling Salesman Problem (TSP), 718, 719, 755Trend analysis by linear regression, 166Trend-adjusted double-exponential smoothing, 167Trend-based time series, 166Tricriteria
ALB, 791for n × 1, 393for n × 2, 401PERT, 476p-median, clustering, 686rank order clustering, GT, 661similarity coefficient, GT, 674
Two-dimensional clustering, 645Type I error (producer’s risk), quality control, 919Type II error (consumer’s risk), quality control, 920Types of cellular layout, 718Types of inventory, 315
raw materials, 315work-in-process, 315
JWBS102-IND JWBS102-Malakooti Printer: Yet to Come November 22, 2013 20:15 Trim: 7in × 10in