Index A -series paper sizes 298 Above Ordnance Datum 33 Absolute measurement 554 Absolute Minimum Radius 363 Absolute network 561 Accuracy, definition of 210 Accuracy denial 283 Accuracy in building 545 Accuracy of setting out 485, 543 Additive constant 145 Adjustment to opposites 260 Agent 477 Algebraic difference 405 Alidade 80 Alignment 390, 539 Alignment by laser eyepiece attachments 529 pillaging with 531 theodolites 529 tunnels 532 verticality 535 Almanac 279 Alphanumeric keyboard 166 Amplitude modulation 155 Angle adjustment 235, 259, 265 Angle and distance methods see Bearing and distance methods Angle condition 259, 265 Angle measurement 79, 107-14 abstraction of angles 230 allowable misclosure in traversing 234 booking and calculating angles 112 by total station 163 errors in 113, 114 field procedure and booking for (in traversing) 230 horizontal angles 108 importance of observing procedure 114 in triangulation 257 precision of 216, 222 principle of 79 propagation of errors in 216 vertical angles Ill Angle of depression 80 Angle of elevation 80 Angular misclosure 234 Angular precision 216, 222 Angular resection 273 Annotation (of drawings) 317 Anti-spoofing 283 Arbitrary north 10 Area 424 Area calculation areas enclosed by irregular lines 428 areas enclosed by straight lines 424 from coordinates 425 from triangles 424 give and take lines 428 graphical method 428 mathematical method 428 planimeter 431 Simpson's rule 430 Trapezoidal rule 428 worked examples 426, 429, 431 As-built drawing 480 Atmospheric conditions in EDM 192 Atmospheric correction switch 192 Atmospheric effects for GPS 282 Automated Polar System 564 Automatic level 34 permanent adjustment of 46 use of 38 Automatic vertical index 83 Average haul distance 463, 464, 467 Back bearing 236 Back sight 51 Balancing line 464 choice of 467 example of its use in costing earth-moving 469 Band of interest 336, 384 Bar-coded staff 42, 555 Baselines 252, 269, 270 for setting out 489, 505 Batter boards 496 Battery power 98, 167 Beam compass 300, 301 Bearing and distance methods 13 for deformation monitoring 563 572
15
Embed
Index [link.springer.com]978-1-349-12… · · 2016-01-05Area calculation areas enclosed by ... Simpson's rule 430 Trapezoidal rule 428 worked examples 426, 429, ... example of
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Index
A -series paper sizes 298 Above Ordnance Datum 33 Absolute measurement 554 Absolute Minimum Radius 363 Absolute network 561 Accuracy, definition of 210 Accuracy denial 283 Accuracy in building 545 Accuracy of setting out 485, 543 Additive constant 145 Adjustment to opposites 260 Agent 477 Algebraic difference 405 Alidade 80 Alignment 390, 539 Alignment by laser
abstraction of angles 230 allowable misclosure in traversing 234 booking and calculating angles 112 by total station 163 errors in 113, 114 field procedure and booking for (in
traversing) 230 horizontal angles 108 importance of observing procedure 114 in triangulation 257 precision of 216, 222 principle of 79 propagation of errors in 216 vertical angles Ill
Angle of depression 80 Angle of elevation 80
Angular misclosure 234 Angular precision 216, 222 Angular resection 273 Annotation (of drawings) 317 Anti-spoofing 283 Arbitrary north 10 Area 424 Area calculation
areas enclosed by irregular lines 428 areas enclosed by straight lines 424 from coordinates 425 from triangles 424 give and take lines 428 graphical method 428 mathematical method 428 planimeter 431 Simpson's rule 430 Trapezoidal rule 428 worked examples 426, 429, 431
As-built drawing 480 Atmospheric conditions in EDM 192 Atmospheric correction switch 192 Atmospheric effects for GPS 282 Automated Polar System 564 Automatic level 34
permanent adjustment of 46 use of 38
Automatic vertical index 83 Average haul distance 463, 464, 467
Back bearing 236 Back sight 51 Balancing line 464
choice of 467 example of its use in costing
earth-moving 469 Band of interest 336, 384 Bar-coded staff 42, 555 Baselines 252, 269, 270
for setting out 489, 505 Batter boards 496 Battery power 98, 167 Beam compass 300, 301 Bearing and distance methods 13
for deformation monitoring 563
572
for road curves 346, 395 setting out by 201, 490, 504
Building surveyor 3 Buildings, setting out 512 Bulking 461 Bulking factor 461 Bundle adjustment 567
C/A-code 279, 281 Cadastral surveying 6 Caesium clock 281 Calculator functions required 19 Calibration, of EDM 194 Card reader 187 Care of instruments 481 Carrier phase ambiguity 285 Carrier phase measurements 284 Carrier wave 155 Cartesian geometry 9 Cartridge paper 298 Catenary 128, 137 Central circular arc 378 Centre line, establishment of
for circular curves 338 for composite curves 376
Centre of curvature 333 Centre-point polygons 253 Centre-point triangle 263 Centring 86, 103
errors in 107, 114, 230 Centring device 525 Centring rod 84 Centroid, of cross-section 449 Chainage 335 Chalked string 513 Change plate 58 Change point 51 Channel Tunnel 5, 253, 291 Channels 360, 404
INDEX
Chartered surveyor Check lines 228 Checking drawings 483 Checking setting out 485 Chord length 342 Circle eccentricity errors 91 Circle reading methods 86-94 Circle reading telescope 82 Circular bubble 34, 81 Circular curves 331-57
chainage along 335 computer methods 337, 350 coordinate setting out 346, 352 design of 336 establishing centre line of 338 important relationships in 333 length of 334 location of tangent points 339 obstructions to setting out 34 7 offset setting out 344 terminology 332 traditional setting out 341 types 332, 348 worked examples 350
calculations 472 areas 473 cross-sections 473 mass haul diagrams 474 volumes 474
Computer-aided plotting 320 acquisition of data 323 coding 323 digital terrain models 327 for control networks 299 mapping software 322 output data 326 plotters 326 processing data 324
plotting 301 Coordinate measuring systems 565 Coordinate setting out
advantages of 381 applications 537 bridges 541 buildings 504, 549 circular curves 346, 352 composite curves 379, 395 control 487 piling 540 vertical curves 414 with total stations 173, 200
Coordinates bearing and distance from 13, 504 for GPS 288 for networks 259-77 from total stations 169 in detail surveying 314 in traversing 244 National Grid 15, 197, 488 plan area calculation from 425 plotting 299-303 polar 11 rectangular 9
Corner cube prism 157 Crest curve 405
K -values 411 Cross coordinate method 425
applications of 426, 445 Cross hairs 35 Cross-correlation 281 Cross-sectional area calculation 438-46
use of 446-9, 450, 454 Cross-sections 67, 434
computer generated 473 eccentricity of 449 example drawings 437 fieldwork for 67 from contours 75 horizontal 438 involving cut and fill 442 irregular 445 three-level 440
INDEX 575
two-level 439 location of 305-15 used to calculate volumes 446,
450, 454 Crystal controlled frequency
oscillator 156 Cubic parabola 366, 369
setting out by coordinates 379, 395 setting out by offsets 369 setting out by tangential angles
370, 377 shift 373 validity of the assumptions made in
the derivation of 372 Cubic spline 350, 373, 390 Curvature
centre of 333 effect on volume calculations 449 of Earth 32, 60, 116 radius of 332
Curvature and refraction correction 60, 117
Cut 413, 438, 442 Cutting 438, 497
locating edges 500 monitoring excavation of 500
Cycle 150 Cyclic error 193
Damping 38 Data message 279 Data recorders 181 Data recording unit 187 Data terminal 182 Data transfer 98 Database 324 Datum surface 33 Deflection angle 331 Deformation monitoring 554-71
accuracy of 554, 559 bearing and distance methods 563 control networks for 561 coordinate measuring systems 565 ECDS 566 horizontal movement 561 intersection methods 562 MONMOS 569 vertical movement 555 worked examples 558
Degree curve 334 Demodulation 156 Department of Transport 336, 362, 404 Depth of cover 508 Depth of road construction 446 Design points 490, 504
setting out from existing 505 Detail pole 157 Detail surveying 293-330
accuracy of 295 booking for 306, 310, 314, 315 budget for 295 fieldwork for stadia tacheometric
methods 308 offsets and ties 305 radiation method 308, 312 specifications for 294 time available for 295 with EDM equipment 312 with theodolite and tape 312 with total stations 312
Deviation angle 366 limiting value 372
Diagonal eyepiece 522 setting out with 522
Diagonals, checking 485, 512 Diaphragm 35
orientation of 121 Differential GPS 283 Differential positioning see Differential
surveying Differential surveying 285-8 Digital level 42, 555
adjustment of 46 in deformation monitoring 555 in sectioning 67
Digital maps 25 Digital planimeter 433 Digital pseudo-random code 281 Digital terrain models 64, 201, 327, 390
grid-based 328 triangulation-based 329
Direct contouring 70 Direct distance measurement 128-43 Direct reading system 86 Display illumination 98 Distance from coordinates 13 Distance measurement 127-201 Distance resection 277 Distancers 178 Dither 283 Diurnal variation 10 Division of an area 426 Double reading optical micrometer
system 90 Double sight rails 509 Double-difference equations 286 Drainage 404, 415 Drawing film 298 Drawing papers 296-9
ISO paper sizes 298 Driver's eye height 410 Drop arrow 132
measurement 149-201 analogy with taping 153 applications of 200 calibration of EDM instruments 194 corrections in 192 distancers 178 effect of the atmosphere on 192 in deformation monitoring 561 in detail surveying 312 in triangulation and trilateration 252,
257 instrumental errors in 192 measurement requirements 154 phase comparison 151 properties of electromagnetic
waves 150 reflectors 157 setting out 379, 537 specifications 159 theodolite-mounted 161 timed-pulse 189 total stations 163 yoke-mounted 161
Electomagnetic waves 150 Electronic data recording 180-8
data recorders 181 field computers 183 internal memories 187 memory cards 186
Electronic field book 181 Electronic gate 189 Electronic tacheometers see Total stations Electronic theodolites 92-100
absolute 97 features of 98 incremental 95
Electronic tilt sensor 100 Embankment 439, 497
locating toes 498 monitoring construction of 500
Employer 476 End areas method 44 7 Engineer 476 Engineering surveying 6-8
Face 83 Fall 51 Fast static surveying 288 Fibreglass tapes 143 Field computers 183 Fill 413, 438, 442
monitoring 496-501 Film 298 Fine centring 104 Fine levelling 105 First stage setting out 486 Fixed tracing arm planimeter 432 Flat curves 406 Flat-bed plotter 327 Floor screeding 537 Focusing lens 35 Focusing screw 35, 81, 83 Follower 130 Footscrews 80 Forced centring 82 Fore sight 51 Formation level 64, 438, 460 Formation width 438 Formwork 513 Forward bearing 236 Foul water sight rail 509 Four-point resection 274 Fractional linear misclosure 241 Free haul distance 463 Free haul volume 463 Free station point 506 Free stationing (with total stations) 171 Freehaul 463 Frequency 150 Frequency drift 193 Full kinematic surveying 288 Full Overtaking Sight Distance
(FOSD) 409
INDEX 577
GaAs diode 155 GaAs laser diode 188, 527 General practice surveyor 2, 3 Geodetric surveying 5 Geodimeter 464 175 Geodimeter System 500 175 Geodimeter System 4000 176 Geometric corrections (for EDM) 195 Give and take lines 428 Glass arc 80 Global Positioning System (GPS) 279-92
Surveyors (ICES) 1 Institution of Civil Engineers (ICE) 477 Integrating disc (on planimeter) 432 Interior laser 535 Intermediate sight 51 Internal memory 187 International Standards
Organisation (ISO) 298, 475, 543 A-series paper sizes 298
578
ISO 7737 543 ISO 7976 543 ISO 8322 543 ISO 9000 543 ISO/DP 7078 475
Interpolation graphical 7 4 mathematical 73 of contours 73
Intersection 266 by solution of triangle 269 for deformation monitoring 562 for road curves 346, 352 from two baselines 270 setting out by 346, 505 using angles 270 using bearings 270 worked example 271
Intersection angle 333 Intersection point 332, 339
for GPS 286 in control networks 258 in deformation monitoring 562 principle 204
Left-hand angle 236 Leica VIP survey system 178 Level book 53, 55, 66, 68 Level line 31 Level vial
magnetic 101 optical 102 spirit 40
Levelling 31-77 adjustment of 54 allowable misclosure in 56 applications 64 booking and reducing 53 definitions 31 effects of curvature and refraction
on 60 effects of weather conditions on 61 equipment 34:._50, 555 equipment errors 58 field errors 58 field procedures 52, 61-4 laser levelling 536 misclosure in 54 precision of 56, 221 principles of 50 propagation of errors in 215 reading and booking errors in 59 worked examples 48, 53, 55, 62
Levelling staff 49, 555 for use with laser instruments 536 keeping vertical 50 reading examples 49
Levelling station 555 Levels 34-49, 555
adjustments of 44 laser 533 principle of 41
Light, speed of 150 Lightweight paper 296 Limitations, of Surveying for
Engineers 29 Limiting Radius Value 363 Line, measurement of a 128, 130 Line of collimation 35, 84 Line of sight 35 Linear misclosure 241 Link traverse 226, 248 Liquid crystal display (LCD) 166
Long chord 333 setting out by offsets from 344
Longitudinal section 64, 390, 415, 434, 462, 474
example drawing 436 fieldwork for 64 from contours 75
Loop traverse 226 Lower plate 80 Lumi-guide 167
Magnetic north 10 Magnetic tilt sensor 101 Manholes, setting out 510 Map projection 198 Map references 24 Mapping software 322 Maps, Ordnance Survey 21-7 Marking arrow 130 Mass haul diagrams 459-72
by computer 474 costing with 465 drawing 460 economics of 465 properties of 463 relation to formation level 460 terminology 463 uses of 471 worked examples 465, 469
Master bench mark 492 Master control station 280 Master survey drawing 317 Mathematical interpolation 73 Mean sea level 33
correction to 197 Mechanical planimeter 432 Memory cards 186 Meteorological conditions 192 Micrometer reading systems
removel of 37, 106 Parallel-sided glass block 87 Parts per million (ppm) 210 Passenger comfort 365, 406 Pen-map system 321 Per cent key 98 Permanent adjustments 44-9, 119-23
of a digital level 46 of a theodolite 119 of a tilting level 4 7 of an automatic level 46
Photogrammetry 6 Pi ('IT) 17 Piano wire 501, 516 Picking up detail 305 Piling, setting out 540 Pillaging 507-11
horizontal control for 508 sight rails for 509 vertical control for 508 with an alignment laser 531 worked example 548
Pipe laser 531 Plan area calculation
by planimeter 431 from coordinates 425 from triangles 424 graphical method 428 Simpson's rule 430 trapezoidal method 428 using give and take lines 428 worked examples 426, 429, 431
Plan production 293 Plan width 439, 440, 443 Plane of collimation 50 Plane surveying 29 Planform 324 Planimeter
digital 433 fixed arm 432 measuring with 433 movable arm 432 worked examples 438, 465
Planning and development surveyor 3 Plans 315
annotation of 317 border 318 completed survey plan 317 contours on 73, 326 key 317 master survey drawing 317 setting out 4 79 title block 318
Plate level 80 adjustment 119
Plotters 326 Plotting
accuracy of 295 by hand 70, 300, 307, 310, 315, 317 centre lines of road curves 348, 382 computer-aided 320 control stations 301 coordinate grids 299 detail surveys 307-15 embankments and cuttings 446 offsets and ties 307 radiation surveys by EDM and total
stations 315 stadia tacheometry surveys 310
survey plans 315 vertical curves 415
Plumb bobs 86, 516 Plumb line 132 Pocket calculator functions 19 Polar coordinates II
calculation of 13-15 for road curves 346, 395 for setting out 201, 490, 504 in deformation monitoring 563 worked example 13-14
Polar rays see Polar coordinates Polar/rectangular conversion 13 Pole arm 432 Pole block 432 Pole-mounted reflector !57 Polyester film 298 Polygon traverse 226, 246 Polynomials 350 Pond level 37 Positioning techniques 479, 504
from coordinates 504 from existing detail 504
Post-processing 284 Power supply 98, 167 Precise mode, for distance
measurement 165 Precise positioning service 280 Precision
definition of 206, 210 for angle measurement 216, 222 for levelling 215, 221 for slope corrections 222 for stadia tacheometry 219 for trigonometrical heighting 218, 222
Pre-defined format (for Superplan) 26 Prism constant 157 Prism set 157 Prismoid 448 Prismoidal formula 448 Probability, laws of 204 Profile boards 50 I
continuous 502 transverse 502
Projection distance see Grid distance Promoter 476 Propagation, of standard errors
for area of rectangle 213 for area of triangle 213 in angle measurement 216 in levelling 215 in stadia tacheometry 219 in sum and difference 212 in survey methods 221-3 in trigonometrical heighting 218 in vertical monitoring 559 Ia w of propagation 211
EDM and total stations 312 stadia tacheometry 308 theodolite and tape 312
Radius curve 334 Radius of curvature 332
Absolute Minimum Value 363 Desirable Minimum Value 363 Limiting Value 363
Random errors 203 Ranging 130 Ranging rods 130 Rapid static surveying 288 Rate of change of radial acceleration
365 Raw data 166, 323 Reader, for digital level 44 Reciprocal heighting 118 Reciprocal levelling 63 Reconnaissance 228, 254, 562 Reconstruction, of carrier 285 Record drawing 480 Record keeping, in setting out 481 Recording module 42, 186
volumes from 456 Spot levels see Spot heights Spring balance 134 Squaring techniques 285 Stadia hairs see Stadia lines Stadia lines 144 Stadia tacheometry 144-8, 308-12
accuracy and sources of error in 14 7 applications of 148 basic principle of 144 booking and calculating 145, 309 fieldwork 308 formulae 145 in detail surveying 308 plotting 310 propagation of errors in 219 worked example 145
Staff intercept 145 Standard conditions, in steel taping 130 Standard deviation 205, 547 Standard errors 206
in angle measurement 216, 222 in levelling 215, 221 in stadia tacheometry 219 in trigonometrical heighting 218, 222 propagation of 210-21 significance of 207 worked examples 212-21
Standard format (for Superplan) 26
584
Standard mode, for distance measurement 165
Standard positioning service 280 Standardisation 133
correction for 133 Standards 82 Static differential positioning 286 Station unit 176 Stations 229, 256, 487
plotting of 301 Steel straight edge see Straight edge Steel tapes 129
standard conditions 130 Steel taping 129-42
applications 138 combined formula for 137 corrections 131-7 general rules for 139 precision of 137 sag effects in 136 slope measurements and corrections
in 131 standardisation in 133 temperature variations in 135 tensioning effects in 134 worked examples 138
circle reading 82 internally focusing 35 transitting 83
Temperature 135 correction for 136 standard 135
Template 515 Temporary adjustments
for a level 38-9, 42 for a theodolite 108-11
Temporary bench mark (TBM) 34, 492 for deformation monitoring 555
Tender 476 Tension 134
correction for 135 standard 135
Tensioning 134 Terrain modelling see Digital terrain
models Testing bar 433 Textual form 324, 326 Theodolite-mounted EDM systems 161 Theodolites 78-126
adjustments 119 angle measurement using 107 axes 84 centring method for 103 circle reading methods 86 classification of 78 constructional features of 80 controlling vertically with 518 electronic 92 height measurement using 115 importance of observing procedure 114 laser 529 levelling method of 105 permanent adjustments of 119 setting up 103 worked examples 123
Thermometers 136
Three-level section 440 Three-peg test 194 Three-point resection 273 Three-tripod traversing 231, 520 Through chainage 335 Ties 305 Tilt sensor
magnetic 100 optical 102
Tilting level 40 adjustment of 47 use of 42
Tilting screw 40 Time, GPS 280 Timed-pulse EDM 188-92
Tip 459 Title block 317 Topographical surveying 5 Total stations 163-78
features of 163 in control surveys 232, 252, 257, 277 in detail surveying 312 in setting out 173, 379, 506, 537 onboard software 168 preCISIOn 166 range 166 specialised 175
Touch screen 324 Tracing arm 432 Tracing paper 298 Tracing point 432 Tracking mode, for distance
measurement 166 Tracklight 167 Transferred Bench Mark (TBM) 34
for monitoring 555 in setting out 492
Transferring height 525 Transit axis see Trunnion axis Transit method 243 TRANSIT system 278 Transit time 188 Transition curves 258-403
choice of 366, 373 clothoid 366 composite curves 359 computer-based curves 390 cubic parabola 369 design of 383 design standards 362 establishing centre line 376 length of 365 purposes of 360 rate of change of radial
acceleration 365
INDEX 585
setting out 369-71, 377-82, 391-401 spirals 360 wholly transitional 364, 385, 402 worked examples 391
abstract of fieldwork 233 abstraction of angle 230 angle adjustment 235 calculation of final coordinates 244 calculation of whole-circle bearings 235 computation of coordinate
differences 238 distribution of misclosure in 242 errors in angular measurements 230 field procedure and booking 230 misclosure in 240 station marking 229 with total stations 171 worked examples 246
dislevelment of 114, 122 Tunnel alignment by laser 532 Two-level section 439
586 INDEX
Two-peg test 46 worked example 48
Underground detail 303 Unicorn 167 United States Department of Defense (US
DoD) 278 Units 17 Universal laser 535 Upper plate 80 User segment 280
Valuation surveyor 2, 3 Variance 206 Vellum 298 Vertex, of prism 159 Vertical, direction 31 Vertical alignment 390, 404-22
phasing with horizontal alignment 387, 413
Vertical angle 80 measurement of 111 monitoring vertical settlement with 558
Vertical axis 84 effect of tilt 100-13, 114
Vertical circle 82 graduations 83, 99
Vertical collimation error 113, 114 adjustment of 122
Vertical control 7, 225, 492, 508 Vertical curves 404-22
adequate visibility along 406 algebraic difference 405 computer-designed 417 design of 416 equation of 407 gradients 404 highest/lowest point 415 K-values 410 length of 413 minimum length of 413 parabolic 406 passenger comfort and safety on 406 phasing of vertical and horizontal
alignments 413 plotting on longitudinal section 414 purposes of 406 setting out on the ground 414
sight distances 409 types 406 validity of assumptions made in 407 with unequal tangent lengths 416 worked examples 418
by computer 474 end areas method 44 7 effect of curvature on 449 from contours 457 from cross-sections 447-56 from spot heights 456 prisrnoidal formula 448 worked examples 450, 454
Walking the site 483 Waste 463 Wavelength 150 Well-conditioned network 254 WGS84 coordinate system 289 Whole-circle bearings 11, 235, 263, 266
from coordinates 13-15 Wholly transitional curves 364, 385, 402
radius of 386 Witnessing sketch 229 Working drawings 387, 479 Working from the whole to the part
485, 487, 492 Works 476
Y-code 283 Yoke-mounted EDM systems 161
Zenith angle 80 Zero Ill Zero chainage 335 Zero circle 433 Zero error 57, 193 Zero point of a steel tape 129