Top Banner
305 QUALITY CIRCLE | HUNTSVILLE, ALABAMA 35806 256.533.1040 256.539.1942 Do you have the clause FAR 52.216-7 "Allowable Cost and Payment" in any of your contracts? If you do, you have a requirement to prepare an Incurred Cost Submission for your company and submit to your local DCAA office by June 30th, 2018. Typically, this FAR clause is incorporated in cost reimbursable contracts and Time-and-Materials (T&M) contracts that are direct to the government or a flow-through from a prime contractor. A fixed price contract may also have a cost reimbursable element(s) so be sure to check all your contracts for this clause that triggers the requirement for submission. If you discover that you do have the requirement and would like help in the preparation or review of the submission, we’d be happy to help with that. Please contact Michelle Jenkins at [email protected] and we can get you on your way to compliance! INCURRED COST SUBMISSIONS DUE SOON! www.anglincpa.com
1

INCURRED COST SUBMISSIONS DUE SOON! · 2019-12-17 · you do, you have a requirement to prepare an Incurred Cost Submission for your company and submit to your local DCAA office by

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INCURRED COST SUBMISSIONS DUE SOON! · 2019-12-17 · you do, you have a requirement to prepare an Incurred Cost Submission for your company and submit to your local DCAA office by

305 QUALITY CIRCLE | HUNTSVILLE, ALABAMA 35806 256.533.1040 256.539.1942

Do you have the clause FAR 52.216-7 "Allowable Cost and Payment" in any of your contracts? If you do, you have a requirement to prepare an Incurred Cost Submission for your company and submit to your local DCAA office by June 30th, 2018. Typically, this FAR clause is incorporated in cost reimbursable contracts and Time-and-Materials (T&M) contracts that are direct to the government or a flow-through from a prime contractor. A fixed price contract may also have a cost reimbursable element(s) so be sure to check all your contracts for this clause that triggers the requirement for submission. If you discover that you do have the requirement and would like help in the preparation or review of the submission, we’d be happy to help with that. Please contact Michelle Jenkins at [email protected] and we can get you on your way to compliance!

INCURRED COST SUBMISSIONS DUE SOON!

www.anglincpa.com