Top Banner
7

Increasing Costs

Feb 23, 2016

Download

Documents

Increasing Costs. adaptation. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Increasing Costs
Page 2: Increasing Costs

INCREASING COSTS

Page 3: Increasing Costs

ADAPTATIONThe management of forest lands in BC has already become more challenging as a result of climate change. The MPB and Dothistroma needle blight outbreaks have led to fundamental changes to forest management in the province. Dothistroma has resulted in lodgepole pine no longer being considered a preferred tree species for management in the epidemic area and instead plantations of lodgepole pine in northwest BC are considered as uncertain liabilities. The far more extensive MPB epidemic has driven change in silvicultural system choices and has dramatically reduced mid-term timber sup- ply in the interior of BC (BCMFR 2007), directly impacting the stability of several timber dependent communities..

We believe the current system of forest management, based on predictable ecosystem responses, is not consistent with the rapidly changing ecology that has been forecast. The need for change is already evident. Forest management must become more flexible with reversible, incremental steps that favour ongoing learning and the capacity to change direction as situations change (Millar et al. 2007).

Page 4: Increasing Costs

IMPACTS, VULNERABILITIES, AND RISKS

Page 5: Increasing Costs

ADAPTATION OPTIONS

Page 6: Increasing Costs

ADAPTATION OPTIONS (2)

Page 7: Increasing Costs

8. PLEASE INDICATE WHICH, IF ANY, ADAPTATION PRACTICES YOU ARE CURRENTLY UNDERTAKING.

Response Chart PercentageResearch (e.g. use of climate models, projections)

10%

Experimentation (e.g. small scale pilots, operational trials)

12%

Risk, impact and / or vulnerability assessments

10%

Incorporating into strategic planning

15%

Incorporating into operational planning

16%

Practices on the ground (to meet obligation requirements)

19%

Monitoring and evaluation 23%None of the above 46%Other, please specify... 8%