INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status
Mar 30, 2015
INAF-OATs WorkShop – Trieste - 21 June 2013
V.Baldini
MA05
INAF-OATs Workshop
ESPRESSO Control Electronics Status
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO quick overview
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO functions overview
INAF-OATs WorkShop – Trieste - 21 June 2013
Progress from the previous phase
I. Coretti, V. Baldini
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
• Provide power supply from SCP to each cabinet
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)
• Network
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)
• Network• HW choices - BOM (cabinets-racks, cables, connectors)
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
• Provide power supply from SCP to each cabinet– Power Budget (UPS and Normal Power Supply)
• Network• HW choices - BOM (cabinets-racks, cables, connectors)
• PLC modules choice
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO Control Electronics Design
INAF-OATs WorkShop – Trieste - 21 June 2013
Beckhoff PLC as new control system
• Flexibility• Low cost• Decentralization features• Low space occupancy
– Lot of advantages
INAF-OATs WorkShop – Trieste - 21 June 2013
Beckhoff PLC as new control system
• Flexibility• Low cost• Decentralization features• Low space occupancy
– Lot of advantages
• Never used before in ESO permanent instruments
INAF-OATs WorkShop – Trieste - 21 June 2013
Function to control (example)
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO electrical drawings
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO electrical drawings
INAF-OATs WorkShop – Trieste - 21 June 2013
ESPRESSO electrical drawings
INAF-OATs WorkShop – Trieste - 21 June 2013
Schedule and FTE
• September 2013 - Delta FDR at ESO• Until end of 2013 - Phase C: procurement and
assembly• November 2015 - Phase D: system integration in
Geneva• End of 2015 - PAE• 2016 - Phase E: installation in Chile,
PAC
INAF-OATs WorkShop – Trieste - 21 June 2013
Schedule and FTE
• Control electronics:– I.Coretti (staff, 2.7 FTE)– V.Baldini (contractor, 2.3 FTE)– S.Galeotta (staff, 0.7 FTE)
INAF-OATs WorkShop – Trieste - 21 June 2013
Schedule and FTE
• Control electronics:– I.Coretti (staff, 2.7 FTE)– V.Baldini (contractor, 2.3 FTE)– S.Galeotta (staff, 0.7 FTE)
• Control Software– P.Di Marcantonio (staff, 1.6 FTE)– R.Cirami (staff, 1.8 FTE)– M.Mannetta (contractor, 1.5 FTE)– S.Galeotta (staff, 0.7 FTE)
INAF-OATs WorkShop – Trieste - 21 June 2013
Conclusion and Criticalities
• FDR successfully passed
• Ready for purchases– around 120,000 € (Beckhoff, Schroff, ESO, RS..), about
400 different items
• Manufacturing phase will require space for 6-7 cabinets
• Short on permanent staff