Top Banner
In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit
30

In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Dec 10, 2015

Download

Documents

Lillian Graham
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

In-Situ Remediationat Silver Lake

Region 4 Hazardous MaterialsGeo/Bridge/Environmental Unit

Page 2: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

LUSTs and Sustainability• Limited groundwater

resources• Once impacted from

petroleum hydrocarbons, subsurface ecosystem can take decades to recover

• Limited financial resources

Page 3: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

LUSTs – Why So Bad?

• Petroleum Fuel – contains known or suspected carcinogens

• Released fuel doesn’t stay put – migrates

• Travels with groundwater• Difficult to see• Difficult to cleanup = $$$!

Page 4: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

What is In-Situ Remediation?In-Situ means “in place”.

Remediation – providing remedy. Treatment or removal contaminants in soil and groundwater.

In Situ – in place remedy. Remove, treat, change, transform contaminants in subsurface.

Page 5: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 6: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Silver Lake Maintenance Facility

Page 7: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Late 1980s– 6,000 gallons of diesel spilled from newly installed

AST1992

– 5 USTs decommissioned– Unknown amount of fuel spilled from USTs– 3,500 yd3 of Petroleum Contaminated Soil excavated

1993– Subsurface investigation, Corrective Action Plan

Page 8: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 9: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 10: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 11: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 12: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Page 13: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

1995– Groundwater extraction (“pump and treat”)– Operated for total of 6 weeks– No measurable hydrocarbon recovery

1996 - 1998– Soil Vapor Extraction (SVE) system installed– Horizontal trenches– Operated for 21 months– Only recovered total of 25 lbs of petroleum

hydrocarbons

Silver Lake In-Situ Cleanup

What went wrong?

Page 14: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Restoring Aquifers

Enhanced Naturally Occurring Biological Degradation• Use natural healing forces of nature• Microbes dismantle petroleum hydrocarbons (HC)

deriving energy from that process• Give nature a helping hand• What does the system lack? O2? Nutrients? Use

mechanical technology to distribute electron receptors and nutrients.

• What is occurring now under the “Do Nothing” Technology?

Page 15: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Fresh Start• Delineate full extent of diesel contamination• Chemistry• Evaluate in-situ remedial options• Pilot Test• Final Design• Construction• Operation

Page 16: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Drilling – Expanded Subsurface Investigation

Page 17: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Groundwater Sampling

Page 18: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Groundwater Contours

Page 19: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Extent of Contamination

Page 20: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Anaerobic ConditionsAerobic Conditions

Page 21: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

HC Molecule (electron donor)

e-

Oxygen (electron receptor)

Secondary receptors => Fe, SO4, NO3

Energy Released

Aerobic Biodegredation“oxidized”

“reduced”

HC + O2 -> CO2 + H2O

Page 22: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

HC Molecule (electron donor)

e-

Carbon (electron receptor)

Energy Released

Anaerobic Biodegradation“oxidized”

“reduced”

HC + CO2 -> CH4 + H2OMethanogenesis

Page 23: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Remedial AlternativesNo Action

– doesn’t remove risk or future liability

Air Sparging– uncertainty of uniformity of air injection

Dissolved Oxygen Injection– enhancement of natural attenuation

Dual Phase Extraction– removes groundwater and vapors

Ozone Injection– uncertainty of uniformity of air injection

Page 24: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

O2 as an electron receptor is primary limiting factor in bioremediation.

To promote faster bioremediation, dissolved O2 must be supplied in large quantities.

Solution – Provide dissolved O2 and lots of it!

Page 25: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

GroundwaterRecovery Wells

DO Injection Wells

Page 26: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

In-Situ DO Remediation Installation

• Install injection points• Gnd wtr recovery wells• Trenching and piping• Super-OxTM system

Page 27: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Injection Well Installation

Page 28: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Trenches and Piping

Page 29: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Questions?

Page 30: In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.

Beer Molecule

e-

O2

Energy Released

“oxidized”

“reduced”

Beer + O2 -> CO2 + H2O