Top Banner
In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist 2016 SCAPA Winter Meeting Columbia, SC
28

In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Apr 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

In-Place Pavement Recycling:

VDOT Experiences and Expectations

Brian Diefenderfer, PhD, PE

Senior Research Scientist

2016 SCAPA Winter Meeting

Columbia, SC

Page 2: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Pavement Recycling

• Overview

• VDOT experiences

– Why VDOT recycles

– Performance and cost examples

• Goal

– Show how pavement recycling can work in

South Carolina

Page 3: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Interstate Use

Page 4: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Most Use

• New York

– 350 lane miles in 2015

• Iowa

– 2300 lane miles over last 5 years

• Nevada

– Has recycled nearly 25% of their system

Page 5: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Definitions

• Processes

– Full-depth reclamation (FDR)

– Cold in-place recycling (CIR)

– Cold central-plant recycling (CCPR)

• Differences

– Location & thickness

Page 6: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

6

Full-Depth

Reclamation

– Bound layers, agg base, and subgrade

– Creates a stabilized base course

– 4 to 12 inches

Page 7: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

7

Cold In-Place

Recycling

– Within the asphalt layers

– 2 to 5 inches

Page 8: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

8

Cold Central-Plant

Recycling

– Similar to CIR

– Multiple layers

– Stockpiles of existing RAP

Page 9: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• ARRA

– Basic Asphalt Recycling Manual

• NCPP regional workshops

– Presentations online (free)

• NHI

– Asphalt Pavement In-Place

Recycling Techniques

• Wirtgen

– Cold Recycling Technology

(free)

More Information

Page 10: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Why VDOT Recycles (and why SCDOT should too)

• Economic

– Nevada DOT saved $600 million over 20 years

– 30-50 percent cost savings per project

• Environment

– MTO (Ontario) estimated 50 percent less greenhouse

gases emitted

• Construction

– Fixes deterioration causes rather than symptoms

Page 11: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

11

• Rapid deterioration

– Overlays had 2-3 year

service-life

I-81

Page 12: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-81 Design & Construction

• 30 year design

– AADT = 23,000 with 28% trucks

– 102 million ESALs

– 7.9 required SN

• Construction

– 8 months

– Innovative traffic management

– $10 million (vs $16 million)

Page 13: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• Left lane

1) Mill 2 inches

2) CIR 5 inches

3) 4 inch asphalt

overlay

I-81 Processes

• Right lane

1) Mill 10 inches

2) FDR 12 inches

3) 8 & 6 inch CCPR

4) 4 & 6 inch asphalt

overlay

Page 14: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

14

Page 15: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-81 Performance

• Summer 2015

– 4 years ~ 7 million ESALs (right lane)

– Average rut depth = 0.1 inches

– Average IRI = 53 / 44 (left / right)

– SNeff > 9 (right lane)

• 3-year performance report

– AASHTO High Value Research project

– www.virginiadot.org/vtrc/main/online_reports/pdf/15-r1.pdf

Page 16: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

16

Page 17: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT

N3 N4

S12

Page 18: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT

5-in CCPR

6-in AC

Subgrade

6-in Agg

N3

5-in CCPR

4-in AC

Subgrade

6-in Agg

N4

5-in CCPR

4-in AC

Subgrade

8-in FDR

S12

Page 19: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT Performance

• 2012 Track Cycle

– 10 million ESALs

– No surface cracking

– Average rut depth < 1/4 inch

• 2015 Track Cycle

– About 1.5 million ESALs so far

– 11.5 million total

Page 20: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCAT Performance 4 inch AC

6 inch AC

4 inch AC+FDR

Page 21: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

• 17 inches manipulated

– Layer 1 = 12.5% recycled

– Layer 2 = 30% recycled

– Layer 3 = 100% recycled

– Layer 4 = 100% recycled

• Entire cross section

– 80% recycled

• New construction?

S12 Recycled Content

5-inch CCPR

4-inch AC

Subgrade

8-inch FDR

S12 1 2

3

4

Page 22: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-64 Lane Widening

Current AADT =

37,500 w/ 8.5%

trucks

Page 23: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

I-64 Lane Widening

• Design build, 7.08 miles

– Add travel lane and shoulder to the inside

• CCPR

– Reconstruct existing two lanes

• FDR + CCPR

– Awarded January 2016

• Benefits

– RAP use could exceed 200,000 tons

– Cost savings could exceed $10 million

Page 24: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCHRP 9-51

• Material Properties for CIR and FDR for

Pavement Design

• Cores from 24 projects

• Partners

– Univ of Maryland

– Virginia DOT

– Wirtgen

– Colas Solutions

Page 25: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

NCHRP 9-51

0

2000

4000

6000

8000

10000

12000

0.0001 0.01 1 100 10000

Dy

na

mic

Mo

du

lus

(MP

a)

Reduced Frequency (Hz)

CCPR

CIR

FDR

Higher temperature

Lower temperature

Page 26: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

0

2000

4000

6000

8000

10000

12000

0.0001 0.01 1 100 10000

Dy

na

mic

Mo

du

lus

(MP

a)

Reduced Frequency (Hz)

Emulsified Asphalt

Foamed Asphalt

NCHRP 9-51

Higher temperature

Lower temperature

Page 27: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt

Summary

• Pavement recycling can reduce costs by 30-50%

• It can reduce greenhouse gas emissions by

more than 50%

• It has been used successfully on high volume

roadways

• It can be used on new construction and

rehabilitation projects

Page 28: In-Place Pavement Recycling: VDOT Experiences and …In-Place Pavement Recycling: VDOT Experiences and Expectations Brian Diefenderfer, PhD, PE Senior Research Scientist ... –Asphalt