Improving Portability and Improving Portability and Reducing Cost In The TTP Reducing Cost In The TTP Program Through Design and Program Through Design and Implementation of a Compact Implementation of a Compact Alternative Alternative Avraham Teitz, Mark Avraham Teitz, Mark Shanis Shanis , Mustafa , Mustafa Mustafa Mustafa , and Mark Winter , and Mark Winter US EPA Region 2 Edison, NJ US EPA Region 2 Edison, NJ Mark Mark Shanis Shanis at US EPA, OAQPS, RTP, NC at US EPA, OAQPS, RTP, NC
56
Embed
Improving Portability and Reducing Cost In The TTP Program ... · Improving Portability and Reducing Cost In The TTP Program Through Design and Implementation of a Compact Alternative
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Improving Portability and Improving Portability and Reducing Cost In The TTP Reducing Cost In The TTP
Program Through Design and Program Through Design and Implementation of a Compact Implementation of a Compact
AlternativeAlternativeAvraham Teitz, Mark Avraham Teitz, Mark ShanisShanis, Mustafa , Mustafa
MustafaMustafa, and Mark Winter, and Mark Winter
US EPA Region 2 Edison, NJUS EPA Region 2 Edison, NJMark Mark ShanisShanis at US EPA, OAQPS, RTP, NCat US EPA, OAQPS, RTP, NC
TTP Trailer AdvantagesTTP Trailer Advantages
Turn key systemTurn key systemSame Time/Every Time SetupSame Time/Every Time Setup
Lessens contractor training needsLessens contractor training needsEasier startup @ siteEasier startup @ site
Established and Proven DesignEstablished and Proven DesignIn CaliforniaIn CaliforniaIn The EPA RegionsIn The EPA Regions
Access to SitesAccess to SitesTerrainTerrainMetro Traffic/Bridge and TunnelsMetro Traffic/Bridge and TunnelsHomeland Security IssuesHomeland Security Issues
Run Audit Instruments in Audit ShelterRun Audit Instruments in Audit ShelterUse House PowerUse House PowerInverter to power instruments in transitInverter to power instruments in transitSecure Instruments with ESecure Instruments with E--TrackTrack
Field Audits w/ Compact SystemField Audits w/ Compact System
MFC Based Derivation of MultiMFC Based Derivation of Multi--Blend AuditBlend AuditConcentrations vs. CO Analyzer Based Concentrations vs. CO Analyzer Based
DeterminationDetermination
Eliminates need for 3 CO Calibration TanksEliminates need for 3 CO Calibration TanksEliminates Need for one complete Rack in Eliminates Need for one complete Rack in Monitoring Monitoring StationStationAudits are 1 hour shorterAudits are 1 hour shorter
ConclusionsConclusions
Compact System is analytically equivalent to Compact System is analytically equivalent to trailer based systemtrailer based systemTransportation is easierTransportation is easierLoad in/load out in 15Load in/load out in 15--20 minutes20 minutesMaintenance costs are significantly lessMaintenance costs are significantly lessAccess to audit sites is much improvedAccess to audit sites is much improvedRequires slightly more technical expertiseRequires slightly more technical expertiseInitial capital expense is lessInitial capital expense is less