ORDER FORM All prices are subject to prevailing government taxes. All festive goodies are available from 20 January to 8 February 2020. uary 2020. Please allow three days for processing of orders. The last order should be made by 6 February 2020, 12pm. Uncollected items will be fully charged. Please email the order form to [email protected]. For enquiries, please contact Gourmet Carousel at 6589 7788. DESCRIPTION QUANTITY TOTAL ($) PROSPERITY YU SHENG SETS WONDERLAND PROSPERITY YU SHENG Small (4-6 persons) Large (8-10 persons) SALMON YU SHENG Small (4-6 persons) Large (8-10 persons) TUNA YU SHENG Small (4-6 persons) Large (8-10 persons) ABALONE YU SHENG Small (4-6 persons) Large (8-10 persons) $158 $188 $68 $98 $68 $98 $98 $138 _ _ _ _ _ _ _ _ Name: Telephone: (H) (O) (HP) Mode of Payment: By Cash (payment upon collection) By Credit Card Credit Card Details: American Express MasterCard Visa Credit Card Number: Expiry Date: / (mm/yy) Signature on Card: CVV: Collection: Date: Time: 11.00am - 12.00pm 5.00pm - 6.30pm By checking this box, I accept Royal Plaza on Scotts’ and Carousel’s privacy policies and consent to the collection, use and disclosure of my personal data for the purpose of processing the above transaction.
1
Embed
Improving Implementation and Effectiveness Monitoring at ... · Gloucester, MA . Presentation Map •Consider why we monitor dam removal sites •Review NOAA Restoration Center’s
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
101 102 103 104 mud mud/sand sand sand/gravel gravel <<1 <1 1-2 2-5 PU PL CP NU SL HV Y N Dfb Dfa Cfa
Penobscot River, ME X X X X X X
Brewer Dam, ME X X X X X X
Merrimack Village Dam, NH X X X X X X X
Larkin Mill Dam, MA X X X X X X
Patapsco River, MD X X X X X X
climate
Dfb Dfa Cfa
X
X
X
X
X
Northeast Region
Tier II sites:
dam removal
Tier II technique effectiveness example:
Merrimack Village Dam (NH) KEY QUESTION
• At what rates do sediments (sand) deliberately discharged to a downstream reach, and temporarily stored there, remobilize?
IMPACT
• Improved understanding of the potential impacts of sediment accretion on stream biota, infrastructure, flood stages, recreational uses of the river, and adjacent land uses
RESULTS
• Large downstream sand deposits remobilize surprisingly quickly
• Results directly impacted Patapsco dam removal design approach and regulatory process
aft
er
Pe
ars
on
et
al. (
20
11)
after Pearson et al. (2011)
• Simkins dam removal site (MD)
analogous to Merrimack site
Sediment volume, grain size, and
quality
Watershed size
Low gradient downstream reach
• Simkins project team seeking
passive sediment management
Further Work
• Improve Tier II network’s representation of regional
habitat variability
• Formalize a process for identifying monitoring
questions of programmatic importance
• Strengthen many components of the integrated
monitoring process
Implementing the Framework
• To do…
U.S. Department of Commerce | National Oceanic and Atmospheric Administration | NOAA Fisheries | Page 19