IMPROVEMENT OF THE SAFETY OF THE
WORK IN NRIC
Opera&onal program “Human resources
development” 2007-‐2013, Scheme:
BG051PO001-‐2.3.03 “Safe labor”
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
-
Key dates for the implementaBon of
the project
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
Commencing of the
procedure
Final term for submission of
applica&ons
List of the approved projects
Signing of Agreement
Confirming of the schedule for
tendering procidures
Analyses of the labor’s
ac&vi&es
End of the tendering procedure for
equipment and training – signed
Agreement
End of the tendering
procedures for СРО-‐signed agreement
End of the ac&vi&es
Submission of final report
18.09.2012г. 26.11.2012г. 23.05.2013г.
28.06.2013г. 11.09.2013г.
27.09.2013г. 28.02.2014г. 08.08.2014г.
06.09.2014г. \.
-
Accomplished objecBves? Ø General objecBve:
§ Improved of the labor condi&ons
and safety of the work force
in NRIC.
Ø Specific objecBves: § Achieved factor
of labor trauma&sm in NRIC
is Кlт-‐0,91, which is lower
than the average trauma&sm
(Klt-‐1,22) under the economic
ac&vi&es. From the beginning
of the year up to the
moment we have 4 registered
case of labor trauma&sm. For
the same period of the last
year the registered cases had
been 9; § Improvement of
safety, health and produc&vity of
the employees; § Gaining of knowledge
and skills for work with the
new equipment; § Becer produc&vity
and effec&veness of the work
force.
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
-
Task force
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
Ø 3800 employee of NRIC working
in the fields of maintenance and
repairing of the railway lines
in different weather condi&ons
wearing a special working clothes
a n d w o r k i n g w i t h s p e c i a
l equipment.
-
Employees of
NRIC working in the following
units:
Ø Maintenance and repairing of the
railway lines and equipment;
Ø Maintenance and repairing of
signaling and tele-‐communica&on
equipment; Ø Maintenance and repairing
of the catenary; Ø Rapid response
units for recovering of the
railway traffic in case of
accidents and incidents.
Task force IInnvveessttiinngg iinn yyoouurr
ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
-
AcBviBes • 100% progress D1:
Commencing of the project and
formaBon of the team (opera&onal
management)
• 100% progress D2: Performance of
analyses of the labor acBviBes
in NRIC
• 100% progress D3: Performing of
tendering procedure and delivery of
special working clothes
• 100% progress D4: Performing of
tendering procedure and delivery of
equipment (polyester sapans)
• 100% progress D5: Training of
the employees for safety work
with new delivered equipment
• 100% progress D6: Publicity and
informa&on
• Forthcoming in near future D7:
Audit of the project
up to 28.08.2014
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
-
Financing and duraBon of the
project Ø Financing
§ Total amount of the project–
232 540 лв.
§ GFC (ESF + EFRD) –
186 032
лв.
Ø DuraBon § 12 months § June 2013
– September 2014
(temporary
interrup.on for 2
months)
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
Special working clothes
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Ø Water resistance suit: jacket
with hood and trouser with
signaling elements for becer visibility.
Ø The general purpose of the
suit is protec&on of the
employees from the impact of
different weather condi&ons and from
vehicles moving along the railway
line.
-
Ø Polyester sapans – used for
equipment of the railways cranes
working for recovering of the
railway traffic aoer accidents or
incidents;
Ø Reducing the heavy physical labor
during the work with the
exis&ng steel sapans (especially
when is necessary their movement
from one place to the other);
Ø The polyester sapans are not so
heavy, they are more reliable,
required significantly less number
of employees to work with them
and do not influence the
health and the abili&es of
the employees.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Delivered equipment
-
Ø Performed training for safety
exploita&on of the new equipment
• DuraBon of the training: 45
hours • Form of the training –
every day lectures
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module
1-‐ Introduc&on and horizontal
principles: 1. General requirements
for safety work 2. Rights,
requirements and responsibili&es of
the employees, related with safety
work. 3. Circled sapans from
polyester fibers: 3.1. Defini&on,
construc&on, terms and marking
3.2. Color codding. 3.3. Table
for hois&ng capacity. 4.
Determina&on of working angel and
choice of sapans
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module 2 –
Working with the new equipment:
1. Safety requirements 1.1. Signs
and signals 1.2. Collec&ve
protec&ve equipment. 1.3. Personal
protec&ve equipment /PPE/
2. Instruc&ons for exploita&on:
2.1. Control and check-‐up of
sapans. 2.2. Way of
exploita&on and types of catches.
2.3. Exploita&on in extreme
working and weather condi&ons.
3. Keeping and condi&ons for
discarding.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module 3-‐
Improvement of the working process
and implementa&on of good
prac&ces 1. Use of special
joint elements. 2. Dobри
практики при повдигане и монтаж
2.1. Laser
leading 3. Contemporary technics for
working posi&oning.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Ø PracBcal training
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Trainings of 106 employees and
issue of cerBficate for
accomplishment работещи и предоставено
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Results Ø Set up a team for
project management; Ø Analyses for
the present working condi&ons in
the company; Ø Have been performed
2 tender procedures; Ø On &me
delivery of working clothes and
equipment in accordance with preliminary
prepared specifica&on;
Ø Training of the employees working
with new delivered equipment;
Ø Organiza&on and performance of
two press conferences, issued 200
brochures, folders and ball-‐point
pens;
Ø Prepara&on and installa&on of
tree informa&on boards;
Ø Forthcoming prepara&on of audit
report.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
The team
-
Take care!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
What should not be done in
electrified secBons with tracBon
current 25 КV :
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
• Do not go up to the roof of the vehicles; do not open
apertures of cisterns, freezing and other special wagons. • Do not
go near and do not touch broken or hanging wires and ropes of the
catenary and catenary’s elements, despite that they might touch the
ground or grounded constructions.
-
Thank you for your apenBon!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety
of the work in NRIC”
Financed by the Operational program “Human resources
development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!