Top Banner
IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005
14

IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Dec 30, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

IMPROVED NAVY LIGHTERAGE THROUGHPUT

MODELING AND SIMULATION TOOL

JOINT SEABASED THEATRE ACCESS WORKSHOP

FEBRUARY 9-10 2005

Page 2: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

PURPOSE

•Develop a modeling tool to support INLS OPEVAL •Include latest MPSRON load plans and squadron remix

•Supplement to Operational Testing•Provide a tool to measure environmental conditions effect

•Develop IAW SECNAV 5200.40A•Validation and Verification required•Certification by Program Manager and OPTEVFOR•Transition as Fleet tool for training, exercises, operations

2

Page 3: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

INLS Capabilities Analysis Tool (ICAT)

STATEMENT OF WORK•Develop an INLS throughput modeling tool that will allow the planner to examine the dynamics of INLS Developmental Testing and Operational Testing.

–Identify possible bottlenecks and problems–Assess the impact of a dynamic event–Plan contingencies for use during execution–Reduce time required for Developmental and Operational Testing

–Transition to a tool for the operating forces

3

Page 4: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

INLS Capabilities Analysis Tool (ICAT)

•MS Windows-based•Provides a modeling and simulation capability to provide system engineering insight across flows. It consists of:

–A simulation engine–Libraries of graphical elements of integrated spreadsheet and project management tools (for timeline analysis), and

– MS Access Database•Visualization for easy understanding and presentation•Discrete Event Simulation of INLS offload timeline•Algorithms are visual and do not require an understanding of a computer software language

•No license or fee for runtime version of TopView

4

Page 5: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Specifics of the ICA Tool

•Developed using Extend/TopView modeling and simulation tool•Map area established by entering latitude and longitude of map corners.

•Each element has a Lat/Long location for computing distance from other elements.

–Elements are updated after they move.• Inventory represents the available elements that can be used in the model.

•Lighterage and Ships can be activated from inventory and deactivated back to inventory before a simulation run.

•Performance measures are computed by the simulation•Multiple Trial Monte Carlo Execution for Metrics Data Collection

5

Page 6: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

ICAT

6

Page 7: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Algorithms and Capabilities

• Distance between locations• Current Direction and Speed• Maintenance Downtime• Casualties • Anchorage Point selection• Pairing RRDF with Watercraft• Matching RRDF to ship• Matching lighterage to ship• Matching lighterage to discharge point

• Cargo Transfer LO/LO, RO/RO• Beach Cargo Transfer• Beach Gradient• Visibility• Precipitation• Sea State• Modified Surf Index (MSI)• Tide

• Movement of ships and lighterage

• Beach Point Selection

• Cargo type (Tracked and Wheeled Vehicles and Containers)

7

Page 8: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Data Base

•MS Access •All simulation data parameters can be changed in MS Access not in the model.

•Changing data values–Cargo Quantities–Cargo Transfer Rate–Environment–Capacities

•Reviewing data•Data Collection for Performance Measure calculation.

8

Page 9: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Database

9

Page 10: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Performance Measures

•Throughput Time to offload all ships•Short Tons per hour•Square Feet per hour•Ship offload rate•Some data collected during a run displayed in the Notebook

10

Page 11: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Mean Throughput and Standard Deviation

11

Page 12: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Rates by Cargo Type

12

Page 13: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Notebook

13

Page 14: IMPROVED NAVY LIGHTERAGE THROUGHPUT MODELING AND SIMULATION TOOL JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005.

Questions

14