Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP. Storm Water Permit Update. Storm water regulations and the Texas Pollutant Discharge Elimination System (TPDES) Municipal Separate Storm Sewer System (MS4) Federally mandated permit and program - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Implementing Committee MeetingMay 15th, 2014

New BraunfelsMS4 program and the HCP

1

Page 2: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Storm Water Permit Update

2

• Storm water regulations and the Texas Pollutant Discharge Elimination System (TPDES)

• Municipal Separate Storm Sewer System (MS4)

• Federally mandated permit and program requirements

• Storm Water Management Plan (SWMP)

• Minimum control measures and implementation

Page 3: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Permit Requirements

3

• Storm Water Management Program (SWMP)

• Submit Notice of Intent (NOI)

• Annual Reports

Page 4: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Program Requirements

4

Storm Water Management Plan (SWMP) and Minimum Control Measures (MCM)

1. Public Education, Outreach, and Involvement

2. Illicit Discharge, Detection and Elimination

3. Construction Site Storm water Runoff Control

4. Post-Construction Storm water Management in New Development and Redevelopment

5. Pollution Prevention/Good Housekeeping for Municipal Operations

Page 5: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

MCM 1: Public Education, Outreach and Involvement

5

Best Management Practices:

PE-1: Stormwater Educational Materials and StrategiesPE-2: Public Participation and Involvement ProgramsPE- 3: Partnerships with Other Institutions and

Organizations – Alligator/Geronimo WPP, EA HCP, etc.PE-4: Presentation to Local Elementary SchoolsPE-5: “Love your Park” Volunteer ProgramPE-6: Tree City USA Program

Page 6: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

MCM 2: Illicit Discharge Detection and Elimination

6

Best Management Practices:

ID-1: Storm Sewer Mapping ID-2: Detection and Elimination Program ID-3: Field Staff Training ID-4: Public Reporting of Illicit Discharges and Spills ID-5: Illicit Discharge Ordinance ID-6: River Cleanup

Page 7: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

MCM 3: Construction Site Storm water Runoff Control

7

Best Management Practices:

CS-1: Construction Site Inspection Program

CS-2: Construction Site Inventory CS-3: Construction Site Waste Control Ordinance CS-4: Construction Site Runoff Control Ordinance

Page 8: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

MCM 4: Post-Construction Storm water Management in New Development and

Redevelopment

8

Best Management Practices: PC-1: Staff Training PC-2: Post-Construction Development Review Procedures – evaluation/establishment of

structural measures to enhance stormwater quality PC-3: Long-Term Operation and Maintenance PC-4: Storm water Management Ordinance for New Development and Redevelopment PC-5: Encouragement of Low Impact Development Designs PC-6: Establish No-Mow Zones

Page 9: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

MCM 5: Pollution Prevention/Good Housekeeping for Municipal Operations

9

Best Management Practices:

GH-1: Operations and Maintenance: Street Sweeping GH-2: Mapping of Facilities and Inventory Control GH-3: Municipal Operations and Facility Survey GH-4: Facility Inspection Program GH-5: Good Housekeeping Operations – Outdoor Storage

GH-6: Fleet and Equipment Maintenance GH-7: Vehicle and Equipment Washing GH-8: Landscaping GH-9: Structural Control Maintenance GH-10: Spill Prevention and Response GH-11: Employee Training Program GH-12: Green Waste Management

Page 10: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Annual Report Requirements

10

The report must include:• Status of compliance;• Summary of results analyzed;• Summary of activities;• Proposed changes to SWMP;• Description and schedule for additional

BMP implementation; and • Any agreements with other MS4s.

Source: TPDES General Permit No. TXR040000

Page 11: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Impacts

11

Residential and Development• Existing Residential homes and lots

• No impact• New and Redevelopment ( 1 acre)

• Construction – SWPPP still required• First .5” rain water quality requirement

(Drainage Criteria Manual anticipated update)

Page 12: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Manpower requirements

12

Positions FTE’s Watershed Manager 0.50Watershed Coordinator 0.50Inspector 1.50Admin 0.50

Total FTE’s needed to support MS4 program 3.00

Page 13: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Cost Analysis (yearly)

13

MCM FTE cost Fixed Cost1 (Education) $23,160 $5,000

2 (Illicit Discharge) $26,045 $45,0003 (Constr. Runoff) $45,760 $04 (Development) $54,460 $05 (Housekeeping) $45,320 $15,000

Report $14,955 $0Total Costs: $209,700 $65,000

TOTAL OVERALL COST: $274,700.00

Page 14: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Low Impact Development (LID) & MS4

• What is LID?– LID in the HCP is an incentives based program that

allows citizens to participate in improving the quality of the runoff that occurs in and around watersheds draining to Landa Lake.

• How does LID in the HCP differ from MS4?– LID program in the HCP concentrates on

opportunities for stormwater quality enhancement in areas draining to critical habitats. The MS4 program is a city wide city funded program.

14

Page 15: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

LID focus

15

• Public education is focused on citizens within watersheds draining to critical habitats

• Long term establishment of program efficiencies based on water quality monitoring

• Rebate program for LID features in areas just upstream of critical habitats

• Website development of the habitat and LID education relationship

• Pilot and Test projects• BMP’s • New technologies for improving water quality

Page 17: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Impervious Cover / Water Quality / LID

• Budget

• Table 7.1 $ 100,000• 2014 WP $ 100,000

• No identified decisions or deviations

Page 18: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

Impervious Cover / Water Quality (WQ) / Low Impact Development (LID)

• 2013 work plan activities• Beginning stages of the creation of the overall LID plan through

public involvement and meetings with City of New Braunfels

• 2014 work plan• Further development of LID/WQ program in watersheds

draining to critical habitats• Implementation of the LID/BMP program utilizing public

involvement and feedback

Page 19: Implementing Committee Meeting May 15 th , 2014 New Braunfels MS4 program and the HCP

19

QUESTIONS ?